Solar Project Under BOOT Model

Embed Size (px)

Citation preview

  • 8/17/2019 Solar Project Under BOOT Model

    1/4

     

    SetupSolarPVPowerProjectsat

    NilCapitalInvestment.Leaseyour

    Rooftopsforfixedtermperiodand

    enjoycheap,green,reliable,

    constant&independentPowerfor

    upto25years. 

    SOLAR PV

    POWER

    PROJECTS Under BOOT Model

    Asun Solar Power (P) Ltd

    64, Navjivan Vihar, New Delhi

    C: +91 011 26691663, 26693494

    www.asun.co.in | Email: [email protected]

  • 8/17/2019 Solar Project Under BOOT Model

    2/4

     

    _____________________________________________________________________________________________________________________

    SettingupGridConnectedSolarPVPowerPlantsrangingfrom100KWtoMWscalepowerprojects

    undertheBuild,Operate,OwnandTransfer(BOOT)Model

    HOW THIS HAPPEN?

      RooftopLease:Weutilizevacant

    RooftopspacesandsetupaSolarPV

    PowerplantatourownCost.

      CaptiveConsumption:Allpower

    generatedfromtheSolarPlantisfed

    intotheLTpanelandis100%utilized.

      PowerPurchaseAgreement(PPA):We

    signaPPAwiththeRooftopOwnerand

    sellthepoweronmonthlycyclefora

    fixedtermperiod.

      Operation&Maintenance:Wemaintain

    theentireplantandstationourteamat

    siteatourowncostsandexpensefor

    theentireterm.

    PROJECT VIABILITY FOR ROOTOP OWNERS:

      RooftopOwnersenjoycheaperpower

    thantheircurrentpowertariffs&cost

    includingtheuseofDGsets.

      GettingridofPowerTariffEscalations

    andinflationrisks.

     

    Buybacktheprojectonthe15 thor20th

    yearatdepreciatedvalueandenjoy

    freepowerfortheremaininglifeofthe

    systemwhichisexpectedtobe35

    years.

      NilCapitalInvestmentrequired.

      ComplywithyourRenewableEnergy

    PurchaseObligationsandreduce

    Carbonfootprints.

    HIGHLIGHTS:

    Technology: SolarPhotovoltaic(PV)

    SystemDesign: Grid-ConnectedSystem{Solar+Grid}

    Totalrooftoparearequired 8,000squarefeetper100KWsetup

    ProposedSolarPanels(PV): 230to320watt|Poly/MonoCrystallineAAARatedwithModuleefficiencyhigherthan14.8%

    SolarInverter: 100KWTierIMultipleStingInverters,3phase

    Maximumoutputefficiencyat98%

    EstimatedAnnualEnergyGeneration: 150,000kWhinthefirstyearforevery100KW

    system.(  Leverageof+10%) 

    ProjectCompletiontenure: WithinFour(4)months

  • 8/17/2019 Solar Project Under BOOT Model

    3/4

     

    _____________________________________________________________________________________________________________________

    GENERAL CONDITIONS OF CONTRACT:

    CompleteProjectcostborneby: AsunGroupandaffiliateCompanies

    RooftopRighttoLease RooftopOwnershallprovidetheRighttoUseofthe

    rooftoptoAsunforthefixedtermperiodfromthe

    dateofhandingovertheproject.

    MeterAccounting BasedontheDatalogs(whichaccountseveryunit

    ofpowersupplied) Asunshallraisethebillonthe1st

    dateofeveryEnglishcalendarmonth.Aseparate

    metermayalsobeinstalledtoverifytheactual

    powersupplied.

    Billing ForallthekW/hofpowersuppliedfromthesolar

    plant,hospitalshallpaythesaidduestoAsunonor

    before4thdateofeveryEnglishCalendarmonth

    failingwhichthereshallbeapenaltyof2%per

    monthleviedtotheRooftopOwner.

    TerminationofthePPA ThePPAshallbevalidforthefixedlockinperiod.

    Asunmayterminatethesaidagreement.However,

    theconditionwhereinPPAmaybeterminatedbythe

    RooftopOwnerisafteritcompensatesAsunforthe

    estimatedpowergenerationp.a.forthebalance

    numberofyearsi.e.term;inaccordancewiththe

    definedpowerratesinthePPA.

    BankGuarantee AsunshallrequirearevolvingBankGuaranteeofthe

    amountequalingtotheestimatedpowergeneration

    onyearlybasis.

    Inverterreplacement OnPartofAsun

    Replacementofanydefectiveequipment

    duringtheTerm:

    OnpartofAsun

    Operation&MaintenanceofthePlant OnpartofAsun

    Installationof3Phasemeter/sub-Meters

    andallothernecessarywiringsfromthe

    Distributionpoint.

    ByRooftopOwner

  • 8/17/2019 Solar Project Under BOOT Model

    4/4

     

    _____________________________________________________________________________________________________________________

    PPATARIFFSANDESCLATIONRATES:

    Basedonathroughfeasibilityandviabilitystudy,wehavedrawndownthePPAtariffsdependingon

    casetocasebasis;underwhichthefinancialmodelingoftheprojectisproposedfortheRooftop

    Owner:

    Scheme I –PPA25

    ProjectTenure(PPATerm) Lock-inperiodofTwentyfive(25)years

    TurnkeyprojectcostbornebyAsun: @90/watt(AsperthebenchmarkrateoftheMNRE)

    amountingtoINR90,00,000/-per100KW.

    Scheme II –PPA20

    ProjectTenure(PPATerm) Lock-inperiodofTwenty(20)years

    TurnkeyprojectcostbornebyAsun: @90/watt(AsperthebenchmarkrateoftheMNRE)

    amountingtoINR90,00,000/-per100KW.

    Scheme III–PPA15

    ProjectTenure(PPATerm) Lock-inperiodofFifteen(15)years

    TurnkeyprojectcostbornebyAsun: @90/watt(AsperthebenchmarkrateoftheMNRE)

    amountingtoINR90,00,000/-per100KW.

    PPAtariffsrangingfromINR8/kWhtoINR11/kWh

    PPAtermrangingfrom15yearsto25years

    PowerTariffescalationcyclefrom5%to15%every3to5years

    REQUEST A PROJECT PROPOSAL

    Contact: Mr.HitakshSachar,VP-Projects

    AsunSolarPower(P)Ltd.

    [email protected],+919811971111