PRESENT CONDITION INDEX Simple . . convenient . . inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

Embed Size (px)

Citation preview

Page 1: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

PRESENT CONDITION INDEX

Simple . . convenient . . inexpensive

Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

Page 2: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

WHAT IT IS PSI?

The Pavement Condition Index rates the condition

of the surface of a road network.

Page 3: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud
Page 4: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

THE PCI MEASURES TWO CONDITIONS:

• The type, extent and severity of pavement surface distresses • The smoothness and ride comfort of the road 

Page 5: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

THE PCI IS A SUBJECTIVE METHOD OF EVALUATION BASED ON INSPECTION AND OBSERVATION

Method of PCI

By public works officials

Page 6: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

WHAT IT PROVIDES ? : THE PCI TELLS PUBLIC WORKS OFFICIALS

-The current condition of the road network -The rate of deterioration of the road network

Page 7: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

A PCI IS USED TO:

• Identify immediate maintenance and rehabilitation needs• Monitor pavement condition over time

Page 8: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

CONTINUE

• Develop a network preventive maintenance strategy• Develop road maintenance budgets

•Evaluate pavement materials and designs

Page 9: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

A PCI NEEDS TO BE BASED ON:

Manageable road sections

A roads inventory

•A classification and rating system for road defects

Page 10: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

Conducting a PCI

Page 11: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

THE DRIVE THROUGH:

A PCI is developed based on visual inspection and observation– sometimes

called a “windshield inspection.”

Ideally, two people should do the inspection together –one driving while the other takes notes – and both evaluating the pavement as they go.

Page 12: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

TO CALCULATE PCI

Evaluating SurfaceDistresse

s:

Ride ComfortRating:

-Type-Frequency

-SeverityBy Next Form

-subjective assessment

Page 13: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

CALCULATING THE PCI:

Page 14: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

CASE STUDY

Page 15: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

INTRODUCTION:

we choose three streets with different Performance and functional as a sample and build upon it using the PCI the quality of the district’s streets and

a precise results for these streets .

Page 16: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

OBJECTIVES:

Identify the distresses at field.Taking the PCI at field.

Calculate the resultEvaluation the street in Ar Rabia

Page 17: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

We take a sample of three streets within the district abu moad alansary , alghtght and krimh alzbyryh

LOCATION:

Page 18: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

PROCEDURE:

W depend on eye notice to the sample , so we walk on the street and write down the distresses that we see in a special  form writing down the name of the distress & its number then we write its severity depending on an accurate measurement .also, we write its length if it is measured with width or its area if it is measured with area . then we calculate the index manually using the curves in the lecture note and deducts the points from 100. After that , we rate it using the pci rating figure &give its rating .we calculated the pci using an average of sections with all information above (severity , length , area,..) and a took pictures  each  of a distress.

Page 19: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

PROCEDURE:

Page 20: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

PROCEDURE:

Page 21: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

PROCEDURE:

Page 22: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

ASPHALT PAVEMENT INSPECTION SHEET

Page 23: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

:SAMPLE OF CALCULATION

Density= 0.1Severity = M

4 Deduct value=

Page 24: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

:SAMPLE OF CALCULATION

(TDV)Total Deduct Value= 55q = 3

(CDV)Corrected Deduct Value=36

Page 25: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

:SAMPLE OF CALCULATION

PCI = 100 – CDVPCI = 100 -36PCI = 64SO ,Condition rating= GOOD

Page 26: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

RESULTS AND ANALYSIS:

PCI VALUES ( AL GADGAD STREET ) PCI VALUES ( AL ANSARY STREET )

1234560

10

20

30

40

50

60

70

80

90

100

Series2Series1

1234560

10

20

30

40

50

60

70

80

Series2Series1

Page 27: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

RESULTS AND ANALYSIS

PCI VALUES ( AZ ZABIREA STREET )

1234560

20

40

60

80

100

120

Series2Series1

Page 28: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

RESULTS AND ANALYSIS:

Page 29: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

RESULTS AND ANALYSIS:

After taking the average, we note that the first road  got a good rating, while the second road  as well as picking a good rating, while the third and got a very good estimate.

Page 30: Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud

RECOMMENDATION:

After taking the general assessment of the three ways, the result is good grade, so this sample represents the entire district of AR Rabia.

 The final arbiter of the ways is good, so do not require re-asphalt the roads in this district.