Upload
graceenggint8799
View
213
Download
0
Embed Size (px)
Citation preview
8/17/2019 Solar Project Under BOOT Model
1/4
SetupSolarPVPowerProjectsat
NilCapitalInvestment.Leaseyour
Rooftopsforfixedtermperiodand
enjoycheap,green,reliable,
constant&independentPowerfor
upto25years.
SOLAR PV
POWER
PROJECTS Under BOOT Model
Asun Solar Power (P) Ltd
64, Navjivan Vihar, New Delhi
C: +91 011 26691663, 26693494
www.asun.co.in | Email: [email protected]
8/17/2019 Solar Project Under BOOT Model
2/4
_____________________________________________________________________________________________________________________
SettingupGridConnectedSolarPVPowerPlantsrangingfrom100KWtoMWscalepowerprojects
undertheBuild,Operate,OwnandTransfer(BOOT)Model
HOW THIS HAPPEN?
RooftopLease:Weutilizevacant
RooftopspacesandsetupaSolarPV
PowerplantatourownCost.
CaptiveConsumption:Allpower
generatedfromtheSolarPlantisfed
intotheLTpanelandis100%utilized.
PowerPurchaseAgreement(PPA):We
signaPPAwiththeRooftopOwnerand
sellthepoweronmonthlycyclefora
fixedtermperiod.
Operation&Maintenance:Wemaintain
theentireplantandstationourteamat
siteatourowncostsandexpensefor
theentireterm.
PROJECT VIABILITY FOR ROOTOP OWNERS:
RooftopOwnersenjoycheaperpower
thantheircurrentpowertariffs&cost
includingtheuseofDGsets.
GettingridofPowerTariffEscalations
andinflationrisks.
Buybacktheprojectonthe15 thor20th
yearatdepreciatedvalueandenjoy
freepowerfortheremaininglifeofthe
systemwhichisexpectedtobe35
years.
NilCapitalInvestmentrequired.
ComplywithyourRenewableEnergy
PurchaseObligationsandreduce
Carbonfootprints.
HIGHLIGHTS:
Technology: SolarPhotovoltaic(PV)
SystemDesign: Grid-ConnectedSystem{Solar+Grid}
Totalrooftoparearequired 8,000squarefeetper100KWsetup
ProposedSolarPanels(PV): 230to320watt|Poly/MonoCrystallineAAARatedwithModuleefficiencyhigherthan14.8%
SolarInverter: 100KWTierIMultipleStingInverters,3phase
Maximumoutputefficiencyat98%
EstimatedAnnualEnergyGeneration: 150,000kWhinthefirstyearforevery100KW
system.( Leverageof+10%)
ProjectCompletiontenure: WithinFour(4)months
8/17/2019 Solar Project Under BOOT Model
3/4
_____________________________________________________________________________________________________________________
GENERAL CONDITIONS OF CONTRACT:
CompleteProjectcostborneby: AsunGroupandaffiliateCompanies
RooftopRighttoLease RooftopOwnershallprovidetheRighttoUseofthe
rooftoptoAsunforthefixedtermperiodfromthe
dateofhandingovertheproject.
MeterAccounting BasedontheDatalogs(whichaccountseveryunit
ofpowersupplied) Asunshallraisethebillonthe1st
dateofeveryEnglishcalendarmonth.Aseparate
metermayalsobeinstalledtoverifytheactual
powersupplied.
Billing ForallthekW/hofpowersuppliedfromthesolar
plant,hospitalshallpaythesaidduestoAsunonor
before4thdateofeveryEnglishCalendarmonth
failingwhichthereshallbeapenaltyof2%per
monthleviedtotheRooftopOwner.
TerminationofthePPA ThePPAshallbevalidforthefixedlockinperiod.
Asunmayterminatethesaidagreement.However,
theconditionwhereinPPAmaybeterminatedbythe
RooftopOwnerisafteritcompensatesAsunforthe
estimatedpowergenerationp.a.forthebalance
numberofyearsi.e.term;inaccordancewiththe
definedpowerratesinthePPA.
BankGuarantee AsunshallrequirearevolvingBankGuaranteeofthe
amountequalingtotheestimatedpowergeneration
onyearlybasis.
Inverterreplacement OnPartofAsun
Replacementofanydefectiveequipment
duringtheTerm:
OnpartofAsun
Operation&MaintenanceofthePlant OnpartofAsun
Installationof3Phasemeter/sub-Meters
andallothernecessarywiringsfromthe
Distributionpoint.
ByRooftopOwner
8/17/2019 Solar Project Under BOOT Model
4/4
_____________________________________________________________________________________________________________________
PPATARIFFSANDESCLATIONRATES:
Basedonathroughfeasibilityandviabilitystudy,wehavedrawndownthePPAtariffsdependingon
casetocasebasis;underwhichthefinancialmodelingoftheprojectisproposedfortheRooftop
Owner:
Scheme I –PPA25
ProjectTenure(PPATerm) Lock-inperiodofTwentyfive(25)years
TurnkeyprojectcostbornebyAsun: @90/watt(AsperthebenchmarkrateoftheMNRE)
amountingtoINR90,00,000/-per100KW.
Scheme II –PPA20
ProjectTenure(PPATerm) Lock-inperiodofTwenty(20)years
TurnkeyprojectcostbornebyAsun: @90/watt(AsperthebenchmarkrateoftheMNRE)
amountingtoINR90,00,000/-per100KW.
Scheme III–PPA15
ProjectTenure(PPATerm) Lock-inperiodofFifteen(15)years
TurnkeyprojectcostbornebyAsun: @90/watt(AsperthebenchmarkrateoftheMNRE)
amountingtoINR90,00,000/-per100KW.
PPAtariffsrangingfromINR8/kWhtoINR11/kWh
PPAtermrangingfrom15yearsto25years
PowerTariffescalationcyclefrom5%to15%every3to5years