www.kgc.net.au 3/55 John St. Bentley WA 6102 P: +61 8 9258 4393 F: +61 8 9258 4417 E: [email protected] 4 LOCATION CAPE PRESTON, WA 4 CLIENT MCC MINING (WA) PTY LTD 4 STATUS: COMPLETED 4 PERIOD OF ASSIGNMENT YEAR 2012 4 CONTRACT VALUE $18 M 4 PROJECT OVERVIEW STRUCTURAL, MECHANICAL AND PIPING INSTALLATION FOR THE GRINDING MILL COOLING WATER SYSTEM The project is consisted of 230 tonnes of structural steel 7 cooling towers; 6 refrigerated chillers Associated pumps, tanks, and ancillaries Over 6,000m of process piping to AS4041 Development of weld procedures for pipe welding; Pipe installation 4 MAIN SUBCONTRACTOR Burgess BLA CPC Goldfields 4 REFEREE Xingyong ZHAO Principal’s Representative MCCM Construction Department 1 Sino Iron Project at Cape Preston Tel: 08 9184 8827 Mobile: 0467 444 867 Email: [email protected] 4 PROJECT MANAGER Mark Fidler & Klaus Hartmann 4 SITE MANAGER Wenge Liu 4 CHIEF ENGINEER Harry Yang PROJECT REFERENCE PROJECT NAME: SINO IRON PROJECT COOLING WATER SYSTEM

SINO IRON PROJECT COOLING WATER SYSTEM

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SINO IRON PROJECT COOLING WATER SYSTEM

www.kgc.net.au 3/55 John St. Bentley WA 6102

P: +61 8 9258 4393 F: +61 8 9258 4417 E: [email protected]

4 LOCATION CAPE PRESTON, WA

4 CLIENT MCC MINING (WA) PTY LTD

4 STATUS: COMPLETED

4 PERIOD OF ASSIGNMENT YEAR 2012

4 CONTRACT VALUE $18 M

4 PROJECT OVERVIEW

STRUCTURAL, MECHANICAL AND PIPING INSTALLATION FOR THE GRINDING MILL COOLING WATER SYSTEM

The project is consisted of

230 tonnes of structural steel

7 cooling towers; 6 refrigerated chillers

Associated pumps, tanks, and ancillaries

Over 6,000m of process piping to AS4041

Development of weld procedures for pipe welding; Pipe installation

4 MAIN SUBCONTRACTOR Burgess BLA CPC Goldfields

4 REFEREE Xingyong ZHAO Principal’s Representative MCCM Construction Department 1 Sino Iron Project at Cape Preston Tel: 08 9184 8827 Mobile: 0467 444 867 Email: [email protected]

4 PROJECT MANAGER Mark Fidler & Klaus Hartmann

4 SITE MANAGER Wenge Liu

4 CHIEF ENGINEER Harry Yang

PROJECT REFERENCE

PROJECT NAME: SINO IRON PROJECT COOLING WATER SYSTEM