37
• Site I - Post Harvest • Site II - Pre Harvest • Site II - Post Harvest Cumulative Effects Iron Canyon Soil Monitoring

Site I - Post Harvest Site II - Pre Harvest Site II - Post Harvest Cumulative Effects

Embed Size (px)

DESCRIPTION

Iron Canyon Soil Monitoring. Site I - Post Harvest Site II - Pre Harvest Site II - Post Harvest Cumulative Effects. Iron Canyon II Feller-Buncher Harvesting August 2003, 23% Soil H 2 0 at 0-60 cm. Iron Canyon II Soil Monitoring Pre- vs. Post-Harvest Disturbance. - PowerPoint PPT Presentation

Citation preview

Page 1: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

• Site I - Post Harvest

• Site II - Pre Harvest

• Site II - Post HarvestCumulative Effects

Iron Canyon Soil Monitoring

Page 2: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon IIFeller-Buncher Harvesting

August 2003, 23% Soil H20 at 0-60 cm

Page 3: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Pre-Harvest

Undist 675

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

undist67%

dist22%

skid11%

Page 4: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Page 5: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Page 6: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Page 7: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216 46 147 23

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Page 8: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216 46 147 23

Skid 109 12 49 48

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Page 9: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

2003-Harvest

Undist Dist Skid

1960’s-Harvest 215 607 178 Cumulative

Undist 675 157 411 107 157 Undist

Dist 216 46 147 23 604 Dist

Skid 109 12 49 48 239 Skid

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Page 10: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

PREHarvest

POSTHarvest % Change

Undist 67% 16% -77

Dist 22% 60% +180

Skid 11% 24% +119

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Percent Change in Pre-Harvest Classes

Page 11: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringPost-Harvest Disturbance Extent

undist16%

dist60%

skid24%

undist67%

dist22%

skid11%

PRE

POST

Page 12: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

March 2004 (47% Soil Moisture)0

10

20

30

40

50

60

0 1000 2000 3000 4000

STRENGTH (kPa)

DE

PT

H (

cm

)

undist

dist

skid

landing

Page 13: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

Soil Strength Through the Growing Season (10-20 cm)

0

500

1000

1500

2000

2500

3000

3500

4000

Oct-02

Dec-02

Feb

-03

Ap

r-03

Jun

-03

Au

g-03

Oct-03

Dec-03

Feb

-04

Ap

r-04

Jun

-04

Au

g-04

SO

IL S

TR

EN

GT

H (

kP

a)

skid

dist

undistharvest

Page 14: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringSoil Strength Before & After Harvest

0

1000

2000

3000

4000

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

ST

RE

NG

TH

(k

Pa

)

PRE

POST

10 Month Averages at 10-20 cm

Page 15: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Page 16: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringSoil Strength Before & After Harvest

0

1000

2000

3000

4000

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

ST

RE

NG

TH

(k

Pa

)

PRE

POST

10 Month Averages at 10-20 cm

Page 17: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringBulk Density Before & After Harvest

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

BU

LK

DE

NS

ITY

(g

/cm

3 )

PRE POST

Averages at 10-20 cm

Page 18: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringBulk Density Before & After Harvest

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

BU

LK

DE

NS

ITY

(g

/cm

3 )

PRE POST

24% of Harvest Area

Averages at 10-20 cm

Page 19: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Class Matrix

Post-Harvest

Undist Dist Skid

Pre-Harvest 215 607 178 Cumulative

Undist 675 157 411 107 157 Undist

Dist 216 46 147 23 604 Dist

Skid 109 12 49 48 239 Skid

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1000 ft total in transects)

Page 20: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

Bulk Density, Post-Harvest (10-20cm)

0.00

0.20

0.40

0.60

0.80

1.00

1.20

undist dist skid undist dist skid undist dist skid

UNDISTURBED DISTURBED SKID

BU

LK

DE

NS

ITY

(g

/cm

3)

POSTPRE

Page 21: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

Bulk Density, Post-Harvest (10-20cm)

0.00

0.20

0.40

0.60

0.80

1.00

1.20

undist dist skid undist dist skid undist dist skid

UNDISTURBED DISTURBED SKID

BU

LK

DE

NS

ITY

(g

/cm

3)

POSTPRE

7% OF HARVEST AREA

Page 22: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Category: Low Mod High units

bulk density 0.89 0.94 1.01 g/cm3

Iron Canyon I Soil MonitoringLooking Back….

Averages by Disturbance Category (10-20 cm depth)

Region 5 Standard: 10% Porosity Reduction

Initial Db: 0.76

Threshold Db: 0.95

2001 UNIT - HARVESTED IN MAY

Page 23: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

Disturbance Basics• EXTENT

% area, depth

• SEVERITYundisturbed extreme

• DISTRIBUTIONdispersed concentrated

• DURATIONshort term long term

mitigation? natural

recovery?

Page 24: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects
Page 25: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects
Page 26: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects
Page 27: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

5 15 25 35 45 55 65 75 85 95 105 115 125 135 145 155 165 175 185 195

UNDIST DIST SKIDUNDIST DIST SKIDPRE

POST

Page 28: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

1. Meaningful disturbance classes can be established easily and objectively

Conclusions from Iron Canyon IISoil Monitoring Results

Page 29: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

1. Meaningful disturbance classes can be established easily and objectively

2. Pre-harvest stands came with legacy impacts that remained significant after decades

Conclusions from Iron Canyon IISoil Monitoring Results

Page 30: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

1. Meaningful disturbance classes can be established easily and objectively

2. Pre-harvest stands came with legacy impacts that remained significant after decades

3. Legacy impacts were compounded by recent thinning, creating cumulative impacts

Conclusions from Iron Canyon IISoil Monitoring Results

Page 31: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

1. Meaningful disturbance classes can be established easily and objectively

2. Pre-harvest stands came with legacy impacts that remained significant after decades

3. Legacy impacts were compounded by recent thinning, creating cumulative impacts

4. Assessing cumulative impacts requires pre-harvest monitoring

Conclusions from Iron Canyon IISoil Monitoring Results

Page 32: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

5. Cumulative impacts exceed thresholds on some skid trails

Conclusions from Iron Canyon IISoil Monitoring Results

Page 33: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

5. Cumulative impacts exceed thresholds on some skid trails

6. Old and new skid trails were coincidental at best.

Conclusions from Iron Canyon IISoil Monitoring Results

Page 34: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

5. Cumulative impacts exceed thresholds on some skid trails

6. Old and new skid trails were coincidental at best

7. Mechanical operations on these soils will produce detrimental impacts

Conclusions from Iron Canyon IISoil Monitoring Results

Page 35: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

5. Cumulative impacts exceed thresholds on some skid trails

6. Old and new skid trails were coincidental at best

7. Mechanical operations on these soils will produce detrimental impacts

8. The result is more areal impacts, adding to legacy disturbance for next harvest.

Conclusions from Iron Canyon IISoil Monitoring Results

Page 36: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

National Forest Soil Scientists are Charged with Monitoring

Monitoring need not be difficult or expensive.It’s less expensive than planning & lawsuits!

Page 37: Site I - Post Harvest  Site II - Pre Harvest  Site II - Post Harvest Cumulative Effects

THANKS TO:

Dr. Robert Powers - PSW

Brad Rust – Shasta-Trinity NF

Scott Miles – R-5