September 27, 2019 TH 60 – 4 th Street NW Weekly Construction Updates – Week 24 The City of Faribault and its project partners intend to send out and publish a weekly construction update on the TH 60/4th Street NW Reconstruction Project. This weekly update will be issued through the City of Faribault Facebook page and the City’s website www.faribault.org on the Project website http://www.ci.faribault.mn.us/549/2019-03-TH-60- Reconstruction. You can sign up to receive an emailed pdf of the newsletter by submitting your email address to [email protected] and requesting to be placed on the weekly TH 60 newsletter distribution list or you can sign up for a text notification that will contain a link to the newsletter via the Faribault chamber of Commerce by texting Faribault Hwy60 to 313131. Questions about the contents of the weekly updates or about the project in general can be directed to Mark DuChene, Faribault City Engineer at either 507.333.0360 or [email protected] or to Glenn Cunningham, Senior Engineering Technician at either 507.333.0366 or [email protected]. Answers too many frequently asked questions (FAQ) about the project can be found at: http://www.ci.faribault.mn.us/DocumentCenter/View/4246/Hwy-60-FAQ---2019-03-21?bidId= . The project is proposed to be completed in 4 main phases, and a copy of a map showing the project detour as well as project phasing and anticipated phasing timelines can be found at: http://www.ci.faribault.mn.us/DocumentCenter/View/4263/DetourMap_v2?bidId= If there is a non-life threatening emergency within the construction limits (such as loss of water) outside of normal business hours please call dispatch at 507.334.4305 and they will contact the appropriate parties. Previous Weeks Review 9/21/19 to 9/27/19 All sanitary sewer and watermain work for the project is now 100% complete and only a small portion of storm sewer in the 800 block remains. Crews also poured more concrete sidewalks and driveways and continued to install more street lights. The 600 & 700 blocks are complete and prepped and ready for pavement. Next Week Look Ahead 9/28/2019 to 10/6/2019 Crews are scheduled to complete all underground utility work next week and construct drain tile, sand and gravel on the last block of the project between 8 th Avenue and the railroad tracks. Weather depending concrete curb and gutter should also be completed on the last block and paving is scheduled to start on the west end including the frontage road, 5 th St NW, and TH 60 west of the railroad. Paving is also tentatively scheduled for the 600, 700 & 800 blocks in the next couple weeks. The paving scheduled will be primarily driven by the weather and when the paving crew can get here.

September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

September 27, 2019

TH 60 – 4th Street NW Weekly Construction Updates – Week 24

The City of Faribault and its project partners intend to send out and publish a weekly construction update on the TH 60/4th Street NW Reconstruction Project. This weekly update will be issued through the City of Faribault Facebook page and the City’s website www.faribault.org on the Project website http://www.ci.faribault.mn.us/549/2019-03-TH-60-Reconstruction. You can sign up to receive an emailed pdf of the newsletter by submitting your email address to [email protected] and requesting to be placed on the weekly TH 60 newsletter distribution list or you can sign up for a text notification that will contain a link to the newsletter via the Faribault chamber of Commerce by texting Faribault Hwy60 to 313131. Questions about the contents of the weekly updates or about the project in general can be directed to Mark DuChene, Faribault City Engineer at either 507.333.0360 or [email protected] or to Glenn Cunningham, Senior Engineering Technician at either 507.333.0366 or [email protected].

Answers too many frequently asked questions (FAQ) about the project can be found at: http://www.ci.faribault.mn.us/DocumentCenter/View/4246/Hwy-60-FAQ---2019-03-21?bidId= .

The project is proposed to be completed in 4 main phases, and a copy of a map showing the project detour as well as project phasing and anticipated phasing timelines can be found at: http://www.ci.faribault.mn.us/DocumentCenter/View/4263/DetourMap_v2?bidId=

If there is a non-life threatening emergency within the construction limits (such as loss of water) outside of normal business hours please call dispatch at 507.334.4305 and they will contact the appropriate parties.

Previous Weeks Review 9/21/19 to 9/27/19

All sanitary sewer and watermain work for the project is now 100% complete and only a small portion of storm sewer in the 800 block remains. Crews also poured more concrete sidewalks and driveways and continued to install more street lights. The 600 & 700 blocks are complete and prepped and ready for pavement.

Next Week Look Ahead 9/28/2019 to 10/6/2019

Crews are scheduled to complete all underground utility work next week and construct drain tile, sand and gravel on the last block of the project between 8th Avenue and the railroad tracks. Weather depending concrete curb and gutter should also be completed on the last block and paving is scheduled to start on the west end including the frontage road, 5th St NW, and TH 60 west of the railroad. Paving is also tentatively scheduled for the 600, 700 & 800 blocks in the next couple weeks. The paving scheduled will be primarily driven by the weather and when the paving crew can get here.

Page 2: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

General Traffic Control/Detour Notes

During the duration of the entire project and through the entire project limits which extend from Lyndale Avenue/TH 21 on the west end to Central Avenue on the east end, thru traffic will be detoured off TH 60 and rerouted along 2nd Avenue NW, TH 3/20th Street NW and TH 21 (see detour map link above) Portions of TH 60/4th Street NW within the project limits may be signed “Road Open to Local Traffic or Road Closed to Thru Traffic” or something similar. Please keep in mind that “local traffic/access” is defined as having direct access on TH 60, or having business with someone or a business who has direct access on TH 60. If you do not fall into either of these two categories, you should not be on TH 60 within the project limits at any time. Travel on TH 60 within the project limits should take place only when there is no other possible alternative. Also please be respectful of private property and do not use private property to “short cut” the detour route.

Pedestrian traffic will be maintained to the maximum extent practical to provide access to businesses and residents who have access to TH 60, however other portions of sidewalk will be closed to facilitate construction work and those sidewalks will be detoured along an alternate pedestrian route (typically around the block). Please review the link to the FAQ above for more information about access during construction.

Central Avenue to 4th Avenue NW Access Notes:

This area is open to traffic. All work is substantially complete.

4th Avenue NW to 6th Avenue NW

This phase is open to traffic. Note that the manhole castings have been raised in anticipation of final paving so be careful when traveling through this area.

6th Avenue NW to Lincoln Avenue Access Notes:

4th St NW/TH 60 is now closed from 6th Avenue to Lincoln Avenue for Phase 3 & 4 construction, the intersection of Irving Avenue and TH 60 will be open for traffic crossing TH 60 only. Access to Affinity Plus Credit Union shall be from 5th St NW via the Lincoln Avenue & 5th Street NW intersection or from the Irving Avenue intersection on the south side of TH 60. Access to Auto Zone shall be from either Irving Avenue via Division Street or from Old 4th Street. See attached map.

Traffic is permitted on the avenues on both sides of TH 60 up to the construction project limits. On-street parking on the avenues is also open. If your business is on or near the project limits and you need assistance with maps to post at your business or on your business website to direct traffic to/from your business, please contact the City Engineer.

Page 3: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

Construction Photo of the Week

The left picture below shows 700 block prepped and ready for pavement. Paving on this block as well as the remainedr of the project is scheduled to commence starting next week and should be mostly completed in the next two to three weeks or so, weather dependent. The right picture below shows the railroad crossing signal pole foundation just prior to the concrete being poured. The base of the foundation is 8 ft by 8 ft wide.

Page 4: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

60

3RD ST NE

4TH ST NE

5TH ST NE3R

D AVE

NW

1ST AV

E NW

2ND A

VE NW

5TH ST NW

4TH ST NW

3RD ST NW

Central Park

CountyOffices

L.E.C.

Court House

Shelter

P.D

CENT

RAL A

VE

Centu

ry Li

nk

Union

Hall

Basil

leo's

Style

s on 4

thGa

ry Vo

egele

Law

FaribaultPolice Dept.

State

Farm

Farib

ault V

acuu

m&

Sewi

ng C

enter

FarewayFoods

TH 60 - 4th St NW Business Access Map

Alternate Pedestrian RouteDD Roads Closed - No Access Across

Sidewalk ClosedRoad Currently Closed

Pedestrian Access RoutesRoads Currently Open Public Parking

Private Parking

0 100 200 300Feet

Ace Hardware

Braden Law

Rice Co.

Page 5: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

DD

60

3RD A

VE NW

6TH A

VE NW

5TH AV

E NW

3RD ST NW

5TH ST NW

4TH ST NW

Central Park

Farm

er's

Insur

ance

1st United Bank

Sout

hern

Citie

s Clin

ic

Godf

ather

'sHo

ly Sm

oke T

obac

coTh

e UPS

Sto

reEd

ward

Jone

s

FarewayFoods

0 100 200 300Feet

Rice Co.

Premier Bank

Trinity LutheranChurch

McDonald's

TH 60 - 4th St NW Business Access Map

4TH A

VE NW

Public ParkingPrivate ParkingDD Roads Closed - No Access Across

Road Currently ClosedRoads Currently OpenAlternate Pedestrian Route Sidewalk ClosedPedestrian Access Routes

Page 6: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

DD

DDDD DD

DD

DD

DD

60HWY 60 W

IRVING

AVE

8TH A

VE NW

5TH ST NW

7TH AV

E NW

6TH A

VE NW

4TH ST NW

3RD ST NW

Minnesota ICE

WholesaleTireLamperts Hardware Pa

pa M

urph

y'sGr

eat C

lips

Holiday

Walgreens

Fami

ly Vi

deo

0 100 200 300Feet

Domi

no'sTeskeAuto Spa

Affinity Plus

TH 60 - 4th St NW Business Access Map

Mizu

ki Fu

sion

Fami

ly Do

llar

Public ParkingPrivate ParkingDD Roads Closed - No Access Across

Road Currently ClosedRoads Currently OpenAlternate Pedestrian RouteSidewalk ClosedPedestrian Access Routes

AutoZone

Page 7: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

DD

DD

DD

DD

")48

60 60

21

CROS

S AVE

GEORGE L ST

HWY 60 W

5TH ST NW

HULE

TT AV

E

IRVING

AVE

LYNDA

LE AV

E

3RD ST NW

6TH ST NW

LINCO

LN AV

E NW

2ND ST NW

4TH ST NW

Minnesota ICE

Barwaqo HalalMarketArby's

Kwik Trip

O'Re

ily A

uto P

arts

State

Farm

Affinity Plus FederalCredit Union

Lincoln ElementarySchool

Home

Town

Cred

it Unio

n

0 100 200 300 400Feet

Farib

ault

Exten

ded S

tay

AutoZoneAuto Parts

TH 60 - 4th St NW Business Access Map

Eilri

ch C

hirop

racti

c

Public ParkingPrivate ParkingDD Roads Closed - No Access Across

Road Currently ClosedRoads Currently OpenSidewalk ClosedPedestrian Access Routes

Business Access Route

TH60/4th St NW, 5th St NW, and the frontage road between

TH60 & Kwik Trip to open to traffic as a milled surface

CWS

Page 8: September 27, 2019 TH 60 – 4 Street NW Weekly …...TH 60 – 4th Street NW Weekly Construction Updates – Week 24 . The City of Faribault and its project partners intend to send

DD

DD

60

8TH A

VE NW

4TH ST NW

Minnesota ICE

0 30 60 90FeetAlternate Pedestrian Route

Pedestrian Access RoutesSidewalk Closed

Teske Detailing &Auto Spa Access

Roads Closed - No Access AcrossDD

Roads Currently OpenRoad Currently Closed

Business Access

No Parking