S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

  • Upload
    sajid

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    1/152

     

    N ISO 9001-2000 CERTIFIED COMP NY

    OR

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    2/152

     

    PROUDLY AN ISO 9001:2000

    CERTI IED COMPANY

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    3/152

     

    or The Kind Attention Of:

    Ms. Wang Xiuchun

    CMEC COMTRANS

     

    中  际商务运输代理有限责任公司 

    北京市宣武区广安

    门外大街178

    号中

     大厦1206

    电话:010-63445388

    传真:010-63268182

    手机:13701200568

    Wang Xiuchun

    CMEC COMTRANS INTERNATIONAL CO., LTD

    No.178 Guanganmenwai Street, Xuanwu District,

    Beijing, China

    Tel: 8610-63445388

    ax: 8610-63268182

    Mobile: 86-13701200568

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    4/152

     

    COMPANIES PRO ILE

    IRMS NAME :

    M/s S.M.Asghar (Pvt) Limited

     

    n ISO 9001:2000 Certified Company 

    COMPLETE ADDRESS : 908-910, 9

    th

      loor, Chapal

    Plaza, Hasrat Mohani Road

    Off I.I.Chundrigar Road

    Karachi.

    CORPORATE STATUS O IRM : PRIVATE LIMITED.

    TELEPHONE NO : 00+ 92+21+32468091 -5

    AX NO : 00+92+21+32468090.

    IRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).

    DATE O REGISTRATION WITH : 30-03-1980.

    CUSTOMS

    E- MAIL ADDRESS : [email protected] 

    E- MAIL ADDRESS : [email protected] 

    Web- Page : http://www.smasghar.com.pk 

    DATE O ISSUE O LICENCE : 30-03-1980.

    NUMBER O STA EMPLOYED : 20.

    YEAR O ESTABLISHMENT : 1980.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    5/152

     

    SYED KHALID JAMAL CHIEF EXECUTIVE 

    SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION

    SYED MOHAMMAD ALI KHALID GENNERAL MANAGER 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    6/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    7/152

     

    PEOPLE BEHIND THE COMPANY

     

    SYED KHALID JAMAL : CHIEF EXECUTIVE.

    SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV

    SYED MOHAMMAD ALI KHALID : GENERAL MANAGER 

    MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.

    MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION

    MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.

    S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.

    MOHD SALEEM : ASST PORT OPERATIONS.

    MOHAMMAD TARIQ : ASST. PORT OPERATIONS

    MOHD JAVED : ASST PORT OPERATIONS.

    QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.

    SALEEM NOOR : ASST. AIRPORT OPERATIONS

    AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY

    SAEED KHAN : HEAD OF COMPUTER DIVISION

    DILSHAD A. SIDDIQUI. : MANAGER FINANCE

    ASIF KHAN : ASST. MANAGER FINANCE

    ATIA FASIAL : ASST. OFFICE CO-ORDINATOR

    MOHAMMAD SAMI : INCHARGE GD PREPARATION (BY AIR)

    ASAD ABBAS : ASST.BILLINGS & ACCOUNTS

    MOHSIN KHAN : FIELD OFFICER.

    SADDAM HUSSAIN : FIELD OFFICER.

    SULEMAN : OFFICE PEON.USMAN GHANI : OFFICE PEON.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    8/152

     

    SECTION 1 : INTRODUCTION

    SECTION 2 : SCOPE OF WORK

    SECTION 3 : DOCUMENTATION

    REQUIREMENTS

    SECTION 4 : PROJECT REFERENCES

    SECTION 5  : PICUTRE GALLARY

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    9/152

     

    问候巴基斯坦

    我们感谢您对我们组织的信任和信心,通过发送电子邮件

    我们

     privilage在巴基斯坦几乎所有的 国公司工作重要级别的所有的

    国家重大工程项目。

    其 有。

     

    1) 国石油

    2) 国广西

    3) 国水利水电建 集团

    4) 中国港湾建 集团

    5) 中国电线电缆

    6) 中国云南公司

    7) 中国新疆北新建 路与桥梁

    8) 中国瑞福祥

    我们很高兴通过所有强大的真主的恩典来告诉你,我们目前正在办理

    项目估价或多或少US $ 12 亿美元。  

    你会

    赞赏,在所有下面提到我们已经采取了

    各种豁免及各种SRO 的利益因客户和项目上,以项目为基础的项目。  

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    10/152

     

    随着我们的背景经历,米 / 秒。  S.M.Asghar

    营)有限公司已成功完成国家重要的所有主要和著名的项目,以及

    具有国际重要性。  

    我们的专业团队与坐镇前的项目

     / 项目和开发的系统,并针对最复杂的

    要求,我们的客户的方法一般灵活性的开始

    ..客户

     

    我们将很高兴与你的信誉良好的组织工作

    带着敬意

    赛义德

    Sajid 贾马尔

    导演项目和商业部

    Cell: +92-302-8269260 

    Cell: +92-314-2000073 

    We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more orless US $ 1.2 Billion Dollars. 

    You will appreciates that in all of the Projects mentioned belowwe have taken various Exemptions & benefits of various SRO’sfrom Customer to Customer & on Project to Project Basis.

    With our background experience, M/s. S.M.Asghar (Pvt) Limited  has successfully completed all the major & PrestigiousProjects of National Importance  as well asInternational Importance.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    11/152

     

    We on merit got the benefit of various ConcessionarySRO’s & Exemptions to our valued Customer to theirEntire satisfaction & without any problems and difficulty.

    Our team of professionals sits with the Customer priorto the start of the Project/Projects & developed systemsand a general flexibility of approach tailored to ourClients most Complex of requirements.

    We believe that our Professional approach to ourClient is unparalleled by any competitors.

    Few of the recent Projects & Customer Referencesare given below, for whom we have claimed the various SRO’s& Exemptions to our valued Customer to their entiresatisfaction. 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    12/152

     

    MOL MAKORI GAS FIELD SRO: 678(I)/2004, DT: 07-08-2004

    GHAMBAT SOUTH GAS PROCESSING FACILITY (GPF II)PROJECT OF PAKISTAN PETROLEUM LIMITED (PPL) 

    SRO: 678(I)/2004, DT: 07-08-2004

    Petrosin Ravi  SRO: 678(I)/2004, DT: 07-08-2004

    SHELL GAS

    SRO: 678(I)/2004, DT: 07-08-2004

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    13/152

     

    SHV ENERGY PAKISTAN  Various Equipments & Material Including Break Bulk LPG Mixture

    SRO: 678(I)/2004, DT: 07-08-2004

    Expansion of Plant: RAVI GAS  SRO: 678(I)/2004, DT: 07-08-2004

    WEATHERFORD DRILLING

    SRO: 678(I)/2004, DT: 07-08-2004

    Petrosin Engineering  

    (One of the Largest Private Sector Project for OGDCL US $ 135 Million Dollars)  

    SRO: 678(I)/2004, DT: 07-08-2004

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    14/152

     

    TRANSASIA REFINERY LTD (Re-Location) (One of the Largest Private Sector Project US $ 700 Million Dollars) 

     

    SRO: 575(I)/2006, DT: 05-06-2006

    INDUS REFINERY LTD (Re-Location) (Another Largest Private Sector Project US $ 650 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

    DESALINATION & POWER PROJECT” at DHA Karachi (Total Cost of the Project US $ 160 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

    KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi EXPANSION PROJECT & NEW GANTRY CRANE

    (Total Cost of the Project US $ 400 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    15/152

     

    MIRANI HYDRO POWER DAM PROJECT  (The Project Cost US $ 80 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

    SATPARA HYDRO POWER DAM PROJECT  (The Project Cost US $ 30 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    MANGLA RAISING HYDRO POWER DAM PROJECT  (The Project Cost US $ 100 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    MANGLA RAISING HYDRO POWER DAM PROJECT  (The Project Cost US $ 100 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    16/152

     

    GOMAL ZAM HYDRO POWER DAM PROJECT  (The Project Cost US $ 100 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I  (The Project Cost US $ 45 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    17/152

     

    JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II  (The Project Cost US $ 20 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    PROGAS LPG STORAGE & HANDLING TERMIANAL (Private Sector Project US $ 50 Million Dollars)  

    SRO: 575(I)/2006, DT: 05-06-2006

    FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES  (The Second Expansion Phase Project US $ 30 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    PETROSIN ENGINEERING (Pvt) LTDQADIRPUR 600 MMSOFD EXPANSION PROJECT

    (The Project Cost US $ 6 Million Dollars)

    SRO: 678(I)/2004, DT: 07-08-2004

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    18/152

     

    CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR

    BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD(The Project Cost US $ 14 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT

    PROGRAM FOR ERRA(The Project Cost US $ 300 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

     ALSTOM PAKISTAN LIMITEDFUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)

    SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

    (The Project Cost US $ 20 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    19/152

     

     ALSTOM PAKISTAN LIMITEDZHORLU WIND POWER ( Heavy Transformers)

    SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

    SRO: 575(I)/2006, DT: 05-06-2006

    FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY

    FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.(  The Project Cost US $ 50 Million Dollars)

    SRO: 575(I)/2006, DT: 05-06-2006

    DESCON ENGINEERING

    SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1(The Project Cost US $ 130 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    20/152

     

    DESCON ENGINEERINGSETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2

    (The Project Cost US $ 130 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

    DESCON ENGINEERINGSETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)

    (The Project Cost US $ 30 Million Dollars) 

    SRO: 575(I)/2006, DT: 05-06-2006

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    21/152

     

     VARIOUS PORTS AT KARACHI

    Qasim International Container Limited (QICT) Karachi Port Trust Head office (KPT) 

    Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT) 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    22/152

     

    S.M.ASGHAR (PVT) LIMITED

    908-910, 9

    th

      loor, Chapal Plaza, Hasrat Mohani

    Road, Off I.I Chundrigar Road, KARACH I

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    23/152

     

    We have a pleasure to give a brief introduction of our Company

    M/s. S.M.Asghar (Pvt) Limited , a name famous for its credibility,

    reliability  & commitment in this part of world.

    We are proudly an ISO 9001-2000 Certified Company.

    We are among the few & pioneer company who got the ISOCertification in Custom Clearance in Pakistan. 

    With our background experience, M/s. S.M.Asghar (Pvt) Limited  

    has been able to developed systems and a general flexibility ofapproach tailored & personalized solutions to our Clients most ComplexRequirements that we believe is unparalleled by any competitors.

    Most important our customers are able to deal with an InternationalNetwork who can arrange the movement and supervisionof cargo from Europe, and beyond, whilst they onlyinstruct one control office. This International Strengthand wealth of experience combined with a genuinely personalapproach we feel makes us a formidable contender.

    Our Credentials our Enthusiasm and our Track Record speak for themselves.

    For over the last 15 Years,  M/s. S.M.Asghar (Pvt) Limited  have developed & specializes and simultaneously Transformitself into a PROJECT CLEARANCE SPECIALIST.

    If one can give a brief look at the Pakistan’s Most Advanced

    & the Important Industrial Estate  PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor forM/s. S.M.Asghar (Pvt) Limited   to perform the Complete CustomClearance & the Logistics Support in the form of Local Transportation to thesePrestigious Projects. 

    Privilege To Handle The Prestigious Projects At 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    24/152

     

    Port Bin Qasim ew Are Listed below  

    PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM(The Contractor for PARCO Project Cost US $ 300 Million Dollars) 

    ICI PTA T-11(The Largest Private Sector Project US $ 480 Million Dollars) 

    Engro Vopak Terminal Ltd   (VCM Tank Farm) 

    Engro Vopak Terminal Ltd   (MEG Tank Farm) 

    Engro Vopak Terminal Ltd   (LPG Tank Farm) 

    Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm) (Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars) 

    PROGAS LPG STORAGE & HANDLING TERMINAL(Private Sector Project US $ 50 Million Dollars) 

    INDUS REFINERY LIMITED(Another Largest Private Sector Project US $ 750 Million Dollars) 

    TRANASIA REFINERY LIMITED(Another Largest Private Sector Project US $ 800 Million Dollars) 

    FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (FOTCO)(The Second Expansion Phase Project US $ 30 Million Dollars)

    CHINA HARBOR ENGINEERING(The Contractor for EVTL for the EVTL JETTY Private Sector Project US$ 4 Million Dollars) 

    ENGRO ASAHI POLYEMR & CHEMICALS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    25/152

     

    (Another One of the Largest Private Sector Project US $ 80 Million Dollars) 

    FAUJI FERTILIZER BIN QASIM LTD(Handling of Break Bulk Phosphoric Acid) 

    LPG BREAK BULK SHIPMENT(Handling of 90% of Pakistan Break Bulk LPG Shipments at  EVTL& SSGC Terminal  ) 

    VCM BREAK BULK SHIPMENT(Handling of 100% of Break Bulk VCM Shipments at EVTL) 

    ETHYLENE BREAK BULK SHIPMENT(Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL) 

    Karachi International Container Terminal Phase II Expansion PROJECT  Total Cost of the Project US $ 400 Million Dollars 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    26/152

     

    Hydro Power Sector

    Privilege to Handle the Major Hydropower Power & Dam Projects ofNational Importance, among these Projects of National Importance are:

    MIRANI HYDRO POWER DAM PROJECT(The Project Cost US $ 80 Million Dollars)

    SATPARA HYDRO POWER DAM PROJECT(The Project Cost US $ 30 Million Dollars)

    MANGLA RAISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)

    GOMAL ZAM HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars )

    DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)

    KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)

     ALAI KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    27/152

     

    DHA DESALINATION PLANT 3 MIGD

    & 94 MW POWER PLANT KARACHI

    Project Name DHA DESALINATION & POWER PLANT

    PAKISTAN IRST EVER SEA DESALINATION

    & POWER PLANT

    Location: DHA, PHASE VIII. KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 130 million

    CLIENTDHA COGEN LIMITED (DCL)

     

    Completion: UNDER CONSTRUCTION 

    This is the first ever desalination plant in history of Pakistan. It has acapacity to Desal, 3 MGD (Million Gallons Per Day) of Water, beside toProduce & Generate Electricity of a Capacity 95 MW

    TOTAL VALUE O L/C ESTABLISHED:

    Siemens AG Germany $ 41,400,000 $ 33,120,000

    Siemens AG Germany € 6,550,000 € 5,240,000

    Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241

    Lincas Electro Vertibas € 295,500 € 236,390

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    28/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    29/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    30/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    31/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    32/152

     

    JAMSHORO JOINT VENTURE LIMITED

    SINGLE LARGEST LPG EXTRACTION PLANT

    Project Name JAMSHORO JOINT VENTURE LIMITED

    Location: JAMSHORO, SINDH

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 80 million

    CLIENT ASSOCIATED GROUP 

    Completion: 2005

    JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I(The Project Cost US $ 80 Million Dollars)

    M/s. S.M.Asghar (Pvt) Limited   was awarded the President of Pakistan Award by the President General Pervez Musharraf for successfully andtimely performance in Clearance and Logistics of JJVL Phase I Project

    JJVL is Pakistan’s single largest producer of LiquefiedPetroleum Gas. Situated in Dei Shah Bukhari, DistrictHyderabad, JJVL’s Extraction Plant has a daily output of about500 metric tons of LPG and 150 metric tons of NGL/Naphtha.JJVL accounts for about one-third of the total local LPG production ofthe country.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    33/152

     

    JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II  (The Project Cost US $ 20 Million Dollars)

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    34/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    35/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    36/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    37/152

     

    PARCO White Oil Pipeline ProjectBy China Petroleum & Consortium 

    M/s S.M.Asghar (Pvt Limited also have a privilege of Handling02 chartered flights carrying main booster pumps weighingover 100 Tons by Air for

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    38/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    39/152

     

    ICI T11 PTA Plant

    Project Name ICI PTA T11 PLANT

    Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 480 million

    CLIENT TRANSCAR PROJECTS UK/ OOSTER WHEELER UK

    Completion: 1998

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    40/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    41/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    42/152

     

    We also have a privilege of handling one of the Heaviest and Length WisePiece in History of Pakistan which Weights 265 M/tons and Length

    Approx.76 Meters.

    REQUIRED FOR CUSTOM CLEARANCE 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    43/152

     

    SCOPE OF WORK

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    44/152

     

    BENE IT O VAVARIOUS

    CONCESSIONARY

    SRO’s & EXEMPTIONS 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    45/152

     

    PREPARATION BE ORE ARRIVAL

    O VESSEL

    Upon receipt of the written instruction from the Importer /Representatives of the Importer , we will be in close contact with theshipping Company in order to ascertain the expected arrival date( ETA ) of the Ocean going Vessel at the Un-loading Port of theCountry.

    CON IRMATION O THE ARRIVAL

    O VESSEL:-

    We shall inform the arrival and the berthing date of the vessel tothe Importer / Representatives of the Importer   in order to keep a closeLoop for the berthing of the vessel.

    CUSTOM CLEARANCE: 

    We shall collect in full advance all the necessarydocuments for the onward Custom Clearancefrom the Importer / Representatives of theImporter   when intimated and will prepare GDand all the required documents and formalities tobe submitted to the related Custom Authority

    and Will Complete the preparation of the GD (Goods Declaration) as perInvoice, Packing List & Bill Of Lading depending on weather the Vessel hasarrived and also subject to the Lodging Of Manifestation of IGM (ImportGeneral Manifest) by the Shipping Company / Shipping Agent.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    46/152

     

    OBTAINING THE DELIVERY ORDER:

     

    We shall complete all the formalities required by the relative Shipping Agent / Main Carrier Agent/ relevant Port Authority and will obtain the Delivery Order   from the ShippingCompany/ OR their Agent against the presentation/ submission of Original Bill of Lading.

    The delivery Order's are generally issued after filing of IGM in order to ascertain the goodshave not been Transshipped.

    NECESSARY ASSISTANCE:

    We shall provide all necessary Assistance andConsultancy Services Concerning Custom Clearance tothe Importer  / Representatives of the Importer. 

    AIR CARGOES: 

    We shall also perform the Works Related to the Air Cargo As per request ofImporter / Representatives of the Importer… DELIVERY AT / TO THE PLANT SITE 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    47/152

     

    We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low

    Bed OR as per the requirement & Nature of Cargo to the Warehouse or theopen storage area as per the instruction of Importer / Representatives of theImporter.

    CUSTOM DUTIES TAXES

    SRO’s AND NECESSARY PERMITS

     All the Plant, Machinery, Equipment and Parts/Spares which are imported intoPakistan shall be subject to Custom Duties and Taxes Prevailing at the time ofImport.

    The Duties and Taxes concerns with the Custom Authorities as per

    Pakistan Custom Tariff includes:-

    Custom Duty/Duties From 5% Minimum To 20% Maximum

    Sales Tax/Taxes 17 %

    Income Tax/Taxes 5.5%

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    48/152

     

    The Taxes Concerns with the Port Authorities:-

    Port Wharfage

    Port Demurrage

    Weighment Charges (If any) (for Products like Pipes of Iron/Steel/Coil-Bar)

    There Are Two Major Ports in Karachi Namely as below:

    Karachi Port

    Port Bin Qasim

    Karachi Port is Further Divided into 02 Parts, namely;

    1) EAST WHARF: 

    a) Pakistan Container Terminal (PICT) Private Terminal 

    b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.

    c) Ghass Bunder, For Launches, Steamer and Boats

    2) WEST WHARF: 

    a) Karachi International Container Terminal Ltd (KICT)

    b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24 And 25

    c) Berth Number 25 is for Heavy Lift Cargo that has On Shore HeavyCrane for capacity 50 M/Tons.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    49/152

     

    For Containerized Cargo the various Yards/Ports are charging differentHandling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking

    Charges/Yard Storage Charges.

    Please note that for all the above mentioned charges the relevantPort /Yard will issue Receipts for the relevant charges.

    Excise Taxes @ 1.0-1.05% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing at

    the time of Import shall be Paid by the I m p o r t e r   immediately before

    the Clearance of the Consignments from the Port.

    Further the completion of GD’s (Bill of Entry) and other Custom formalities aresubject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.

     Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /

    Bill of Lading OR any other relevant documents submitted by the Importer ,

    will may render in delay to clear the consignment.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    50/152

     

    SUBMITTAL O SHIPPING GUARANTEE

    BOND IN ABSENCE O ORIGINAL BILL O LADING

     

    If there is a delay in the arrival of the Original Bill of Lading, can cause a

    delay in getting the Goods/ Cargo release of the from the Port

    premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading

    would be therefore required by the shipping company in order to issue the

    Delivery Order. It shall be discussed and settle before arrival of the vessel.

    We will provide all necessary assistance and advice for the Shipping

    Guarantee to the Importer / Representatives of the Importer. 

    During the Unloading of the Break Bulk/ loose Cargo from the vessel

    There are chances of getting the goods Damage OR in case we find any

    Loss of Goods and or the Goods already Damage on or after its receiving

    We shall report to the Importer / Representatives of the Importer or

     Arrange a joint survey as soon as possible. Marine/Transit insurance

    Shall be arranged by Importer / Representatives of the Importer ,

    from Place of Origin up to the Plant Site

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    51/152

     

    METHOD STATEMENT Newly Implemented Web-BasedOne Customs WeBoc) SYSTEM

    At the present there are 02 procedures for Custom Clearance:-

    Under this newly implemented procedure if the Vessel is berthed

    at any of the below Ports i.e.

    Karachi Port Trust (KPT)Karachi International Container Terminal (KICTL)Pakistan International Container Terminal (PICTL)Qasim International Container Terminal (QICTL Port Qasim)Air Freight Unit (AFU)FCL/LCL/Loose/Break Bulk

    Goods Declaration (GD) is prepared on Line Under the New WeBOC System 

    (Via Electronic Mail Data Transfer System).

    The G.D (Goods Declaration) is prepared in accordance with the declarationof the Importer and the documents provided by the Importer i.e.Commercial Invoice, Bill of Landing and the Packing List. Thereafter the G.Dis submitted to the Custom for Assessment on Line.

    WEB BASED ONE CUSTOM WeBOC

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    52/152

     

    * The amount of Custom Duties & Taxes and the Sindh Infra StructureFee (CESS) has to be paid in advance as per the Importer declaration.

    * If the assessment by the WeBOC is done as per the declaration ofImporter, than the G.D  is processed and the Importer can take thedelivery of the goods, after the payment of all the necessary Port Dues &Excise Tax.

    In case the goods have been processed under WeBOC SYSTEM  does notaccept the Importer Declaration, than the Importer may asked for additionalDuties & Taxes or If the Importer wants to Contest with the views of theCustoms than they can go for appeal & meet the Senior Custom Officialsalong with the relevant Documents & Proof to justify their claims.

    The Custom Authorities may differ in three basic ways: 

    1) Disagreement in the PCT OR HS Code Classification.

    2) Not Extending the Benefit of the Claimed Benefit/SRO.

    3) Disagreement with the Valuation.

    The GD is Prepared and filed Online (Via Electronic Filling),as per declaration of the Importer.

    If Customs satisfy with all the 03 criteria’s mentioned above i.e.

    PCTSRO

    Valuation

    The GD is than completed by the Concerned Group. The Importer has tothan pay the Applicable Duties & Taxes after that the GD is forwarded tothe Port side for Examination after which the Importer can take theDelivery of the goods after the payment necessary Port Dues.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    53/152

     

    * If Customs do not satisfy with all the 03 Criteria’s mentioned above i.e.

    PCTSROValuation

    Than the GD is forwarded to the Port Side for Physical Examination tocheck the goods are in conformity to the declaration of the Importer &under the light of Examination Report GD will be completed by theconcerned Group in the Custom House.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    54/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    55/152

     

    The following documents are required generally by the customs for processingthe B/E for the Cargo arriving at Sea Port.

    I Original Invoice showing complete description of the goods with value ofthe each individual item

    II Detail Packing List showing complete Description, Quantity GrossWt, Net Wt, Ullage Certificate.

    III Original Bill of Lading duly endorsed at the backside in our Favor.

    IV Certificate of Origin

    V  All Govt. Sanctions, Authorization from Government Agencies if any 

    VII Original Letter of Credit

    VIII Sales Tax Registration Certificate

    IX Import Registration

    X National Tax No Certificate Copy

    XI WeBOC Registration (User ID & Pass Word)

    Any other document that may be requested by the Custom to verify thedeclaration of Importer

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    56/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    57/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    58/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    59/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    60/152

     

    CLIENTS PROJECTS

    * M/S CHINA GUANGXI CORPORATION

    PAT EEDER CANAL PROJECT

    * M/S CHINA DONG ANG CORPORATION

    SEWERAGE TREATMENT PROJECT

    * M/S CHINA PETROLEUM

    KORANGI SEWERAGE TREATMENT

    * M/S CHINA YUNNAN CORPORATION

    KPT JINNAH BRIDGE PHASE II

    * M/S CHINA NATIONAL ELECTRIC WIRE & CABLES

    QUEENS ROAD POWER STATION

    * M/S CHINA HARBOR ENGINEERING

    JETTY OR ENGRO PAKTANK

    * M/S IJM / IGI JOINT VENTURE.

    LBOD SANGHAR PROJECTS

    * M/S LI E LINE (Pvt) LTD.

    DHURNAL LPG GAS EXPANSION PROJECT

    * M/S ENGRO PAKTANK TERMINAL.

    LPG TERMINAL AT BIN QASIM

    CLIENTS PROJECTS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    61/152

     

    * M/S ENGRO PAKTANK TERMINAL

    VCM TERMINAL HANDLING PROJECT

    * M/S HYUNDAI CORP KHI O ICE.

    K.E.S.C HIGH TENSION CABLE PROJ.

    * M/S HYDERABAD DEVELOPMENT AUTHORITY.

    MACHINERY UNDER SPANISH GRANT

    * M/S CHINA YUNNAN CORPORATION.

    MALDIVE SPARLIAMENT BUILDING

    * M/S CHINA NATIONAL CHEM ENGG CORP.

    SUB CONTRACTOR OR DONG ANG

    S2 PROJECT 

    * ENGRO ASAHI TRADING (PVT) LTD

    EXPORT O PVC WORLD WIDE

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    62/152

     

    CLIENTS PROJECTS

    * M/S DESCON ENGINEERING WORKED OR NUMBER O PROJECTS 

    1) EPTL OR LPG TERMINAL

    2) EPTL OR VCM PROJECT

    3) EVTL OR MEG PROJECT

    4) OR PARCO MID COUNTRY RE INERY

    5) LASMO OIL BHIT GAS IELD PROJECT

    US $ 6.5 Million Dollars

    * M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD

    HUB & PIPRI PROJECT UNDED BY ADB

    £ 15.8 Million Sterling

    * M/S HYUNDAI HIDCO HAKAS JV

    EXPORT O HEAVY DREDGING MACHINERY

    US $ 2.5 Million Dollars

    * M/S AL - NOOR SUGAR MILLS LTD

    MD BOARD IBRE BUILDING BOARD PLANT

    (LASSANI)

    CLIENTS PROJECTS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    63/152

     

    * PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.

    US $ 4.5 Million Dollars

    * M/S ENGRO PAKTANK TERMINAL.

    CHEMICAL STORAGE TERMINAL

    US $ 5.5 Million Dollars

    * M/S SHV ENERGY PAKISTAN

    GAS EXPANSION PROJECT

    US & 1.5 Million Dollars

    * M/S TEKSER INSAAT SANAYI VE TICCARRET

    CHASMA RIGHT BANK CANNAL PROJECT C-

    65 US $ 260 Million Dollars 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    64/152

     

    BREAK BULK

    LIQUID CHEMICALS &

    PETROCHEMICALS HANDLING

    PROJECTS IN HAND

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    65/152

     

    * SHV ENERGY LIMITED

    LIQUIFIED PETROLEUM GAS (LPG)

    IN BULK OF VARIOUS PARCELS

    * JAMSHORO JOINT VENTURE LIMITED

    LIQUIFIED PETROLEUM GAS (LPG)

    IN BULK OF VARIOUS PARCELS

    * AFTAB TRADERS LIQUIFIED PETROLEUM GAS (LPG)

    IN BULK OF VARIOUS PARCELS

    * CRESS LPG LIQUIFIED PETROLEUM GAS (LPG)

    IN BULK OF VARIOUS PARCELS

    * RELIANCE CONSULTANCY

    LIQUIFIED PETROLEUM GAS (LPG)

    IN BULK OF VARIOUS PARCELS

    * ENGRO POLYMER & CHEMICAL LIMITED

    VINYL CHLORIDE (VCM)

    IN BULK OF VARIOUS PARCELS

    EDC IN BULK OF VARIOUS PARCELS

    CAUSTIC SODA IN BULK ETHELYNE

    IN BULK OF VARIOUS PARCELS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    66/152

     

    UNDER GOING

    PROJECTS

    IN HAND

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    67/152

     

    * M/S ENGRO OODS LIMITED

    1) LAUNCHING & SETTING UP A COMPLETE STATE O AN ART

    O O'MORE ICE CREAM PLANT

    2) BRAND NEW STATE O AN ART ENGRO RICE &

    PAR BOILING PLANT

    3) EXPANSION O EXISTING DAIRY MILK PLANT. (OLPER'S

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    68/152

     

    * M/s. OUNDATION ENERGY LIMITED-1

    SETTING UP A STATE O AN ART WIND POWER PROJECT O A

    CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

    * M/s. OUNDATION ENERGY LIMITED-II

    SETTING UP A STATE O AN ART WIND POWER PROJECT O A

    CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

    * M/S. PAK ARAB RE INERY LIMITED

    SETTING UP A COMPLETE BRAND NEW ASPHALT BUILT UNIT

    (ABU UNIT)

    * ENGRO POLYMER TRADING LIMITED

    EXPORT O PVC RESIN (SABZ BRAND) WORLD WIDE

    APPROXIMATE EXPORT IN M/TONS 2500 PER MONTH

    * M/s. CIVIL AVIATION AUTHORITY

    SETTING UP A BRAND NEW BENAZIR BHUTTO

    INTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06

    RE UEL HYDRANT SYSTEM.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    69/152

     

    KARKEY PAKISTAN

    POWER SHIP & OIL SUPPLY TANKER

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    70/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    71/152

     

    VARIOUS OTHER PROJECTS

    O NATIONAL IMPORTANCE INCLUDING

    HYDRO, SEWERAGE WATER

    TREATMENT, DAMS CHEMICAL

    INDUSTRY OIL & GAS SECTOR

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    72/152

     

    * M/S CHINA SINOHYDRO CORPORATION

    1) GOMAL ZAM DAM HYDRO POWER

    2) DUBAR KHAWAR DAM HYDRO POWER

    3) KHAN KHAWAR DAM

    4) KWSB K-III

    * M/S. INDUS RE INERY LIMITED.

    HI-TECH 100,000 BPSD OIL RE INERY

    ON RELOCATION BASIS

    * M/S. JAMSHORO JOINT VENTURE

    LPG EXTRACTION PLANT

    * M/S. PETROSIN RAVI ENGINEERING

    OIL & GAS PROJECTS LTD.

    * M/S. SHELL GAS LPG PAKISTAN LTD

    LPG PROJECTS / LPG GAS

    * M/S. BI-WATER INTERNATIONAL

    KARACHI WATER & SEWERAGE

    BOARD HUB & PIPRI PUMPING

    STATION PROJECT

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    73/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    74/152

     

    * AREVA T&D PAKISTAN (PVT) LTD.

    132 KV GRID STATION AT

    CREEK CITY, DHA

    * KHALID RAU & CO., (PVT) LTD.

    IN RASTRUCTURE PROJECTS

    LAHORE RING ROAD

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    75/152

     

    HYDROPOWER PROJECTS

    From our background experience, strength & experiences from

    industrial development projects, S.M.Asghar (Pvt) Limited 

    has rapidly established itself as a key player in infrastructure

    projects.

    We successfully did the Custom Clearance & In-land

    Transportation jobs of large-scale projects like dams, barrages,

    highways and housing complexes.

    We hold the distinction of being the first ever local company to do

    the 07 Major Hydropower Projects Simultaneously of National

    Importance in Pakistan

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    76/152

     

    HYDROPOWER

    PROJECTTaunsa Barrage Rehabilitation

    And Modernization 

    Location: Taunsa Pakistan

    Year Of Project March 2006-2007

    Cost Of Project US $ 140 Million Dollars

    Completion : May 2008

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    77/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    78/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    79/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    80/152

     

    HYDROPOWER

    PROJECT.SATPARA DAM

    HYDROPOWER PROJECT

     

    LOCATION PAKISTAN

    NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.

    COST OFPROJECT

    US $ 140 Million Dollars

    Completion : March 2007

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    81/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    82/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    83/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    84/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    85/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    86/152

     

    Project Name

    Duber Khwar

     

    Location:

    The project located on river Duber Khwar, right

    bank tributary of Indus river near Patan in NW P

    at a distance 265 Km from Islamabad.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF PROJECT US$ 109 million

    Completion: 4 YEARS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    87/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    88/152

     

    Location:Allai Khwar

    Hydropower Plant

    The Project is located on Allai

    Khwar River, Left Tributary of

    River Indus near Besham in

    NW P, 245 km from Islamabad.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF PROJECT US$ 110 million

    Completion: 4 YEARS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    89/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    90/152

     

    Project Name

    MIRANI DAM

     

    Location: In the Dasht River Basin about 30 miles (48 km)

    West of Turbat Town in Makran Div of

    Baluchistan.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND

    TRANSPORTATION.

    COST OF

    PROJECT

    US$ 120 million

    Completion: 4 YEARS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    91/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    92/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    93/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    94/152

     

    Integrated Bulk Liquid Chemical

    Terminal Storage & Handling acilities

    Terminal Information

    Item Description

    Port Port Muhammad Bin Qasim

    Port Entrance Phitti Creek Fairway Buoy 24o33.1’,N, 67o02.9’,E

    Tide Table PHB - 2, Pakistan Tide Tables

    Local Time GMT + 5 Hrs

    Berth Type Jetty

    Commissioning 25th November 1997

    Depth Alongside 11.0 m

    Max LOA 225 m

    Max Beam 33 m

    Max Deadweight 75,000 tons

    Current Operations Unloading and Storage (Chemicals and LPG)

    Truck Loading and Pipeline Transfer

    Products Handled /

    Stored

    Paraxylene (PX), Acetic Acid (AA), Vinyl Chloride

    Monomer

    (VCM), Acylonitrile (ACN), Phosphoric Acid, Mono

    Ethylene Glycol (MEG), Liquefied Petroleum Gas

    (LPG) and Ethylene

    ServicesHeating, Chilling, Weighing and Nitrogen Blanketing,

    Water

    Storage Capacity 82,400 cubic meters

    Number of Tanks 21

    Total Area 102 Acres

    Access Sea / Road / Pipeline

    Investment Over USD 100 million

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    95/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    96/152

     

    EVTL Bulk liquid Chemical and Storage Terminal the first phase comprised

    construction of 41,000 cubic meter of storage facility the cost of first phase of the

    Project was US $ 60 million the tank farm is situated on reclaimed land in the PQA.

    PARAXYLENE 

    ACETIC ACID 

    PHOSPHORIC ACID (HANDLING ONLY)

    VINYL CHLORIDE MONOMER 

    A

    CRYLONITRILE

     

    L

    IQUE IED

    P

    ETROLEUM

    G

    AS

     

    MONO ETHYLENE GLYCOL 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    97/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    98/152

     

    Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint

    Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi

    Corporation (Japan), each with an 80% and 20% shareholding, respectively

    EAPCL is the only PVC manufacturer in Pakistan with a Capacity

    Of 100,000tons per annum (TPA) and its operations are located at Port Qasim

    Project NameENGRO ASAHI POLYMER

    & CHEMICALS LIMITED

     

    Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 80 million

    CAPACITY 100,000 (TPA) PVC MANU ACTURING PLANT

    CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD

    Completion: 1999-2000

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    99/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    100/152

     

    PARCO Mid Country Refinery (100, 000 BPD)

    Project Name PAK ARAB RE INERY COMPANY

    Location: MULTAN, PAKISTAN

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 80 million

    CLIENT DESCON ENGINEERING 

    Completion: 1998

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    101/152

     

    INDUS RE INERY LIMITED

    PAKISTAN SECOND LARGEST RE INERY

    Project Name IRL is a 100,000 bpd or 4.95 million metric tons per

    annum complex fuels refinery. It will be the sixth

    petroleum refinery in Pakistan and the country’s

    largest refinery.

    Location: PORT QASIM INDUSTRIAL ESTATE

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 700 million

    CLIENT INDUS RE INERY LIMITED 

    Completion: UNDER CONSTRUCTION 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    102/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    103/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    104/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    105/152

     

    PETRO CANADA RE INERY TO PAKISTAN PORT QASIM

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    106/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    107/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    108/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    109/152

     

    Gambat South Gas Processing Facility(GPF-||) Project

    Location: Distt. Sanghar, Sindh-Pakistan

    Capacity: 50 MMSCFD Gas Processing

    LPG 11 MTPD, Condensate 1050 BPD

    Scope: EPCC of Complete Facility

    Major Equipment 

      Wellhead Air Cooler

      Inlet Separation

      Feed Gas Compressor

       Amine Purification Unit (MDEA Type)

      HCDP Control Unit (Propane based Refrigeration

    Compressor Package)

    ProjectGambat South Gas Processing Facility

    PROJECT NATURE

    50 MMSCFD Gas Processing

    LPG 11 MTPD, Condensate 1050 BPD 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    110/152

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    111/152

     

    TRANSASIA RE INERY LIMITED

    PAKISTAN SECOND LARGEST RE INERY

    Project Name TRL is a 100,000 bpd or 4.00 million metric tons per

    annum complex fuels refinery. It will be the state of an

    Art petroleum refinery in Pakistan and will be one of

    the country’s largest refinery.

    Location: PORT QASIM INDUSTRIAL ESTATE

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 700 million

    CLIENT TRANSASIA RE INERY LIMITED 

    Completion: UNDER CONSTRUCTION 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    112/152

     

    TRANASIA REFINERY LIMITED

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    113/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    114/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    115/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    116/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    117/152

     

    WIND POWER

    PROJECTS

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    118/152

     

    AUJI ERTILIZER ENERGY COMPNAY

    LIMITED ( CEL) 49.5 MW WIND ENERGY

    PROJECT AT JHAMPIR, KARACHI

    Project Name CEL WIND ENERGY PROJECT O CAPACITY 49.5 MW

    Location: JHAMPIR, NEAR THATTA

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 110 million

    CLIENT DESCON ENGINEERING LIMITED 

    Completion: ALREADY COMPLETED 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    119/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    120/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    121/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    122/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    123/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    124/152

     

    Project Name ASPHALT BUILT UNIT PROJECT (ABU)

    OR PARCO

    Location: PARCO MID COUNTRY RE INERY, MULTAN

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 30 Million

    Completion: DECEMBER 2012 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    125/152

     

    Project Name 49.5 MW OUNDATION WIND ENERGY-1 PROJECT

    Location: JHAMPIR, KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 130 Million

    Completion: SEPTEMBER 2014 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    126/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    127/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    128/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    129/152

     

    Project Name 49.5 MW OUNDATION WIND ENERGY-II (Pvt) Ltd.

    PROJECT

    Location: JHAMPIR, KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 130 Million

    Completion: SEPTEMBER 2014 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    130/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    131/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    132/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    133/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    134/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    135/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    136/152

     

    Project Name NEW KHANKI BARRAGE HYDROPOWER PROJECT

    Location: RIVER CHENAB, DISTT GUJRANWALA

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 70 Million

    Completion: SEPTEMBER 2016 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    137/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    138/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    139/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    140/152

     

    Project NameASPHALT BUILT UNIT PROJECT (ABU)

    OR PARCO

     

    Location: PARCO MID COUNTRY RE INERY, MULTAN

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 30 Million

    Completion:DECEMBER 2012

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    141/152

     

    Project Name METRO HABIB CASH & CARRY PAKISTAN (PVT) LTD

    Location: HEAD O ICE THOKAR NIAZ BAIG, MULTAN RD, LHR.

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 3.4

    Completion: STILL UNDERGOING 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    142/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    143/152

     

    KARACHI INTERNATIONAL CONTAINER

    TERMINAL (KICTL) KARACHI

    Project Name KARACHI INTERNATIONAL CONTAINER

    TERMINAL (KICTL)

    PHASE III EXPANSION PROJECT

    Location: WEST WHAR ROAD, KARACHI

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 400 million

    CLIENT KICTL PAKISTAN 

    Completion: UNDER CONSTRUCTION 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    144/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    145/152

     

    BAHRIA TOWN (PVT) LIMITED

    RAWALPINDI

    Project Name BAHRIA TOWN (Pvt) LIMITED

    AWAMI VILLAS PROJECT.

    TOTAL # O VILLAS 8000

    Location: RAWALPINDI, PAKISTAN

    NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

    COST OF PROJECT US$ 120 million

    CLIENT BAHRIA TOWN (Pvt) LIMITED 

    Completion: UNDER CONSTRUCTION/ PROGRESS 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    146/152

     

    HEALTH, SA ETY AND ENVIRONMENT 

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    147/152

     

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    148/152

     

    S.M.Asghar (Pvt) Limited believes that ACCIDENTS

    DON

    T JUST

    happen, they’re caused, and it is the duty of the Companyto remove and minimize all possible causes of Accidents.

    We at S.M.Asghar (Pvt)  Limited  takes preliminary guide to therecognition of potential hazards to the following.

    M O S T - S A E - P L A C E S

    M MACHINERY  : Sources of Mechanical Power

    O OPENINGS  : Pits, Sumps, Ducts & Drains

    S STACKS  : Stores Materials, Raw & Process.

    T TOOLS  : All type of Tools.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    149/152

     

    S A E - P L A C E S

    S STRUCTURE  : loors, Walls, Ceilings, Road

    A ATMOSPHERE  : Dust, gases, fumes & Spray.

    IRE : ire Points & ire Exits. 

    E ELECTRICITY  : Wires, Cables, Switches. 

    P PRESSURE VESSEL  : Boilers & Compressors

    L LADDERS : Steps, trestles & Scaffolds

    A ATTIRE : Protective Clothing, Helmets

    C CRANES : Hoist, Derricks & Ropes / Hooks

    E EXPLOSIVES  : lammable Liquids, LPG, Radioactive.

    S or SIGNALS  :

    Warning Light, Telephone Buzzers. 

    As a Company Policy we take care of our Employee to the best Standards because

    Employees are Our Assets.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    150/152

     

    We provide following safety Equipments to our Port staff such as :

    Safety Belts : They are provided to the Staff who

    Works On the Ship /Vessel (VCM/LPG)

    Emergency Lights : In case of Night Delivery at the Port

    Premise/ Highways

    Safety Helmets : At time of delivery at the Port Area

    During Loading/ Unloading

    Heavy Machineries/ Hazardous Cargo

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    151/152

     

    Safety Boots : At the Ship Derricks & the Port

    Premises

     

    Safety Glasses : They are provided to the Staff who

    Work on the Ship /Vessel.

  • 8/16/2019 S.M.Asghar (Pvt) Limited Introduction For CMEC Comtrans

    152/152

     

    HEAVY & SUPER HEAVY LIFTTRANSPORTATION EXPERIENCE

    WE CALLED THIS ASABNORMAL LOADS