Upload
somi-delano
View
230
Download
0
Embed Size (px)
DESCRIPTION
Â
Citation preview
SELECTED WORKS University of Pennsylvania
Master of architectUre + Master of engineering
267-736-7471
SOmi DelanO
soMi delano267-736-7471 | 1234 SW 18TH AvE. APT 308. PORTLANd, OR. 97205 | [email protected] | bRITISH
education2012 – 15 university of pennsylvania, school of design philadelphia, pa
sTruCTures TeaChing assisTanT (2013 - 15)mASTER OF ARCHITECTURE M.ARCH
2006 – 10 queens’ college, cambridge universitycambridge, uk
M.eng projeCT, foundaTion engineering: “surging on jaCked-in piles”DEVISED METHOD TO IMPROVE THE SPEED OF PILE INSTALLATION. METHOD NOW USED IN INDUSTRY
royal aCadeMy of engineering leadership award (2008) – naTional award To 30 sTudenTs eleCTed presidenT, CaMbridge universiTy afriCan Caribbean soCieTy (2008)
b.ENG & M.ENG civil, structural & environmental engineering
program eXperienceadobe suiTe (illusTraTor, phoToshop, indesign)MiCrosofT offiCe suiTe
Maya
auToCadskeTCh-upreviT
rhinoCeros grasshopper
vray
referencethomas roBBins, assoCiaTe prinCipal
yosT grube hall arChiTeCTure
707 washingTon sT | porTland, or [email protected] | 503-221-0150
riChard farley, division viCe presidenT
jaCobs 2301 ChesTnuT sT | philadelphia, pa [email protected] | 215-569-2900
nanako umemoto, prinCipal
rur arChiTeCTure pC28 s washingTon ave | ny 10052 [email protected] | 212-421-8880
employmentOCT 15 – dATEJUN – AUG 14MAY – AUG13
architect, yost grube hall architecture portland, ordeveloped prograM Massing sTudies for a Mixed-use CoMplex To MaxiMize sunlighT and views
developed reviT Model of a CoMMuniTy College wiTh MulTiple building faÇade CoMponenTs
CreaTed ConsTruCTion doCuMenTaTion drawings for CoMMuniTy College building
infrastructure consultant, lagos state government lagos, nigeriaensured CoMplianCe To design Code on ConsTruCTion of lagos lighT rail projeCT
reCeived CoMMendaTion froM governor for reporT on iMproving loCal CapaCiTy for infrasTruCTure projeCTs
SEP 11– JUN 12
graduate structural engineer, price & myers llp london, ukdesigned sTruCTures and sCulpTures inCluding 23M (76’) sTeel sCulpTures by wolfgang buTTress
deTailed ConneCTions for joinTs in bridges and sCulpTures
JAN – MAY 11
research student, giken (silent piler manufacturer) kochi, Japanled a TeaM of 9 To iMprove speed of pile insTallaTion proCedures
JUL – AUG 09
intern, ato architects lagos, nigeriadeveloped arChiTeCTural drawings for residenTial buildings and ChurChes
JUL – AUG 11
4
This is a $28M expansion for
CheMekeTa CoMMuniTy College.
The expansion will provide new
faCiliTies for The MaChining
and eleCTroniCs prograMs,
and renovaTion iMproveMenTs
for auToMoTive, visual
CoMMuniCaTions, welding and
drafTing/engineering.
i was parT of a TeaM of Three
designers. i developed The
reviT and skeTCh-up Model of
The building. i also produCed
renders for The proposal whiCh
were used during group design
CriTs. There was a sTrong foCus
on The design deTails suCh as
The plaCeMenT of Mullions and
shading deviCes.
Professional workCHEMEKETA COMMUNITY COLLEGE // SALEM, OR // YOST GRUbE HALL // 2014
Level 1100' - 0"
Level 2115' - 6"
Roof131' - 0"
2
A4.01
2
A4.01
234.25678 1
3
A4.01
3
A4.01
1
A4.01
1
A4.01
2.59 6.57.510 5.5
2
A4.14
1
A4.14
4
Level 1100' - 0"
Level 2115' - 6"
Roof131' - 0"
2 3 4.2 5 6 7 82.7115' - 0" 15' - 0" 5' - 0" 25' - 0" 35' - 0" 25' - 0" 15' - 0" 15' - 0" 20' - 0" 10' - 0" 25' - 0" 5' - 0" 15' - 0" 15' - 0"
2.5 96.5 7.5 105.5
PERF METAL SUNSCREENPERF METAL SUNSCREEN
11' -
6"
9' -
6"3'
- 0"
4
Level 1100' - 0"
Level 2115' - 6"
Roof131' - 0"
10
2
A4.13
Level 1100' - 0"
Level 2115' - 6"
Roof131' - 0"
1
1
A4.10
Level 1100' - 0"
Level 2115' - 6"
1
Level 1100' - 0"
Level 2115' - 6"
4
A4.13
Scale
Date
Sheet Title
Project No.
Drawing No.
Con
sulta
ntO
wne
rPr
ojec
t
4000
Lanc
aste
rDriv
eN
ES
alem
,OR
9 730
9
FOR R
EFER
ENCE
ONLY
1/8" = 1'-0"
10/1
9/20
1510
:40:
57A
M A3.01
Che
mek
eta
Com
mun
ityC
olle
geA
pplie
d Te
chno
logy
Bui
ldin
g
EXTERIORELEVATIONS
Issue Date
95716
Schematic Design
4000
Lanc
aste
rDriv
eN
E
1/8" = 1'-0"2 NorthMARK DATE DESCRIPTION
1/8" = 1'-0"6 North Partial at East 1/8" = 1'-0"5 North Partial at West
1/8" = 1'-0"3 South Partial at West 1/8" = 1'-0"4 South Partial at East
elevation showing the panelling details
FEC
CLASSROOM CLASSROOM
CIVIL
MACHINING COMPUTERLAB
DRAFTING LAB A OUTPUT ROOM
IAS OFFICE
DRAFTING LAB B
ELECTRICAL
SPRINKLER
MATERIAL PREP &STORAGE
HEAT TREAT
FINISHING SHOP
LOBBY
ENTRY
ENTRY
PROGRAM STORAGE
PLASMA CUTTER +COMPUTER
CNC + EDM LABLATHE SHOP MILL SHOP
ELEV ROOM
WOMEN
MEN
FAMILY
JANITOR CLOSET
VEN
DIN
GRE
CYC
LING
ELEVATOR
QUALITY ASSURANCELAB
RAPID PROTOTYPE
ENTRY
PHEN
OLIC
LO
CKE
RS
MACHINING PROGRAMSTORAGE
ROLL-UP WINDOW
STUDENT LOUNGE
HALLWAY
6' - 4 3/8"
SEMINARTOOL CRIB
5' - 0"
COMPRESSOR
HALLWAY + LOCKERS
MACHINING LOCKERS
3' - 3 1/2"
5
3" = 1'-0"1 STUDS EXTEND TO ACOUSTICAL TILE CEILING 1 1/2" = 1'-0"2 Wall Type P - Studs Braced to Roof/Floor Deck
3" = 1'-0"1 Wall Type A 1 1/2" = 1'-0"3 Wall Type P - Studs Extend to Roof/Floor Deck
STEEL 1" 'Z'S @ 24" OCSPAN (2) FLUTES MIN.TACK WELD TO DECK.
STEEL DEFORMED TRACK
2 1/2" STEEL STUDSALTERNATING @ 48" O.C.& PAIR AT EA. DOOR JAMB
STEEL DEFLECTIONTRACK W/1" DEFLECTIONSPACE
GYP. BD./STEEL STUD
INSULATION 4' W. EA.SIDE OF PARTITION @ 'S'
INSULATION @ 'S'
STEEL ROOF /FLOOR DECK -SEE SECTIONSFOR TYPE
SEE PLANS FORPARTITION TYPE
CEILING PERSCHEDULE
0' -
6"
TOP OF SLAB
ACOUS SEALANT @ S
SEE PLANS FOR PARTITIONTYPE
SOUND ATTENUATIONBLANKET @ S
FASTEN RUNNER TO CLGSUPPORT @ 2'-0" OC THRUNEOPRENE BLOCKS
WALL LATERAL BRACING:12 GA STL WIRE @ 5'-0" OCBOTH SIDES, EXTEND AT 45ANGLE FROM C PARTITIONHEAD TO STRUCTUREABOVE
CENTERLINE STUD ONPLANNING GRID MODULEOR AS DIMENSIONED
SUSPENDED TILE CEILINGNEOPRENE FOAM TAPECONT BETWEEN BLOCKS
CONT METAL CASING BEAD
SOUND ATTENUATIONBLANKET 4'-0" EASIDE OF PARTITIONAT "S" WALL TYPE
PARTITIONTYPE ASSCHEDULED.S=SOUNDATTEN.BLANKET
FLOOR OR ROOFSYSTEM: CONC &/ORSTEEL DECKW/FIREPROOFING
PACK CAVITY W/ SOUNDATTENUATION BLANKET
18 GA 'Z' CLIP @ 24" O.C.,SPAN (2) FLUTES MIN.TACK WELD TO DECKING
1/2" DEFLECTION SPACE
HEAD TRACK: 20 GA. W/2"DEEP LEG W/(2) #8 TEKSCREWS TO 'Z' CLIP @ 24"O.C. SCREW GWB TOWALL STUDS MIN. 1/2"BELOW TRACK LEG.
CENTERLINE STUD ONPLANNING GRID MODULEOR AS DIMENSIONED
INSULATION
STEEL 1" 'Z'S @ 24" O.C.SPAN (2) FLUTES MIN.TACK WELD TO DECK
STEEL DEFLECTIONTRACK W/1"DEFLECTION SPACE
STEEL STUD
INSULATION @ 'S'
5/8", TYPE X GWB EA SIDE
STEEL ROOF /FLOOR DECK -SEE SECTIONSFOR TYPE
SEE PLANS FORPARTITION TYPE
CEILINGPERSCHEDULE
0' -
6"
wall connection details
first floor plan showing different classroom types
6
This is a proposal for a visiTors
CenTer for a new residenTial
CoMplex planned in saudi
arabia. The visiTors’ CenTer
serves as a show rooM To
poTenTial ClienTs inforMing TheM
of The kinds of housing and
reCreaTional faCiliTies ThaT are
available. inside The visiTors’
CenTer are TheaTers, offiCes and
MulTi-purpose lounges where
ClienTs Can be hosTed. There are
Two offiCe bloCks nexT To The
visiTors’ CenTer where full-TiMe
eMployees will work.
Professional workMAYASEM vISITORS’ CENTER // SAUdI ARAbIA // YOST GRUbE HALL // 2014
SCHEME 3STREET VIEW FROM SOUTH
CONSTRUCTION OFFICE BUILDING
GROUND FLOOR PLAN
UP
UP
A
1
B D E F H
2
3
4
5
C G4500 4500 3000 1500 6000 6000 4500 4500
1500
4500
1500
4500
1500
C.1
OFFICE
SHAMAYEL OFFICES
KITCHEN
WORK ROOM
SMALL CONFERENCE OFFICE OFFICE
CONSTRUCTIONSUPERVISION
M. TOILETLARGE CONFERENCE
SMALL CONFERENCEOFFICEOFFICE
CONSTRUCTIONMANAGEMENT
VESTIBULE
VESTIBULE
3.1
OPENABOVE
JAN.
0 5m1 2.5
EXEC/ W. TOILET
ELEC.
TO COURTYARD
TO PARKING
ground floor plan for office block
7
row house addition // PhiLadeLPhia, Pa // CritiC: FranCa trubiano
revit design work
LEVEL 1
2' - 0"
LEVEL 2 REAR
11' - 0"
LEVEL 2
13' - 6"
LEVEL 3 REAR
21' - 0"
LEVEL 3
23' - 6"
LEVEL BASEMENT
-6' - 6"
GROUND
0' - 0"
1" GRAVEL
2 1/2 " INSULATION
GRAVEL
6" CONCRETE FLOOR
32" X 16" FOUNDATION FOOTING
1 1/2" RIGID INSTALLATION
16" FOUNDATION WALL
8" X 8" X 16" CONCRETE BOND BEAM
WEEP HOLES @ 2" O.C.
BRICK DRIP SILL
36" X 72" WINDOW
CONCRETE MASONRY UNIT
INSULATON
METAL CAPING
Level 12' - 0"
Level 213' - 6"
Level 323' - 6"
Level Basement(Orig)-6' - 6"
GROUND0' - 0"
2 1/2" Rigid Insulation
1" Gravel Layer
4" French Drain
1 1/2 Rigid Insulation
12" Foundation Wall
Steel Angle 6"X 6" X 1/2"
CMU Structural Bond Beam
Insulation
Metal Ties @ 16" o.c.
Flashing with Drip Edge
6" Concrete Floor Slab
32" X 16" Concrete Footing
ADD5043
ADD5042
ADD5023
1" Square Mullions
3/4" Gypsum Wall Board
1/2" Metal Furring
Vapour Barrier
Level 12' - 0"
Level 213' - 6"
Level 323' - 6"
Level Basement(Orig)-6' - 6"
GROUND0' - 0"
ADD5022
ADD5021
3/4" Gypsum Wall Board1/2" Metal Furring
Vapour Barrier
Steel Angle 6"X 6" X 1/2"
CMU Structural Bond Beam
Insulation
Metal Ties @ 16" o.c.
Flashing with Drip Edge
2 1/2" Rigid Insulation
1" Gravel Layer
4" French Drain
1 1/2 Rigid Insulation
12" Foundation Wall
6" Concrete Floor Slab
32" X 16" Concrete Footing
Gravel
Scale
Date
Drawn by
1/2" = 1'-0"
12/1
2/20
12 1
1:36
:09
PM
ADD401
Wall Sections
Add
ition
to a
n Ex
istin
g Ph
ilade
lphi
a Ro
who
me
ARC
H 4
31/5
31: C
onstr
uctio
n Te
chno
logy
1
Dec 11, 2012Olusomi Delano
1/2" = 1'-0"1 North Wall Section 1/2" = 1'-0"
2 East Wall Section
1/2" = 1'-0"3 South Wall Section.
Solar Shading
Gravel
LEVEL 1
2' - 0"
LEVEL 2
13' - 6"
LEVEL 3
23' - 6"
LEVEL T.O. ROOF
34' - 0"
LEVEL BASEMENT
-6' - 6"
GROUND
2ADD202
LEVEL 1
2' - 0"
LEVEL 2
13' - 6"
LEVEL 3
23' - 6"
LEVEL BASEMENT
-6' - 6"
GROUND
2ADD201
YokoHaMa, tokYo // 2-Person CollaBoration ProjeCt // CritiC: nanako uMeMoto (rur arCHiteCture)
YokoHaMa reduX // a revised ProPosal for YokoHaMa Port terMinal
YokoHaMa, tokYo // 2-Person CollaBoration ProjeCt // CritiC: nanako uMeMoto (rur arCHiteCture)
YokoHaMa reduX // a revised ProPosal for YokoHaMa Port terMinal The oCCasion of The yokohaMa
porT TerMinal CoMpeTiTion in
1995 was a waTershed for The
disCipline in Many respeCTs. a
new generaTion of arChiTeCTs
seized iT as a plaTforM To explore
eMerging ModaliTies in design,
design TeChnology, and delivery
whiCh would in The ensuing
deCades beCoMe The MediuM
Through whiCh and againsT
whiCh MuCh of ConTeMporary
praCTiCe played ouT.
This projeCT re-engaged
yokohaMa wiTh neiTher
nosTalgia nor negaTiviTy.
design proCeeded in Three
phases. firsTly, a forMal
analysis of a signifiCanT enTry
in The CoMpeTiTion was Made.
The seCond phase involved
Taking The design prinCiples
derived froM The analysis
and CreaTing a design Model
ThaT beCaMe The basis for our
proposal. This involves a shifT
froM The analyTiCal Mode To The
projeCTive Mode. The Third phase
was The deliberaTe inTroduCTion,
aT Three disTinCT sCales and
using Three differenT sysTeMs, of
disCreTe prograMMaTiC eleMenTs
inTo The ConTinuous Models
analyzed in The previous phases.
9
object > cast > REmODEL
reference > re-interpret > REmODEL
yOKOhama REDux
10
a REviSED pROpOSaL fOR yOKOhama pORT TERminaL
11
12
yOKOhama REDux
N
N
13
SCALE 1:600
a REviSED pROpOSaL fOR yOKOhama pORT TERminaL
elevation showing continuous structural diagrid through terminal and towers
10
PRIMARY RIB STRUCTURE
OBJECTS
TRANSITION SURFACE
FIELD
PRIMARY RIB STRUCTURE
3RD YEAR STUDIO | SPRING 2015
Spring2015_Portfolio__Layou8_toPrint.indd 10 6/23/2015 3:05:49 AM
a Post-sCientifiC MuseuM of geologYCentral Park, nYC // 3-Person CollaBoration ProjeCt // CritiC: ferda kolatan
ThroughouT hisTory, sCienCe
has Tried To beTTer undersTand
our world by aTTeMpTing To
logiCally explain naTure. The
geologiCal objeCT is ofTen
viewed as soMeThing ThaT Can be
fully grasped and undersTood
by various sCienTifiC Means and
MeThods. our proposal for a
“posT-sCienTifiC MuseuM of
geology” aiMs To ConfronT
This TradiTional approaCh,
by aTTeMpTing To CreaTe a
provoCaTive experienCe ThaT
beCoMes a MediuM for a new
undersTanding of whaT naTure
is To us.
Tension exisTs beTween all
objeCTs in naTure. This Tension
CreaTes ConneCTiviTy beTween
differenT objeCTs. we aiM To use
This idea of Tension To CuraTe
and organize The spaCes wiThin
The MuseuM.
The CuraTion seeks To give The
individual The opporTuniTy To
Make his own definiTions of
The objeCTs on display. The
building uses irregular seCTional
Changes To give The individual
The opporTuniTy To view objeCTs
froM MulTiple perspeCTives aT
various poinTs in spaCe and TiMe.
15
16
muSEum Of gEOLOgy
deriving museum form
museum form
drape surface
over rock
contoured rock
rock
17
a pOST-SCiEnTifiC muSEum
floor plan (p2) showing continuity of floors and internal spaces
S1
S1
UP
DOWN
DOWN
UP
DOWN
DOWN
DOWN
S2
S2
N
section (s1) showing structural support and lack of continuous floor slabs
Cafe
exhibiTion spaCe
offiCe
baseMenT
abCd
18
muSEum Of gEOLOgy
1/4” STEEL PLATE
STEEL RIB
6”
5/8” EXTERIOR SHEATHING
STEEL Z-PLATE
18” PANEL4”
VAPOR BARRIER
3” INSULATION
4” COLD-FORMED FRAMING
paneliZation and support of eXterior cladding (d1)
Cafe
exhibiTion spaCe
offiCe
baseMenT
composition of eXterior panels
F
H
E
15’
10’
G
C
H
L
D
I
J
KL
A
A
C
B
B
E G
D F
J K
PANELS FOR FENESTRATION
SOLID PANELS
10’
5’
15’
7’10’’
20’
3’ 2’
25’
3’
15’
8’ 25’
30’
30’
5’
AXON SURFACE UNROLLED
25’ 25’
30’
30’
F
H
E
15’
10’
G
C
H
L
D
I
J
KL
A
A
C
B
B
E G
D F
J K
PANELS FOR FENESTRATION
SOLID PANELS
10’
5’
15’
7’10’’
20’
3’ 2’
25’
3’
15’
8’ 25’
30’
30’
5’
AXON SURFACE UNROLLED
25’ 25’
30’
30’
F
H
E
15’
10’
G
C
H
L
D
I
J
KL
A
A
C
B
B
E G
D F
J K
PANELS FOR FENESTRATION
SOLID PANELS
10’
5’
15’
7’10’’
20’
3’ 2’
25’
3’
15’
8’ 25’
30’
30’
5’
AXON SURFACE UNROLLED
25’ 25’
30’
30’
19
a pOST-SCiEnTifiC muSEum
solid panels fenesTraTion panels
20
muSEum Of gEOLOgy
21
1
1
5
3
4
2
a pOST-SCiEnTifiC muSEum
section (s2) showing eXhibition spaces carved into steel plates
audiToriuM3
exhibiTion rooM1
ground floor4MeChaniCal spaCe5
offiCes2
triBeCa, nYC // CritiC: Hina jaMelle
sHifting HYBrids // transforMations for a new Hotel & residential Building
sHifting HYBrids // transforMations for a new Hotel & residential Building
23
This projeCT explores how
branChing, TexTure and
MisalignMenT Can be used as
paraMeTers To CreaTe a Mixed used
residenTial and hoTel building
CreaTed froM aggregaTing
individual uniTs.
branChing, is used To CreaTe
differenT prograMMaTiC spaCes.
seaMing The building gives iT
TexTure These seaMs were also
developed To forM a sysTeM of
inTerior furnishes. Misaligning
The uniTs gave The building More
dynaMisM.
The projeCT is 8-sTory building,
Covers 45,000fT2 and
ConTains uniTs of differenT
sizes. aCCess To The residenTial
uniTs is separaTe froM general
hoTel aCCess To allow for
privaCy. The 1sT floor also
hosTs a resTauranT To inCrease
CoMMerCializaTion of The
building.
24
ShifTing hybRiDS
4th floor plan - units transitionally grow, branch and misalign from each other
MISALIGNMENT
BRANCHING
single unit double unit system for aggregation of units
+ +
PUBLIC SPACE
RESIDENTIAL UNITSHOTEL UNITS
s1
25
hOTEL & RESiDEnTiaL buiLDing
section (s1) showing how branching and teXture is used on interior walls
+0'
GROUND FLOOR
P1
P2
STORAGE LAUNDRY
+97'
+85'
+73'
+49'
+37'
+25'
+13'
+61'
0 5 10 20
26
ShifTing hybRiDS
misalignment of units creating dynamism in building
27
1
4
5
6
33
2
publiC MulTifunCTion spaCe3
reCepTion1
balCony4double uniT
single uniT
56
lobby2
hOTEL & RESiDEnTiaL buiLDing
section showing lobby space, housing units and teXtured walls
28
ShifTing hybRiDS
29
hOTEL & RESiDEnTiaL buiLDing
CritiC: ali raHiM
an inHaBitaBle surfaCe - SEAMING // NESTING
30
31
3d print study of surfaces showing nesting and seaming qualities
seaming
pinching
nested surface
twisting
using Two TeChniques
of seaMing and nesTing
an inhabiTable surfaCe To
perforM MulTiple funCTions
was designed. There was
a To CreaTe a ConTrolled
surfaCe ThaT appeared siMple
yeT ConTinuous. eaCh surfaCe
appears To be disTinCTively
ConneCTed wiTh The oTher
Through seaMing. oTher
surfaCe qualiTies suCh as
TwisTing and pinChing were
also produCed as a resulT.
SELECTED WORKS University of Pennsylvania
Master of architectUre + Master of engineering
267-736-7471
SOmi DelanO
Thank YOu