  • Site ID ZTE_3465

    Site Name Srondol

    DESIGN PACKSmartfren LTE Project

    Site Design Pack

  • Site Type Outdoor&GF

    Tower Type Angular Tower

    Document NO. Ed. Date

    PROJECT: SMARTFREN LTE PROJECT

    CONTRACT NO:

    Company Title Name Signature

    Prepared by ZTE

    Checked by Smartfren

    THE EAST BUILDING 26-27th FLOORJL. LINGKAR MEGA KUNINGAN KAV. E3-2. NO.1JAKARTA 12950TEL:021-2994 2000FAX:021-2994 2002

    PT. SMART Telecom JL. H. AGUS SALIM 45 KEBON SIRIH MENTENG JAKARTA PUSAT TEL:021-31922255 FAX:021-3162519

    Documentation Identification: DESIGN PACK

    Document No.

  • Approved by Smartfren

    Site Name: Total Pages: Site ID: Edition:

    Document NO. Ed. Date

    TABLE OF CONTENT

    DESIGN PACK

    1. PROPOSED SOLUTION

    1.1 Site Information 1.2 Site Model Summary 1.3 Proposed RAN Solution 1.4 Proposed LTE Antenna&Feeder System 1.5 Infran & Power Equipment Information 1.6 Proposed Mini CME

    2. MAIN EQUIPMENT BOM

    This document is exclusively property of ZTE and shall not be used copied or communicated to the third party without its prior authorization.

  • 3. INSTALLATION AUXILIARY MATERIALS

    4. BILL OF QUANTITY OF MINI CME

    5. SITE DESIGN DRAWING

    APPENDIX I Standard Environmental Requirement

    I. General Requirement II. Floor loading requirement III. Grounding System IV. Power Supply requirements V. Temperature and Humidity Requirement

    APPENDIX II Detailed Design Drawings

  • DESIGN PACKSmartfren LTE Project

    Site Design Pack

  • Page

    PROJECT: SMARTFREN LTE PROJECT

    CONTRACT NO:

    Date

    PT. SMART Telecom JL. H. AGUS SALIM 45 KEBON SIRIH MENTENG JAKARTA PUSAT TEL:021-31922255 FAX:021-3162519

    Document No.

  • Total Pages: Edition:

    Page

    TABLE OF CONTENT

    This document is exclusively property of ZTE and shall not be used copied or communicated to the third party without its prior authorization.

  • 1. PROPOSED SOLUTIONSite ID: ZTE_3465Site Name: SrondolLocation: 1.1 Site Information

    No. Items Information1 Site ID ZTE_34652 Site Name Srondol

    3 Site Address

    4 Site Ownership Tower provider5 Region6 Morphology Class Suburban7 Longitude(E):

    8 Latitude(N):

    9 Site Type Outdoor&GF10 Building Height11 Tower/Pole Type Angular Tower12 Equipment Room Type Outdoor13 Room Demension14 Existing BTS Equipment/Type BS890015 Existing Power Equipment16 PLN Connection Capacity 17 Generator Set Capacity18 Air Conditioner Qty and capacity19 Environment Alarm System

    1.2 Site Model SummaryNo. Site Model Description12345 M5-1: TDD+FDD, For BS8900, Reuse power system6 M5-2: TDD+FDD, For BS8900, New power system7 M6-1: TDD+FDD, For BS8800, Reuse power system8 M6-2: TDD+FDD, For BS8800, New power system9 M7: TDD+FDD, For BS8906E10 M8-1: TDD+FDD, For CBTS12 Indoor, Reuse power system11 M8-2: TDD+FDD, For CBTS12 Indoor, New power system12 M9: TDD+FDD, For CBTS12 Outdoor13 M10-1: TDD+FDD, For SAMSUNG Indoor, Reuse power system14 M10-2: TDD+FDD, For SAMSUNG Indoor, New power system15 M11-1: TDD+FDD, For SAMSUNG Outdoor, Reuse power system16 M11-2: TDD+FDD, For SAMSUNG Outdoor, New power system17 M12-1: FDD only, For BS8900, Reuse power system18 M12-2: FDD only, For BS8900, New power system19 M13-1: FDD only, For BS8800, Reuse power system20 M13-2: FDD only, For BS8800, New power system

    M1: TDD only, For New site on 17m poleM2: TDD only, For New site on towerM3: FDD only, For New site on towerM4: TDD+FDD, For New site on tower

  • 21 M14: FDD only, For BS8906E22 M15-1: FDD only, For CBTS12 Indoor, Reuse power system23 M15-2: FDD only, For CBTS12 Indoor, New power system24 M16: FDD only, For CBTS12 Outdoor25 M17-1: FDD only, For SAMSUNG Indoor, Reuse power system26 M17-2: FDD only, For SAMSUNG Indoor, New power system27 M18-1: FDD only, For SAMSUNG Outdoor, Reuse power system28 M18-2: FDD only, For SAMSUNG Outdoor, New power system29 M19: TDD only, For Indoor DAS(Distribution Antenna System)30 M20: FDD only, Shooting site solution31 M21: TDD only, For Pico

  • 1.3 Proposed RAN SolutionNo. Proposed Items Proposed Information1 Proposed Solution M5-22 Proposed Rack BC8910+PC89103 Proposed BBU type BS8300(TDD+FDD)4 Proposed BBU Installation In BC89105 RRU Type For TDD R89646 RRU Qty For TDD 37 RRU Type For FDD R8862A8 RRU Qty For FDD 39 Proposed ANT type 3*Dual-Band 6 ports(CVV65CSX-M)10 Proposed DCPD6 Yes

    1.4 Proposed LTE Antenna&Feeder System Item Sector-1

    1 Antenna Type 850M&2300MHZ Dual-Band2 Qty of Antennas 13 Port of Antenna 44 Height (m,AGL) 405 Azimuth 06 Machanical Tilt7 Electrical Tilt8 Antenna Jumper Length(m) for TDD 59 Antenna Jumper Length(m) for FDD 310 Feeder Type Fiber11 Feeder/Fiber Length 3612 RRU Type R8964&R8862A(T+F)13 Qty. of RRU 114 DC Power Cable Length(m)for TDD 3615 DC Power Cable Length(m)for FDD 36

    1.5 Infra & Power Equipment InformationNo. Items Information1 Tower structural analysis Need

    2 Tower structural statement from Consultant

    3 Pole structural analysis/design No need4 Building structural analysis Need5 Power System Solution Replacement Battery 8 Blocks Only6 Proposed DC System Type ZXDU68 S3017 Add Rectifier Moudle 2*30A8 Proposed new battery for new PS Reused9 Battery replacement Reused10 Proposed DCPD Box or Subrack DCPD Subrack11 Transmission Solution Dark Fiber12 Proposed IPRAN Installation In Existing 19"Rack13 New added Power Loading(MAX) 2890W

    1.6 Proposed Mini CMENo. Proposed Items Proposed Information

  • 1 Proposed equipment foundation? Yes2 Poposed Antenna mounting Type Mounting to Monopole-3000mm3 Poposed Antenna mounting Qty 34 Poposed RRU mounting Type Sharing ANT mounting5 Poposed RRU mounting Qty 06 Porposed Cable Tray-Type1 No need7 Length of cable tray type1 08 Porposed Cable Tray-Type2 Indoor cable tray(width 40cm)9 Length of cable tray type2 010 BC+PC installation type Up&Down installation11 Porposed Grounding Bar Qty 112 Porposed new feeder window? Yes

  • 1. PROPOSED SOLUTIONSite ID: ZTE_3465Site Name: SrondolLocation: 1.1 Site Information

    Information TipsZTE_3465 Linked to cover page, automatically generate

    Srondol Linked to cover page, automatically generate

    Tower provider Smartfren,Tower provider, Other operators

    Suburban Denseurban,Urban,Suburban, RuralWith(xx.xxx) format

    With(xx.xxx) format

    Outdoor&GF Linked to cover page, automatically generateFill with building height if it is Rooftop site

    Angular Tower Linked to cover page, automatically generateOutdoor Shelter,Concrete room, Outdoor

    (mm) (HxWxD)BS8900 BS8800,BS8900,BS8906E,CBTS12,SAMSUNG

    1.2 Site Model SummarySite Model Description

    M1M2M3M4

    M5-1: TDD+FDD, For BS8900, Reuse power system M5-1M5-2: TDD+FDD, For BS8900, New power system M5-2M6-1: TDD+FDD, For BS8800, Reuse power system M6-1M6-2: TDD+FDD, For BS8800, New power system M6-2M7: TDD+FDD, For BS8906E M7M8-1: TDD+FDD, For CBTS12 Indoor, Reuse power system M8-1M8-2: TDD+FDD, For CBTS12 Indoor, New power system M8-2M9: TDD+FDD, For CBTS12 Outdoor M9M10-1: TDD+FDD, For SAMSUNG Indoor, Reuse power system M10-1M10-2: TDD+FDD, For SAMSUNG Indoor, New power system M10-2M11-1: TDD+FDD, For SAMSUNG Outdoor, Reuse power system M11-1M11-2: TDD+FDD, For SAMSUNG Outdoor, New power system M11-2M12-1: FDD only, For BS8900, Reuse power system M12-1M12-2: FDD only, For BS8900, New power system M12-2M13-1: FDD only, For BS8800, Reuse power system M13-1M13-2: FDD only, For BS8800, New power system M13-2

  • M14: FDD only, For BS8906E M14M15-1: FDD only, For CBTS12 Indoor, Reuse power system M15-1M15-2: FDD only, For CBTS12 Indoor, New power system M15-2M16: FDD only, For CBTS12 Outdoor M16M17-1: FDD only, For SAMSUNG Indoor, Reuse power system M17-1M17-2: FDD only, For SAMSUNG Indoor, New power system M17-2M18-1: FDD only, For SAMSUNG Outdoor, Reuse power system M18-1M18-2: FDD only, For SAMSUNG Outdoor, New power system M18-2M19: TDD only, For Indoor DAS(Distribution Antenna System) M19M20: FDD only, Shooting site solution M20M21: TDD only, For Pico M21

  • 1.3 Proposed RAN SolutionProposed Information Tips

    M5-2 Choose a ModelBC8910+PC8910 Automatically generate according to Model

    BS8300(TDD+FDD) Automatically generate according to ModelIn BC8910

    R8964 Automatically generate according to Model3 Automatically generate according to Model

    R8862A Automatically generate according to Model3 Automatically generate according to Model

    3*Dual-Band 6 ports(CVV65CSX-M) Automatically generate according to ModelYes Automatically generate according to Model

    1.4 Proposed LTE Antenna&Feeder System Sector-2 Sector-3 Sector-4

    850MHZ Single-Band 2300MHZ Single-Band

    1 14 440 40

    120 240

    5 53 3

    Fiber Fiber36 36

    R8964(TDD) R8964&R8864A(T+F)1 136 4040 40

    1.5 Infra & Power Equipment Information Information Tips

    Need Need, No need,

    No need Need, No need,Need Need, No need,

    Replacement Battery 8 Blocks OnlyZXDU68 S301

    2*30AReusedReused

    DCPD Subrack Box will be installed on wall, subrack in 19" rackDark Fiber IPRAN,MW,LL,Dark Fiber, Existing 5928

    In Existing 19"Rack2890W Automatically generate according to Model

    1.6 Proposed Mini CMEProposed Information Tips

  • YesMounting to Monopole-3000mm

    3Sharing ANT mounting

    0No need 8 types of cab tray

    0Indoor cable tray(width 40cm) 8 types of cab tray

    0Up&Down installation

    1 Including tower grounding bar and main grouding barYes

  • 2. MAIN EQUIPMENT BOMSite ID: ZTE_3465Site Name: SrondolLocation: 2.1 RAN Equipment BOM

  • 2.2 Power Equipment BOM

  • 2.3 Transmission Equipment BOM(if have)Pls comment there is no ZTE transmission equipment if the site do not have indeed.

  • Pls comment there is no ZTE transmission equipment if the site do not have indeed.

  • 2. MAIN EQUIPMENT BOMSite ID: ZTE_3465Site Name: SrondolLocation: 2.1 RAN Equipment BOM

  • 2.2 Power Equipment BOM

  • 2.3 Transmission Equipment BOM(if have)Pls comment there is no ZTE transmission equipment if the site do not have indeed.

  • Pls comment there is no ZTE transmission equipment if the site do not have indeed.

  • 3. INSTALLATION AUXILIARY MATERIALSSite ID: ZTE_3465Site Name: SrondolLocation: ItemZXDU48 Outdoor Rack Installation25 mm2 outdoor red power cable(From DC Power system to ZXDU48 Rack)25 mm2 outdoor blue power cable(From DC Power system to ZXDU48 Rack)16mm2 PVC cable jacket of Kelly(Grouding cable of ZXDU48 Rack)Copper Thumber 0-16 mm2ZXDU48 H002 Installation

    16 mm2 PVC cable jacket of Kelly(Grouding cable of ZXDU48 Rack)Copper Thumber 0-16 mm2DCPD BOX (Or DCPD subrack)Installation50 mm2 outdoor red power cable(From DC Power system to DCPD BOX)50 mm2 outdoor blue power cable(From DC Power system to DCPD BOX)S301 Installation3*16mm2+1core PVC cable jacket of black(From ACDB to S301)16 mm2 PVC cable jacket of gules(From S301 to Battery,red)16 mm2 PVC cable jacket of blove(From S301 to Battery,blue)35 mm2PVC cable jacket of Kelly(Grounding cable for S301,yellow-green)Copper Thumber 0-35 mm2BC8910+PC8910 InstallationBase Frame (BC+PC Up&Down installation need 1 base, Side by side installation need 2) DC Blue Power Cable (From Rec to BC8910 ,16mm2)DC Black GND Cable (From Rec to BC8910 ,16mm2)

    Copper Thumber 0-16 mm2DCPD6 Installation16 mm2 outdoor red power cable(From DC Power system to DCPD6)16 mm2 outdoor blue power cable(From DC Power system to DCPD6)BBU InstallationNew Indoor 19" rack(Frame)BC8181A(Wall-mounted box)BBU power cable

    Qty. of R89642 core shielded power cable(4mm2, length

  • FiberOutdoor fiber(5m)Outdoor fiber(10m)Outdoor fiber(20m)Outdoor fiber(25m)Outdoor fiber(30m)Outdoor fiber(35m)Outdoor fiber(40m)Outdoor fiber(45m)Outdoor fiber(50m)Outdoor fiber(60m)Outdoor fiber(70m)Outdoor fiber(80m)Outdoor fiber(90m)Outdoor fiber(100m)Outdoor fiber(115m)Outdoor fiber(145m)Outdoor fiber(160m)Outdoor fiber(175m)Outdoor fiber(190m)Outdoor fiber(205m)Outdoor fiber(220m)Outdoor fiber(235m)Outdoor fiber(250m)Outdoor fiber(280m)Outdoor fiber(310m)Outdoor fiber(350m)Jumper/Feeder/Adpter1/2" Jumper,1m1/2" Jumper,2m1/2" Jumper,3m1/2" Jumper,5m1/2" Jumper,8m1/2" Jumper,10m1/2" Jumper,more than 10m7/8" feeder5/4" feederFeeder WindowRF AntennaSingle-Band 4 ports(HWXX-6516DS1-VTM)Single-Band 4 ports(LDXX-6515DS-VTM)Dual-Band 6 ports(CVV65CSX-M)Single-Band 2 ports(CMAX-DM30-CPUSEi)GPS AntennaGPS feeder cableGPS MountingRF Antenna MountingMounting on wall 3000mmMounting to angular tower leg 3000mm(Colocated with existing CDMA)Mounting to angular tower leg 3000mm(New Colocated site)Mounting to tubular tower leg 3000mmMounting to Monopole 3000mmMounting to Minipole 3000mm3m Rooftop pole

  • 6m Rooftop poleRRU MountingMounting on wall 1000mmMounting to angular tower leg 1000mm(New Colocated site)Mounting to tubular tower leg 1000mmMounting to Monopole 1000mmCable TrayIndoor cable tray (width 40 cm)Indoor cable tray (width 60 cm)Outdoor-GF-Horizontal cable tray(width 40 cm)Outdoor-GF-Vertical cable tray (width 40 cm)Outdoor-RT-Horizontal cable tray(width 20 cm)Outdoor-RT-Horizontal cable tray(width 30 cm)Outdoor-RT-Horizontal cable tray(width 40 cm)Outdoor-RT-SupportPipeSoft Pipe( For Indoor)Metal flexible piple(For Outdoor)PVC Pipe (Diameter-25mm)PVC DuckSteel Pipe (Diameter-25mm )OthersGrounding Bar 50 mm2 grounding cable (Interconnect grounding cable to MGB,exclude main equipment configured grounding cable)70 mm2 grounding cable (Interconnect grounding cable to MGB,exclude main equipment configured grounding cable)

  • 3. INSTALLATION AUXILIARY MATERIALSSite ID: ZTE_3465Site Name: SrondolLocation:

    Unit Length(m) Qty

    m 8 1m 8 1m 10 1

    pcs

    mm

    pcs

    mm

    mmmm

    pcs

    pcsm 10 1m 10 1mm

    mm

    pcspcs 1m

    pcs 3m 36 3mmm

    pcs

    set 3m 36 3mm

    pcsm

    pcs

    m

  • 5m10m20m25m30m35m40m 645m50m60m70m80m90m

    100m115m145m160m175m190m205m220m235m250m280m310m350m

    m 1 6mm 3 6m 5 12mmmmm

    pcs

    pcspcspcs 3pcs

    m 15pcs 1

    pcspcs 3pcspcspcspcspcs

  • pcs

    pcspcspcspcs

    mmmm 3 1m 3 1mmm

    mmmmm

    pcs 1

    m 20 1

    m 60 1

  • 4. BILL OF QUANTITY OF MINI CMESite ID: ZTE_3465Site Name: SrondolLocation:

    SN ItemsA Tower Structure & RT Pole1 Mounting Antenna Sectoral+RRU+GPS and its accessories2 Erection all material mention at point 1 above.3 Pole, including accessories site type RT/HRB

    4 Pole foundation/counterweight: reinforcement concrete K-225 Slump 12 2

    B Mechanical & Electrical (ME)1 PLN upgrade2 MCB 3P replacement of ACPDB345 Main Power Cable NYY 3x10 mmC Cable Tray (indoor & outdoor) & Feeder Entry Point

    1

    23 Tray Indoor (width 40 cm) incl. accessories, powder coating4 Tray Indoor (width 60 cm) incl. accessories, powder coating

    5

    6

    78 Support & accessories for cable tray outdoor9 Feeder Entry Point (8 hole 4")

    10 Feeder Entry Point (12 hole 4")11 Feeder Entry Point (16 hole 4")D Outdoor Cabinet & Tower & Pole Foundation 1 Soil Excavation2 Sand Layer3 Stone Mansory4 Soil backfilled5 Concrete Pad and Stair (K-175)6 Plastering & Painting7 Support outdoor cable tray Concrete Foundation (K-175)E Grouding System1

    2

    3 MGB / Main Grounding Bar (Steel Galvanized) 300x100x10 mm, 2 rows 14 holes M8

    4 Ceramic Isolator for MGB, EGB & IGB (incl. all accessories required)

    Main Power Cable NYFGBY 4x16 mm Main Power Cable NYFGBY 3x10 mm

    Horizontal Cable Tray Outdoor type (width 30 cm) with clamp,incl. support to FEP and other accessories, finishing with hotdipped galvanized

    Vertical/Tower Cable Tray Outdoor type - if required (width 30 cm) with clamp and other accessories, finishing with hotdipped galvanized

    Cable tray (width 20 cm, out door type, galvanized) for Roof Top including accessories)

    Cable tray (width 30 cm, out door type, galvanized) for Roof Top including accessories)

    Cable tray (width 40 cm, out door type, galvanized) for Roof Top including accessories)

    BC 50mm2 to interconnect to existing site Main Grounding Box

    All Aluminum Alloy Cable(AAAC) 70mm2 Down Conductor/EGB Interconnect

  • 5 Stainless Cable Scone (incl. all accessories required, ex: bolt, Nuts, cable shoe & Label).

    6

    7 PVC pipe cable duct dia. 3/4" (ex. Clipsal) for indoor ring shelter and buried AAAC

    8 Bimetallic connector

    Termination Box / Main Control box (inside 40x40x50 cm) with pad lock (as per design dwg)

  • 4. BILL OF QUANTITY OF MINI CMESite ID: ZTE_3465Site Name: SrondolLocation:

    Unit Qty

    Kg 190.73 Kg 190.73 Kg 0

    m3

    VA pcs m'm'm'

    m0

    m3

    m' 0m' 0

    m' 3

    m' 0

    m' 0

    Ls 0pcspcspcs

    m3m3m3m3m3m2m3

    m 20

    m 60

    pcs 1

    pcs 2

  • pcs

    pcs

    m

    pcs s

  • I. General Requirement

    II. Floor loading requirement

    III. Grounding System

    IV. Power Supply requirements

    V. Temperature and Humidity Requirement

    5.APPENDIX I Standard Environmental Requirement

    The standard requirements are listed in the following to ensure ZTE implementation for smooth execution, subsequent trouble-free operation and maintenance of the BTS station. The requirements have been mentioned without any consideration of responsibility, which has been separately spelled out in preceding paragraphs.

    a) Construction/modification should be completed in all respects as per layout plans.

    b) All walls and ceilings should be properly painted and finished.

    c) Doors and windows as per requirement should be available and must be dust proof and lockable.

    d) Breakthroughs in walls and ceilings should be completed as per floor layout plans.

    e) Room lightings, power supply switches and sockets should be provided according to the requirements.

    f) All rooms, especially the equipment room, should be available in a clean condition.

    g) Facility for load transportation into the building or elevator with a weight capacity of 600kg should be preferably available.

    h) To prevent subsequent accumulation of dust a separate room should be available for storage and unpacking the equipment.i) Protection against lightning stroke for the building/tower has to be provided.

    a) Floor loading for BTS 300kg/m2b) Floor loading for Rectifier 350kg/m2c) Floor loading for Microwave 100kg/m2

    a) The ground resistance of the base station should be less than 5 ohm. b) The engineering requires the ground resistance to be as small as possible

    a) 380V (3phs) AC commercial power supply with a tolerance of 10% or 220V (1-phase) AC commercial is acceptable.b) 50 Hz frequency with a tolerance of 5Hzc) Wave-shape with a tolerance of distortion

  • 6. DETAILED DESIGN DRAWINGSSite ID: ZTE_3465Site Name: SrondolLocation:

    SN DRAWING LIST1 Site Map(detail address,grs,siteidsite name)2 Site Layout3 Tower/Pole foundation drawing4 Pole drawing5 Tower strengthening drawing6 Antenna bracket and mounting drawing7 Shelter/outdoor BTS foundation drawing8 Shelter/outdoor BTS canopy-cage view (front, back, side)9 Outdoor BTS canopy-cage drawing

    10 Fence detail drawing11 Electrical layout12 Equipments layout13 Indoor cable tray layout14 External Grounding system layout15 Detail grounding pit and grounding bar drawing16 Internal Grounding system 17 Electrical and Equipment grounding connectivity18 Internal shelter/outdoor BTS canopy section drawing19 KWH meter pole and foundation drawing20 KWH meter internal front view and SLD21 ACPDB internal front view22 ACPDB SLD23 DC Fan front, side and back view24 Air conditioner position lay out25 EAS/E-Guard front view26 EAS/E-Guard connectivity27 Block Diagram28 AC and DC Power Cable route drawing and table

    29 Feeder cable, IF cable, PCM cable and other cables route drawing and table30 Rectifier and battery system front view31 DCPDB front view32 Rectifier and DCPDB MCB allocation33 BTS front view34 Transmission rack front view35 Mux front view36 DDF,E1 and IP port connection37 Transport Equipment(Switch,Router,PTN,etc) front view38 ODF (Optical Distribution Frame) view39 Fiber Optical Entry Port View40 EAS/E-Guard-DDF-BTS/MW Connection sketch map41 FEP view42 Antenna placement Information43 RRU placement information

  • Note:For new site,just provide had confirmed with smartfren CME team;for existing site,if no need,put N/A

  • 6. DETAILED DESIGN DRAWINGSSite ID: ZTE_3465Site Name: SrondolLocation:

    REVISIONS1.01.01.01.01.01.01.0 NA1.0 NA1.01.0 NA1.01.01.01.01.01.01.0 NA1.0 NA1.0 NA1.0 NA1.0 NA1.0 NA1.0 NA1.01.01.01.01.0

    1.0

    1.01.01.01.01.0 NA1.0 NA1.0 NA1.0 NA1.0 NA1.0 NA1.0 NA1.01.0

  • Note:For new site,just provide had confirmed with smartfren CME team;for existing site,if no need,put N/A

    Cover and Content1.Proposed Solution2.Main Equipment BOM3.Installation Materials4.Mini CME BOQ5.APPENDXI6.Drawings