A glimpse into the future of Solar Energyrealizing renewable energy
SOLAR23 – Turn Key PV Project Experience
WIPRO ENERGIEWORKSHOP 21. November 2013 Jochen Rühle
TABLE OF CONTENTS
1. Introduction SOLAR23
2. Photovoltaic Systems Applications
3. Practice report: How to manage turn key PV projects?
4. After Sales Service
5. Financial analysis
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group1. Introduction SOLAR23
POWER THE WAY TO SUSTAINABILITY
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group1. Introduction SOLAR23
Who are we?
SOLAR23 GmbHZeitblomstrasse 789073 UlmGermanywww.solar23.com
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group1. Introduction SOLAR23
What are our qualifications?
ABIDJAN, Ivory Coast ACCRA, Ghana ADDIS ABABA, Ethiopia ALGIER, Algeria ANTANANARIVO, Madagascar ASMARA, Eritrea BUJUMBURA, Burundi DAKAR, Senegal JEDDAH, Saudi Arabia RIADH, Saudi Arabia JOHANNESBURG, South Africa KAMPALA, Uganda KINSHASA, Dem. Rep. Of Congo LAGOS, Nigeria LOMÉ, Togo LUSAKA, Zambia N´DJAMENA, Chad NOUAKCHOTT, Mauritania OUAGADOUGOU, Burkina Faso TUNIS, Tunisia YOUNDÉ, Cameroon
EUROPE
AFRICA ULM, Germany BRUXELLES, Belgique BOURDEAUX, France
ASIA
NEW DELHI, India KONYA, Turkey
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group1. introduction SOLAR23
Where are we?
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group1. introduction SOLAR23
Who are our customers?
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
Grid Connected Photovoltaic Systems
• large scale on ground photovoltaic power plants
• roof mounted grid systems for houses, farms, commercial and industrial customers
• battery back up systems to increase self consumption
• BIPV = building integrated photovoltaics
Off-Grid Photovoltaic Systems
• village power supply systems
• industrial power supplies (telecom, oil&gas, traffic, …)
• solar home systems
• solar streetlights
• photovoltaic pumping systems
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
photovoltaic power plants
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
roof mounted gridconnected PV system
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
battery back up systems
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
building Integrated PV
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
village powersupply systems
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
photovoltaic power suppliesfor industrial use
here: telecommunication system
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
Solar Home Systems
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
solar powered streetlights
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group2. photovoltaic systems applications
Photovoltaicpumping systems
Personal selling Module coverage plan System sizing
Visualization & Shadow
Bill of materials
Economic analysis
Turn key installation After sales service
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group3. How to manage turn key projects?
Quotation to customer Purchasing & Logistics
transport to site
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group3. How to manage turn key projects?
Photovoltaic system layout &SOLAR23 questionnaire / checklist
Grid connected photovoltaic systems
1.available surface on roof or on ground for solar modules -> 1kWp = 10m²2.load profile: what is the maximum peak load in kW? -> not interesting ! No batteries are required, only daytime3.energy consumption: which is my annual energy consumption in [kWh]? -> 1kWp produces 1500kWh/year* 4.feed in tarif available or self consumption?5.special features? ->BIPV6.your budget -> how much do you want to invest?
* depending on site
Off-grid photovoltaic systems
1.available surface on roof or on ground for solar modules -> 1kWp =10m²2.load profile: what is the maximum peak load in kW? = power of inverter/ chargers; 100% night time?3.Are there seasonal variations of load profile and irradiation?4.Energy consumption: which is my daily average energy consumption in [kWh]? -> worst case analysis5.How many days of battery autonomy do I need? -> recommendation: 5 days6.Do I have back-up from grid or diesel generator?7.Special features? ->BIPV8.Your budget -> how much do you want to invest?
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group3. How to manage turn key projects?
Basic requirements for components
Solar modules IEC 61215, IEC61730, IEC 61646
Grid tie inverter IEC 62103, IEC 61109, IEC 60664
Solar charge controllers IEC 62509
Battery inverter / chargers IEC 60529, IEC 61683
Industrial solar batteries IEC 61427
General quality insurance ISO 9001, ISO14001
Electrical safety / grid connection: VDE AR 4105
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group3. How to manage turn key projects?
Principle:
„Do not look for the lowest investment cost,but look for the lowest lifetime cost (cost per year)“
best practise recommendations:
- choose quality products manufacturered under industrial standards- build long term relations with suppliers to guarantee spare part supplies- standardize your applications, avoid to engineer always a different solar system for each site- establish an own internal quality managment system such as ISO 9000 and document all your activities
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group3. How to manage turn key projects?
Example of battery lifetime
Manufacturer A Manufacturer B
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group3. How to manage turn key projects?
Example of battery lifetime
Manufacturer A Manufacturer B
Gel battery 12V-200Ah Gel battery 12V-200Ah
Price = 200 Euro Price = 449 Euro
Lifetime = 600 cycles at 50%DOD Lifetime = 3000 cycles at 50% DODService life = 1.6 years Service life = 8.2 years
Cost per year = 125 Euro Cost per year = 55 Euro
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group
Lessons learnt, positive and negative
National & international tenders
• Technical specifications set by tender document / consultant• offer only the minimum standard which is requested by the tender• not the quality wins, but price, not ROI, but initial budget• after sales service is mostly forgotten no control mechanism• many winners finally deliver different components than offered
SOLAR23 adapted design
• detailed analysis what customer really needs• lowest annual cost of investment by using long lasting components• turn key solution with all components („nothing forgotten“)• professional project management from A to Z including commissioning if required• after sales service & partnership• remote monitoring
3. How to manage turn key projects?
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group3. How to manage turn key projects?
Lessons learnt, positive and negative
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group
Typical project timeline
Purc
hase
orde
r
paym
ents
proc
urem
ent
12 weeks1 week
manufacturing + procurement+ engineering+ packing
4 weeks
ship
men
t
2 weeks
Impo
rt &
tran
spor
t to
site
2-3 weeks
inst
alla
tion
4 to 5 months
3. How to manage turn key projects?
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group4. After Sales Service
Partnership and long-term engagement offered by SOLAR23to assure successful system operation
1.SOLAR23 usually teams up with local partnerlevel A: financial minority share holdinglevel B: sales agency agreement
level C: customer-supplier relationship
2.Choose first quality components which will safeguard your good reputation among your customers
3. Combine international components with local components (local purchase)
4. Marketing support by SOLAR23 (trade shows, exhibition room etc.)
5. Know how transfer by SOLAR23 to partner company by training
6. Team up for international projects and bid bonds
7.To benefit from manufacturer‘s warranty conditions: local expertise needed!will the manufacturer still be existing?
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group4. After Sales Service
Remote monitoring systems
source: SMA
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group5. Financial analysis
How about the economy of PV systems?
1.PV module prices have dropped by 50% during the last three years and have stabilized.
2.Lead prices are constant (The lead acid battery is not at all dead!)
3.System solution efficiency has increased by means of
- inverter technology (up to 97% efficiency)- LED lighting technology (more than 100 lm/W)- direct use of solar energy (e.g. pumping system without energy storage, solar fridge without battery)- special adaption of components (solar pump inverters adapted to pump characteristics;
system power management, optimised charging algortihms)
4.Knowledge and experience is available, no contingencies required for expected „first time uncertainties“
PV systems are competitive in many cases today… ...when thinking long-term!
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group5. Financial analysis
Kd = (Ao) x [i(1+i)n] / [(1+i)n-1]
Kd = capital serviceAo = initial investment costI = P/100 interest raten = utilisation periodKd = 1.804.251 Euro x [0,04 (1+0,04)25] / [(1+0,04) 25 -1]Kd = 115.493,65 Euro
Calculation of capital service („Kapitaldienst“)
Initial investment cost: 1.550.451 €Investment period: 25 yearsmaintenance (0.25%) =7.752 € p.a. 193.800 €remote monitoring = 2.400 € p.a. 60.000 €
Investment cost over a period of 25 years 1.804.251 €
Example: 1 MWp grid connected PV System
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group5. Financial analysis
Annual production of 1MWp PV system in Africa = 1.500.000 kWh
Annual cost of investment in PV system = 115.493,65 €
-----------------------------------------------------------
Cost per kWh = 0,0769 €/kWh
POWER THE WAY TO SUSTAINABILITY
Chinese streetlight during daytimeseen in Dakar (Senegal)
MADE IN CHINA
POWER THE WAY TO SUSTAINABILITY
MADE IN CHINA
THANK YOU FOR YOUR ATTENTION!
POWER THE WAY TO SUSTAINABILITY
SAIPEM, Italy
Project: Cathodic Protection & Telemetrie System
Investor: SAIPEM
Volume: 1,6 Mio. EURO
Realization: 2012
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (Cathodic Protection System)
PUMPING SYSTEMS, Gambia
Project: 20 x Solar Pumping Systems in Gambia
Investor: Japanese Gouverment
Volume: 3 Mio. EURO
Realization: 2011
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (Pumping)
PUMPING SYSTEMS, Burkina Faso
Project: 27 x Solar Pumping Systems in Burkina Faso
Investor: Japanese Gouverment
Performance: 1.350.000 liter / day
Realization: 2012
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (Pumping)
SOLAR HOME SYSTEMS, Tunisia
Project: 600 x Solar Home Systems in Tunisia
Investor:
Volume: 1 Mio. EURO
Realized: 2010
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (SHS)
FRES
Project: Solar Home Systems in several African countries (Uganda, Burkina Faso, etc.)
Investor: FRES (Dutch NGO)
Volume: 1 Mio. EURO
Realization: 2011
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (SHS)
GRET, Mauritania
Project: PV Systems (pumping, lighting, etc.)
Investor: GRET (French Solidarity and International Cooperation Association)
Volume: 2 Mio. EURO
Realization: 2011
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (Street-Lighting)
Leitz Foundation, Tanzania
Project: 12 kWp for a catholic Priest Community in
Tanzania
Investor: Louis Leitz Foundation
Volume: 56.000 EURO
Realization: 2012/13
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (Off-Grid)
50,75 KWP ON-GRID SYSTEM, Neckarrealschule Stuttgart
Project: Supply of Electricity to a German school by PV
Investor: City of Stuttgart
Volume: 136.000 EURO
Realization: 2012
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (On-Grid)
102,5 KWP ON-GRID SYSTEM, Germany
Project: 102,5 kWp PV for a hospital
Investor: Private Hospital
Volume: 507.000 EURO
Realization: 2006
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (On-Grid)
46,8 KWP ON-GRID SYSTEM, Germany
Project: 46,8 kWp on a commercial company building
Investor: Private investor
Volume: 187.000 EURO
Realization: 2010 / 2011
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (On-Grid)
323,2 KWP ON-GRID SYSTEM, Germany
Project: 323,2 kWp on a industrial building
Investor: Private Investor
Volume: 969.600 EURO
Realization: 2011
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (On-Grid)
7.7 KWP ON-GRID SYSTEM, Germany
Project: 7.7kWp PV Installation for a private Household
Investor: Private Investor
Volume: 35.000 EURO
Realization: 2010
POWER THE WAY TO SUSTAINABILITY
SOLAR23 Group10. References (On-Grid)
THANK YOU FOR YOUR ATTENTION!
POWER THE WAY TO SUSTAINABILITY