Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. The following items will be made available on December 13, 2016 unless otherwise noted: • EBS (Electronic Bidding System) files via Bid Express website • Hardcopy plans/proposals & letting DVD via Engineering Publications o Located in G-19 SCDOT Headquarters o Phone (803)737-4533/ Fax (803)737-4530 o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds) Access the Construction Extranet for the following items: • Plans • Announcements • Bids as Received • CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx. Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-1656. The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx or for purchase by contacting: Engineering Publications at (803) 737-4533. Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice. SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING January 10, 2017 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia, SC

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should signin at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with allLetting related questions.

The following items will be made available on December 13, 2016 unless otherwise noted:• EBS (Electronic Bidding System) files via Bid Express website• Hardcopy plans/proposals & letting DVD via Engineering Publications

o Located in G-19 SCDOT Headquarterso Phone (803)737-4533/ Fax (803)737-4530o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)

Access the Construction Extranet for the following items:• Plans• Announcements• Bids as Received• CPM Schedule Templates

Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx.

Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.

The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx or forpurchase by contacting: Engineering Publications at (803) 737-4533.

Quantities shown herein are approximate for information only and should not be used for bidding purposes.The Department reserves the right to change these quantities without notice.

SOUTH CAROLINADEPARTMENT OF TRANSPORTATION

NOTICE TO CONTRACTORSFOR

REGULAR HIGHWAY LETTINGJanuary 10, 2017

Letting Location: SCDOT Headquarters Building

Conference Room 331 955 Park Street Columbia, SC

Page 2: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 010 1Page:

South Carolina Department of Transportation 12/6/2016

0210130SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Aiken DBE Goal Percent: 1.50%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATIONPROGRAM IN AIKEN COUNTY

6/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029999P029999PCN: Project No.:

P030401P030401PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 622.000 SY

MAINTENANCE STONE 3.780 TON

LIQUID ASPHALT BINDER PG64-22 1.260 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 378.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 14,388.000 SY

MILLED-IN RUMBLE STRIP 11.392 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 20.000 TON

MICRO SURFACING SURFACE COURSE 160,439.190 SY

MICRO SURFACING LEVELING 60.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,296.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,452.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 75,760.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 160.000 LF

12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 51.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 371.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 15.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 9.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 8,130.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 58,030.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,904.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 151,520.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 320.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 102.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 742.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 30.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 18.000 EA

8.13

Page 3: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 010 2Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 16,260.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 116,060.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 182.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 133.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 665.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 20.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 840.000 LF

SAWCUT FOR LOOP DETECTOR 500.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 46.000 SY

DETECTABLE WARNING MATERIAL 250.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 76.000 SY

PEDESTRIAN RAMP CONSTRUCTION 500.000 SY

Page 4: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 020 3Page:

South Carolina Department of Transportation 12/6/2016

0210140SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Aiken DBE Goal Percent: 2.00%

Completion Date:

Description: 2017 FEDERAL AID PAVEMENTPRESERVATION PROGRAM - 02

6/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030000P030000PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 0.140 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 14.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 62.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 162.000 SF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 69,740.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 70.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 1,600.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 62,560.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 139,480.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 140.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,200.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 125,120.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 436.000 EA

MICRO SURFACING SURFACE COURSE 100,202.672 SY

MICRO SURFACING LEVELING 20.000 TON

LIQUID ASPHALT BINDER PG64-22 1.260 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 20.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 100,202.672 SY

6.6

Page 5: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 030 4Page:

South Carolina Department of Transportation 12/6/2016

0410280SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Anderson DBE Goal Percent: 5.00%

Completion Date:

Description: 2017 FA PRESERVATION IN DISTRICT 2.

9/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030505P030505PCN: Project No.:

P030506P030506PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 500.000 SY

REMOVAL OF EXIST. GUARDRAIL 550.000 LF

BORROW EXCAVATION 2,676.000 CY

MAINTENANCE STONE 77.000 TON

FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 6,700.000 SY

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,000.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.0" 1,245.000 SY

MILLED-IN RUMBLE STRIP 6.680 MI

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,544.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 8,880.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 154,051.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4,860.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,564.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 82.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 15.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 20.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 6,720.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 158,566.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 240.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 3,220.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 46,978.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,620.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,422.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 29.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 5.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 7.000 EA

6.21

Page 6: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 030 5Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,240.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 68,283.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 120.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 434.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 368.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 825.000 EA

DETECTABLE WARNING MATERIAL 250.000 SF

PEDESTRIAN RAMP CONSTRUCTION 500.000 SY

SURFACE APPLIED DETECTABLE WARNING 70.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,250.000 LF

GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 300.000 LF

STEEL BEAM GUARDRAIL (THRIE) 150.000 LF

END TERMINAL - TYPE T 14.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 3.190 ACRE

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 133,061.000 SY

MICRO SURFACING SURFACE COURSE 133,061.000 SY

Page 7: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 040 6Page:

South Carolina Department of Transportation 12/6/2016

0708880SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Beaufort DBE Goal Percent: 2.00%

Completion Date:

Description: 2017 FEDERAL AID NHS, PRIMARY ANDSECONDARY BEAUFORT

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030106P030106PCN: Project No.:

P030121P030121PCN: Project No.:

P030164P030164PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 2,273.000 CY

EXCAVATION FOR SHOULDER PAVING 693.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 693.000 STA

MAINTENANCE STONE 29.250 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 1,853.280 TON

HMA SHOULDER WIDENING COURSE 1,652.640 TON

LIQUID ASPHALT BINDER PG64-22 1,326.645 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,225.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,700.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 128,496.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 16,500.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 700.000 SY

MILLED-IN RUMBLE STRIP 10.920 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,649.133 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 15,489.573 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 3,999.910 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 100.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,768.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 12,400.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 62,470.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 200.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 320.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 43.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 43.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 4.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 4.000 EA

6.98

Page 8: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 040 7Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 7,640.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 61,860.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 37,200.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 187,390.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 600.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 680.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 75.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 75.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 22,920.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 185,550.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,840.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 732.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 462.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 784.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 200.000 LF

NO.14 CU.WIRE, 1 CONDUC,IMSA-20-1 1,500.000 LF

SAWCUT FOR LOOP DETECTOR 350.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 4.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 7.170 ACRE

Page 9: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 050 8Page:

South Carolina Department of Transportation 12/6/2016

0809110SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Berkeley DBE Goal Percent: 5.00%

Completion Date:

Description: 2017 FA RESURFACING IN BERKELEYCOUNTY

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029996P029996PCN: Project No.:

P030109P030109PCN: Project No.:

P030147P030147PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 2.000 EA

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 3,310.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 1,340.000 LF

UNCLASSIFIED EXCAVATION 990.000 CY

BORROW EXCAVATION 2,370.000 CY

EXCAVATION FOR SHOULDER PAVING 348.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 348.000 STA

MAINTENANCE STONE 786.250 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 2,676.960 TON

LIQUID ASPHALT BINDER PG64-22 1,424.402 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,385.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 16,990.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 109,530.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 44,600.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 700.000 SY

MILLED-IN RUMBLE STRIP 6.280 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 5,644.896 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 16,631.413 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 2,020.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,614.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 8,720.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 34,940.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 3,385.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 120.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,444.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 45.000 EA

6.27

Page 10: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 050 9Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 45.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 11.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 4.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 11,670.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 59,045.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 17,440.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 120,180.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,770.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,868.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 92.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 92.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 8.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 21,880.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 179,720.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,695.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 924.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 669.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 972.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 2,300.000 LF

NO.14 CU.WIRE, 1 CONDUC,IMSA-20-1 21,750.000 LF

SAWCUT FOR LOOP DETECTOR 9,750.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 35.000 EA

CATCH BASIN - TYPE 16 (TOP ONLY) 4.000 EA

CATCH BASIN - TYPE 16 (BOX ONLY) 1.000 EA

CATCH BASIN T-18 (CONVERT C.B. TYPE 7) 9.000 EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 980.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 360.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 1,680.000 SY

DETECTABLE WARNING MATERIAL 388.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 1,020.000 SY

CONCRETE MEDIAN 10.000 SY

PEDESTRIAN RAMP CONSTRUCTION 775.000 SY

SURFACE APPLIED DETECTABLE WARNING 70.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 2.970 ACRE

Page 11: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 060 10Page:

South Carolina Department of Transportation 12/6/2016

1009430SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Charleston DBE Goal Percent: 4.00%

Completion Date:

Description: 2017 FA RESURFACING IN CHARLESTONCOUNTY

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030161P030161PCN: Project No.:

P030293P030293PCN: Project No.:

P030361P030361PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

SELECTED CLEARING & GRUBBING 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,223.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 1,060.000 LF

UNCLASSIFIED EXCAVATION 150.000 CY

BORROW EXCAVATION 1,598.000 CY

EXCAVATION FOR SHOULDER PAVING 521.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 521.000 STA

MAINTENANCE STONE 140.470 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 3,088.800 TON

LIQUID ASPHALT BINDER PG64-22 1,362.334 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,500.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 7,547.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 109,093.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,590.000 SY

MILLED-IN RUMBLE STRIP 0.920 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 17,684.826 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 4,510.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,724.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,260.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 20.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 50,890.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 30,690.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,330.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 30.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 334.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 20.000 EA

8.79

Page 12: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 060 11Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 12.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 9.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4,515.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 69,210.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 9,770.000 LF

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 40.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 110,610.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 78,200.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,650.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 688.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 48.000 EA

WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 67.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 37.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 21.000 EA

BIKE LANE SYMBOL - FAST DRY PAINT 67.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,900.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 179,090.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 150.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 2,060.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 2,060.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 2,060.000 LF

BIKE LANE SYMBOL -PREFORMED THERMO - 90MIL 65.000 EA

BIKE LANE ARROW - PREFORMED THERMO - 90MIL 63.000 EA

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 90.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 182.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 754.000 EA

REMOVAL OF PAVEMENT MARKINGS 6,180.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,500.000 LF

NO.14 CU.WIRE, 1 CONDUC,IMSA-20-1 13,000.000 LF

SAWCUT FOR LOOP DETECTOR 4,800.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 20.000 EA

12"X 18" HORIZONTAL ELLIPTICAL(HE) RC PIPE CUL.-CLASS HE-III 225.000 LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 1,060.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 375.000 SY

CONCRETE SIDEWALK(6" UNIFORM) 60.000 SY

DETECTABLE WARNING MATERIAL 155.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 855.000 SY

PEDESTRIAN RAMP CONSTRUCTION 250.000 SY

SURFACE APPLIED DETECTABLE WARNING 300.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 2.820 ACRE

ROOT BARRIER 200.000 LF

SILT FENCE 100.000 LF

Page 13: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 070 12Page:

South Carolina Department of Transportation 12/6/2016

1110530SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Cherokee DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 CHEROKEE CTC RESURFACING

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030735P030735PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CONCRETE 13.000 CY

BORROW EXCAVATION 1,904.000 CY

STATION GRADING 107.724 STA

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 4 67,700.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 3,046.500 TON

MAINTENANCE STONE 60.000 TON

LIQUID ASPHALT BINDER PG64-22 278.574 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,300.000 SY

MILLED-IN RUMBLE STRIP 9.520 MI

HOT MIX ASPHALT SURFACE COURSE TYPE C 2,017.080 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 2,423.820 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 67,700.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,224.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 880.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 100,580.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 840.000 LF

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,320.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 86,500.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 440.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 50,290.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 420.000 LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,160.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 43,250.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 321.000 EA

15" SMOOTH WALL PIPE 192.000 LF

4.76

Page 14: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 070 13Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

18" SMOOTH WALL PIPE 8.000 LF

24" SMOOTH WALL PIPE 8.000 LF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,925.000 LF

END TERMINAL - TYPE T 14.000 EA

RESET END TERMINAL-TYPE T 3.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 800.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 7.000 ACRE

SILT FENCE 2,425.000 LF

REPLACE/REPAIR SILT FENCE 250.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 250.000 LF

Page 15: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 080 14Page:

South Carolina Department of Transportation 12/6/2016

1309660SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Chesterfield DBE Goal Percent: 2.00%

Completion Date:

Description: PEE DEE COG RESURFACING

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P028939P028939PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 1,304.000 CY

EXCAVATION FOR SHOULDER PAVING 689.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 689.000 STA

HMA SHOULDER WIDENING COURSE 4,590.080 TON

LIQUID ASPHALT BINDER PG64-22 913.374 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 200.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,500.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,400.000 SY

MILLING - VARIABLE - 2' WIDTH 9,200.000 SY

FIBER REINFORCED MEMBRANE - SURFACE TREAMENT 16,427.000 SY

MILLED-IN RUMBLE STRIP 13.040 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 11,150.188 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 1,500.000 TON

FULL DEPTH CONCRETE PAVEMENT PATCH - 9" 200.000 SY

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 300.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 137,800.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 300.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,120.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 65,500.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 150.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 68,900.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 150.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 6,560.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 32,750.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 440.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 13.040 ACRE

6.52

Page 16: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 090 15Page:

South Carolina Department of Transportation 12/6/2016

1405370SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Clarendon DBE Goal Percent: 2.00%

Completion Date:

Description: EFLAP RESURFACING IN CLARENDONCOUNTY

7/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

FLAP015P029537PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 432.000 CY

EXCAVATION FOR SHOULDER PAVING 228.096 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 228.096 STA

MAINTENANCE STONE 8.600 TON

HMA SHOULDER WIDENING COURSE 1,140.480 TON

LIQUID ASPHALT BINDER PG64-22 206.987 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 860.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 100.000 SY

MILLED-IN RUMBLE STRIP 3.456 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 2,398.460 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 316.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 80.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 22,950.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 120.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 1,900.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 12,800.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 160.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 45,900.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 240.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,800.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 25,600.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 145.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 1.048 ACRE

2.16

Page 17: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 100 16Page:

South Carolina Department of Transportation 12/6/2016

2083671SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Fairfield DBE Goal Percent: 4.00%

Completion Date:

Description: SC 34 BRIDGE OVER LITTLE RIVER

4/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$126.00

$37.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $53.00

Letting Time:

BR200070039042RD01PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

MOBILIZATION - SUBCONTRACTOR 1.000 LS

BRIDGE CONSTRUCTION ACCESS 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 4,054.000 SY

REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS

UNCLASSIFIED EXCAVATION 11,080.000 CY

BORROW EXCAVATION 29,220.000 CY

BORROW EXCAVATION - SPECIAL (FA-10) 3,540.000 CY

BORROW PIT SET-UP 1.000 LS

MUCK EXCAVATION 4,200.000 CY

GEOGRID REINFORCEMENT (UNIAXIAL) 4,700.000 SY

GEOGRID REINFORCEMENT (BIAXIAL) 5,810.000 SY

MONITORING DEVICE - SETTLEMENT PLATE 4.000 EA

MONITORING DEVICE – PIEZOMETER – VIBRATING-WIRE 4.000 EA

TEMPORARY SHORING WALL 739.000 LF

GROUND MODIFICATION (VIBRO-STONE COLUMN) 15,500.000 LF

NO. 57 STONE FOR BACKFILL 1,680.000 TON

FLOWABLE FILL 140.000 CY

MAINTENANCE STONE 210.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 1,451.000 TON

HMA SHOULDER WIDENING COURSE 63.000 TON

LIQUID ASPHALT BINDER PG64-22 132.000 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,200.000 SY

MILLED-IN RUMBLE STRIP 1.200 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 673.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE CM 767.000 TON

0.616

Page 18: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 100 17Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 38.000 TON

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN FOR MAINT 2.000 EA

TEMPORARY CONCRETE BARRIER 2,740.000 LF

BARRICADE - TYPE 3 4.000 LF

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 184.000 SF

PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 20.000 SF

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2 10.000 EA

ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2) 10.000 EA

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 6,530.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 6,530.000 LF

TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 48.000 EA

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 6,550.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 6,550.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 51.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 1,000.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 1,000.000 LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 63.000 SF

U-SECTION POST FOR SIGN SUPPORTS - 3P 130.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,805.300 LF

CONC. FOR STRUCTURES - CLASS 4000 995.000 CY

COMPRESSION SEAL JOINT 93.400 LF

GROOVED SURFACE FINISH 2,097.000 SY

REINF. STEEL FOR STRUCTURES (BRIDGE) 288,673.000 LB

HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 14,594.000 LB

PRESTRESSED CONC. BEAM (TYPE IV) 2,297.000 LF

CONCRETE BRIDGE BARRIER PARAPET 836.400 LF

CONCRETE BRIDGE BARRIER PARAPET TRANSITION 4.000 EA

DYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 4.000 EA

PILE DRIVING SET-UP 14.000 EA

REINF. PILE TIPS (HP14 X 73) 14.000 EA

STEEL H BEARING PILING (HP14 X 73) 567.000 LF

DRILLED SHAFT SET-UP 9.000 EA

DRILLED SHAFT WITH WET & DRY EXCAVATION - 54" DIAMETER 30.000 LF

DRILLED SHAFT WITH ROCK EXCAVATION - 54" DIAMETER 110.400 LF

DRILLED SHAFT WITH WET & DRY EXCAVATION - 60" DIAMETER 383.700 LF

CONSTRUCTION CASING - 60" DIAMETER 413.800 LF

24" SMOOTH WALL PIPE 120.000 LF

30" SMOOTH WALL PIPE 54.000 LF

36" SMOOTH WALL PIPE 66.000 LF

CONCRETE CURB (9" X 15") 8.000 LF

BRIDGE APPROACH CONCRETE CURB AND GUTTER(1'-10") 60.000 LF

ELASTOMERIC BEARING 48.000 EA

Page 19: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 100 18Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

CROSSHOLE SONIC LOGGING SETUP 9.000 EA

AGGREGATE UNDERDRAIN(AGG#789)WITH 4"PERF.PIPE FOR STRUC 202.000 TON

RIP-RAP (CLASS A) 90.000 TON

RIP-RAP (CLASS B) 210.000 TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 130.000 SY

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE D 188.000 SY

STEEL BEAM GUARDRAIL STEEL BEAM GR. 783.000 LF

END TERMINAL - TYPE T 4.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

MOVING ITEM NO. 1 1.000 LS

MOVING ITEM NO. 10 1.000 LS

MOVING ITEM NO. 11 1.000 LS

MOVING ITEM NO. 12 1.000 LS

MOVING ITEM NO. 13 1.000 LS

MOVING ITEM NO. 2 1.000 LS

MOVING ITEM NO. 3 1.000 LS

MOVING ITEM NO. 4 1.000 LS

MOVING ITEM NO. 5 1.000 LS

MOVING ITEM NO. 6 1.000 LS

MOVING ITEM NO. 7 1.000 LS

MOVING ITEM NO. 8 1.000 LS

MOVING ITEM NO. 9 1.000 LS

RIGHT OF WAY MARKER(REINFORCED CONCRETE) 28.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT COVER 8.000 ACRE

TEMPORARY COVER 4.000 ACRE

FERTILIZER (NITROGEN) 8,000.000 LB

FERTILIZER (PHOSPHORIC ACID) 8,000.000 LB

FERTILIZER (POTASH) 8,000.000 LB

AGRICULTURAL GRANULAR LIME 16,000.000 LB

SELECTIVE WATERING 15,000.000 GAL

MOWING 5.000 ACRE

WATERPROOFING (SUBSTRUCTURE-SECOND METHOD) 31.800 SY

TURF REINFORCEMENT MATTING (TRM) TYPE 1 0.400 MSY

TURF REINFORCEMENT MATTING (TRM) TYPE 2 0.900 MSY

TEMPORARY EROSION CONTROL BLANKET (CLASS A) 7.500 MSY

SEDIMENT TUBES FOR DITCH CHECKS 285.000 LF

SILT FENCE 2,650.000 LF

REPLACE/REPAIR SILT FENCE 265.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 663.000 LF

AGGREGATE NO.5 FOR EROSION CONTROL (6" UNIFORM) 100.000 SY

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 20: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 100 19Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 12" 400.000 LF

TEMPORARY 48"X36"SEDIMENT CONTROL STRUCTURE 1.000 EA

GRADED AGGREGATE BASE COURSE (8" UNIFORM) 5,608.000 SY

PRIME COAT 1,514.000 GAL

HOT MIX ASPHALT BASE COURSE - TYPE B 2,524.000 TON

LIQUID ASPHALT BINDER PG64-22 109.000 TON

Page 21: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 110 20Page:

South Carolina Department of Transportation 12/6/2016

2110460SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Florence DBE Goal Percent: 1.00%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATION -FLORENCE

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030819P030819PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 30.000 TON

LIQUID ASPHALT BINDER PG64-22 23.625 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,000.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE D 375.000 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 187,700.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,026.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 800.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 274,480.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 120.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 27,600.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 112,180.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 120.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,060.000 EA

15.8

Page 22: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 120 21Page:

South Carolina Department of Transportation 12/6/2016

2308700SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Greenville DBE Goal Percent: 2.50%

Completion Date:

Description: 2017 NHS FEDERAL AID STATE PROGRAM-GREENVILLE COUNTY

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029951P029951PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 3,974.000 SY

MAINTENANCE STONE 232.820 TON

LIQUID ASPHALT BINDER PG64-22 2,558.591 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 23,282.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 428,962.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,323.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE B 41,932.384 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 1,017.500 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 4,232.670 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,008.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 135,738.000 LF

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,410.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 3,690.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 3,660.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 42,801.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 13,887.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 423.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 105.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 48.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 14,430.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 226,413.000 LF

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 3,885.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,128.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 45,246.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 470.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,230.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,220.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 14,267.000 LF

8.1

11/30/2017

Page 23: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 120 22Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 53.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 4,629.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 141.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 35.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 16.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,810.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 75,471.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,295.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 376.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 2,387.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 649.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,139.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID 388.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)WH.SING.ARROW 2.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM(60MIL)WH.COMB.ARROW 2.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL. 178.000 LF

FURNISH & INSTALL2.0" GALV. RIGID CONDUIT (BORED AND JACK 220.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 5,375.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 2,705.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 28,848.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 2,175.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 89,977.000 LF

REMOVE & REPLACE WIRELESS SENSOR WITH NEW HOUSING 181.000 EA

SAWCUT FOR LOOP DETECTOR 32,677.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 88.000 EA

FURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE 9,451.000 LF

ADJUST DROP INLET ADJUST D. I. 8.000 EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 350.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 150.000 LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 100.000 LF

DETECTABLE WARNING MATERIAL 675.000 SF

PEDESTRIAN RAMP CONSTRUCTION 1,350.000 SY

SURFACE APPLIED DETECTABLE WARNING 140.000 SF

Page 24: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 130 23Page:

South Carolina Department of Transportation 12/6/2016

2409910SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Greenwood DBE Goal Percent: 5.00%

Completion Date:

Description: DISTRICT 2 2017 FEDERAL AID SECONDARYPROGRAM

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030367P030367PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 375.000 SY

BORROW EXCAVATION 226.000 CY

MAINTENANCE STONE 37.000 TON

LIQUID ASPHALT BINDER PG64-22 105.611 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,000.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 700.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 5,810.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,000.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE C 1,760.171 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 906.000 SF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 276.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 364.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 5,492.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 182.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 182.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 2,746.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 57.000 EA

CATCH BASIN -TYPE 16 2.000 EA

ADJUST CATCH BASIN 2.000 EA

ADJUST DROP INLET ADJUST D. I. 6.000 EA

DETECTABLE WARNING MATERIAL 187.500 SF

PEDESTRIAN RAMP CONSTRUCTION 375.000 SY

STEEL BEAM GUARDRAIL STEEL BEAM GR. 312.500 LF

STEEL BEAM GUARDRAIL (THRIE) 100.000 LF

END TERMINAL - TYPE T 4.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 106.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 0.740 ACRE

1.13

Page 25: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 140 24Page:

South Carolina Department of Transportation 12/6/2016

3009300SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Laurens DBE Goal Percent: 5.00%

Completion Date:

Description: 2017 FEDERAL AID PAVEMENTIMPROVEMENT PROGRAM

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030153P030153PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 550.000 LF

BORROW EXCAVATION 972.000 CY

EXCAVATION FOR SHOULDER PAVING 498.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 498.000 STA

MAINTENANCE STONE 152.000 TON

HMA SHOULDER WIDENING COURSE 2,205.867 TON

LIQUID ASPHALT BINDER PG64-22 681.265 TON

FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 15,200.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 91,461.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,900.000 SY

MILLED-IN RUMBLE STRIP 9.180 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 11,051.067 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 900.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,870.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 154,746.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 942.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,500.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 169,050.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 2,290.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 51,582.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 314.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,500.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 56,350.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 106.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 523.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,500.000 LF

5.5

Page 26: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 140 25Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

SAWCUT FOR LOOP DETECTOR 404.000 LF

13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,325.000 LF

END ANCHOR-TYPE B 1.000 EA

END TERMINAL - TYPE T 19.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 3.520 ACRE

Page 27: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 150 26Page:

South Carolina Department of Transportation 12/6/2016

3609460SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Newberry DBE Goal Percent: 7.00%

Completion Date:

Description: 2017 FA PIPP IN DISTRICT 2

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030154P030154PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 100.000 LF

BORROW EXCAVATION 2,300.000 CY

EXCAVATION FOR SHOULDER PAVING 541.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 541.000 STA

MAINTENANCE STONE 106.000 TON

HMA SHOULDER WIDENING COURSE 2,698.080 TON

LIQUID ASPHALT BINDER PG64-22 608.620 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 6,300.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 71,950.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 800.000 SY

MILLED-IN RUMBLE STRIP 10.220 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 8,938.026 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 372.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 720.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 161,895.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 216.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 18,000.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 40,470.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 240.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 53,965.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 72.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 6,000.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 13,490.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 338.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 5,850.000 LF

END TERMINAL - TYPE T 16.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 4.070 ACRE

5.11

Page 28: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 150 27Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

SEDIMENT TUBES FOR DITCH CHECKS 210.000 LF

SILT FENCE 2,050.000 LF

REPLACE/REPAIR SILT FENCE 205.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 515.000 LF

Page 29: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 160 28Page:

South Carolina Department of Transportation 12/6/2016

3908160SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Pickens DBE Goal Percent: 2.00%

Completion Date:

Description: 2017 NHS FEDERAL AID STATE PROGRAM -PICKENS COUNTY

11/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029950P029950PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,350.000 SY

REMOVAL OF EXIST. GUARDRAIL 40.000 LF

BORROW EXCAVATION 482.000 CY

EXCAVATION FOR SHOULDER PAVING 169.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 169.000 STA

MAINTENANCE STONE 244.700 TON

HMA SHOULDER WIDENING COURSE 1,129.920 TON

LIQUID ASPHALT BINDER PG64-22 1,250.906 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 24,470.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 198,259.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 900.000 SY

MILLED-IN RUMBLE STRIP 6.860 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 19,309.640 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 704.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 1,983.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,564.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 31,461.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 71,625.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,729.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,338.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 96.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 51.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,650.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 164,841.000 LF

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4,800.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 10,487.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 23,875.000 LF

4.41

Page 30: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 160 29Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 2,243.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 12.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,446.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 32.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 17.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,550.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 54,947.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,600.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 845.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 360.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 749.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,680.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 220.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 30,160.000 LF

REMOVE & REPLACE WIRELESS SENSOR WITH NEW HOUSING 2.000 EA

SAWCUT FOR LOOP DETECTOR 10,960.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 15.000 EA

DETECTABLE WARNING MATERIAL 500.000 SF

PEDESTRIAN RAMP CONSTRUCTION 1,000.000 SY

END TERMINAL - TYPE T 4.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 1.069 ACRE

Page 31: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 170 30Page:

South Carolina Department of Transportation 12/6/2016

4208130SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Spartanburg DBE Goal Percent: 2.00%

Completion Date:

Description: 2017 NHS FEDERAL AID STATE PROGRAM INSPARTANBURG COUNTY

9/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029952P029952PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,000.000 SY

BORROW EXCAVATION 220.000 CY

MAINTENANCE STONE 84.350 TON

LIQUID ASPHALT BINDER PG64-22 1,341.299 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,435.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 225,289.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE B 22,704.683 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 200.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 1,937.700 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,424.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 62,250.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 76,659.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 24,105.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 2,460.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 8,901.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 276.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 135.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 51.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,040.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 161,943.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 20,750.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 25,553.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 8,035.000 LF

12" WHITE SOLID LINES - THERMO. - 125 MIL. 820.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 20.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,967.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 92.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 45.000 EA

4.31

Page 32: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 170 31Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 17.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 680.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 53,981.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,281.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 80.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 768.000 EA

FURNISH & INSTALL2.0" GALV. RIGID CONDUIT (BORED AND JACK 90.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 2,300.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 2,320.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 12,000.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 2,575.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 54,460.000 LF

REMOVE & REPLACE WIRELESS SENSOR WITH NEW HOUSING 50.000 EA

SAWCUT FOR LOOP DETECTOR 20,250.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 32.000 EA

FURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE 3,195.000 LF

ADJUST DROP INLET ADJUST D. I. 5.000 EA

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 300.000 LF

DETECTABLE WARNING MATERIAL 337.500 SF

PEDESTRIAN RAMP CONSTRUCTION 675.000 SY

PERMANENT GRASSING FOR SMALL PROJECTS 1.800 ACRE

Page 33: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 180 32Page:

South Carolina Department of Transportation 12/6/2016

4208281SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Spartanburg DBE Goal Percent: 2.00%

Completion Date:

Description: I-85 MEAR MM 69 TO MM77

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$165.00

$285.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029074P029074PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

CROSS SLOPE VERIFICATION 1.000 LS

TRAFFIC CONTROL 1.000 LS

OFF-DUTY LAW ENFORCEMENT OFFICER 8,760.000 HR

CPM PROGRESS SCHEDULE 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 588,645.000 SY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 18,962.000 SY

REMOVAL OF EXIST. GUARDRAIL 41,750.000 LF

REM&REPL CABLE BAR. END ANCHOR 50.000 EA

REMOVAL & DISPOSAL OF CABLE BARRIER 35,510.000 LF

UNCLASSIFIED EXCAVATION 16,060.000 CY

BORROW EXCAVATION 59,980.000 CY

BORROW PIT SET-UP 1.000 LS

FINE GRADING 631,080.000 SY

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 565,247.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 18,060.000 TON

MAINTENANCE STONE 100.000 TON

CEMENT STAB. AGGR. BASE CR. (10" UNIF.) 18,962.000 SY

PORTLAND CEMENT FOR CEMENT STAB. AGGREGATE BASE COURSE POR.CEMENT FOR CEMENT STABILIZED AGGR. BASE COURSE

505.000 TON

LIQUID ASPHALT BINDER PG64-22 3,509.000 TON

MILLING EXISTING ASPHALT PAVEMENT 1.5" 3,788.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 410,228.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE B 316.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 55,547.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 2,422.000 TON

HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 3,040.000 TON

PORTLAND CEMENT CONC. PAV. 13" UNIFORM 546,970.000 SY

PORTLAND CEMENT CONC.PAVEMENT-FAST TRACK-16" UNIFORM 37,464.000 SY

8.125

CONTRACTORS ARE ADVISED THAT THERE WILL BE A MANDATORY PRE-BID CONFERENCE FOR THIS PROJECT TO BE HELD AT 10:00AM ON DECEMBER 19, 2016 AT THE DISTRICT 3 OFFICE, CONFERENCE RM 4A: 252 S. PLEASANTBURG DR, GREENVILLE, SC.

CONTRACTORS WHO DO NOT ATTEND THIS PRE-BID CONFERENCE WILL NOT BE ALLOWED TO SUBMIT A BID PROPOSAL FOR THIS PROJECT. PLANS WILL BE AVAILABLE ON DECEMBER 13TH & CHANGES TO PLANS WILL BE DISCUSSED AT THE MEETING.

Page 34: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 180 33Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

MILLING EXISTING CONCRETE PAV. 0.75" 57,199.000 SY

MILLED-IN RUMBLE STRIP (CONCRETE)- 16" WIDE 16.250 MI

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 784.000 SF

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(70MPH) 8.000 EA

ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 3) 70MPH 12.000 EA

TEMPORARY CONCRETE BARRIER 78,200.000 LF

CONSTRUCTION ZONE ELECTRIC ADVANCE WARNING ARROW PANEL (TRAILERMOUNTED)

6.000 EA

TEMPORARY GLARE SCREENS FOR TRAFFIC CONTROL 76,500.000 LF

PAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 94,940.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 1,962.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 813,110.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" YELLOW SOLID LINES 864,995.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-12" WHITE SOLID LINES 13,260.000 LF

TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4" 2,400.000 EA

TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,100.000 EA

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 654.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 654.000 LF

6" WHITE BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 48,900.000 LF

6" BLACK BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 23,200.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 114,500.000 LF

8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION-EPOXY PAINT 225.000 LF

12" WHITE SOLID LINES (GORE MARKINGS) EPOXY PAINT 12,250.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)EPOXY PAINT 200.000 LF

24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) EPOXY PAINT 1,900.000 LF

WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT 12.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT) EPOXY PAINT 2.000 EA

6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE - EPOXY PAINT 110,400.000 LF

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 28,990.000 EA

PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 2,650.000 EA

REMOVAL OF PAVEMENT MARKINGS 85,000.000 LF

15" CORR.HDPE PIPE TYPE (C OR S) TEMP. 200.000 LF

DROP INLET (24" X 36") 10.000 EA

ADJUST DROP INLET ADJUST D. I. 172.000 EA

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 200.000 LF

PARTIAL DEPTH REMOVAL OF UNSOUND CONCRETE 1,704.700 SY

CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING 95.000 CY

POLYMER MODIFIED ASPHALT EXPANSION JOINT 831.000 LF

CONCRETE BEAM REPAIR 1.000 LS

RIP-RAP (CLASS A) 100.000 TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 200.000 SY

STEEL BEAM GUARDRAIL GUARDRAIL W-BEAM SYSTEM 34,950.000 LF

Page 35: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 180 34Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

GUARDRAIL W-BEAM CONNECTOR (TRAILING END) 21.000 EA

MEDIAN CABLE BARRIER 35,510.000 LF

RESET MEDIAN CABLE BARRIER 500.000 LF

RESET GUARDRAIL RESET GR. 500.000 LF

CABLE BARRIER END ANCHOR 50.000 EA

THRIE BEAM G.R.BRIDGE CONN. 22.000 EA

GUARDRAIL LEADING TYPE T TL3 (50') 43.000 EA

GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT 35.000 EA

GR TRAILING END TREATMENT W-BEAM TYPE B 42.000 EA

PERMANENT COVER 40.622 ACRE

TEMPORARY COVER 20.311 ACRE

STRAW OR HAY MULCH WITH TACKIFIER 30.467 ACRE

FERTILIZER (NITROGEN) 4,062.000 LB

FERTILIZER (PHOSPHORIC ACID) 4,062.000 LB

FERTILIZER (POTASH) 4,062.000 LB

AGRICULTURAL GRANULAR LIME 81,244.000 LB

SELECTIVE WATERING 271,500.000 GAL

MOWING 121.866 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 60.933 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 3,804.000 LF

SILT FENCE 53,300.000 LF

REPLACE/REPAIR SILT FENCE 5,330.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 13,325.000 LF

CLEANING INLET STRUCTURE FILTERS 212.000 EA

INLET STRUCTURE FILTER - TYPE D1 40.000 EA

FILTER MATERIAL FOR INLET STRUCTURE FILTER - TYPE D1 960.000 EA

INLET STRUCTURE FILTER - TYPE A 2,640.000 LF

STABILIZED CONSTRUCTION ENTRANCE 4,675.000 SY

ON-THE-JOB TRAINEE (ROADWAY) 8,840.000 HR

Page 36: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 190 35Page:

South Carolina Department of Transportation 12/6/2016

4610390SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: York DBE Goal Percent: 1.50%

Completion Date:

Description: 2017 FA PRESERVATION IN YORK COUNTY

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030516P030516PCN: Project No.:

P030523P030523PCN: Project No.:

P030530P030530PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LIQUID ASPHALT BINDER PG64-22 74.750 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,000.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 7,300.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE E 1,150.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 480,796.832 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,320.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 64,370.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 118,220.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,470.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,050.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 222.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 138.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 2.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 32,900.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 307,350.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 520.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 36,160.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 59,940.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 4,310.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 16.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,280.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 133.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 79.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 10.000 EA

15.67

Page 37: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 190 36Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 18,450.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 169,000.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 260.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,900.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,600.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,840.000 EA

Page 38: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 200 37Page:

South Carolina Department of Transportation 12/6/2016

5108870SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Lexington Richland DBE Goal Percent: 3.00%

Completion Date:

Description: 2017 FEDERAL AID PROGRAM

11/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030324P030324PCN: Project No.:

P030325P030325PCN: Project No.:

P030327P030327PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,390.000 SY

REMOVAL OF EXIST. GUARDRAIL 1,075.000 LF

BORROW EXCAVATION 1,532.000 CY

EXCAVATION FOR SHOULDER PAVING 554.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 554.000 STA

MAINTENANCE STONE 186.430 TON

HMA SHOULDER WIDENING COURSE 2,772.000 TON

LIQUID ASPHALT BINDER PG64-22 1,761.780 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 8,992.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 9,651.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 39,520.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 140,252.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 5,742.000 SY

MILLED-IN RUMBLE STRIP 12.800 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 4,655.200 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 13,514.453 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 10,843.288 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 300.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,052.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 27,714.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 135,044.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 640.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,663.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,830.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 64.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 39.000 EA

10.6

Page 39: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 200 38Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 17.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,572.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 125,503.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 3,620.000 LF

6"YEL SOLID LINES ON 6"CONC.CURB(TOP&SIDE)-FAST DRY PNT 1,055.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,170.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 200.000 LF

24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) EPOXY PAINT 24.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 1,560.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9,638.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 90,330.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 320.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 2,488.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 15.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,300.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 36.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 21.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 13.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 11,740.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 70,149.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 585.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 393.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 480.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,625.000 EA

REMOVAL OF PAVEMENT MARKINGS 1,784.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 424.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 21,043.000 LF

SAWCUT FOR LOOP DETECTOR 7,038.000 LF

DETECTABLE WARNING MATERIAL 675.000 SF

PEDESTRIAN RAMP CONSTRUCTION 1,350.000 SY

SURFACE APPLIED DETECTABLE WARNING 70.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 925.000 LF

END TERMINAL - TYPE T 10.000 EA

THRIE BEAM G.R.BRIDGE CONN. 2.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 7.133 ACRE

Page 40: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 210 39Page:

South Carolina Department of Transportation 12/6/2016

5209100SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: AbbevilleMcCormick

DBE Goal Percent: 2.50%

Completion Date:

Description: DISTRICT 2 2017 FEDERAL AID SECONDARYPROGRAM

7/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030261P030261PCN: Project No.:

P030303P030303PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 450.000 SY

BORROW EXCAVATION 216.000 CY

MAINTENANCE STONE 28.600 TON

LIQUID ASPHALT BINDER PG64-22 187.263 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 635.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2,225.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 32,200.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4,000.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE C 2,028.850 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 1,040.180 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 688.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 274.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 26,840.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 58.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 400.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 36,580.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 137.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 13,420.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 116.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 296.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 27,800.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 137.000 EA

ADJUST DROP INLET ADJUST D. I. 2.000 EA

DETECTABLE WARNING MATERIAL 237.500 SF

PEDESTRIAN RAMP CONSTRUCTION 450.000 SY

SURFACE APPLIED DETECTABLE WARNING 30.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 0.800 ACRE

2.03

Page 41: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 210 40Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

SEDIMENT TUBES FOR DITCH CHECKS 30.000 LF

SILT FENCE 300.000 LF

REPLACE/REPAIR SILT FENCE 30.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 75.000 LF

Page 42: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 220 41Page:

South Carolina Department of Transportation 12/6/2016

5209400SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: AbbevilleMcCormick

DBE Goal Percent: 4.00%

Completion Date:

Description: 2017 FEDERAL AID PIPP FOR DISTRICT 2

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030066P030066PCN: Project No.:

P030095P030095PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 1,000.000 CY

EXCAVATION FOR SHOULDER PAVING 334.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 334.000 STA

MAINTENANCE STONE 55.500 TON

HMA SHOULDER WIDENING COURSE 1,555.840 TON

LIQUID ASPHALT BINDER PG64-22 725.851 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,200.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 3,350.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 42,680.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 68,647.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 800.000 SY

MILLED-IN RUMBLE STRIP 6.240 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 7,024.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 4,596.445 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 644.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 12,465.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 100,200.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 396.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 20,400.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 76,240.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,215.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 33,400.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 180.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,800.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 65,320.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 316.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 494.000 EA

5.46

Page 43: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 220 42Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 827.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,000.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 3,232.000 LF

SAWCUT FOR LOOP DETECTOR 808.000 LF

13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA

SURFACE APPLIED DETECTABLE WARNING 25.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 950.000 LF

GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 122.000 LF

STEEL BEAM GUARDRAIL (THRIE) 78.000 LF

END ANCHOR-TYPE B (THRIE BEAM) 1.000 EA

END TERMINAL - TYPE T 9.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 200.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 2.270 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 150.000 LF

SILT FENCE 1,450.000 LF

REPLACE/REPAIR SILT FENCE 150.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 375.000 LF

Page 44: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 230 43Page:

South Carolina Department of Transportation 12/6/2016

5210220SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Abbeville EdgefieldLaurens McCormickNewberry

DBE Goal Percent: 8.00%

Completion Date:

Description: PRESERVATION OF DISTRICT 2 ROUTES

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030497P030497PCN: Project No.:

P030498P030498PCN: Project No.:

P030499P030499PCN: Project No.:

P030500P030500PCN: Project No.:

P030504P030504PCN: Project No.:

P030507P030507PCN: Project No.:

P030509P030509PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 3,250.000 LF

BORROW EXCAVATION 3,432.000 CY

MAINTENANCE STONE 119.050 TON

LIQUID ASPHALT BINDER PG64-22 7.875 TON

FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 7,650.000 SY

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,600.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 600.000 SY

MILLED-IN RUMBLE STRIP 14.480 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 125.000 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 237,192.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,832.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,426.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 314,471.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 80.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 706.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 9,236.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 260,616.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 550.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 636.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 185,018.000 LF

19.71

Page 45: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 230 44Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 378.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,190.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 173,966.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 550.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 10.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,203.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,500.000 LF

SAWCUT FOR LOOP DETECTOR 404.000 LF

13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 5,000.000 LF

END TERMINAL - TYPE T 16.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 352.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 12.810 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 30.000 LF

SILT FENCE 300.000 LF

REPLACE/REPAIR SILT FENCE 30.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 75.000 LF

Page 46: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 240 45Page:

South Carolina Department of Transportation 12/6/2016

5210270SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Greenwood Saluda DBE Goal Percent: 3.00%

Completion Date:

Description: 2017 FA PRESERVATION IN DISTRICT 2

9/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030495P030495PCN: Project No.:

P030501P030501PCN: Project No.:

P030570P030570PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 350.000 SY

BORROW EXCAVATION 302.000 CY

MAINTENANCE STONE 52.000 TON

LIQUID ASPHALT BINDER PG64-22 1.200 TON

FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 1,900.000 SY

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,300.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 350.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE C 20.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 128,610.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,696.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 20,635.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24,833.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 450.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 5,844.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,720.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 66.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 43.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 24.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 8,540.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 102,596.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 8,332.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 12,256.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 150.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,948.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 15.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 686.000 LF

4.24

Page 47: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 240 46Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 25.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 16.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,972.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 51,418.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 436.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 255.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 662.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,500.000 LF

SAWCUT FOR LOOP DETECTOR 404.000 LF

13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA

DETECTABLE WARNING MATERIAL 175.000 SF

PEDESTRIAN RAMP CONSTRUCTION 350.000 SY

SURFACE APPLIED DETECTABLE WARNING 320.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 137.500 LF

END TERMINAL - TYPE T 4.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 0.960 ACRE

Page 48: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 250 47Page:

South Carolina Department of Transportation 12/6/2016

5210290SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Abbeville EdgefieldLaurens

DBE Goal Percent: 1.00%

Completion Date:

Description: PRESERVATION TREATMENT IN DISTRICT 2

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030496P030496PCN: Project No.:

P030503P030503PCN: Project No.:

P030508P030508PCN: Project No.:

P030684P030684PCN: Project No.:

P030723P030723PCN: Project No.:

P030782P030782PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 25.000 SY

BORROW EXCAVATION 2,173.000 CY

MAINTENANCE STONE 103.000 TON

FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 8,200.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 9,512.000 SY

MILLED-IN RUMBLE STRIP 18.160 MI

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,472.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 58,277.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 172,902.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 11,977.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 6,074.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 127.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 3.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 22,800.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 289,654.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,210.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 19,837.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 76,862.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 4,059.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,118.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 45.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 3.000 EA

9.77

Page 49: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 250 48Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7,600.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 118,246.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 502.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,077.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 612.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 921.000 EA

DETECTABLE WARNING MATERIAL 12.500 SF

PEDESTRIAN RAMP CONSTRUCTION 25.000 SY

SURFACE APPLIED DETECTABLE WARNING 390.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 5.630 ACRE

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 289,306.800 SY

MICRO SURFACING SURFACE COURSE 289,306.800 SY

Page 50: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 260 49Page:

South Carolina Department of Transportation 12/6/2016

5309750SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Greenville OconeePickensSpartanburg

DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATION INDISTRICT 3

10/15/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030343P030343PCN: Project No.:

P030369P030369PCN: Project No.:

P030370P030370PCN: Project No.:

P030381P030381PCN: Project No.:

P030383P030383PCN: Project No.:

P030480P030480PCN: Project No.:

P030594P030594PCN: Project No.:

P030596P030596PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 225.000 SY

MAINTENANCE STONE 130.110 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 13,011.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 65.470 LaMi

MICRO SURFACING SURFACE COURSE 486,951.461 SY

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 26,416.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 126,753.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,797.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,827.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 275.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,421.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 119.000 EA

WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 103.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 16.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 13.000 EA

BIKE LANE SYMBOL - FAST DRY PAINT 103.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,190.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 223,274.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 322.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 322.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 26,416.000 LF

19.93

Page 51: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 260 50Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 126,753.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,797.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 6,827.000 LF

12" WHITE SOLID LINES - THERMO. - 125 MIL. 275.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,421.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 119.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 16.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 13.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 13,190.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 223,274.000 LF

BIKE LANE SYMBOL -PREFORMED THERMO - 90MIL 103.000 EA

BIKE LANE ARROW - PREFORMED THERMO - 90MIL 103.000 EA

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,755.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,213.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 3,184.000 EA

DETECTABLE WARNING MATERIAL 125.000 SF

PEDESTRIAN RAMP CONSTRUCTION 250.000 SY

SURFACE APPLIED DETECTABLE WARNING 20.000 SF

Page 52: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 270 51Page:

South Carolina Department of Transportation 12/6/2016

5309760SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Greenville OconeePickensSpartanburg

DBE Goal Percent: 1.00%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATIONDISTRICT 3

10/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030344P030344PCN: Project No.:

P030345P030345PCN: Project No.:

P030368P030368PCN: Project No.:

P030382P030382PCN: Project No.:

P030585P030585PCN: Project No.:

P030587P030587PCN: Project No.:

P030595P030595PCN: Project No.:

P030597P030597PCN: Project No.:

P030598P030598PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 202.610 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 20,261.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 195.405 LaMi

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4,500.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6,400.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 500.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 800.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,800.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 10,300.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 210.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 3,770.000 LF

SAWCUT FOR LOOP DETECTOR 1,370.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 3.000 EA

DETECTABLE WARNING MATERIAL 75.000 SF

PEDESTRIAN RAMP CONSTRUCTION 150.000 SY

SURFACE APPLIED DETECTABLE WARNING 320.000 SF

62.21

Page 53: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 280 52Page:

South Carolina Department of Transportation 12/6/2016

5410360SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Cherokee Union DBE Goal Percent: 1.50%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATION INCHEROKEE AND UNION COUNTIES

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030511P030511PCN: Project No.:

P030515P030515PCN: Project No.:

P030517P030517PCN: Project No.:

P030522P030522PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LIQUID ASPHALT BINDER PG64-22 11.375 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 5,050.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE E 175.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 112,935.195 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,152.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 17,460.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 87,760.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,900.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,440.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 48.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 26.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 8.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 9,840.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 102,940.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 8,730.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 43,880.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 950.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 720.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 24.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 13.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 4.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA

5.4

Page 54: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 280 53Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,920.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 51,470.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 458.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 290.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 897.000 EA

Page 55: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 290 54Page:

South Carolina Department of Transportation 12/6/2016

5410380SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: ChesterfieldLancaster

DBE Goal Percent: 1.50%

Completion Date:

Description: 2017 FA PRESERVATION IN CHESTERFIELDAND LANCASTER COUNTIES

7/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030513P030513PCN: Project No.:

P030514P030514PCN: Project No.:

P030519P030519PCN: Project No.:

P030521P030521PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LIQUID ASPHALT BINDER PG64-22 24.050 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,190.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE E 370.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 170,633.934 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,014.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 19,840.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 148,280.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 88.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 88.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5,500.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 115,720.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9,920.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 74,140.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 44.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 44.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,750.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 57,860.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 490.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 290.000 EA

9.63

Page 56: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 300 55Page:

South Carolina Department of Transportation 12/6/2016

5410400SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Cherokee ChesterChesterfield FairfieldLancaster Union

DBE Goal Percent: 1.50%

Completion Date:

Description: 2017 FEDERAL AID SECONDARYPRESERVATION

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030524P030524PCN: Project No.:

P030525P030525PCN: Project No.:

P030526P030526PCN: Project No.:

P030527P030527PCN: Project No.:

P030528P030528PCN: Project No.:

P030529P030529PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,600.000 SY

MICRO SURFACING SURFACE COURSE 150,550.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,872.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,684.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 248,880.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,800.000 LF

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,000.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 237,180.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 842.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 124,440.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 900.000 LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,500.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 118,590.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 801.000 EA

11.78

Page 57: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 310 56Page:

South Carolina Department of Transportation 12/6/2016

5507231SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: DISTRICT5 DBE Goal Percent: 0.00%

Completion Date:

Description: THERMOPLASTIC PAVEMENT MARKERS -DISTRICT 5

11/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029837P029837PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 405,000.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,980,000.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 65,000.000 LF

12" WHITE SOLID LINES - THERMO. - 125 MIL. 875.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 800.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 49,000.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 550.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 320.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 130.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 35.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 40.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 160,000.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,900,000.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 6,300.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 3,750.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 27,400.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 27,400.000 LF

232.0

Page 58: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 320 57Page:

South Carolina Department of Transportation 12/6/2016

5509960SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Darlington Marlboro DBE Goal Percent: 3.00%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATION -DARLINGTON AND MARLBORO

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030076P030076PCN: Project No.:

P030077P030077PCN: Project No.:

P030089P030089PCN: Project No.:

P030090P030090PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 1,868.000 CY

MAINTENANCE STONE 24.600 TON

LIQUID ASPHALT BINDER PG64-22 96.745 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,060.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 400.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 66.120 LaMi

MILLED-IN RUMBLE STRIP 16.160 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 1,535.625 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 125,240.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,518.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 7,420.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 180,020.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 300.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 200.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 10.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 17,740.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 106,160.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 3,710.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 90,010.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 150.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 120.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 6.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 5.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,870.000 LF

25.87

Page 59: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 320 58Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 53,080.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 136.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 533.000 EA

REMOVAL OF PAVEMENT MARKINGS 51,920.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 5.886 ACRE

Page 60: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 330 59Page:

South Carolina Department of Transportation 12/6/2016

5509970SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Dillon Marion DBE Goal Percent: 3.50%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATION - DILLONAND MARION

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030078P030078PCN: Project No.:

P030079P030079PCN: Project No.:

P030087P030087PCN: Project No.:

P030088P030088PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

BORROW EXCAVATION 1,502.000 CY

MAINTENANCE STONE 13.600 TON

LIQUID ASPHALT BINDER PG64-22 79.421 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 400.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 960.000 SY

MILLED-IN RUMBLE STRIP 9.280 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 1,260.625 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 173,600.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,352.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 22,020.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 122,600.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,960.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,420.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 62.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 26.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,960.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 140,260.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,220.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 11,010.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 61,300.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 980.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 740.000 LF

8.69

Page 61: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 330 60Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 31.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 13.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 2.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,480.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 70,130.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 632.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 225.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 915.000 EA

REMOVAL OF PAVEMENT MARKINGS 20,210.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 4.735 ACRE

Page 62: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 340 61Page:

South Carolina Department of Transportation 12/6/2016

5509980SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date:

PCN: P030082 PCN: P030083 PCN: P030084 PCN: P030085 CO(S).: Horry

GeorgetownDBE Goal Percent: 3.00%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATION -GEORGETOWN AND HORRY

9/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030082Project No.:

P030083Project No.:

P030084Project No.:

P030085Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

BORROW EXCAVATION 7,254.000 CY

MAINTENANCE STONE 32.920 TON

LIQUID ASPHALT BINDER PG64-22 234.084 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,292.000 SY

MILLED-IN RUMBLE STRIP 72.540 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 3,715.625 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 549,790.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,092.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 26,900.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 734,000.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,240.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,100.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 20.000 EA

WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 16.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 20.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 59,720.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 394,300.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 13,450.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 367,000.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 620.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 550.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 18.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 10.000 EA

34.74

Page 63: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 340 62Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 29,860.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 197,150.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 363.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,310.000 EA

REMOVAL OF PAVEMENT MARKINGS 94,320.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 22.854 ACRE

Page 64: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 350 63Page:

South Carolina Department of Transportation 12/6/2016

5510450SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: FlorenceWilliamsburg

DBE Goal Percent: 11.00%

Completion Date:

Description: 2017 FEDERAL AID PRESERVATION -FLORENCE AND WILLIAMSBURG

9/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030080P030080PCN: Project No.:

P030081P030081PCN: Project No.:

P030091P030091PCN: Project No.:

P030092P030092PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,720.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 1,200.000 LF

BORROW EXCAVATION 3,168.000 CY

MAINTENANCE STONE 35.100 TON

LIQUID ASPHALT BINDER PG64-22 111.668 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,060.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 450.000 SY

SURFACE PLANE ASPHALT PAVEMENT - VARIABLE 16,600.000 SY

MILLED-IN RUMBLE STRIP 31.680 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 1,772.500 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 261,600.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,304.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 20,900.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 302,300.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,600.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,120.000 LF

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 23,640.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 173,140.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 10,450.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 151,150.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,300.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 560.000 LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA

14.71

Page 65: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 350 64Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 11,820.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 86,570.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 440.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 965.000 EA

REMOVAL OF PAVEMENT MARKINGS 181,230.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 750.000 LF

SAWCUT FOR LOOP DETECTOR 500.000 LF

CATCH BASIN T-17 (CONVERT C.B. TYPE 5) 3.000 EA

CATCH BASIN T-18 (CONVERT C.B. TYPE 7) 11.000 EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 200.000 LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 1,000.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 1,250.000 SY

DETECTABLE WARNING MATERIAL 325.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 820.000 SY

PEDESTRIAN RAMP CONSTRUCTION 650.000 SY

PERMANENT GRASSING FOR SMALL PROJECTS 9.980 ACRE

Page 66: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 360 65Page:

South Carolina Department of Transportation 12/6/2016

5607241SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: DISTRICT6 DBE Goal Percent: 0.00%

Completion Date:

Description: THERMOPLASTIC PAVEMENT MARKERS -DISTRICT 6

11/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029838P029838PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 215,000.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,760,000.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 35,000.000 LF

12" WHITE SOLID LINES - THERMO. - 125 MIL. 420.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 500.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 30,000.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 475.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 140.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 50.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 10.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 30.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 156,000.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,600,000.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 200.000 LF

REMOVAL OF PAVEMENT MARKINGS 34,600.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 1,800.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 18,500.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.BROKEN 1,800.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 12,500.000 LF

195.0

Page 67: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 370 66Page:

South Carolina Department of Transportation 12/6/2016

5707251SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: DISTRICT7 DBE Goal Percent: 0.00%

Completion Date:

Description: THERMOPLASTIC PAVEMENT MARKINGS -DISTRICT 7

11/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029839P029839PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 125,000.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 2,200,000.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 154,000.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 300.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 19,000.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 120.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 40.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 20.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 5.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 25.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 177,000.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,500,000.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 1,050.000 LF

229.5

Page 68: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 380 67Page:

South Carolina Department of Transportation 12/6/2016

5709640SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Allendale BambergBarnwell Hampton

DBE Goal Percent: 3.50%

Completion Date:

Description: 2017 FA PAVEMENT IMPROVEMENTPROGRAM(PM)-03,05,06,25

11/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030347P030347PCN: Project No.:

P030405P030405PCN: Project No.:

P030406P030406PCN: Project No.:

P030433P030433PCN: Project No.:

P030434P030434PCN: Project No.:

P030463P030463PCN: Project No.:

P030483P030483PCN: Project No.:

P030573P030573PCN: Project No.:

P030574P030574PCN: Project No.:

P030851P030851PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 900.000 SY

BORROW EXCAVATION 2,989.800 CY

EXCAVATION FOR SHOULDER PAVING 1,496.246 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 1,496.246 STA

MAINTENANCE STONE 68.140 TON

HMA SHOULDER WIDENING COURSE 7,637.901 TON

LIQUID ASPHALT BINDER PG64-22 2,004.120 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 5,913.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 901.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.25" 8,250.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 1,250.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 17,690.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 20,750.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 9,550.000 SY

MILLED-IN RUMBLE STRIP 19.632 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 9,167.560 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 9,752.180 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 8,749.354 TON

18.61

Page 69: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 380 68Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,000.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 900.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 166,325.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,556.000 LF

12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 108.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 20.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,334.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 14,175.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 109,820.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 920.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 332,650.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,112.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 216.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,688.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 28,350.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 220,240.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 5.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,254.000 EA

DETECTABLE WARNING MATERIAL 450.000 SF

PEDESTRIAN RAMP CONSTRUCTION 900.000 SY

SURFACE APPLIED DETECTABLE WARNING 300.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 1,525.000 LF

STEEL BEAM GUARDRAIL (THRIE) 125.000 LF

END TERMINAL - TYPE T 8.000 EA

THRIE BEAM GUARDRAIL BRACKET CONNECTION 4.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 15.975 ACRE

Page 70: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 390 69Page:

South Carolina Department of Transportation 12/6/2016

5710180SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Allendale BambergBarnwell Hampton

DBE Goal Percent: 1.00%

Completion Date:

Description: 2017 FA PAVEMENT PRESERVATIONPROGRAM(MICRO)-03,05,06,25

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P029989P029989PCN: Project No.:

P030006P030006PCN: Project No.:

P030018P030018PCN: Project No.:

P030564P030564PCN: Project No.:

P030566P030566PCN: Project No.:

P030567P030567PCN: Project No.:

P030571P030571PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 225.000 SY

MAINTENANCE STONE 18.780 TON

LIQUID ASPHALT BINDER PG64-22 40.950 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,598.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 280.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,320.000 SY

MILLED-IN RUMBLE STRIP 6.600 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 650.000 TON

MICRO SURFACING SURFACE COURSE 212,801.201 SY

MICRO SURFACING LEVELING 302.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,684.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,095.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 133,320.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 390.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 290.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 2.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 9,145.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 96,490.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,690.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 227,240.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 780.000 LF

22.93

Page 71: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 390 70Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 280.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 18,290.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 192,980.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 108.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 947.000 EA

DETECTABLE WARNING MATERIAL 112.500 SF

PEDESTRIAN RAMP CONSTRUCTION 225.000 SY

SURFACE APPLIED DETECTABLE WARNING 170.000 SF

Page 72: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 400 71Page:

South Carolina Department of Transportation 12/6/2016

5710190SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Allendale BambergBarnwell Hampton

DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 FA PVMT PRESERVATIONPROGRAM(MICRO/TL ALT.)-03,05,06,25

8/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030004P030004PCN: Project No.:

P030005P030005PCN: Project No.:

P030007P030007PCN: Project No.:

P030019P030019PCN: Project No.:

P030563P030563PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 10.980 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,059.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 39.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 450.000 SY

MILLED-IN RUMBLE STRIP 6.166 MI

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,128.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 294.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 99,961.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 391.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 6,580.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 66,878.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 294.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 147,692.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 347.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,160.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 134,756.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 960.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 960.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 649.000 EA

MICRO SURFACING SURFACE COURSE 134,158.926 SY

MICRO SURFACING LEVELING 278.000 TON

LIQUID ASPHALT BINDER PG64-22 17.514 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,406.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE D 278.000 TON

9.64

Page 73: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 400 72Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 134,158.926 SY

Page 74: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 410 73Page:

South Carolina Department of Transportation 12/6/2016

5710240SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Calhoun ClarendonOrangeburg

DBE Goal Percent: 1.00%

Completion Date:

Description: 2017 FA PAVEMENT PRESERVATIONPROGRAM(MICRO)-09,14,38

7/31/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030014P030014PCN: Project No.:

P030035P030035PCN: Project No.:

P030568P030568PCN: Project No.:

P030569P030569PCN: Project No.:

P030572P030572PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 150.000 SY

MAINTENANCE STONE 39.800 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,935.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 45.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 6,870.000 SY

MILLED-IN RUMBLE STRIP 3.142 MI

MICRO SURFACING SURFACE COURSE 204,111.994 SY

MICRO SURFACING LEVELING 427.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,280.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,080.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 94,960.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 80.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 180.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 3.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 10,460.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 58,030.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,950.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 189,920.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 160.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 360.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

14.18

Page 75: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 410 74Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 20,920.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 116,060.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 126.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 156.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,026.000 EA

DETECTABLE WARNING MATERIAL 75.000 SF

PEDESTRIAN RAMP CONSTRUCTION 150.000 SY

SURFACE APPLIED DETECTABLE WARNING 240.000 SF

Page 76: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 420 75Page:

South Carolina Department of Transportation 12/6/2016

5710250SC File NO(S).:

January 10, 2017

2:00 P.M.

Letting Date: CO(S).: Calhoun ClarendonOrangeburg

DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 FA PAVEMENT PRESERVATIONPROGRAM(TL/MICRO ALT)-09,14,38

9/30/2017

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P030015P030015PCN: Project No.:

P030016P030016PCN: Project No.:

P030017P030017PCN: Project No.:

P030029P030029PCN: Project No.:

P030792P030792PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

MAINTENANCE STONE 30.560 TON

LIQUID ASPHALT BINDER PG64-22 6.300 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,056.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,220.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 340.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 84,200.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 35.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 1.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 1.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 1.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 6,190.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 46,070.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 660.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 168,400.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 70.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 2.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 2.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 12,380.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 92,140.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 13.000 EA

9.95

Page 77: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

Call No.: 420 76Page:

South Carolina Department of Transportation 12/6/2016

Description Quantity Units

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 614.000 EA

SURFACE APPLIED DETECTABLE WARNING 20.000 SF

MICRO SURFACING SURFACE COURSE 122,713.064 SY

MICRO SURFACING LEVELING 1,477.000 TON

LIQUID ASPHALT BINDER PG64-22 93.051 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4,200.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE D 1,577.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 122,713.064 SY

Page 78: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.

1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bondssubmitted by US mail or express delivery service shall be enclosed in sealed envelope or containerwith Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealedenvelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by USmail or express delivery service must be received by the Contract Administrator, or designee, priorto the time and date for opening of proposals indicated in the beginning of this Notice. Thedepartment will not be responsible for delays in the US mail or express delivery service.

2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealedenvelope marked with Contractor Name and "Bid Bond for SC File No._______", and must bedelivered directly to the Contract Administrator or designee prior to the time and date for opening ofproposals indicated in the beginning of this Notice.

PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeffrey Elliott at (803) 737-1253.

STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.

MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.

In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "SupplementalSpecifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:

Page 79: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/01102017 Notice to... · Call No.: 030 Page: 5 South Carolina Department of Transportation

TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.

Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, andthe bidder should check with the SCDOT Engineering Publications office for the cost of plans when theplans are indicated to be available.

THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

Prepared by L. Stuckey

Issued by:

Jeffrey O.Elliott

Contract Administration Engineer