Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Slurry/Micro-Surface Mix Design ProcedureSlurry/Micro-Surface Mix Design Procedure
Prepared ByFugro Consultants Inc.APTechConsolidated Engineering LaboratoriesMACTEC
Prepared ByPrepared ByFugro Consultants Inc.Fugro Consultants Inc.APTechAPTechConsolidated Engineering LaboratoriesConsolidated Engineering LaboratoriesMACTECMACTEC
Northeast Pavement Preservation PartnershipWarwick, Rhode Island
December 11, 2007
Northeast Pavement Preservation PartnershipNortheast Pavement Preservation PartnershipWarwick, Rhode IslandWarwick, Rhode Island
December 11, 2007December 11, 2007
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Pooled Fund Study TeamPooled Fund Study Team
DOTDOT’’ssCaltransCaltrans, Delaware, Georgia, Illinois, , Delaware, Georgia, Illinois, Kansas, Maine, Michigan, Minnesota, Kansas, Maine, Michigan, Minnesota, Missouri, New Hampshire, New York, Missouri, New Hampshire, New York, North Dakota, Texas, VermontNorth Dakota, Texas, Vermont
FHWAFHWAISSAISSAContractorsContractors
Fugro ConsultantsFugro ConsultantsMACTEC Engineering and ConsultingMACTEC Engineering and ConsultingConsolidated Engineering LaboratoriesConsolidated Engineering LaboratoriesApplied Pavement TechnologyApplied Pavement Technology
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Project ObjectivesProject Objectives
Rational mix design proceduresRational mix design proceduresGuidelines for proper use and Guidelines for proper use and application of these systemsapplication of these systemsImproved specificationsImproved specifications
Improve the performance of slurry surfacing systems through the development of:
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Work Plan and Study ApproachWork Plan and Study Approach
Phase IPhase IReview literatureReview literatureSurvey industry and agenciesSurvey industry and agenciesDevelop detailed plans for Phases II Develop detailed plans for Phases II and IIIand III
Phase II Phase II Develop and evaluate mix design Develop and evaluate mix design proceduresprocedures
Phase III Phase III Conduct field validationConduct field validationDevelop guidelines & specsDevelop guidelines & specsDevelop training materialsDevelop training materials
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase I Phase I –– Literature ReviewLiterature Review
Extent of use worldwideExtent of use worldwideMix design procedures and laboratory Mix design procedures and laboratory teststests
ISSA, ASTM, TTIISSA, ASTM, TTIPerformance of existing projectsPerformance of existing projects
9 projects in U.S. and Canada9 projects in U.S. and CanadaGuidelines and specificationsGuidelines and specifications
ISSA, Caltrans, TTI, CSIR, ISSA, Caltrans, TTI, CSIR, AustroadsAustroads
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase I Phase I -- SurveysSurveys
Mix design methodMix design methodExtent of useExtent of useBenefitsBenefitsProblemsProblemsLife expectancyLife expectancyTests that relate to performanceTests that relate to performanceQuality assurance testingQuality assurance testing
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase I Phase I -- SurveysSurveys
Agencies Agencies –– 21 respondents21 respondentsIndustry Industry –– 21 respondents21 respondentsAdvisory panel Advisory panel –– 4 respondents4 respondents
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
FindingsFindings
All methods derived from ISSA All methods derived from ISSA Guidelines A105 and A143Guidelines A105 and A143Extensive experience with product Extensive experience with product needed to ensure success of a projectneeded to ensure success of a projectConcerns with the repeatability of the Concerns with the repeatability of the laboratory tests used in designlaboratory tests used in design
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Findings (ContFindings (Cont’’d)d)
Documented slurry seal and Documented slurry seal and microsurfacing performance data microsurfacing performance data limited limited Failures generally a result of:Failures generally a result of:
Poor project selection (need to Poor project selection (need to educate agencies on the proper use educate agencies on the proper use of slurry and microsurfacing)of slurry and microsurfacing)Contractor capabilities and Contractor capabilities and experienceexperience
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase I DeliverablesPhase I Deliverables
Phase I ReportPhase I ReportDetailed Work Plan for Phase IIDetailed Work Plan for Phase IIDetailed Work Plan for Phase IIIDetailed Work Plan for Phase III
Phase I Phase I –– CompletedCompletedPanel Meeting Panel Meeting –– Due February 2004Due February 2004
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase II ActivitiesPhase II Activities
Develop framework for rational mix Develop framework for rational mix design proceduredesign procedureEvaluate existing and proposed test Evaluate existing and proposed test methodsmethodsPerform ruggedness testing of Perform ruggedness testing of proposed test methodsproposed test methodsFinalize mix design and develop Finalize mix design and develop AASHTO style test protocolsAASHTO style test protocolsMake recommendations for Make recommendations for ““field testfield test””for slurry and microsurfacingfor slurry and microsurfacing
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Philosophy Philosophy –– Mix PropertiesMix Properties
Mixable Mixable –– Components can be Components can be mixed, coated and applied mixed, coated and applied through the machinethrough the machine
Workable Workable –– Applied mixture sets Applied mixture sets and cures within a reasonable and cures within a reasonable time to allow return of traffic time to allow return of traffic without causing damagewithout causing damage
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Philosophy Philosophy
Mixture performance Mixture performance Maintains acceptable friction Maintains acceptable friction resistanceresistanceDoes not ravel, deDoes not ravel, de--bond, bond, bleed, exhibit moisture bleed, exhibit moisture damage, or lose damage, or lose cohesiveness over the life of cohesiveness over the life of the treatmentthe treatment
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Philosophy Philosophy –– Laboratory TestsLaboratory Tests
RepeatableRepeatableRelate to field performanceRelate to field performanceCovers the range of temperature Covers the range of temperature and humidity conditions that may and humidity conditions that may occur in the fieldoccur in the fieldEasy to implementEasy to implementReasonable costReasonable cost
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Slurry Vs. Micro | Slurry Vs. Micro | S3S3
Should there be a distinction?Should there be a distinction?PerformancePerformance –– Mix design method should Mix design method should simply show the benefit of one system over simply show the benefit of one system over the other (e.g., rut filling capabilities, rapid the other (e.g., rut filling capabilities, rapid vs. slow set)vs. slow set)ConstructabilityConstructability –– Issues are the sameIssues are the same
TeamTeam’’s recommendation:s recommendation:Slurry = Micro = Slurry Surfacing Systems (S3)Slurry = Micro = Slurry Surfacing Systems (S3)
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Strawman Specification Strawman Specification Hi Med Low Hi Med Low Hi Normal
35 C 25 C 10 C 90% 50%PFS-1 (Mixing)Mixing Torque - maximum kg-cm 9 9 9 9 9 9 9 9Mixing time - minimum sec. 120 120 120 120 120 120 120 120
Spread index - maximum @ 120 sec. kg-cm 12 12 12 12 12 12 12 12
Blot test - 30 sec. - clear water
clear water
N/A clear water
clear water
clear water
clear water
clear water
Coating - 100% 100% 95% 95% 95% 100% 100% 95%PFS-2 (Wet Cohesion)30 min. cohesion - minimum kg-cm 12 12 12 12 12 12 12 1260 min. cohesion - minimum kg-cm 23 20 20 20 20 20 20 2090 min. cohesion - minimum kg-cm 25 25 25 25 25 25 25 2512 hr. cohesion - minimum kg-cm 28 28 28 28 28 28 28 28PFS-3 (Abrasion Loss)30 min. loss - maximum g/m2 200 200 400 300 300 300 300 3001hr. loss - maximum g/m2 100 100 300 100 200 100 100 2003 hr. loss - maximum g/m2 100 100 200 100 100 100 100 100PFS-1 (Mixing)Mixing Torque - maximum kg-cm 9 9 9 9 9 9 9 9Mixing time - minimum sec. 120 120 120 120 120 120 120 120
Spread index - maximum @ 120 sec. kg-cm 12 12 12 12 12 12 12 12
Blot test - 30 sec. - clear water
clear water
N/A clear water
clear water
clear water
clear water
clear water
Coating - 100% 100% 95% 95% 95% 100% 100% 95%PFS-2 (Wet Cohesion)30 min. cohesion - minimum kg-cm 12 12 12 12 12 12 12 1260 min. cohesion - minimum kg-cm 23 20 20 20 20 20 20 2090 min. cohesion - minimum kg-cm 25 25 25 25 25 25 25 2512 hr. cohesion - minimum kg-cm 28 28 28 28 28 28 28 28PFS-3 (Abrasion Loss)30 min. loss - maximum g/m2 200 200 400 300 300 300 300 3001hr. loss - maximum g/m2 100 100 300 100 200 100 100 2003 hr. loss - maximum g/m2 100 100 200 100 100 100 100 100
Slow
Test or field Condition UnitsSet TimeTraffic Temperature Humidity
Rapid
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Summary of Proposed Major ChangesSummary of Proposed Major Changes
CURRENT PROPOSED
ISSA TB 113 – Trial Mix Procedure for Slurry Seal Design
Automated Mixing Test (AMT)
ISSA TB 100 – Test Method for Wet Track Abrasion of Slurry Surfaces (WTAT)
Cohesion-Abrasion Test (CAT)
ISSA TB 139 – The Modified Cohesion Tester
Automated Cohesion Test (ACT)
Tests run at standard laboratory temperature and humidity conditions
Tests run over a range of temperature and humidity conditions
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Automated Mixing Test (AMT)Automated Mixing Test (AMT)
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC AMT ResultsAMT Results
Time (minutes)
Torq
ue
(N-c
m)
Mixing Torque
12 N-cm
Mixing Time
Spread Time
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
CohesionCohesion--Abrasion Test (CAT)Abrasion Test (CAT)
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
CAT EvaluationCAT Evaluation
300 tests on 5 slurry surfacing systems at 3 300 tests on 5 slurry surfacing systems at 3 temperatures and 2 humidity levelstemperatures and 2 humidity levels
With and without compactionWith and without compactionWith and without conditioning (soaking With and without conditioning (soaking + oven cure)+ oven cure)
Major findingsMajor findingsCompaction does not influence the Compaction does not influence the resultsresultsTemperature, humidity and curing time Temperature, humidity and curing time affect abrasion resistance of nonaffect abrasion resistance of non--soaked soaked specimens and predictive models can be specimens and predictive models can be developed to estimate these effectsdeveloped to estimate these effects
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Automated Cohesion Tester (ACT)Automated Cohesion Tester (ACT)
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
ACT Comparison with Modified ACT Comparison with Modified Cohesion TesterCohesion Tester
y = 0.5711xR2 = 0.7073
0
5
10
15
20
25
30
0 5 10 15 20 25 30Manual Torque (kg-cm)
Auto
mat
ed T
orqu
e (k
g-cm
)
Automated
Automated Corrected
Equality Line
Linear (Automated)
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Field Test for Micro/SlurryField Test for Micro/Slurry
PurposePurposeCorrelate with long term Correlate with long term performanceperformanceEvaluate uniformity and Evaluate uniformity and conformance with mix designconformance with mix designEvaluate readiness for Evaluate readiness for opening to trafficopening to traffic
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Field Test for Micro/SlurryField Test for Micro/Slurry
ApproachApproachLiterature review / select Literature review / select candidate test methodscandidate test methodsLimited experimental studyLimited experimental studyRecommendations for futureRecommendations for future
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Candidate Field TestsCandidate Field Tests
Field cohesion test (traffic time)Field cohesion test (traffic time)Field abrasion test (performance)Field abrasion test (performance)GeoGauge (traffic time)GeoGauge (traffic time)Infrared camera (traffic time, Infrared camera (traffic time, uniformity)uniformity)In situ shear tester (performance)In situ shear tester (performance)
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase II DeliverablesPhase II Deliverables/Progress/Progress
Recommended mix design Recommended mix design / Strawman / Strawman V.3 availableV.3 availableEvaluation of promising test methods Evaluation of promising test methods / / AMT, CAT completed, ACT in progressAMT, CAT completed, ACT in progressRuggedness testing Ruggedness testing / in progress/ in progressNew and revised test methods in New and revised test methods in AASHTO format AASHTO format / AMT, CAT / AMT, CAT completed, ACT in progress completed, ACT in progress Recommended field tests for QA Recommended field tests for QA purposes purposes / in progress/ in progress
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase III Phase III –– Pilot ProjectsPilot Projects
Identify test sectionsIdentify test sectionsDevelop site selection guidelinesDevelop site selection guidelinesDevelop test section layoutDevelop test section layout•• Control / preferred / Control / preferred / new (S3)new (S3)
Develop construction guidelinesDevelop construction guidelinesPrePre--constructionconstructionConstructionConstructionPostPost--constructionconstruction
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase III Phase III –– TrainingTraining
1.51.5--Day training courseDay training courseReference manualReference manualVisual aidsVisual aidsInstructors guideInstructors guideHandsHands--on workshops:on workshops:•• Use of laboratory test Use of laboratory test
equipmentequipment•• Evaluate learning using Evaluate learning using
gamegame--style Q&Astyle Q&A
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase III Phase III –– TrainingTraining
PrePre--job training module job training module Pocket guidePocket guide““TailgateTailgate”” sessionsession
Caltrans Contract No. 65A0151Caltrans Caltrans Contract No. 65A0151
MACTEC
Phase III Phase III -- DeliverablesDeliverables
Training Training –– 95% completed95% completedGuidelines Guidelines –– 90% completed90% completedPilot projects / field validation Pilot projects / field validation ––completion due by fall 2008completion due by fall 2008