    PUNJAB: SALIENT FEATURESTOTAL GEOGRAPHICAL AREA: 50,362 sq. KmsPOPULATION: 243.59 LACS (2001 CENSUS)

    No. OF DISTRICTS : 20

    Total power sales by PSEB: 41625 MUs

    Total power generation: 26897 MUs

    Net energy purchased: 14728 MUsEnergy Purchase from NTPC : 7291 MUs

    NRSE Generation: 231 MUs

  • 7/31/2019 Solar Energy Conclave 2010 15

    3/22

  • 7/31/2019 Solar Energy Conclave 2010 15

    4/22

  • 7/31/2019 Solar Energy Conclave 2010 15

    5/22

  • 7/31/2019 Solar Energy Conclave 2010 15

    6/22

    Time bound clearances with in a period of 60 days by an EmpoweredCommittee headed by the Chief Secretary.

    PSEB shall provide wheeling of power through its network with in the

    state at a uniform wheeling rate of 2% of the energy fed to the grid.

  • 7/31/2019 Solar Energy Conclave 2010 15

    7/22

    Inter-state Sale of power

    The State Of Punjab is the first state in thecountry which has allowed Inter State Saleof Power generated from NRSE projects in

    accordance with Open Accessegu a ons o e appropr a e

    Commission as per the addendum notifiedto the NRSE Policy-2006 issued on

    11/6/2009.

    PEDA has initiated steps for adoption ofCERC Tariffs in the state.

  • 7/31/2019 Solar Energy Conclave 2010 15

    8/22

    Small/Micro Hydro Power Projects PEDA (8 nos.) 9.8 MW Private Developers (25 nos.) 25.00 MW

    Biomass Cogeneration Power Projects Private Developers ( 20 nos.) 218.65 MW

    Biomass Power Projects. .

    Waste-to-energy power Projects

    PEDA (1 no.) 1 MW

    Solar Power Projects PEDA (4 nos.) 325KW Private Developer Azure Power 2MW

    TOTAL (32 nos.) 285.25 MW

  • 7/31/2019 Solar Energy Conclave 2010 15

    9/22

    (TO BE COMMISSIONED BY JUNE 2010)(TO BE COMMISSIONED BY JUNE 2010)

  • 7/31/2019 Solar Energy Conclave 2010 15

    10/22

    S.No. Name of Scheme Capacity(MW)

    1 Mini Hydel Projects (Commissioned) 35

    2 Projects under Execution by Private Developerson BOO basis 26.70

    3 Self Identified Sites by Private Developers 7.50

    6 Potential identified under Master Plan on TailRace of Existing Hydel Channel i.e. MukerianHydel Channel

    42.00

    Total105.75 MW

  • 7/31/2019 Solar Energy Conclave 2010 15

    11/22

  • 7/31/2019 Solar Energy Conclave 2010 15

    12/22

    SOLARSOLAR PHOTOVOLTAICPHOTOVOLTAIC POWERPOWERPROJECTSPROJECTS (MW(MW Scale)Scale) ONON BUILD,BUILD,

    OWNOWN && OPERATEOPERATE BASISBASIS

    PROJECTS ALLOCATED TOTAL CAP. 19 MW.

    SPV Power Plant Cap. 2MW in Distt. Amritsarcommissioned and Inau urated on 15th Dec.2009.

    MOU signed with BPCL for development of a 1 MW SPVPower Plant at Lalru in Punjab- PPA SIGNED, planned tobe commissioned by March2010

    MOU signed with M/s. Enterprise Business Solutions Inc.,USA for setting up of a 5MW SPV Power Plant in Punjab,PPA signed and planned to be commissioned byJune2010.

  • 7/31/2019 Solar Energy Conclave 2010 15

    13/22

  • 7/31/2019 Solar Energy Conclave 2010 15

    14/22

    First Solar PV Power Plant on BOO basis commissionedin the Country on 1st December ,2009, Cap. 2 MW,

    V. Awan, Amritsar, Punjab

  • 7/31/2019 Solar Energy Conclave 2010 15

    15/22

    PSEB Grid interconnection at 11 KV Transmission Line

  • 7/31/2019 Solar Energy Conclave 2010 15

    16/22

    Proposed Roadmap for the State of Punjab under the Solar Mission

    Under the National solar Mission, the state of Punjab plans to setup and achieve the

    following generation levels from Solar Power Installations under the first phase

    (2010-2013) Based on RPO of 0.25%.

    S.No. Application segment Target for Phase-I (2010-13)

    1 Solar Collectors 0.469 Million Sq.Mtrs.

    2 Off grid solar applications 14 MW

    3 Utility grid power, including roof top 67 MW

    PEDA shall facilitate the signing of PPA with the NTPC Vidyut Vyopar Nigam Ltd.

    as enshrined under the Solar Mission or the Utility PSEB on project case to case

    basis. The tariff shall be applicable as per CERC guidelines.

    MNRE, GOI should consider providing the generation based incentives to

    projects getting inter-connected to 11 KV system in the state.

  • 7/31/2019 Solar Energy Conclave 2010 15

    17/22

    ROOF TOP SOLAR PV PROJECT FOR THE CITY OFSAS NAGAR MOHALI , PUNJAB

    SAS Nagar is a planned city of the State of Punjab adjoiningChandigarh and population in 2006 was about 2 Lacs

    Distributed utility Solar PV grid connected ProjectWith Proposed project capacity : 5 MWp

    Roof tops of houses proposed to be covered : 5000 Nos

    approx. ac roo top to ave 1 p spv gr connect system

    Each House having a connected load of 5 -8 Kwp.

    Each project shall be Grid connected on 415V LT utility Grid

    Facility of Bidirectional Import export energy meters. Nett Energy Metering concept to be deployed. Solar energy generated from the roof top systems project

    should be given CERC tariff.

  • 7/31/2019 Solar Energy Conclave 2010 15

    18/22

    ROOF TOP SOLAR PV SYSTEM CONCEPT ANDROOF TOP SOLAR PV SYSTEM CONCEPT ANDPLANPLAN

    ROOF TOP SOLAR PV SYSTEM CAPACITY 1 KWpSOLAR PV PANELS 1 KWpPOWER CONDITIONING UNIT 1.5 KVABATTERY BANK: ADEQUATELY SIZED FOR 5 HRS BACK-UP

    BIDIRECTIONAL ENERGY METER OF O.5 CLASS. .

    POWER GENERATED FROM THE PV SYSTEM SHALL BE USED BYTHE HOUSE IN CASE LOAD EXCEEDS GENERATIONPOWER SHALL BE EXPORTED TO GRID DURING NO LOAD/LESS

    LOAD CONDITIONSPOWER GENERATED SHALL ALSO PROVIDE BACK-UP POWER TOEMERGENCY LOADS DURING GRID FAILURE FOR WHICH ABATTERY BANK IS ALSO THERE.

  • 7/31/2019 Solar Energy Conclave 2010 15

    19/22

    ROOF TOP SPV SYSTEMROOF TOP SPV SYSTEM--

    BENEFITSBENEFITS COMPLETE SYSTEM OF 5 MWp SHALL OPERATE ASCOMPLETE SYSTEM OF 5 MWp SHALL OPERATE ASA SMALL DISTRIBUTED UTILITY HAVING MAJORA SMALL DISTRIBUTED UTILITY HAVING MAJORBENEFITS:BENEFITS:

    SYSTEM SHALL USE EXISTING ROOF TOP SPACESYSTEM SHALL USE EXISTING ROOF TOP SPACE

    THE GRID.THE GRID.

    SHALL PROVIDE IMMEDIATE RELIEF TO THE GRIDSHALL PROVIDE IMMEDIATE RELIEF TO THE GRIDBY EXCESS GENERATION DURING DAY TIME.BY EXCESS GENERATION DURING DAY TIME.

    SHALL PROVIDE EMERGENCY POWER RELIEFSHALL PROVIDE EMERGENCY POWER RELIEFDURING POWER SHUTDOWN SITUATIONS.DURING POWER SHUTDOWN SITUATIONS.

    SHALL LOWER THE LOAD ON THE L.T. SYSTEM.SHALL LOWER THE LOAD ON THE L.T. SYSTEM.

  • 7/31/2019 Solar Energy Conclave 2010 15

    20/22

    ROOF TOP SPV SYSTEMROOF TOP SPV SYSTEM--

    COMMERCIALSCOMMERCIALS EACH 1 KWp SYSTEM TO COST 2.5 LACS APPROX.EACH 1 KWp SYSTEM TO COST 2.5 LACS APPROX. PROPOSALPROPOSAL --1 EACH BENEFICIARY TO PAY 50% OF1 EACH BENEFICIARY TO PAY 50% OF

    THE COST, BALANCE COST BY MNRE, GOI.THE COST, BALANCE COST BY MNRE, GOI.

    UTILITY TO GIVE CREDIT FOR GENERATIONUTILITY TO GIVE CREDIT FOR GENERATION..

    CONSUMER TO BE BILLED FOR NET ENERGY ATCONSUMER TO BE BILLED FOR NET ENERGY ATREGULAR UTILITY TARIFF.REGULAR UTILITY TARIFF.

    UTILITY TO GET COMPENSATION THROUGH GBIUTILITY TO GET COMPENSATION THROUGH GBI

    UNDER SOLAR MISSION.UNDER SOLAR MISSION.

    PROPOSALPROPOSAL--2 EACH BENEFICIARY TO PAY 100% OF2 EACH BENEFICIARY TO PAY 100% OFTHE COST, ENTIRE GENERATION TO BE ALLOWEDTHE COST, ENTIRE GENERATION TO BE ALLOWEDFOR BILLING AT CERC TARIFF.FOR BILLING AT CERC TARIFF.

  • 7/31/2019 Solar Energy Conclave 2010 15

    21/22

    SOLAR PV POWER PROJECTSSOLAR PV POWER PROJECTS

    PUNJAB SOLAR RPO @ 0.25% = 100 MU=67MW CAPACITYPUNJAB SOLAR RPO @ 0.25% = 100 MU=67MW CAPACITY

    GOOD SOLAR INSOLATION LEVELS OF 4GOOD SOLAR INSOLATION LEVELS OF 4--7Kwh/sq7Kwh/sq mtrmtr/day./day.

    GRID INTERCONNECTION AT 11 KV/66KVGRID INTERCONNECTION AT 11 KV/66KV

    PEDA, THE STATE NODAL AGENCY SHALL PROVIDEPEDA, THE STATE NODAL AGENCY SHALL PROVIDE

    COMPLETE FACILITATION FOR PROJECTS.COMPLETE FACILITATION FOR PROJECTS.

    PROJECT DEVELOPERS CAN INVEST AND SET UPPROJECT DEVELOPERS CAN INVEST AND SET UP..

    LAND AVAILABLE ON LEASE FROM VILLAGE PANCHAYATS.LAND AVAILABLE ON LEASE FROM VILLAGE PANCHAYATS.

    BANKABLE/SECURED POWER PURCHASE AGREEMENTSBANKABLE/SECURED POWER PURCHASE AGREEMENTSWITH PSEB.WITH PSEB.

    VARIOUS INCENTIVES UNDER THE NRSE POLICYVARIOUS INCENTIVES UNDER THE NRSE POLICY--2006.2006.

    ROOFTOPS OF HOUSES IN VILLAGES UNDER A CLUSTERROOFTOPS OF HOUSES IN VILLAGES UNDER A CLUSTER

    APPROACH CAN BE PROVIDED TO PVT. DEVELOPERS FORAPPROACH CAN BE PROVIDED TO PVT. DEVELOPERS FOR

    SETTING UP OF ROOFTOP PV PROJECTS.SETTING UP OF ROOFTOP PV PROJECTS.

  • 7/31/2019 Solar Energy Conclave 2010 15

    22/22

    Further details regarding Govt. Policies /Projects / Programmes being undertaken

    by PEDA, can be accessed from ourofficial website http://peda.gov.inhttp://peda.gov.in

    OROR

    CONTACTCONTACT

    Chief Executive, Director, Jt. Director, PEDAChief Executive, Director, Jt. Director, PEDA

    Phone nos 0172Phone nos 0172--2663392,2664402, 26670052663392,2664402, 2667005

    http://peda.gov.in/http://peda.gov.in/http://peda.gov.in/http://peda.gov.in/