Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should signin at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with allLetting related questions.
The following items will be made available on December 13, 2016 unless otherwise noted:• EBS (Electronic Bidding System) files via Bid Express website• Hardcopy plans/proposals & letting DVD via Engineering Publications
o Located in G-19 SCDOT Headquarterso Phone (803)737-4533/ Fax (803)737-4530o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)
Access the Construction Extranet for the following items:• Plans• Announcements• Bids as Received• CPM Schedule Templates
Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx.
Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.
The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx or forpurchase by contacting: Engineering Publications at (803) 737-4533.
Quantities shown herein are approximate for information only and should not be used for bidding purposes.The Department reserves the right to change these quantities without notice.
SOUTH CAROLINADEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORSFOR
REGULAR HIGHWAY LETTINGJanuary 10, 2017
Letting Location: SCDOT Headquarters Building
Conference Room 331 955 Park Street Columbia, SC
Call No.: 010 1Page:
South Carolina Department of Transportation 12/6/2016
0210130SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Aiken DBE Goal Percent: 1.50%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATIONPROGRAM IN AIKEN COUNTY
6/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029999P029999PCN: Project No.:
P030401P030401PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 622.000 SY
MAINTENANCE STONE 3.780 TON
LIQUID ASPHALT BINDER PG64-22 1.260 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 378.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 14,388.000 SY
MILLED-IN RUMBLE STRIP 11.392 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 20.000 TON
MICRO SURFACING SURFACE COURSE 160,439.190 SY
MICRO SURFACING LEVELING 60.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,296.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,452.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 75,760.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 160.000 LF
12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 51.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 371.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 15.000 EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 9.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 8,130.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 58,030.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,904.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 151,520.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 320.000 LF
12" WHITE SOLID LINES - FAST DRY PAINT 102.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 742.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 30.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 18.000 EA
8.13
Call No.: 010 2Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 16,260.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 116,060.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 182.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 133.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 665.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 20.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 840.000 LF
SAWCUT FOR LOOP DETECTOR 500.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 46.000 SY
DETECTABLE WARNING MATERIAL 250.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 76.000 SY
PEDESTRIAN RAMP CONSTRUCTION 500.000 SY
Call No.: 020 3Page:
South Carolina Department of Transportation 12/6/2016
0210140SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Aiken DBE Goal Percent: 2.00%
Completion Date:
Description: 2017 FEDERAL AID PAVEMENTPRESERVATION PROGRAM - 02
6/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030000P030000PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 0.140 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 14.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 62.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 162.000 SF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 69,740.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 70.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 1.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 1,600.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 62,560.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 139,480.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 140.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,200.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 125,120.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 436.000 EA
MICRO SURFACING SURFACE COURSE 100,202.672 SY
MICRO SURFACING LEVELING 20.000 TON
LIQUID ASPHALT BINDER PG64-22 1.260 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 20.000 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 100,202.672 SY
6.6
Call No.: 030 4Page:
South Carolina Department of Transportation 12/6/2016
0410280SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Anderson DBE Goal Percent: 5.00%
Completion Date:
Description: 2017 FA PRESERVATION IN DISTRICT 2.
9/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030505P030505PCN: Project No.:
P030506P030506PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 500.000 SY
REMOVAL OF EXIST. GUARDRAIL 550.000 LF
BORROW EXCAVATION 2,676.000 CY
MAINTENANCE STONE 77.000 TON
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 6,700.000 SY
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,000.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.0" 1,245.000 SY
MILLED-IN RUMBLE STRIP 6.680 MI
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,544.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 8,880.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 154,051.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4,860.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,564.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 82.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 15.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 20.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 6,720.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 158,566.000 LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT 240.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 3,220.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 46,978.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,620.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,422.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 29.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 5.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 7.000 EA
6.21
Call No.: 030 5Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,240.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 68,283.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 120.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 434.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 368.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 825.000 EA
DETECTABLE WARNING MATERIAL 250.000 SF
PEDESTRIAN RAMP CONSTRUCTION 500.000 SY
SURFACE APPLIED DETECTABLE WARNING 70.000 SF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,250.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 300.000 LF
STEEL BEAM GUARDRAIL (THRIE) 150.000 LF
END TERMINAL - TYPE T 14.000 EA
THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 3.190 ACRE
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 133,061.000 SY
MICRO SURFACING SURFACE COURSE 133,061.000 SY
Call No.: 040 6Page:
South Carolina Department of Transportation 12/6/2016
0708880SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Beaufort DBE Goal Percent: 2.00%
Completion Date:
Description: 2017 FEDERAL AID NHS, PRIMARY ANDSECONDARY BEAUFORT
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030106P030106PCN: Project No.:
P030121P030121PCN: Project No.:
P030164P030164PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 2,273.000 CY
EXCAVATION FOR SHOULDER PAVING 693.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 693.000 STA
MAINTENANCE STONE 29.250 TON
HOT MIX ASPHALT BASE COURSE - TYPE B 1,853.280 TON
HMA SHOULDER WIDENING COURSE 1,652.640 TON
LIQUID ASPHALT BINDER PG64-22 1,326.645 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,225.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,700.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 128,496.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 16,500.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 700.000 SY
MILLED-IN RUMBLE STRIP 10.920 MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,649.133 TON
HOT MIX ASPHALT SURFACE COURSE TYPE B 15,489.573 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 3,999.910 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 100.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,768.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 12,400.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 62,470.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 200.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 320.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 43.000 EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 43.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING 4.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 4.000 EA
6.98
Call No.: 040 7Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 7,640.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 61,860.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 37,200.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 187,390.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 600.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 680.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 75.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 75.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA
WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 22,920.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 185,550.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,840.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 732.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 462.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 784.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 200.000 LF
NO.14 CU.WIRE, 1 CONDUC,IMSA-20-1 1,500.000 LF
SAWCUT FOR LOOP DETECTOR 350.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 4.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 7.170 ACRE
Call No.: 050 8Page:
South Carolina Department of Transportation 12/6/2016
0809110SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Berkeley DBE Goal Percent: 5.00%
Completion Date:
Description: 2017 FA RESURFACING IN BERKELEYCOUNTY
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029996P029996PCN: Project No.:
P030109P030109PCN: Project No.:
P030147P030147PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 2.000 EA
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 3,310.000 SY
REMOVAL & DISPOSAL OF EXISTING CURB 1,340.000 LF
UNCLASSIFIED EXCAVATION 990.000 CY
BORROW EXCAVATION 2,370.000 CY
EXCAVATION FOR SHOULDER PAVING 348.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 348.000 STA
MAINTENANCE STONE 786.250 TON
HOT MIX ASPHALT BASE COURSE - TYPE B 2,676.960 TON
LIQUID ASPHALT BINDER PG64-22 1,424.402 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,385.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 16,990.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 109,530.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 44,600.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 700.000 SY
MILLED-IN RUMBLE STRIP 6.280 MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 5,644.896 TON
HOT MIX ASPHALT SURFACE COURSE TYPE B 16,631.413 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 2,020.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,614.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 8,720.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 34,940.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 3,385.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 120.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,444.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 45.000 EA
6.27
Call No.: 050 9Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 45.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING 11.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 4.000 EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 11,670.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 59,045.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 17,440.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 120,180.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,770.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,868.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 92.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 92.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 8.000 EA
WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 21,880.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 179,720.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,695.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 924.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 669.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 972.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 2,300.000 LF
NO.14 CU.WIRE, 1 CONDUC,IMSA-20-1 21,750.000 LF
SAWCUT FOR LOOP DETECTOR 9,750.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 35.000 EA
CATCH BASIN - TYPE 16 (TOP ONLY) 4.000 EA
CATCH BASIN - TYPE 16 (BOX ONLY) 1.000 EA
CATCH BASIN T-18 (CONVERT C.B. TYPE 7) 9.000 EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 980.000 LF
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 360.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 1,680.000 SY
DETECTABLE WARNING MATERIAL 388.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 1,020.000 SY
CONCRETE MEDIAN 10.000 SY
PEDESTRIAN RAMP CONSTRUCTION 775.000 SY
SURFACE APPLIED DETECTABLE WARNING 70.000 SF
PERMANENT GRASSING FOR SMALL PROJECTS 2.970 ACRE
Call No.: 060 10Page:
South Carolina Department of Transportation 12/6/2016
1009430SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Charleston DBE Goal Percent: 4.00%
Completion Date:
Description: 2017 FA RESURFACING IN CHARLESTONCOUNTY
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030161P030161PCN: Project No.:
P030293P030293PCN: Project No.:
P030361P030361PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
SELECTED CLEARING & GRUBBING 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,223.000 SY
REMOVAL & DISPOSAL OF EXISTING CURB 1,060.000 LF
UNCLASSIFIED EXCAVATION 150.000 CY
BORROW EXCAVATION 1,598.000 CY
EXCAVATION FOR SHOULDER PAVING 521.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 521.000 STA
MAINTENANCE STONE 140.470 TON
HOT MIX ASPHALT BASE COURSE - TYPE B 3,088.800 TON
LIQUID ASPHALT BINDER PG64-22 1,362.334 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,500.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 7,547.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 109,093.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,590.000 SY
MILLED-IN RUMBLE STRIP 0.920 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 17,684.826 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 4,510.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,724.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,260.000 LF
6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 20.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 50,890.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 30,690.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,330.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 30.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 334.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 20.000 EA
8.79
Call No.: 060 11Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 12.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING 9.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4,515.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 69,210.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 9,770.000 LF
6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 40.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 110,610.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 78,200.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,650.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 688.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 48.000 EA
WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 67.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 37.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 21.000 EA
BIKE LANE SYMBOL - FAST DRY PAINT 67.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,900.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 179,090.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 150.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 2,060.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 2,060.000 LF
4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 2,060.000 LF
BIKE LANE SYMBOL -PREFORMED THERMO - 90MIL 65.000 EA
BIKE LANE ARROW - PREFORMED THERMO - 90MIL 63.000 EA
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 90.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 182.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 754.000 EA
REMOVAL OF PAVEMENT MARKINGS 6,180.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,500.000 LF
NO.14 CU.WIRE, 1 CONDUC,IMSA-20-1 13,000.000 LF
SAWCUT FOR LOOP DETECTOR 4,800.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 20.000 EA
12"X 18" HORIZONTAL ELLIPTICAL(HE) RC PIPE CUL.-CLASS HE-III 225.000 LF
CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 1,060.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 375.000 SY
CONCRETE SIDEWALK(6" UNIFORM) 60.000 SY
DETECTABLE WARNING MATERIAL 155.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 855.000 SY
PEDESTRIAN RAMP CONSTRUCTION 250.000 SY
SURFACE APPLIED DETECTABLE WARNING 300.000 SF
PERMANENT GRASSING FOR SMALL PROJECTS 2.820 ACRE
ROOT BARRIER 200.000 LF
SILT FENCE 100.000 LF
Call No.: 070 12Page:
South Carolina Department of Transportation 12/6/2016
1110530SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Cherokee DBE Goal Percent: 0.00%
Completion Date:
Description: 2017 CHEROKEE CTC RESURFACING
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030735P030735PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS
REMOVAL & DISPOSAL OF EXISTING CONCRETE 13.000 CY
BORROW EXCAVATION 1,904.000 CY
STATION GRADING 107.724 STA
CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 4 67,700.000 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 3,046.500 TON
MAINTENANCE STONE 60.000 TON
LIQUID ASPHALT BINDER PG64-22 278.574 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,300.000 SY
MILLED-IN RUMBLE STRIP 9.520 MI
HOT MIX ASPHALT SURFACE COURSE TYPE C 2,017.080 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 2,423.820 TON
ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 67,700.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,224.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 880.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 100,580.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 840.000 LF
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,320.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 86,500.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 440.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 50,290.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 420.000 LF
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,160.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 43,250.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 321.000 EA
15" SMOOTH WALL PIPE 192.000 LF
4.76
Call No.: 070 13Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
18" SMOOTH WALL PIPE 8.000 LF
24" SMOOTH WALL PIPE 8.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,925.000 LF
END TERMINAL - TYPE T 14.000 EA
RESET END TERMINAL-TYPE T 3.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 800.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 7.000 ACRE
SILT FENCE 2,425.000 LF
REPLACE/REPAIR SILT FENCE 250.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 250.000 LF
Call No.: 080 14Page:
South Carolina Department of Transportation 12/6/2016
1309660SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Chesterfield DBE Goal Percent: 2.00%
Completion Date:
Description: PEE DEE COG RESURFACING
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P028939P028939PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 1,304.000 CY
EXCAVATION FOR SHOULDER PAVING 689.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 689.000 STA
HMA SHOULDER WIDENING COURSE 4,590.080 TON
LIQUID ASPHALT BINDER PG64-22 913.374 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 200.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,500.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,400.000 SY
MILLING - VARIABLE - 2' WIDTH 9,200.000 SY
FIBER REINFORCED MEMBRANE - SURFACE TREAMENT 16,427.000 SY
MILLED-IN RUMBLE STRIP 13.040 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 11,150.188 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 1,500.000 TON
FULL DEPTH CONCRETE PAVEMENT PATCH - 9" 200.000 SY
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 300.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 137,800.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 300.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,120.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 65,500.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 150.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 68,900.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 150.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 6,560.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 32,750.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 440.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 13.040 ACRE
6.52
Call No.: 090 15Page:
South Carolina Department of Transportation 12/6/2016
1405370SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Clarendon DBE Goal Percent: 2.00%
Completion Date:
Description: EFLAP RESURFACING IN CLARENDONCOUNTY
7/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
FLAP015P029537PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 432.000 CY
EXCAVATION FOR SHOULDER PAVING 228.096 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 228.096 STA
MAINTENANCE STONE 8.600 TON
HMA SHOULDER WIDENING COURSE 1,140.480 TON
LIQUID ASPHALT BINDER PG64-22 206.987 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 860.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 100.000 SY
MILLED-IN RUMBLE STRIP 3.456 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 2,398.460 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 316.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 80.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 22,950.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 120.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 1,900.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 12,800.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 160.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 45,900.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 240.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,800.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 25,600.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 145.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 1.048 ACRE
2.16
Call No.: 100 16Page:
South Carolina Department of Transportation 12/6/2016
2083671SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Fairfield DBE Goal Percent: 4.00%
Completion Date:
Description: SC 34 BRIDGE OVER LITTLE RIVER
4/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$126.00
$37.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $53.00
Letting Time:
BR200070039042RD01PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
MOBILIZATION - SUBCONTRACTOR 1.000 LS
BRIDGE CONSTRUCTION ACCESS 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
TRAFFIC CONTROL 1.000 LS
CPM PROGRESS SCHEDULE 1.000 LS
CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 4,054.000 SY
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS
UNCLASSIFIED EXCAVATION 11,080.000 CY
BORROW EXCAVATION 29,220.000 CY
BORROW EXCAVATION - SPECIAL (FA-10) 3,540.000 CY
BORROW PIT SET-UP 1.000 LS
MUCK EXCAVATION 4,200.000 CY
GEOGRID REINFORCEMENT (UNIAXIAL) 4,700.000 SY
GEOGRID REINFORCEMENT (BIAXIAL) 5,810.000 SY
MONITORING DEVICE - SETTLEMENT PLATE 4.000 EA
MONITORING DEVICE – PIEZOMETER – VIBRATING-WIRE 4.000 EA
TEMPORARY SHORING WALL 739.000 LF
GROUND MODIFICATION (VIBRO-STONE COLUMN) 15,500.000 LF
NO. 57 STONE FOR BACKFILL 1,680.000 TON
FLOWABLE FILL 140.000 CY
MAINTENANCE STONE 210.000 TON
HOT MIX ASPHALT BASE COURSE - TYPE B 1,451.000 TON
HMA SHOULDER WIDENING COURSE 63.000 TON
LIQUID ASPHALT BINDER PG64-22 132.000 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,200.000 SY
MILLED-IN RUMBLE STRIP 1.200 MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 673.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE CM 767.000 TON
0.616
Call No.: 100 17Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 38.000 TON
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN FOR MAINT 2.000 EA
TEMPORARY CONCRETE BARRIER 2,740.000 LF
BARRICADE - TYPE 3 4.000 LF
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 184.000 SF
PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 20.000 SF
PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2 10.000 EA
ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2) 10.000 EA
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 6,530.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 6,530.000 LF
TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 48.000 EA
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 6,550.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 6,550.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 51.000 EA
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 1,000.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 1,000.000 LF
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 63.000 SF
U-SECTION POST FOR SIGN SUPPORTS - 3P 130.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,805.300 LF
CONC. FOR STRUCTURES - CLASS 4000 995.000 CY
COMPRESSION SEAL JOINT 93.400 LF
GROOVED SURFACE FINISH 2,097.000 SY
REINF. STEEL FOR STRUCTURES (BRIDGE) 288,673.000 LB
HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 14,594.000 LB
PRESTRESSED CONC. BEAM (TYPE IV) 2,297.000 LF
CONCRETE BRIDGE BARRIER PARAPET 836.400 LF
CONCRETE BRIDGE BARRIER PARAPET TRANSITION 4.000 EA
DYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 4.000 EA
PILE DRIVING SET-UP 14.000 EA
REINF. PILE TIPS (HP14 X 73) 14.000 EA
STEEL H BEARING PILING (HP14 X 73) 567.000 LF
DRILLED SHAFT SET-UP 9.000 EA
DRILLED SHAFT WITH WET & DRY EXCAVATION - 54" DIAMETER 30.000 LF
DRILLED SHAFT WITH ROCK EXCAVATION - 54" DIAMETER 110.400 LF
DRILLED SHAFT WITH WET & DRY EXCAVATION - 60" DIAMETER 383.700 LF
CONSTRUCTION CASING - 60" DIAMETER 413.800 LF
24" SMOOTH WALL PIPE 120.000 LF
30" SMOOTH WALL PIPE 54.000 LF
36" SMOOTH WALL PIPE 66.000 LF
CONCRETE CURB (9" X 15") 8.000 LF
BRIDGE APPROACH CONCRETE CURB AND GUTTER(1'-10") 60.000 LF
ELASTOMERIC BEARING 48.000 EA
Call No.: 100 18Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
CROSSHOLE SONIC LOGGING SETUP 9.000 EA
AGGREGATE UNDERDRAIN(AGG#789)WITH 4"PERF.PIPE FOR STRUC 202.000 TON
RIP-RAP (CLASS A) 90.000 TON
RIP-RAP (CLASS B) 210.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 130.000 SY
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE D 188.000 SY
STEEL BEAM GUARDRAIL STEEL BEAM GR. 783.000 LF
END TERMINAL - TYPE T 4.000 EA
THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
MOVING ITEM NO. 1 1.000 LS
MOVING ITEM NO. 10 1.000 LS
MOVING ITEM NO. 11 1.000 LS
MOVING ITEM NO. 12 1.000 LS
MOVING ITEM NO. 13 1.000 LS
MOVING ITEM NO. 2 1.000 LS
MOVING ITEM NO. 3 1.000 LS
MOVING ITEM NO. 4 1.000 LS
MOVING ITEM NO. 5 1.000 LS
MOVING ITEM NO. 6 1.000 LS
MOVING ITEM NO. 7 1.000 LS
MOVING ITEM NO. 8 1.000 LS
MOVING ITEM NO. 9 1.000 LS
RIGHT OF WAY MARKER(REINFORCED CONCRETE) 28.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT COVER 8.000 ACRE
TEMPORARY COVER 4.000 ACRE
FERTILIZER (NITROGEN) 8,000.000 LB
FERTILIZER (PHOSPHORIC ACID) 8,000.000 LB
FERTILIZER (POTASH) 8,000.000 LB
AGRICULTURAL GRANULAR LIME 16,000.000 LB
SELECTIVE WATERING 15,000.000 GAL
MOWING 5.000 ACRE
WATERPROOFING (SUBSTRUCTURE-SECOND METHOD) 31.800 SY
TURF REINFORCEMENT MATTING (TRM) TYPE 1 0.400 MSY
TURF REINFORCEMENT MATTING (TRM) TYPE 2 0.900 MSY
TEMPORARY EROSION CONTROL BLANKET (CLASS A) 7.500 MSY
SEDIMENT TUBES FOR DITCH CHECKS 285.000 LF
SILT FENCE 2,650.000 LF
REPLACE/REPAIR SILT FENCE 265.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 663.000 LF
AGGREGATE NO.5 FOR EROSION CONTROL (6" UNIFORM) 100.000 SY
STABILIZED CONSTRUCTION ENTRANCE 550.000 SY
Call No.: 100 19Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 12" 400.000 LF
TEMPORARY 48"X36"SEDIMENT CONTROL STRUCTURE 1.000 EA
GRADED AGGREGATE BASE COURSE (8" UNIFORM) 5,608.000 SY
PRIME COAT 1,514.000 GAL
HOT MIX ASPHALT BASE COURSE - TYPE B 2,524.000 TON
LIQUID ASPHALT BINDER PG64-22 109.000 TON
Call No.: 110 20Page:
South Carolina Department of Transportation 12/6/2016
2110460SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Florence DBE Goal Percent: 1.00%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATION -FLORENCE
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030819P030819PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 30.000 TON
LIQUID ASPHALT BINDER PG64-22 23.625 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,000.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE D 375.000 TON
ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 187,700.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,026.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 800.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 274,480.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 120.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 27,600.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 112,180.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 120.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,060.000 EA
15.8
Call No.: 120 21Page:
South Carolina Department of Transportation 12/6/2016
2308700SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Greenville DBE Goal Percent: 2.50%
Completion Date:
Description: 2017 NHS FEDERAL AID STATE PROGRAM-GREENVILLE COUNTY
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029951P029951PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 3,974.000 SY
MAINTENANCE STONE 232.820 TON
LIQUID ASPHALT BINDER PG64-22 2,558.591 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 23,282.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 428,962.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,323.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE B 41,932.384 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 1,017.500 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 4,232.670 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,008.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 135,738.000 LF
6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,410.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 3,690.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 3,660.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 42,801.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 13,887.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 423.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 105.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 48.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 14,430.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 226,413.000 LF
6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 3,885.000 LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,128.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 45,246.000 LF
6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 470.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,230.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,220.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 14,267.000 LF
8.1
11/30/2017
Call No.: 120 22Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 53.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 4,629.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 141.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 35.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 16.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,810.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 75,471.000 LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,295.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 376.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 2,387.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 649.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,139.000 EA
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID 388.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)WH.SING.ARROW 2.000 EA
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM(60MIL)WH.COMB.ARROW 2.000 EA
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL. 178.000 LF
FURNISH & INSTALL2.0" GALV. RIGID CONDUIT (BORED AND JACK 220.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 5,375.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 2,705.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 28,848.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 2,175.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 89,977.000 LF
REMOVE & REPLACE WIRELESS SENSOR WITH NEW HOUSING 181.000 EA
SAWCUT FOR LOOP DETECTOR 32,677.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 88.000 EA
FURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE 9,451.000 LF
ADJUST DROP INLET ADJUST D. I. 8.000 EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 350.000 LF
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 150.000 LF
CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 100.000 LF
DETECTABLE WARNING MATERIAL 675.000 SF
PEDESTRIAN RAMP CONSTRUCTION 1,350.000 SY
SURFACE APPLIED DETECTABLE WARNING 140.000 SF
Call No.: 130 23Page:
South Carolina Department of Transportation 12/6/2016
2409910SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Greenwood DBE Goal Percent: 5.00%
Completion Date:
Description: DISTRICT 2 2017 FEDERAL AID SECONDARYPROGRAM
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030367P030367PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 375.000 SY
BORROW EXCAVATION 226.000 CY
MAINTENANCE STONE 37.000 TON
LIQUID ASPHALT BINDER PG64-22 105.611 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,000.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 700.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.5" 5,810.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,000.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE C 1,760.171 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 906.000 SF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 276.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 364.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 5,492.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 182.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 182.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 2,746.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 57.000 EA
CATCH BASIN -TYPE 16 2.000 EA
ADJUST CATCH BASIN 2.000 EA
ADJUST DROP INLET ADJUST D. I. 6.000 EA
DETECTABLE WARNING MATERIAL 187.500 SF
PEDESTRIAN RAMP CONSTRUCTION 375.000 SY
STEEL BEAM GUARDRAIL STEEL BEAM GR. 312.500 LF
STEEL BEAM GUARDRAIL (THRIE) 100.000 LF
END TERMINAL - TYPE T 4.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 106.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 0.740 ACRE
1.13
Call No.: 140 24Page:
South Carolina Department of Transportation 12/6/2016
3009300SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Laurens DBE Goal Percent: 5.00%
Completion Date:
Description: 2017 FEDERAL AID PAVEMENTIMPROVEMENT PROGRAM
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030153P030153PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CPM PROGRESS SCHEDULE 1.000 LS
REMOVAL OF EXIST. GUARDRAIL 550.000 LF
BORROW EXCAVATION 972.000 CY
EXCAVATION FOR SHOULDER PAVING 498.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 498.000 STA
MAINTENANCE STONE 152.000 TON
HMA SHOULDER WIDENING COURSE 2,205.867 TON
LIQUID ASPHALT BINDER PG64-22 681.265 TON
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 15,200.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 91,461.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,900.000 SY
MILLED-IN RUMBLE STRIP 9.180 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 11,051.067 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 900.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,870.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 154,746.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 942.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,500.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 169,050.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 2,290.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 51,582.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 314.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,500.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 56,350.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 106.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 523.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,500.000 LF
5.5
Call No.: 140 25Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
SAWCUT FOR LOOP DETECTOR 404.000 LF
13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA
STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,325.000 LF
END ANCHOR-TYPE B 1.000 EA
END TERMINAL - TYPE T 19.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 3.520 ACRE
Call No.: 150 26Page:
South Carolina Department of Transportation 12/6/2016
3609460SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Newberry DBE Goal Percent: 7.00%
Completion Date:
Description: 2017 FA PIPP IN DISTRICT 2
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030154P030154PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CPM PROGRESS SCHEDULE 1.000 LS
REMOVAL OF EXIST. GUARDRAIL 100.000 LF
BORROW EXCAVATION 2,300.000 CY
EXCAVATION FOR SHOULDER PAVING 541.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 541.000 STA
MAINTENANCE STONE 106.000 TON
HMA SHOULDER WIDENING COURSE 2,698.080 TON
LIQUID ASPHALT BINDER PG64-22 608.620 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 6,300.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 71,950.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 800.000 SY
MILLED-IN RUMBLE STRIP 10.220 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 8,938.026 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 372.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 720.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 161,895.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 216.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 18,000.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 40,470.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 240.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 53,965.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 72.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 6,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 13,490.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 338.000 EA
STEEL BEAM GUARDRAIL STEEL BEAM GR. 5,850.000 LF
END TERMINAL - TYPE T 16.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 4.070 ACRE
5.11
Call No.: 150 27Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
SEDIMENT TUBES FOR DITCH CHECKS 210.000 LF
SILT FENCE 2,050.000 LF
REPLACE/REPAIR SILT FENCE 205.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 515.000 LF
Call No.: 160 28Page:
South Carolina Department of Transportation 12/6/2016
3908160SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Pickens DBE Goal Percent: 2.00%
Completion Date:
Description: 2017 NHS FEDERAL AID STATE PROGRAM -PICKENS COUNTY
11/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029950P029950PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,350.000 SY
REMOVAL OF EXIST. GUARDRAIL 40.000 LF
BORROW EXCAVATION 482.000 CY
EXCAVATION FOR SHOULDER PAVING 169.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 169.000 STA
MAINTENANCE STONE 244.700 TON
HMA SHOULDER WIDENING COURSE 1,129.920 TON
LIQUID ASPHALT BINDER PG64-22 1,250.906 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 24,470.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 198,259.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 900.000 SY
MILLED-IN RUMBLE STRIP 6.860 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 19,309.640 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 704.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 1,983.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,564.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 31,461.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 71,625.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,729.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,338.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 96.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 51.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 3.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,650.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 164,841.000 LF
6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4,800.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 10,487.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 23,875.000 LF
4.41
Call No.: 160 29Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 2,243.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 12.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,446.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 32.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 17.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 1.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,550.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 54,947.000 LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,600.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 845.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 360.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 749.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,680.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 220.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 30,160.000 LF
REMOVE & REPLACE WIRELESS SENSOR WITH NEW HOUSING 2.000 EA
SAWCUT FOR LOOP DETECTOR 10,960.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 15.000 EA
DETECTABLE WARNING MATERIAL 500.000 SF
PEDESTRIAN RAMP CONSTRUCTION 1,000.000 SY
END TERMINAL - TYPE T 4.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 1.069 ACRE
Call No.: 170 30Page:
South Carolina Department of Transportation 12/6/2016
4208130SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Spartanburg DBE Goal Percent: 2.00%
Completion Date:
Description: 2017 NHS FEDERAL AID STATE PROGRAM INSPARTANBURG COUNTY
9/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029952P029952PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,000.000 SY
BORROW EXCAVATION 220.000 CY
MAINTENANCE STONE 84.350 TON
LIQUID ASPHALT BINDER PG64-22 1,341.299 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,435.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 225,289.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE B 22,704.683 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 200.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 1,937.700 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,424.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 62,250.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 76,659.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 24,105.000 LF
12" WHITE SOLID LINES - FAST DRY PAINT 2,460.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 8,901.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 276.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 135.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 51.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,040.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 161,943.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 20,750.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 25,553.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 8,035.000 LF
12" WHITE SOLID LINES - THERMO. - 125 MIL. 820.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 20.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,967.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 92.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 45.000 EA
4.31
Call No.: 170 31Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 17.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 680.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 53,981.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,281.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 80.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 768.000 EA
FURNISH & INSTALL2.0" GALV. RIGID CONDUIT (BORED AND JACK 90.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 2,300.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 2,320.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 12,000.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 2,575.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 54,460.000 LF
REMOVE & REPLACE WIRELESS SENSOR WITH NEW HOUSING 50.000 EA
SAWCUT FOR LOOP DETECTOR 20,250.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 32.000 EA
FURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE 3,195.000 LF
ADJUST DROP INLET ADJUST D. I. 5.000 EA
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 300.000 LF
DETECTABLE WARNING MATERIAL 337.500 SF
PEDESTRIAN RAMP CONSTRUCTION 675.000 SY
PERMANENT GRASSING FOR SMALL PROJECTS 1.800 ACRE
Call No.: 180 32Page:
South Carolina Department of Transportation 12/6/2016
4208281SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Spartanburg DBE Goal Percent: 2.00%
Completion Date:
Description: I-85 MEAR MM 69 TO MM77
7/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$165.00
$285.00$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029074P029074PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
CROSS SLOPE VERIFICATION 1.000 LS
TRAFFIC CONTROL 1.000 LS
OFF-DUTY LAW ENFORCEMENT OFFICER 8,760.000 HR
CPM PROGRESS SCHEDULE 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 588,645.000 SY
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 18,962.000 SY
REMOVAL OF EXIST. GUARDRAIL 41,750.000 LF
REM&REPL CABLE BAR. END ANCHOR 50.000 EA
REMOVAL & DISPOSAL OF CABLE BARRIER 35,510.000 LF
UNCLASSIFIED EXCAVATION 16,060.000 CY
BORROW EXCAVATION 59,980.000 CY
BORROW PIT SET-UP 1.000 LS
FINE GRADING 631,080.000 SY
CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 565,247.000 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 18,060.000 TON
MAINTENANCE STONE 100.000 TON
CEMENT STAB. AGGR. BASE CR. (10" UNIF.) 18,962.000 SY
PORTLAND CEMENT FOR CEMENT STAB. AGGREGATE BASE COURSE POR.CEMENT FOR CEMENT STABILIZED AGGR. BASE COURSE
505.000 TON
LIQUID ASPHALT BINDER PG64-22 3,509.000 TON
MILLING EXISTING ASPHALT PAVEMENT 1.5" 3,788.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 410,228.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE B 316.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 55,547.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 2,422.000 TON
HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 3,040.000 TON
PORTLAND CEMENT CONC. PAV. 13" UNIFORM 546,970.000 SY
PORTLAND CEMENT CONC.PAVEMENT-FAST TRACK-16" UNIFORM 37,464.000 SY
8.125
CONTRACTORS ARE ADVISED THAT THERE WILL BE A MANDATORY PRE-BID CONFERENCE FOR THIS PROJECT TO BE HELD AT 10:00AM ON DECEMBER 19, 2016 AT THE DISTRICT 3 OFFICE, CONFERENCE RM 4A: 252 S. PLEASANTBURG DR, GREENVILLE, SC.
CONTRACTORS WHO DO NOT ATTEND THIS PRE-BID CONFERENCE WILL NOT BE ALLOWED TO SUBMIT A BID PROPOSAL FOR THIS PROJECT. PLANS WILL BE AVAILABLE ON DECEMBER 13TH & CHANGES TO PLANS WILL BE DISCUSSED AT THE MEETING.
Call No.: 180 33Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
MILLING EXISTING CONCRETE PAV. 0.75" 57,199.000 SY
MILLED-IN RUMBLE STRIP (CONCRETE)- 16" WIDE 16.250 MI
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 784.000 SF
PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(70MPH) 8.000 EA
ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 3) 70MPH 12.000 EA
TEMPORARY CONCRETE BARRIER 78,200.000 LF
CONSTRUCTION ZONE ELECTRIC ADVANCE WARNING ARROW PANEL (TRAILERMOUNTED)
6.000 EA
TEMPORARY GLARE SCREENS FOR TRAFFIC CONTROL 76,500.000 LF
PAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 94,940.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 1,962.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 813,110.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" YELLOW SOLID LINES 864,995.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-12" WHITE SOLID LINES 13,260.000 LF
TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4" 2,400.000 EA
TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,100.000 EA
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 654.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 654.000 LF
6" WHITE BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 48,900.000 LF
6" BLACK BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 23,200.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 114,500.000 LF
8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION-EPOXY PAINT 225.000 LF
12" WHITE SOLID LINES (GORE MARKINGS) EPOXY PAINT 12,250.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)EPOXY PAINT 200.000 LF
24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) EPOXY PAINT 1,900.000 LF
WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT 12.000 EA
WHITE LANE DROP ARROW (LEFT OR RIGHT) EPOXY PAINT 2.000 EA
6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE - EPOXY PAINT 110,400.000 LF
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 28,990.000 EA
PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 2,650.000 EA
REMOVAL OF PAVEMENT MARKINGS 85,000.000 LF
15" CORR.HDPE PIPE TYPE (C OR S) TEMP. 200.000 LF
DROP INLET (24" X 36") 10.000 EA
ADJUST DROP INLET ADJUST D. I. 172.000 EA
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 200.000 LF
PARTIAL DEPTH REMOVAL OF UNSOUND CONCRETE 1,704.700 SY
CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING 95.000 CY
POLYMER MODIFIED ASPHALT EXPANSION JOINT 831.000 LF
CONCRETE BEAM REPAIR 1.000 LS
RIP-RAP (CLASS A) 100.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 200.000 SY
STEEL BEAM GUARDRAIL GUARDRAIL W-BEAM SYSTEM 34,950.000 LF
Call No.: 180 34Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
GUARDRAIL W-BEAM CONNECTOR (TRAILING END) 21.000 EA
MEDIAN CABLE BARRIER 35,510.000 LF
RESET MEDIAN CABLE BARRIER 500.000 LF
RESET GUARDRAIL RESET GR. 500.000 LF
CABLE BARRIER END ANCHOR 50.000 EA
THRIE BEAM G.R.BRIDGE CONN. 22.000 EA
GUARDRAIL LEADING TYPE T TL3 (50') 43.000 EA
GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT 35.000 EA
GR TRAILING END TREATMENT W-BEAM TYPE B 42.000 EA
PERMANENT COVER 40.622 ACRE
TEMPORARY COVER 20.311 ACRE
STRAW OR HAY MULCH WITH TACKIFIER 30.467 ACRE
FERTILIZER (NITROGEN) 4,062.000 LB
FERTILIZER (PHOSPHORIC ACID) 4,062.000 LB
FERTILIZER (POTASH) 4,062.000 LB
AGRICULTURAL GRANULAR LIME 81,244.000 LB
SELECTIVE WATERING 271,500.000 GAL
MOWING 121.866 ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 60.933 ACRE
SEDIMENT TUBES FOR DITCH CHECKS 3,804.000 LF
SILT FENCE 53,300.000 LF
REPLACE/REPAIR SILT FENCE 5,330.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 13,325.000 LF
CLEANING INLET STRUCTURE FILTERS 212.000 EA
INLET STRUCTURE FILTER - TYPE D1 40.000 EA
FILTER MATERIAL FOR INLET STRUCTURE FILTER - TYPE D1 960.000 EA
INLET STRUCTURE FILTER - TYPE A 2,640.000 LF
STABILIZED CONSTRUCTION ENTRANCE 4,675.000 SY
ON-THE-JOB TRAINEE (ROADWAY) 8,840.000 HR
Call No.: 190 35Page:
South Carolina Department of Transportation 12/6/2016
4610390SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: York DBE Goal Percent: 1.50%
Completion Date:
Description: 2017 FA PRESERVATION IN YORK COUNTY
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030516P030516PCN: Project No.:
P030523P030523PCN: Project No.:
P030530P030530PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
LIQUID ASPHALT BINDER PG64-22 74.750 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,000.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 7,300.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE E 1,150.000 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 480,796.832 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,320.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 64,370.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 118,220.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,470.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,050.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 222.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 138.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EA
WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 2.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 32,900.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 307,350.000 LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT 520.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 36,160.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 59,940.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 4,310.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 16.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,280.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 133.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 79.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 10.000 EA
15.67
Call No.: 190 36Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 18,450.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 169,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 260.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,900.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,600.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,840.000 EA
Call No.: 200 37Page:
South Carolina Department of Transportation 12/6/2016
5108870SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Lexington Richland DBE Goal Percent: 3.00%
Completion Date:
Description: 2017 FEDERAL AID PROGRAM
11/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030324P030324PCN: Project No.:
P030325P030325PCN: Project No.:
P030327P030327PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,390.000 SY
REMOVAL OF EXIST. GUARDRAIL 1,075.000 LF
BORROW EXCAVATION 1,532.000 CY
EXCAVATION FOR SHOULDER PAVING 554.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 554.000 STA
MAINTENANCE STONE 186.430 TON
HMA SHOULDER WIDENING COURSE 2,772.000 TON
LIQUID ASPHALT BINDER PG64-22 1,761.780 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 8,992.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 9,651.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 39,520.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 140,252.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 5,742.000 SY
MILLED-IN RUMBLE STRIP 12.800 MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 4,655.200 TON
HOT MIX ASPHALT SURFACE COURSE TYPE B 13,514.453 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 10,843.288 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 300.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,052.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 27,714.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 135,044.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 640.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,663.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,830.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 64.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 39.000 EA
10.6
Call No.: 200 38Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 17.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,572.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 125,503.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 3,620.000 LF
6"YEL SOLID LINES ON 6"CONC.CURB(TOP&SIDE)-FAST DRY PNT 1,055.000 LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,170.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 200.000 LF
24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) EPOXY PAINT 24.000 LF
4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 1,560.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9,638.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 90,330.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 320.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 2,488.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 15.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,300.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 36.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 21.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 13.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 11,740.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 70,149.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 585.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 393.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 480.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,625.000 EA
REMOVAL OF PAVEMENT MARKINGS 1,784.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 424.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 21,043.000 LF
SAWCUT FOR LOOP DETECTOR 7,038.000 LF
DETECTABLE WARNING MATERIAL 675.000 SF
PEDESTRIAN RAMP CONSTRUCTION 1,350.000 SY
SURFACE APPLIED DETECTABLE WARNING 70.000 SF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 925.000 LF
END TERMINAL - TYPE T 10.000 EA
THRIE BEAM G.R.BRIDGE CONN. 2.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 7.133 ACRE
Call No.: 210 39Page:
South Carolina Department of Transportation 12/6/2016
5209100SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: AbbevilleMcCormick
DBE Goal Percent: 2.50%
Completion Date:
Description: DISTRICT 2 2017 FEDERAL AID SECONDARYPROGRAM
7/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030261P030261PCN: Project No.:
P030303P030303PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 450.000 SY
BORROW EXCAVATION 216.000 CY
MAINTENANCE STONE 28.600 TON
LIQUID ASPHALT BINDER PG64-22 187.263 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 635.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2,225.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.5" 32,200.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4,000.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE C 2,028.850 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 1,040.180 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 688.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 274.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 26,840.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 58.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 400.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 36,580.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 137.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 13,420.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 116.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 296.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 27,800.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 137.000 EA
ADJUST DROP INLET ADJUST D. I. 2.000 EA
DETECTABLE WARNING MATERIAL 237.500 SF
PEDESTRIAN RAMP CONSTRUCTION 450.000 SY
SURFACE APPLIED DETECTABLE WARNING 30.000 SF
PERMANENT GRASSING FOR SMALL PROJECTS 0.800 ACRE
2.03
Call No.: 210 40Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
SEDIMENT TUBES FOR DITCH CHECKS 30.000 LF
SILT FENCE 300.000 LF
REPLACE/REPAIR SILT FENCE 30.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 75.000 LF
Call No.: 220 41Page:
South Carolina Department of Transportation 12/6/2016
5209400SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: AbbevilleMcCormick
DBE Goal Percent: 4.00%
Completion Date:
Description: 2017 FEDERAL AID PIPP FOR DISTRICT 2
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030066P030066PCN: Project No.:
P030095P030095PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 1,000.000 CY
EXCAVATION FOR SHOULDER PAVING 334.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 334.000 STA
MAINTENANCE STONE 55.500 TON
HMA SHOULDER WIDENING COURSE 1,555.840 TON
LIQUID ASPHALT BINDER PG64-22 725.851 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,200.000 SY
FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 3,350.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 42,680.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 68,647.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 800.000 SY
MILLED-IN RUMBLE STRIP 6.240 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 7,024.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 4,596.445 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 644.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 12,465.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 100,200.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 396.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 20,400.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 76,240.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,215.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 33,400.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 180.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,800.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 65,320.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 316.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 494.000 EA
5.46
Call No.: 220 42Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 827.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,000.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 3,232.000 LF
SAWCUT FOR LOOP DETECTOR 808.000 LF
13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA
SURFACE APPLIED DETECTABLE WARNING 25.000 SF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 950.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 122.000 LF
STEEL BEAM GUARDRAIL (THRIE) 78.000 LF
END ANCHOR-TYPE B (THRIE BEAM) 1.000 EA
END TERMINAL - TYPE T 9.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 200.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 2.270 ACRE
SEDIMENT TUBES FOR DITCH CHECKS 150.000 LF
SILT FENCE 1,450.000 LF
REPLACE/REPAIR SILT FENCE 150.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 375.000 LF
Call No.: 230 43Page:
South Carolina Department of Transportation 12/6/2016
5210220SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Abbeville EdgefieldLaurens McCormickNewberry
DBE Goal Percent: 8.00%
Completion Date:
Description: PRESERVATION OF DISTRICT 2 ROUTES
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030497P030497PCN: Project No.:
P030498P030498PCN: Project No.:
P030499P030499PCN: Project No.:
P030500P030500PCN: Project No.:
P030504P030504PCN: Project No.:
P030507P030507PCN: Project No.:
P030509P030509PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL OF EXIST. GUARDRAIL 3,250.000 LF
BORROW EXCAVATION 3,432.000 CY
MAINTENANCE STONE 119.050 TON
LIQUID ASPHALT BINDER PG64-22 7.875 TON
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 7,650.000 SY
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,600.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 600.000 SY
MILLED-IN RUMBLE STRIP 14.480 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 125.000 TON
ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 237,192.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,832.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,426.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 314,471.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 80.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 706.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 9,236.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 260,616.000 LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT 550.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 636.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 185,018.000 LF
19.71
Call No.: 230 44Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 378.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 3.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,190.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 173,966.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 550.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 10.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,203.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,500.000 LF
SAWCUT FOR LOOP DETECTOR 404.000 LF
13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA
STEEL BEAM GUARDRAIL STEEL BEAM GR. 5,000.000 LF
END TERMINAL - TYPE T 16.000 EA
THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 352.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 12.810 ACRE
SEDIMENT TUBES FOR DITCH CHECKS 30.000 LF
SILT FENCE 300.000 LF
REPLACE/REPAIR SILT FENCE 30.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 75.000 LF
Call No.: 240 45Page:
South Carolina Department of Transportation 12/6/2016
5210270SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Greenwood Saluda DBE Goal Percent: 3.00%
Completion Date:
Description: 2017 FA PRESERVATION IN DISTRICT 2
9/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030495P030495PCN: Project No.:
P030501P030501PCN: Project No.:
P030570P030570PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 350.000 SY
BORROW EXCAVATION 302.000 CY
MAINTENANCE STONE 52.000 TON
LIQUID ASPHALT BINDER PG64-22 1.200 TON
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 1,900.000 SY
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,300.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 350.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE C 20.000 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 128,610.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,696.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 20,635.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24,833.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 450.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 5,844.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,720.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 66.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 43.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 24.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 8,540.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 102,596.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 8,332.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 12,256.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 150.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,948.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 15.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 686.000 LF
4.24
Call No.: 240 46Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 25.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 16.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 8.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,972.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 51,418.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 436.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 255.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 662.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,500.000 LF
SAWCUT FOR LOOP DETECTOR 404.000 LF
13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA
DETECTABLE WARNING MATERIAL 175.000 SF
PEDESTRIAN RAMP CONSTRUCTION 350.000 SY
SURFACE APPLIED DETECTABLE WARNING 320.000 SF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 137.500 LF
END TERMINAL - TYPE T 4.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 0.960 ACRE
Call No.: 250 47Page:
South Carolina Department of Transportation 12/6/2016
5210290SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Abbeville EdgefieldLaurens
DBE Goal Percent: 1.00%
Completion Date:
Description: PRESERVATION TREATMENT IN DISTRICT 2
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030496P030496PCN: Project No.:
P030503P030503PCN: Project No.:
P030508P030508PCN: Project No.:
P030684P030684PCN: Project No.:
P030723P030723PCN: Project No.:
P030782P030782PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 25.000 SY
BORROW EXCAVATION 2,173.000 CY
MAINTENANCE STONE 103.000 TON
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 8,200.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 9,512.000 SY
MILLED-IN RUMBLE STRIP 18.160 MI
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,472.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 58,277.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 172,902.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 11,977.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 6,074.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 127.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 3.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 22,800.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 289,654.000 LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,210.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 19,837.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 76,862.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 4,059.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,118.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 45.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 3.000 EA
9.77
Call No.: 250 48Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7,600.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 118,246.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 502.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,077.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 612.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 921.000 EA
DETECTABLE WARNING MATERIAL 12.500 SF
PEDESTRIAN RAMP CONSTRUCTION 25.000 SY
SURFACE APPLIED DETECTABLE WARNING 390.000 SF
PERMANENT GRASSING FOR SMALL PROJECTS 5.630 ACRE
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 289,306.800 SY
MICRO SURFACING SURFACE COURSE 289,306.800 SY
Call No.: 260 49Page:
South Carolina Department of Transportation 12/6/2016
5309750SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Greenville OconeePickensSpartanburg
DBE Goal Percent: 0.00%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATION INDISTRICT 3
10/15/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030343P030343PCN: Project No.:
P030369P030369PCN: Project No.:
P030370P030370PCN: Project No.:
P030381P030381PCN: Project No.:
P030383P030383PCN: Project No.:
P030480P030480PCN: Project No.:
P030594P030594PCN: Project No.:
P030596P030596PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 225.000 SY
MAINTENANCE STONE 130.110 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 13,011.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 65.470 LaMi
MICRO SURFACING SURFACE COURSE 486,951.461 SY
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 26,416.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 126,753.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,797.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,827.000 LF
12" WHITE SOLID LINES - FAST DRY PAINT 275.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,421.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 119.000 EA
WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 103.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 16.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 13.000 EA
BIKE LANE SYMBOL - FAST DRY PAINT 103.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,190.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 223,274.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 322.000 LF
4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 322.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 26,416.000 LF
19.93
Call No.: 260 50Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 126,753.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,797.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 6,827.000 LF
12" WHITE SOLID LINES - THERMO. - 125 MIL. 275.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,421.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 119.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 16.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 13.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 13,190.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 223,274.000 LF
BIKE LANE SYMBOL -PREFORMED THERMO - 90MIL 103.000 EA
BIKE LANE ARROW - PREFORMED THERMO - 90MIL 103.000 EA
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,755.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,213.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 3,184.000 EA
DETECTABLE WARNING MATERIAL 125.000 SF
PEDESTRIAN RAMP CONSTRUCTION 250.000 SY
SURFACE APPLIED DETECTABLE WARNING 20.000 SF
Call No.: 270 51Page:
South Carolina Department of Transportation 12/6/2016
5309760SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Greenville OconeePickensSpartanburg
DBE Goal Percent: 1.00%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATIONDISTRICT 3
10/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030344P030344PCN: Project No.:
P030345P030345PCN: Project No.:
P030368P030368PCN: Project No.:
P030382P030382PCN: Project No.:
P030585P030585PCN: Project No.:
P030587P030587PCN: Project No.:
P030595P030595PCN: Project No.:
P030597P030597PCN: Project No.:
P030598P030598PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 202.610 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 20,261.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 195.405 LaMi
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4,500.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6,400.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 500.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 800.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,800.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 10,300.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 210.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 3,770.000 LF
SAWCUT FOR LOOP DETECTOR 1,370.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 3.000 EA
DETECTABLE WARNING MATERIAL 75.000 SF
PEDESTRIAN RAMP CONSTRUCTION 150.000 SY
SURFACE APPLIED DETECTABLE WARNING 320.000 SF
62.21
Call No.: 280 52Page:
South Carolina Department of Transportation 12/6/2016
5410360SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Cherokee Union DBE Goal Percent: 1.50%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATION INCHEROKEE AND UNION COUNTIES
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030511P030511PCN: Project No.:
P030515P030515PCN: Project No.:
P030517P030517PCN: Project No.:
P030522P030522PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
LIQUID ASPHALT BINDER PG64-22 11.375 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 5,050.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE E 175.000 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 112,935.195 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,152.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 17,460.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 87,760.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,900.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,440.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 48.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 26.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 8.000 EA
WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 9,840.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 102,940.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 8,730.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 43,880.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 950.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 720.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 24.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 13.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 4.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA
5.4
Call No.: 280 53Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,920.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 51,470.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 458.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 290.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 897.000 EA
Call No.: 290 54Page:
South Carolina Department of Transportation 12/6/2016
5410380SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: ChesterfieldLancaster
DBE Goal Percent: 1.50%
Completion Date:
Description: 2017 FA PRESERVATION IN CHESTERFIELDAND LANCASTER COUNTIES
7/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030513P030513PCN: Project No.:
P030514P030514PCN: Project No.:
P030519P030519PCN: Project No.:
P030521P030521PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
LIQUID ASPHALT BINDER PG64-22 24.050 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,190.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE E 370.000 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 170,633.934 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,014.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 19,840.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 148,280.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 88.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 88.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5,500.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 115,720.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9,920.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 74,140.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 44.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 44.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,750.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 57,860.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 490.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 290.000 EA
9.63
Call No.: 300 55Page:
South Carolina Department of Transportation 12/6/2016
5410400SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Cherokee ChesterChesterfield FairfieldLancaster Union
DBE Goal Percent: 1.50%
Completion Date:
Description: 2017 FEDERAL AID SECONDARYPRESERVATION
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030524P030524PCN: Project No.:
P030525P030525PCN: Project No.:
P030526P030526PCN: Project No.:
P030527P030527PCN: Project No.:
P030528P030528PCN: Project No.:
P030529P030529PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,600.000 SY
MICRO SURFACING SURFACE COURSE 150,550.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,872.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,684.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 248,880.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,800.000 LF
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,000.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 237,180.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 842.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 124,440.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 900.000 LF
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,500.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 118,590.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 801.000 EA
11.78
Call No.: 310 56Page:
South Carolina Department of Transportation 12/6/2016
5507231SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: DISTRICT5 DBE Goal Percent: 0.00%
Completion Date:
Description: THERMOPLASTIC PAVEMENT MARKERS -DISTRICT 5
11/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029837P029837PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 405,000.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,980,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 65,000.000 LF
12" WHITE SOLID LINES - THERMO. - 125 MIL. 875.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 800.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 49,000.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 550.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 320.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 130.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 35.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 40.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 160,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,900,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 6,300.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 3,750.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 27,400.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 27,400.000 LF
232.0
Call No.: 320 57Page:
South Carolina Department of Transportation 12/6/2016
5509960SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Darlington Marlboro DBE Goal Percent: 3.00%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATION -DARLINGTON AND MARLBORO
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030076P030076PCN: Project No.:
P030077P030077PCN: Project No.:
P030089P030089PCN: Project No.:
P030090P030090PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 1,868.000 CY
MAINTENANCE STONE 24.600 TON
LIQUID ASPHALT BINDER PG64-22 96.745 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,060.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 400.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 66.120 LaMi
MILLED-IN RUMBLE STRIP 16.160 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 1,535.625 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 125,240.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,518.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 7,420.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 180,020.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 300.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 200.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 10.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 17,740.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 106,160.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 3,710.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 90,010.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 150.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 120.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 6.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 5.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,870.000 LF
25.87
Call No.: 320 58Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 53,080.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 136.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 533.000 EA
REMOVAL OF PAVEMENT MARKINGS 51,920.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 5.886 ACRE
Call No.: 330 59Page:
South Carolina Department of Transportation 12/6/2016
5509970SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Dillon Marion DBE Goal Percent: 3.50%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATION - DILLONAND MARION
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030078P030078PCN: Project No.:
P030079P030079PCN: Project No.:
P030087P030087PCN: Project No.:
P030088P030088PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
BORROW EXCAVATION 1,502.000 CY
MAINTENANCE STONE 13.600 TON
LIQUID ASPHALT BINDER PG64-22 79.421 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 400.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 960.000 SY
MILLED-IN RUMBLE STRIP 9.280 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 1,260.625 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 173,600.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,352.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 22,020.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 122,600.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,960.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,420.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 62.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 26.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,960.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 140,260.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,220.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 11,010.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 61,300.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 980.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 740.000 LF
8.69
Call No.: 330 60Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 31.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 13.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 2.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,480.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 70,130.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 632.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 225.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 915.000 EA
REMOVAL OF PAVEMENT MARKINGS 20,210.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 4.735 ACRE
Call No.: 340 61Page:
South Carolina Department of Transportation 12/6/2016
5509980SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date:
PCN: P030082 PCN: P030083 PCN: P030084 PCN: P030085 CO(S).: Horry
GeorgetownDBE Goal Percent: 3.00%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATION -GEORGETOWN AND HORRY
9/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030082Project No.:
P030083Project No.:
P030084Project No.:
P030085Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
BORROW EXCAVATION 7,254.000 CY
MAINTENANCE STONE 32.920 TON
LIQUID ASPHALT BINDER PG64-22 234.084 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,292.000 SY
MILLED-IN RUMBLE STRIP 72.540 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 3,715.625 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 549,790.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,092.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 26,900.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 734,000.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,240.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,100.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 20.000 EA
WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 16.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 20.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 59,720.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 394,300.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 13,450.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 367,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 620.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 550.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 18.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 10.000 EA
34.74
Call No.: 340 62Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 29,860.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 197,150.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 363.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,310.000 EA
REMOVAL OF PAVEMENT MARKINGS 94,320.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 22.854 ACRE
Call No.: 350 63Page:
South Carolina Department of Transportation 12/6/2016
5510450SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: FlorenceWilliamsburg
DBE Goal Percent: 11.00%
Completion Date:
Description: 2017 FEDERAL AID PRESERVATION -FLORENCE AND WILLIAMSBURG
9/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030080P030080PCN: Project No.:
P030081P030081PCN: Project No.:
P030091P030091PCN: Project No.:
P030092P030092PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,720.000 SY
REMOVAL & DISPOSAL OF EXISTING CURB 1,200.000 LF
BORROW EXCAVATION 3,168.000 CY
MAINTENANCE STONE 35.100 TON
LIQUID ASPHALT BINDER PG64-22 111.668 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,060.000 SY
FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 450.000 SY
SURFACE PLANE ASPHALT PAVEMENT - VARIABLE 16,600.000 SY
MILLED-IN RUMBLE STRIP 31.680 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 1,772.500 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 261,600.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,304.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 20,900.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 302,300.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,600.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,120.000 LF
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 23,640.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 173,140.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 10,450.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 151,150.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,300.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 560.000 LF
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA
14.71
Call No.: 350 64Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 11,820.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 86,570.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 440.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 965.000 EA
REMOVAL OF PAVEMENT MARKINGS 181,230.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 750.000 LF
SAWCUT FOR LOOP DETECTOR 500.000 LF
CATCH BASIN T-17 (CONVERT C.B. TYPE 5) 3.000 EA
CATCH BASIN T-18 (CONVERT C.B. TYPE 7) 11.000 EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 200.000 LF
CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 1,000.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 1,250.000 SY
DETECTABLE WARNING MATERIAL 325.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 820.000 SY
PEDESTRIAN RAMP CONSTRUCTION 650.000 SY
PERMANENT GRASSING FOR SMALL PROJECTS 9.980 ACRE
Call No.: 360 65Page:
South Carolina Department of Transportation 12/6/2016
5607241SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: DISTRICT6 DBE Goal Percent: 0.00%
Completion Date:
Description: THERMOPLASTIC PAVEMENT MARKERS -DISTRICT 6
11/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029838P029838PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 215,000.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,760,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 35,000.000 LF
12" WHITE SOLID LINES - THERMO. - 125 MIL. 420.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 500.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 30,000.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 475.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 140.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 50.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 10.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 30.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 156,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,600,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 200.000 LF
REMOVAL OF PAVEMENT MARKINGS 34,600.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 1,800.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 18,500.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.BROKEN 1,800.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 12,500.000 LF
195.0
Call No.: 370 66Page:
South Carolina Department of Transportation 12/6/2016
5707251SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: DISTRICT7 DBE Goal Percent: 0.00%
Completion Date:
Description: THERMOPLASTIC PAVEMENT MARKINGS -DISTRICT 7
11/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029839P029839PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 125,000.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 2,200,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 154,000.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 300.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 19,000.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 120.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 40.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 20.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 5.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 25.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 177,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,500,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 1,050.000 LF
229.5
Call No.: 380 67Page:
South Carolina Department of Transportation 12/6/2016
5709640SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Allendale BambergBarnwell Hampton
DBE Goal Percent: 3.50%
Completion Date:
Description: 2017 FA PAVEMENT IMPROVEMENTPROGRAM(PM)-03,05,06,25
11/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030347P030347PCN: Project No.:
P030405P030405PCN: Project No.:
P030406P030406PCN: Project No.:
P030433P030433PCN: Project No.:
P030434P030434PCN: Project No.:
P030463P030463PCN: Project No.:
P030483P030483PCN: Project No.:
P030573P030573PCN: Project No.:
P030574P030574PCN: Project No.:
P030851P030851PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 900.000 SY
BORROW EXCAVATION 2,989.800 CY
EXCAVATION FOR SHOULDER PAVING 1,496.246 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 1,496.246 STA
MAINTENANCE STONE 68.140 TON
HMA SHOULDER WIDENING COURSE 7,637.901 TON
LIQUID ASPHALT BINDER PG64-22 2,004.120 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 5,913.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 901.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.25" 8,250.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.5" 1,250.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 17,690.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 20,750.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 9,550.000 SY
MILLED-IN RUMBLE STRIP 19.632 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 9,167.560 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 9,752.180 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 8,749.354 TON
18.61
Call No.: 380 68Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,000.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 900.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 166,325.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,556.000 LF
12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 108.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 20.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,334.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 3.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 14,175.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 109,820.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 920.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 332,650.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,112.000 LF
12" WHITE SOLID LINES - FAST DRY PAINT 216.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,688.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 28,350.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 220,240.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 5.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,254.000 EA
DETECTABLE WARNING MATERIAL 450.000 SF
PEDESTRIAN RAMP CONSTRUCTION 900.000 SY
SURFACE APPLIED DETECTABLE WARNING 300.000 SF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 1,525.000 LF
STEEL BEAM GUARDRAIL (THRIE) 125.000 LF
END TERMINAL - TYPE T 8.000 EA
THRIE BEAM GUARDRAIL BRACKET CONNECTION 4.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 15.975 ACRE
Call No.: 390 69Page:
South Carolina Department of Transportation 12/6/2016
5710180SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Allendale BambergBarnwell Hampton
DBE Goal Percent: 1.00%
Completion Date:
Description: 2017 FA PAVEMENT PRESERVATIONPROGRAM(MICRO)-03,05,06,25
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P029989P029989PCN: Project No.:
P030006P030006PCN: Project No.:
P030018P030018PCN: Project No.:
P030564P030564PCN: Project No.:
P030566P030566PCN: Project No.:
P030567P030567PCN: Project No.:
P030571P030571PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 225.000 SY
MAINTENANCE STONE 18.780 TON
LIQUID ASPHALT BINDER PG64-22 40.950 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,598.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 280.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,320.000 SY
MILLED-IN RUMBLE STRIP 6.600 MI
HOT MIX ASPHALT SURFACE COURSE TYPE D 650.000 TON
MICRO SURFACING SURFACE COURSE 212,801.201 SY
MICRO SURFACING LEVELING 302.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,684.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,095.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 133,320.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 390.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 290.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 2.000 EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 1.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 9,145.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 96,490.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,690.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 227,240.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 780.000 LF
22.93
Call No.: 390 70Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 280.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 18,290.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 192,980.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 108.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 947.000 EA
DETECTABLE WARNING MATERIAL 112.500 SF
PEDESTRIAN RAMP CONSTRUCTION 225.000 SY
SURFACE APPLIED DETECTABLE WARNING 170.000 SF
Call No.: 400 71Page:
South Carolina Department of Transportation 12/6/2016
5710190SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Allendale BambergBarnwell Hampton
DBE Goal Percent: 0.00%
Completion Date:
Description: 2017 FA PVMT PRESERVATIONPROGRAM(MICRO/TL ALT.)-03,05,06,25
8/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030004P030004PCN: Project No.:
P030005P030005PCN: Project No.:
P030007P030007PCN: Project No.:
P030019P030019PCN: Project No.:
P030563P030563PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 10.980 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,059.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 39.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 450.000 SY
MILLED-IN RUMBLE STRIP 6.166 MI
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,128.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 294.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 99,961.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 391.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 6,580.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 66,878.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 294.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 147,692.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 347.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,160.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 134,756.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 960.000 LF
4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 960.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 649.000 EA
MICRO SURFACING SURFACE COURSE 134,158.926 SY
MICRO SURFACING LEVELING 278.000 TON
LIQUID ASPHALT BINDER PG64-22 17.514 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,406.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE D 278.000 TON
9.64
Call No.: 400 72Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 134,158.926 SY
Call No.: 410 73Page:
South Carolina Department of Transportation 12/6/2016
5710240SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Calhoun ClarendonOrangeburg
DBE Goal Percent: 1.00%
Completion Date:
Description: 2017 FA PAVEMENT PRESERVATIONPROGRAM(MICRO)-09,14,38
7/31/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030014P030014PCN: Project No.:
P030035P030035PCN: Project No.:
P030568P030568PCN: Project No.:
P030569P030569PCN: Project No.:
P030572P030572PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 150.000 SY
MAINTENANCE STONE 39.800 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,935.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 45.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 6,870.000 SY
MILLED-IN RUMBLE STRIP 3.142 MI
MICRO SURFACING SURFACE COURSE 204,111.994 SY
MICRO SURFACING LEVELING 427.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,280.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,080.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 94,960.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 80.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 180.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 3.000 EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 10,460.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 58,030.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,950.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 189,920.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 160.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 360.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA
14.18
Call No.: 410 74Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 20,920.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 116,060.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 126.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 156.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,026.000 EA
DETECTABLE WARNING MATERIAL 75.000 SF
PEDESTRIAN RAMP CONSTRUCTION 150.000 SY
SURFACE APPLIED DETECTABLE WARNING 240.000 SF
Call No.: 420 75Page:
South Carolina Department of Transportation 12/6/2016
5710250SC File NO(S).:
January 10, 2017
2:00 P.M.
Letting Date: CO(S).: Calhoun ClarendonOrangeburg
DBE Goal Percent: 0.00%
Completion Date:
Description: 2017 FA PAVEMENT PRESERVATIONPROGRAM(TL/MICRO ALT)-09,14,38
9/30/2017
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
P030015P030015PCN: Project No.:
P030016P030016PCN: Project No.:
P030017P030017PCN: Project No.:
P030029P030029PCN: Project No.:
P030792P030792PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
MAINTENANCE STONE 30.560 TON
LIQUID ASPHALT BINDER PG64-22 6.300 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,056.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,220.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 340.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 84,200.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 35.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 1.000 EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 1.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING 1.000 EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 6,190.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 46,070.000 LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 660.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 168,400.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 70.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 2.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 2.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 12,380.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 92,140.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 13.000 EA
9.95
Call No.: 420 76Page:
South Carolina Department of Transportation 12/6/2016
Description Quantity Units
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 614.000 EA
SURFACE APPLIED DETECTABLE WARNING 20.000 SF
MICRO SURFACING SURFACE COURSE 122,713.064 SY
MICRO SURFACING LEVELING 1,477.000 TON
LIQUID ASPHALT BINDER PG64-22 93.051 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4,200.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE D 1,577.000 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 122,713.064 SY
BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.
1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bondssubmitted by US mail or express delivery service shall be enclosed in sealed envelope or containerwith Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealedenvelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by USmail or express delivery service must be received by the Contract Administrator, or designee, priorto the time and date for opening of proposals indicated in the beginning of this Notice. Thedepartment will not be responsible for delays in the US mail or express delivery service.
2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealedenvelope marked with Contractor Name and "Bid Bond for SC File No._______", and must bedelivered directly to the Contract Administrator or designee prior to the time and date for opening ofproposals indicated in the beginning of this Notice.
PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeffrey Elliott at (803) 737-1253.
STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.
MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.
In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "SupplementalSpecifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:
TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.
Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, andthe bidder should check with the SCDOT Engineering Publications office for the cost of plans when theplans are indicated to be available.
THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
Prepared by L. Stuckey
Issued by:
Jeffrey O.Elliott
Contract Administration Engineer