Simulation of Five Bus System

Embed Size (px)

Citation preview

  • 7/25/2019 Simulation of Five Bus System

    1/29

    Simulation of Power flow in fivebus system using FACTS devices

    using PowerWorld simulator

    Presented by

    Akshay Karande !"!#$Sharmily %ergu & !"!"'

    (ohita Sagavakar & $!""!)

    %onali Choudhari & $!""!'

  • 7/25/2019 Simulation of Five Bus System

    2/29

    )

    Pur*ose of Study

    + %ain *ur*ose of *ower flow study is todetermine the steady state o*eration of electrical*ower network,

    + This simulation gives us the com*leteinformation of (eal and (eactive *ower flows inthe network,

    + This information gives us the idea how toschedule *owers at different buses so thatsystem o*erates with minimum cost of energy,

  • 7/25/2019 Simulation of Five Bus System

    3/29

    )

    FACTS

    + FACTS devices can be effectively used for

    *ower control- load sharing among *arallel

    corridors- voltage regulation-

    enhancement of transient stability and

    mitigation of system oscillations,

  • 7/25/2019 Simulation of Five Bus System

    4/29

    )

    Shunt Com*ensation

    .sing S/C

    + Shunt ca*acitors com*ensation is more or

    like load com*ensation,

    + They raise the *ower factor which greatly

    increases the active *ower transmitted

    over the line and hence line will not have

    to carry reactive *ower,

  • 7/25/2019 Simulation of Five Bus System

    5/29

    )

    Series Com*ensation

    .sing TCSC

    + The *ur*ose of Series com*ensation is to ad0ust

    the *ower flow of the line by ad0usting the

    im*edance of the line,

    + As 12( 3 04 5l 5c 6 and ( being negligible- by

    changing 5l or 5c we can control the *ower flow

    in the line,

  • 7/25/2019 Simulation of Five Bus System

    6/29

    )

    Test System

    A basic test system is used to show the

    im*rovement in the *ower flow in network by the use

    of the Com*ensating network,

    This system results will be used as the base case

    against which all other solutions will be com*ared,

  • 7/25/2019 Simulation of Five Bus System

    7/29

    )

    Parameters of com*onents in

    System+ Nodal complex voltages of original network:

    + Generator parameters:

  • 7/25/2019 Simulation of Five Bus System

    8/29

    )

    Parameters of com*onents in

    System 4cont,6

    + Network connectivity & transmission line parameters:

    + Load parameters:

  • 7/25/2019 Simulation of Five Bus System

    9/29

    )

    7asic Five 7us System

    without FACTS

  • 7/25/2019 Simulation of Five Bus System

    10/29

    )

    Test System without Com*ensation

  • 7/25/2019 Simulation of Five Bus System

    11/29

    )

    Power Flow 8ata of %ain system

  • 7/25/2019 Simulation of Five Bus System

    12/29

    )

    System with shunt connected

    ca*acitor at 7us 9ake

  • 7/25/2019 Simulation of Five Bus System

    13/29

    System with ca*acitor

    connected on bus %ain

  • 7/25/2019 Simulation of Five Bus System

    14/29

    )

    System with shunt connected

    ca*acitor at bus :9%

  • 7/25/2019 Simulation of Five Bus System

    15/29

    )

    System with ca*acitor connected at

    bus ;orth

  • 7/25/2019 Simulation of Five Bus System

    16/29

    )

    System with ca*acitor connected at

    South

  • 7/25/2019 Simulation of Five Bus System

    17/29

    )

    Table of all readings

  • 7/25/2019 Simulation of Five Bus System

    18/29

    )

  • 7/25/2019 Simulation of Five Bus System

    19/29

    )

    System with TCSC between 9ake and %ain 7us

  • 7/25/2019 Simulation of Five Bus System

    20/29

    )

    TCSC between 9ake and ;orth

  • 7/25/2019 Simulation of Five Bus System

    21/29

    )

    TCSC between ;orth and South

  • 7/25/2019 Simulation of Five Bus System

    22/29

    )

    TSCS between 9ake and South

  • 7/25/2019 Simulation of Five Bus System

    23/29

    )

    TSCS 7etween %ain and South

  • 7/25/2019 Simulation of Five Bus System

    24/29

    )

    TSCS 7etween South and :9%

  • 7/25/2019 Simulation of Five Bus System

    25/29

    )

    TSCS 7etween %ain and :9%

    T bl f ll di f TCSC

  • 7/25/2019 Simulation of Five Bus System

    26/29

    )

    Table of all readings of TCSC

  • 7/25/2019 Simulation of Five Bus System

    27/29

    )

  • 7/25/2019 Simulation of Five Bus System

    28/29

    )

    (:F:(:;C:

    + >Power :lectronic Control in :lectrical Systems? by : Acha

    and T, @, : %iller

    + >.nderstanding FACTS? by ;arain , Bingorani,

    + >Power System Analysis? by ;agrath and Kothari,

    + www,cdee*,iitb,ac,inn*tel:lectrical :ngineeringPower

    System

  • 7/25/2019 Simulation of Five Bus System

    29/29

    )

    Thank You