Brussels - December 2 nd 2014 SESAR RPAS Definition Phase Results & Way Forward Denis Koehl Senior Advisor SESAR Joint Undertaking

SESAR RPAS Definition Phase Results & Way Forward · SESAR ConOps and RPAS 4 SESAR ConOps fully recognises RPAS: “The Concept of Operations at a Glance” (definition phase) updated

Embed Size (px)

Citation preview

Brussels - December 2nd 2014

SESAR RPAS Definition PhaseResults & Way Forward

Denis Koehl

Senior Advisor

SESAR Joint Undertaking

Content

The Rationale

The EC Mandate

Requirements & Challenges

SESAR RPAS Demonstration Projects

Civil RPAS Integration into the European

Aviation System (RPAS Definition Phase)

2 RPAS CivOps Conference - Brussels

The Rationale

SESAR ConOps and RPAS

4

SESAR ConOps fully recognises RPAS:

“The Concept of Operations at a Glance” (definition phase) updated to solve deficiencies in relation to military and GA/R operational needs and constraints

This ConOps responds to the operational vision and operational objectives developed by the airspace users with due regard to the evolving capabilities and requirements of service providers and airports, whilst considering the characteristics of every type of aircraft that requires access to the airspace

RPAS CivOps Conference - Brussels

5

Accommodation or Integration?

Accommodation Integration

The answer is “Integration”

RPAS CivOps Conference - Brussels

Integration challenges

Performance

Detect & Avoid

Data-Link / Spectrum

6 RPAS CivOps Conference - Brussels

Types of Operations

7

Instrument Flight Rules or IFR

Visual Flight Rules or VFR

500 ft------------------------------------------------ 500 ft

Very Low Level Operations• Visual Line of sight (VLOS)• Extended-Visual line of sight (E-VLOS)• Beyond visual line of sight (B-VLOS)

RPAS CivOps Conference - Brussels

IFR/VFR - Timeframe 2014-2028

8

Large R&D effort identified

Detect & avoid Airspace and Airports access C2 communications Human factors Contingency Security SESAR compliance

RPAS CivOps Conference - Brussels

9

Large R&D effort identified

Detect & avoid (replicate the human ability to see & avoid)

C2 communications Human factors including mixed fleet compatibility Contingency Security SESAR compliance

B-VLOS below 500ft is completely new to aviation

B-VLOS - Timeframe 2014-2020

RPAS CivOps Conference - Brussels

European RPAS R&D Roadmap Timeline

10 RPAS CivOps Conference - Brussels

RPAS will generate the emergence of a new service sector

RPAS limited by flight authorisations not aligned one-another and limited to segregated airspace

Need to develop a seamless regulatory framework and enhance the coordination of various on-going R&D initiatives

A broad, safe and swift RPAS integration into the EU civil aviation system requires an enhanced coordination between the numerous actors and the different activities involved (regulatory, R&D and others)

RPAS integration in airspace will be gradual and subsequently alleviated as soon as technology, regulation and societal acceptance progress

In a Nutshell

11 RPAS CivOps Conference - Brussels

The European Commission Mandate

Mandat

13

Address the R&D requirements related to RPAS integration into the European civil aviation system

Aim: integrate RPAS in the aviation system

In line with the European for RPAS integration

Identify what are the essential R&D activities

Funded under Horizon 2020

RPAS CivOps Conference - Brussels

Requirements & Challenges

15

Requirements & Challenges

Requirements for RPAS integration are linked to the European ATM Master Plan and the ICAO Global Plan/ASBU timeline

RPAS will have to fit into the ATM system (and not the reverse), with required adaptations to enable the safe integration of unmanned systems

RPAS will have to prove to be as safe as current manned vehicle operations and, their behaviour in operations, to be equivalent to manned aviation, in particular for air traffic control

Thus, RPAS integration into the Aviation System shall comply with:• existing and consider future regulations and procedures developments

• the SESAR CONOPS(trajectory management)

• ATC rules/procedures

• capability requirements applicable to the airspace within which they operate

And not to:

• impact negatively the operations of the current system and its performance

• compromise existing aviation safety levels nor increase risk levels.

The way RPAS operations will be conducted, as regard to ATM operations has to be equivalent to manned aircraft

RPAS CivOps Conference - Brussels

Normal RPAS Operation:

Unmanned aircraft made little or no difference to ATM operations• speed differentials for some RPAS compared to commercial aviation

posed more of a challenge but well within ability of ATCOs

• R-T for normal operation was the same as manned aviation

• considered more predictable

• sector handover identified no issues

• no significant increase in ATCO workload

ATCOs developed techniques for RPAS operations

Operational transponder considered essential

Control Station handovers• seamless, but RPAS pilots should ensure that handovers do not

coincide with sector handovers

• should be as transparent as possible to the ATCO

Initial Findings from SESAR RPAS Demo Projects (1/2)

16 RPAS CivOps Conference - Brussels

Abnormal Events and Situations:

Increase in ATCO workload• consistent with manned aviation

Slow speed of RPAS was considered positive and negative

RPAS considered significantly more predictable than manned aviation

Backup communication between ATSU and RPAS Pilot• worked well in simulations

• specific procedures required

Sector Handovers gave no problems

17

Initial Findings from SESAR RPAS Demo Projects (2/2)

RPAS CivOps Conference - Brussels

Civil RPAS Integration into the European Aviation System

------SESAR 2020 RPAS Definition Phase

Refine the essential R&D activities for the integration in the EU Aviation System in the context of the Single European Sky initiative, as of 2016 and beyond

Identify globally interoperable and harmonised ATM requirements and enablers to meet the performance requirements

Produce a R&D and Validation programme - including planning, costs and priorities, as required by the different identified ATM requirements and enablers

Establish a high level implementation timeline, including costs and priorities

Provide material supporting the alignment of the legislative, financial and regulatory frameworks required for the deployment, including incentive mechanisms

Structure and organise the RPAS R&D needs to anticipate the 2015 update of the European ATM Master Plan

Necessity of the SESAR RPAS 2020 Definition Phase

19 RPAS CivOps Conference - Brussels

20

… or how do we get there?RPAS CivOps Conference - Brussels

21

SESAR RPAS Definition Phase

The RPAS Definition Phase will result in the following activities:

Regulatory and Business Framework

Performance Requirements and Assessment

Operational Changes in ATM

Enabling Systems

Validation Needs

SESAR RPAS R&D Programme requirements and outline

Input to the EU ATM Master Plan

There is not intend to define a separate RPAS SESAR Programme for R&D

RPAS CivOps Conference - Brussels

Roles and allocation of work

Act. # 1 - IFR/VFR & BVLOS - D&A (2013-2018) - Saab

Act. # 2 - IFR/VFR & (B)VLOS - Comms C2 data link - Honeywell

Act. # 3 - IFR/VFR & BVLOS - Airspace Access and Airport Operations - CANSO

Act. # 4 - IFR/VFR & (B)VLOS - Contingency (2014-2018) - Airbus

Act. # 5 - IFR/VFR and BVLOS - Human Factors (2014-2019) - Eurocontrol

Act. # 6 - Security (2013-2018) - SESAR JU

Act. # 7 - Demonstrations of best practices (2013-2016) - SESAR JU

22 RPAS CivOps Conference - Brussels22

Roles and allocation of work

23

Integration RPAS into SESAR 2020

RPAS activities

SESAR Projects

IFR, VFR & B-VLOS: D&A, Comms C2 Data, Airspace Access, Human Factors, Contingency – Security - Demonstrations of best practices

Enhanced Arrivals & Departures, Integrated Surface Management, Airport Safety Nets, Advanced Airspace Management, Separation Management TMA & En-route, Trajectory & Performance Based Free Routing, Enhanced Air & Ground Safety Nets, CNS, 4D Trajectory Management, AVS, SWIM, Common Services, CWP/HMI

RPAS CivOps Conference - Brussels23

Building SESAR 2020

24 RPAS CivOps Conference - Brussels24

SESAR New Membership Accession Process

25

• Launch of the CFI (closed)

• Evaluation of applications (closed)

• ADB Decision authorising negotiations with candidate members and entrusting the Executive Director to negotiate the conditions of accession

• Notification of outcomes of the evaluation & invitation to participate in Dialogue Phase (end October 2014)

Phase 1 – Pre-selection

July – October 2014

• Dialogue on technical content (November 2014 – March 2015)

• Dialogue on contractual and financial conditions based on current MA-MFA principles (December 2014 – March 2015)

• Closure of dialogue – IBAFO (including final DOW and agreements) (March 2015)

Phase 2 – Dialogue

Nov. 2014 – March 2015

• Evaluation of BAFO

• Award of membership on the basis of BAFO value for money

Phase 3 – Selection

Q2-Q3 2015

RPAS CivOps Conference - Brussels