A Presentation on
“Solarization of Modhera Sun Temple & Town”Pre-bid conference
By:
GUJARAT POWER CORPORATION LIMITED
28 January 2020
03-02-2020
Objectives of the Proposed Project
► To make Sun Temple Town of Modhera, a model town drawing its energy requirements completely from Solar Power.
► Develop Modhera into an ‘Energy-Resilient’ and ‘Net Solar Energy Positive’ - potentially using Solar Energy based Technology
► To Demonstrate next-generation and relevant energy technologies to visitors.►Use of solar photovoltaic (PV)
►Utility-scale energy storage mainly Solar Energy
► Electrical Vehicle Charging Station based on Solar Energy
►Micro-grid and Smart Energy Center (i.e. smart metering, grid balancing, real-time demand-side management, etc.)
2Solarization of Modhera Sun Temple & Town,
03-02-2020
GEOGRAPHICAL LOCATION
3
Mehsana
Gujarat
MODHERA SUN TEMPLE & TOWN
Solarization of Modhera Sun Temple & Town,
Distances
Ahmedabad – 100 kMGandhinagar – 88 kMMehsana -- 24 kMAirport -- 94 kM
03-02-2020
Modhera – Historical Iconic Town
4
► The Sun Temple is a Temple dedicated to the solar deity “SURYA”.
►An iconic Symbol of “Solar Energy”
► Location:
►Village: Modhera Village
► Taluka: Becharaji
►District: Mehsana
► State: Gujarat
► Coordinates:
►N 23˚35’0.47”
► E 72˚08’ 33”
Solarization of Modhera Sun Temple & Town, 20 Nov. 2019.
03-02-2020
Modhera – An Airal View
5Solarization of Modhera Sun Temple & Town, 20 Nov. 2019.
2011 Census Code 509572
Postal Code 384212
Total Area 2436 Ha.
Total Populations 6373 Nos.
Nos. of Households 1372 Nos.
Primary School 4 Nos.
Secondary School 1 No
Higher Sec. School 1 No
PHC 1 No
PHS 1 No
Dispensory 1 No
Energy & Petrochemicals Department
2 No x 3 MW SPP and 2 Nos x 7.5 MWh BESS
Located at Village Sujanpura
50 kW + 150 kWh SOLAR CHARGING STATION
-CUM- SMART ENERGY CENTERLocated Nr. Modhera Temple
11 KV External Grid
Remote RMU located in 66/11/Modhera S/S(Considered as Part of Feederupgradation )
Modhera Solarisation Project Objective – Technical Target
LOAD
Modhera
11 kV 230/400 Volt
Energy & Petrochemicals Department
(1) Psolar + Pbess ≥ Lmodhera
(2) Isolar + Ibess + Igrid ≥ Imodhera where Igrid ≤ 0
(3) isolar + ibess + igrid ≥ imodhera where igrid ≤ 0
Project Technical Objective
Modhera Solarisation Project Objective – Technical Target
(4) isolar + ibess = imodhera where igrid = 0, vgrid = 0,
tilla) Grid is revived/restored ORb) Psolar + PBESS sustain the load, which ever is earlier
Psolar = Power generated by Solar Systems
Pbess = Power Discharged by Battery
Energy Storage System
Lmodhera = Non Agriculture (NA) plus
Agriculture (AG) Load of Modhera Village
Isolar = Current from Solar System,
Ibess = Current from BESS
Igrid = Current from 11KV Busbar ( If
supplied to P&T JGY feeder, then +VE)
where Vgrid = Voltage ( At 11 kV busbar)
For this project, Bidder have option to comply the condition
(A) Round the clock i.e within 24 Hrs
Psolar + Pbess ≥ Lmodhera Where Lmodhera = NA + AG
OR
(B) Day Time & Night time
Psolar + Pbess ≥ Lmodhera Where Lmodhera = NA + AG ( Day time)
Psolar + Pbess ≥ Lmodhera Where Lmodhera = NA ( Night Time)
03-02-2020
Modhera : Load ( Electricity ) Profile
Name of sub station 66 KV
MODHERA S/S
Nos & Name of Villages connected MODHERA
Length of HT Line Main + tap 5KM
Length of LT Line 9KM
Name of the 11 kV feeder on which 6 MW
+15 MWh BESS is connected
Modhera P&T JGY Feeder
Connected Load on Modhera P&T Feeder 3192 KW
2/3/2020 8
Load CategoryNos of
ConsumersLoad (KW)
Non- Agricultural 1709 3192
Agricultural 67 2751
HT 3 1500 *
EHT 2 13275 *
Total 1781 20718
* Not considered for this project
03-02-2020
Modhera P & T JGY Feeder -Electricity Load Curve
0
50
100
150
200
250
300
350
400
450
500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
kW
Daily Load curve
14/05/2016
25/08/2016
07/11/2016
30/01/2017
2/3/2020 9
2 KM
PRESENT POWER DISTRIBUTION SYSTEM (HVDS)
66/11 MODHERA KV S/S
Conventional Meter
Residential/Commercial Consumer
Modhera :Present Distribution System
MODHERA SOLARISATION PROJECT : Technical Presentation
WEATHER
STATION
2 KM
SMT MTR
ROOFTOP SOLAR
66/11 KV S/S
BESS
SOLAR PROJECT
SMART ENERGY CENTER CUM CHARGING STATION
Remote controlled Switching RMU S/S
400 Volt cable/s
( N+1) theory11 kV P&T JGY FEEDER
03-02-2020
Distance & Area Details
12Solarisation of Modhera Temple and Town Date : 28-01-2020
Sujanpura Village
Modhera Village
Sun Temple
66/11 kV Modhera S/S
2 x 3 MW SPP x 7.5 MWh Project site
Cable Route -1: 5 KM
Cable Route -2: 8 KM
S.N. Particulars
1 Village Name : SUJANPURA
2 Survey Numbers Selected : 499 & 500
3 Area Available : 23.91Ha(499) &20.09Ha(500)
4 Distance from ModheraSubstation
: 3.9 km
5 Location Coordinates : 23⁰33’09.0” N
72⁰08’18.0” E
03-02-2020
Smart Energy Center –cum- Solar Charging Station
13Solarisation of Modhera Temple and Town Date : 28-01-2020
Charging Station to be connected with nearest Distribution Transformer at 230/400 V level with sufficient protection system. Maximum Distance is 200 Mtr
03-02-2020
Remote Switching System : Configuration
14Solarisation of Modhera Temple and Town Date : 28-01-2020
Existing 11 KV Busbar of 66/11 KV Modhera S/S
Existing 11 KV Modhera P& T Feeder
P &T JGY Modhera
Feeder
2 x 3 MW SPP x 7.5 MWh BESS
Remote controlled Switching Ring Main
Unit within premise of 66 KV/11
Modhera S/S, with provision of Interlock,
Vacuum breakers, isolators, Controlling
& Measuring CT & PT, all protection
system like overload, over voltage, fault
current protection bypass locking etc,
Having Communication and control
point , with all weather enclosure and
complying to relevant Indian
Standard/s
03-02-2020
“Solarisation of Modhera Sun Temple & Town”Major Project Components
15
Sl. No. Type and Capacity of RE Installation Proposed by MNRE
1 6 MW ground-mounted solar PV power plant
2 271 nos. x 1KW Rooftop Solar PV Systems
3 100 kW aggregate capacity of Rooftop Solar PV Systems on Govt. Buildings
4 15 MWh, 6MW, Battery Energy Storage System (BESS)
5 --------
6 304 nos. of Solar Street Lights ( Retrofitting of 12 Watt LED)
7 Smart Energy Components• Advanced metering infrastructure (AMI) and distribution automation
(Establishment of Smart meters at about 1600 Connections & Setting SEC)• Solar Based EV Charging Station - Solar charging station at 230/400 Volt level)• Modhera Grid Up-gradation and Modernization ( Establishment of RMU at GETCO
S/S and Smartmeter at Distribution Transformer level )
8 ----------
Solarization of Modhera Sun Temple & Town, .
03-02-2020
“Solarisation of Modhera Sun Temple & Town”Major Project Components
16
Sl. No. Component Requirement
1 6 MW ground-mounted solar PV
power plant
- State of the art, efficient, ergonomicallygood looking 2 x 3 MW SPP as specified intender
2 271 nos. x 1KW Rooftop Solar PV
Systems
- Establishment of 271 Nos Rooftop SolarPV system with strong data communicationsystem
3 100 kW aggregate capacity of
Rooftop Solar PV Systems on
Govt. Buildings
- Establishment of 100 kW Nos of RooftopSolar PV system on Govt. Building
4 15 MWh, 6MW, Battery Energy
Storage System (BESS)
- State of the Art, efficient, long lasting 2 x7.5 MWh BESS
5 --------
6 304 nos. of Solar Street Lights
( Retrofitting of 12 Watt LED)
- Retrofitting of existing Tubelights
Solarization of Modhera Sun Temple & Town, .
03-02-2020
“Solarisation of Modhera Sun Temple & Town”Major Project Components
17
Sl. No. Component Requirement
7 Smart Energy Components
(a) Advanced metering
infrastructure (AMI) and
distribution automation
Establishment of Smartmeter on every connection ( aprox. 1700 Nos. ) with strong and efficient data communication system
Establishment of Smart Energy Center (SEC) to monitor all components of entire projects at single location as well as to display important parameters to Public at a large in vernacular language ( Hindi, Gujarati & English)
(B) Solar Based EV Charging
Station
Establishment of State-of the Art Charging Station with Solar Panels
(C) Modhera Grid Up-
gradation and
Modernization
Establishment of Remote controlled Switching unit , with provision of VAR Controller, within 66/11 kV S/S under compliance of Indian Electricity Codes, in consolation with GETCO
Note :(1) The building of Solar Charging Station and Smart Energy Center may be one only. SEC may/may not do controlling activity but
it must accumulate all information from all components of the project .(2) There must be one large display screen( Not less then 8” x 6” ) for public at a large for information(3) The data communication amongst all equipments is very important. Successful EPC Contractor must develop strong data
communication system with necessary back up.(4) All visible structure / building must have good Architectural design, good ergonomic view complying to all relevant standard.
Solarization of Modhera Sun Temple & Town, .
Thanks and End of A Presentation on
Solarization of Modhera Sun Temple & Town