Software Engineering Text (chapters 1 and 3)

Software Development Process

Page 2: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process?

ò Ac#vi#es:  ò Specifica#on  (what)  ò Design  (how)  ò Coding/development  ò Tes#ng/valida#on  ò Maintenance  (change!)  

Page 3: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process?

ò Ac#vi#es:  ò  Specifica#on  (what)  ò  Design  (how)  ò  Coding/development  ò  Tes#ng/valida#on  ò Maintenance  (change!)  

Page 4: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Specification (What) ò Feasibility  study  

Can  we  do  it  using  the  tools,  1me  and  budget  constraints?  

ò Requirements  Analysis  Figuring  out  specifics  of  what  we  need  to  do  

ò Requirements  Spec.  Document  everything  you  found  out.    

ò Requirements  Valida8on  Show  them  to  customers,  do  prototypes  

Page 5: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Specification – Documents

ò UI  Spec  ò Use  Case  Scenarios  ò Prototype  ò Test  Results  of  prototypes  

Page 6: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process?

ò Ac#vi#es:  ò  Specifica#on  (what)  ò  Design  (how)  ò  Coding/development  ò  Tes#ng/valida#on  ò Maintenance  (change!)  

Page 7: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Design (how) ò  Architecture  

Subsystems,  and  their  rela1onships  ò  Abstract  spec.  

Subsystem  services  and  constraints  ò  Interface  Design  

Methods  or  messages  between  subsystems

ò  Component  Design  

ò  Data  Structure  and  Class  Design  (if  OOD)  ò  Algorithm  Design  

Page 8: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Design: Structured Models

ò Data-­‐flow  model  

ò En8ty  Rela8on  model    (should  have  seen  that  in  Dbase)  

ò Object  oriented  methods    (inheritance,  class/object  interac#on  and  rela#onship)  

ò State  Transi8on  models  

Page 9: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process?

ò Ac#vi#es:  ò  Specifica#on  (what)  ò  Design  (how)  ò  Coding/development  ò  Tes#ng/valida#on  ò Maintenance  (change!)  

Page 10: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process? ò  Ac#vi#es:  

ò  Specifica#on  (what)  ò  Design  (how)  ò  Coding/development  

ò  Tes#ng/valida#on  ò  Maintenance  (change!)  

Page 11: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Testing

ò Unit  Tes#ng  ò Module/object  tes#ng  

ò Subsystem  tes#ng  

ò System  tes#ng    

} Done by programmer

} Done by testing group

Page 12: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Testing: Verification and Validation ò Verifica8on:  are  we  building  the  product  

right?  (test  against  specs)  ò Valida8on:  are  we  building  the  right  product?  

(test  with  the  user)  

How do you translate that for your game?

Page 13: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process?

ò Ac#vi#es:  ò  Specifica#on  (what)  ò  Design  (how)  ò  Coding/development  ò  Tes#ng/valida#on  ò Maintenance  (change!)  

Page 14: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process?

ò  Ac#vi#es:  ò  Specifica#on  (what)  ò  Design  (how)  ò  Coding/development  ò  Tes#ng/valida#on  ò Maintenance  (change!)  

How  do  you  translate  this  process  to  games?  

Page 15: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Software Myths

“  If  we  are  behind  the  schedule,    just  add  more  programmers”  

“Nine Women cannot make a baby in nine months”

Page 16: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Software Myths

“  Once  we  write  the  program  and  get  it  to  work,  our  job  is  done”  

“60%-­‐80%  of  all  effort  expended  on  so5ware  will  be  expended  a5er  it  is  delivered  for  the  first  <me”  

Page 17: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

What is Software Process?

ò Activities:

ò  Specification (what)

ò  Design (how)

ò  Coding/development

ò  Testing/validation

ò  Maintenance (change!)

In what order?

Page 18: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Challenges

ò Wiked  problems  

ò Customers  don’t  know  what  they  want    

ò Hard  to  change  code,  esp.  with  evolu#on  of  programming  languages    

Page 19: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Methods the people developed

ò  The  waterfall  model  

ò  Separate  and  dis#nct  phases  of  specifica#on  and  development  

ò  Evolu8onary  development  

ò  Specifica#on  and  development  are  interleaved  

ò  Formal  systems  development  

ò  A  mathema#cal  system  model  is  formally  transformed  to  an  implementa#on  

ò  Reuse-­‐based  development  

ò  The  system  is  assembled  from  exis#ng  components  

Page 20: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Waterfall Model (1970) Requirements

definition

System andsoftware design

Implementationand unit testing

Integration andsystem testing

Operation andmaintenance

Page 21: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Advantages and Disadvantages

ò Good  when  requirements  are  understood  and  problem  has  been  aPached  before  

 

ò Cannot  adapt  to  rapidly  changing  requirements  or  ill-­‐defined  problems  

Page 22: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Building a software is like driving

 “  Driving  is  not  about  geJng  the  car  going  in  the  right  direc1on.  Driving  is  about  constantly  paying  aKen1on,  making  liKle  correc1on  this  way,  a  liKle  correc1on  that  way”  –  from  XP  

Page 23: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Evolutionary Development

ò Exploratory  development    

ò  Objec#ve  is  to  work  with  customers  and  to  evolve  a  final  system  from  an  ini#al  outline  specifica#on    

ò Throw-­‐away  prototyping  ò  Objec#ve  is  to  understand  the  system  

requirements.  Should  start  with  poorly  understood  requirements  

Page 24: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Evolutionary Development

ò  Problems  

ò  Lack  of  process  visibility  ò  Systems  are  oTen  poorly  structured  

ò  Special  skills  (e.g.  in  languages  for  rapid  prototyping)  may  be  required  

ò  Applicability  ò  For  small  or  medium-­‐size  interac#ve  systems  

ò  For  parts  of  large  systems  (e.g.  the  user  interface)  

ò  For  short-­‐life#me  systems  

Page 25: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Reuse Oriented Development

ò Requirements  Spec.  

ò Research  Exis#ng  Components  

ò Rework  Requirements  

ò Design  

ò Component  Integra#on  and  tes#ng  

Page 26: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Process Iteration

ò System  requirements  ALWAYS  evolve  in  the  course  of  a  project  so  process  itera#on  where  earlier  stages  are  reworked  is  always  part  of  the  process  for  large  systems  

ò Two  (related)  approaches  ò  Incremental  development  ò  Spiral  development  

Page 27: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Incremental Method

Page 28: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Spiral Model ò  Process  is  represented  as  a  spiral  rather  than  as  a  

sequence  of  ac#vi#es  with  backtracking  

ò  Each  loop  in  the  spiral  represents  a  phase  in  the  process.    

ò  No  fixed  phases  such  as  specifica#on  or  design  -­‐  loops  in  the  spiral  are  chosen  depending  on  what  is  required  

ò  Risks  are  explicitly  assessed  and  resolved  throughout  the  process  

Page 29: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Spiral Method

Riskanalysis

Riskanalysis

Riskanalysis

Riskanalysis Proto-

type 1

Prototype 2Prototype 3

Opera-tionalprotoype

Concept ofOperation

Simulations, models, benchmarks

S/Wrequirements

Requirementvalidation

DesignV&V

Productdesign Detailed

designCode

Unit testIntegration

testAcceptancetestService Develop, verify

next-level product

Evaluate alternativesidentify, resolve risks

Determine objectivesalternatives and

constraints

Plan next phaseIntegration

and test plan

Developmentplan

Requirements planLife-cycle plan

REVIEW

Page 30: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Project

ò  Pitch (Presented Oct 29)

ò  High Level Design document (Nov 7)

ò  Prototype 1 (Nov 14)

ò  Prototype 2 (Nov 26)

ò  Prototype 3 (Dec 3)

ò  Final Game Show Case (Dec 5), video and presentation video

Page 31: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

UML All materials (including images) are taken from: http://edn.embarcadero.com/article/31863 and

http://atlas.kennesaw.edu/~dbraun/csis4650/A&D/UML_tutorial/diagrams.htm

Page 32: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

UML (what is it?)

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Why do you think you need this?

Page 33: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Page 34: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case Diagrams

Page 35: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service
Page 36: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use cases in Game Development

ò  In games use cases are important for:

ò  Testers to ensure all user interactions are satisfied

ò  Developers to determine the features for the interaction

Page 37: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Page 38: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service
Page 39: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service
Page 40: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Class Diagrams

Page 41: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Class Diagrams in Game Development

ò  In games developers use class diagrams to:

ò  Document the systems involved

ò  Share and discuss among other developers

ò  Code review and assessment to increase maintainability of the code especially for engine code or franchise games

Page 42: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Page 43: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Object Diagrams

ò  Just like the class diagram but with objects instead. This is useful to show the relationships between objects not just classes

Page 44: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Page 45: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Sequence Diagram

ò  Shows the dynamics of the systems. Specifically the sequence of operations between objects.

Green bar: when object has control Red box: object destroyed Blue bar: object active

Page 46: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service
Page 47: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Sequence Diagrams in Game Development

ò  In games developers use sequence diagrams to:

ò  Document the dynamics of the systems

ò  Share and discuss among other developers

ò  Code review and assessment to increase maintainability of the code especially for engine code or franchise games

Page 48: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Page 49: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

State Diagrams

ò  State diagrams describe the behavior of the system. They describe the state of the object when an event occurs

Page 50: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service
Page 51: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

State Diagrams in Game Development

ò  In games developers use state diagrams to:

ò  Document the behavior of objects, specifically AI behaviors

ò  Share and discuss among other developers

ò  Code review and assessment to increase maintainability of the code especially for engine code or franchise games

Page 52: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Page 53: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service
Page 54: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Use Case

ò  Unified Model Language

ò  Standardized representations or models for explaining software design and architecture (like the blueprints of the software)

ò  Use case diagrams

ò  Class diagrams

ò  Object diagrams

ò  Sequence diagrams

ò  State chart diagrams

ò  Component diagrams

ò  Activity diagrams

Page 55: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service

Activity Diagrams

ò  Used to describe more complex dynamic behavior, adding to sequence diagram.

ò  This is especially important for threading or multi-process algorithms

Page 56: Software Development Process - Northeastern Universityrequirements Requirement validation Design V&V Product design Detailed design Code Unit test Integration Acceptance test Service