67
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. The following items will be made available on June 12, 2018 unless otherwise noted: • EBS (Electronic Bidding System) files via Bid Express website • Hardcopy plans & proposals will be printed upon request only via Engineering Publications o Located in room G23 SCDOT Headquarters o Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orders o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds) Access the Construction Extranet for the following items: • Plans • Announcements • Bids as Received • CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx. Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-1656. The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice. SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING July 10, 2018 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia, SC

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should signin at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with allLetting related questions.

The following items will be made available on June 12, 2018 unless otherwise noted:• EBS (Electronic Bidding System) files via Bid Express website• Hardcopy plans & proposals will be printed upon request only via Engineering Publications

o Located in room G23 SCDOT Headquarterso Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orderso Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)

Access the Construction Extranet for the following items:• Plans• Announcements• Bids as Received• CPM Schedule Templates

Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx.

Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.

The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx

Quantities shown herein are approximate for information only and should not be used for bidding purposes.The Department reserves the right to change these quantities without notice.

SOUTH CAROLINADEPARTMENT OF TRANSPORTATION

NOTICE TO CONTRACTORSFOR

REGULAR HIGHWAY LETTINGJuly 10, 2018

Letting Location: SCDOT Headquarters Building

Conference Room 331 955 Park Street Columbia, SC

Page 2: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 010 1Page:

South Carolina Department of Transportation 6/1/2018

0283890SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Aiken DBE Goal Percent: 12.0%

Completion Date:

Description: S-145 INTERSECTION W/ S-65

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$44.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.4570

SA020090042131RD01PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 2,276.000 SY

UNCLASSIFIED EXCAVATION 2,267.000 CY

BORROW EXCAVATION 1,818.000 CY

FINE GRADING 7,284.000 SY

FLOWABLE FILL 25.000 CY

MAINTENANCE STONE 100.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 1,005.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 120.000 TON

LIQUID ASPHALT BINDER PG64-22 177.000 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 526.000 SY

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,534.000 TON

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 80.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 923.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 60.000 TON

STAINED CONCRETE PAVEMENT (8" UNIFORM) 3,953.000 SF

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 392.000 SF

PAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 50.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 14,250.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 15,800.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES 200.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 150.000 LF

PAVEMENT MARKINGS (TEMPORARY PAINT) 24"X36" WHITE TRIANGLE YIELDBAR

75.000 LF

TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 75.000 EA

Page 3: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 010 2Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

8" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 125.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 2,000.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 400.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 100.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 4,300.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 30.000 EA

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 175.200 SF

U-SECTION POST FOR SIGN SUPPORTS - 3P 300.000 LF

REFLECTIVE SIGN POST PANELS 160.000 LF

DESIGN & INSTALLATION OF RDWY. LIGHTING ELECTRICAL SYSTEM 001 1.000 LS

SGL.LIGHT STD.35'HT.AL.POLE-INCL TOP TENON MT. 10.000 EA

18" SMOOTH WALL PIPE 2,116.000 LF

CATCH BASIN -TYPE 16 15.000 EA

BEVELING OF PIPE END 12.000 EA

CONCRETE CURB AND GUTTER(1'-6") OGEE 522.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 2,512.000 LF

CONCRETE DRIVEWAY(6" UNIFORM) 492.000 SY

CONCRETE MEDIAN 472.000 SY

RIP-RAP (CLASS B) 367.000 TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 460.000 SY

RIGHT OF WAY MARKER(REBAR AND CAP) 31.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT COVER 1.043 ACRE

TEMPORARY COVER 0.522 ACRE

FERTILIZER (NITROGEN) 157.000 LB

FERTILIZER (PHOSPHORIC ACID) 157.000 LB

FERTILIZER (POTASH) 157.000 LB

AGRICULTURAL GRANULAR LIME 3,130.000 LB

SELECTIVE WATERING 54,300.000 GAL

MOWING 3.130 ACRE

LANDSCAPING 1.000 LS

DOUBLE-SHREDDED HARDWOOD MULCH 1,810.000 SF

MUHLENBERGIA CAPILLARIS (PINK MUHLY GRASS) #1 CONT. 35.000 EA

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 0.344 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.296 ACRE

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 90.000 LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 90.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 260.000 LF

SILT FENCE 5,157.000 LF

REPLACE/REPAIR SILT FENCE 516.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 1,290.000 LF

CLEANING INLET STRUCTURE FILTERS 30.000 EA

Page 4: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 010 3Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 5: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 020 4Page:

South Carolina Department of Transportation 6/1/2018

0287540SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Aiken DBE Goal Percent: 6.00%

Completion Date:

Description: I-20/S-144 (BETTIS ACADEMY ROAD)INTERCHANGE IMPROVEMENT

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$47.00

$22.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $10.00

Letting Time:

0.7480

P028045P028045PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BRIDGE CONSTRUCTION ACCESS 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CONCRETE 1.670 CY

REMOVAL OF EXIST. GUARDRAIL 662.500 LF

UNCLASSIFIED EXCAVATION 552.000 CY

BORROW EXCAVATION 1,222.000 CY

FINE GRADING 1,932.000 SY

MAINTENANCE STONE 50.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 732.000 TON

LIQUID ASPHALT BINDER PG64-22 182.000 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 100.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 20,730.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 500.000 SY

MILLED-IN RUMBLE STRIP 1.040 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 166.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 2,654.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 408.000 SF

PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 70.000 SF

TEMPORARY CONCRETE BARRIER 3,701.000 LF

BARRICADE - TYPE 3 84.000 LF

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2 2.000 EA

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(70MPH) 2.000 EA

ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2) 2.000 EA

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 2.000 EA

TYPE B - FLASHING LIGHT 16.000 EA

Page 6: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 020 5Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

PREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE 4"WH.SOLID PREF. 1,088.000 LF

PREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE4"YEL.SOLID PREF. 1,088.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 440.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 396.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,000.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6,742.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 440.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,054.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 308.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 24.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 20.000 EA

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 12,068.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,550.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,000.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 4,310.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,264.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 36.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 16.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 308.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 24.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 20.000 EA

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 8,356.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 299.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 10.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 127.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM. 60MIL 3" BLACK SOLID 15.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 111.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 530.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 530.000 LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 267.000 SF

FLAT SHEET, TYPE III, SIZE DETERMINED BY MSG 279.000 SF

Flat Sheet, Type XI, Size Determined by MSG, Overhead 75.000 SF

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 10.000 EA

U-SECTION POST FOR SIGN SUPPORTS - 2P 30.000 LF

U-SECTION POST FOR SIGN SUPPORTS - 3P 646.000 LF

U-SECTION POST FOR SIGN BRACING - 2P 130.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 335.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,646.000 LF

FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 92.000 LF

FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED) 148.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 3,093.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 2,211.000 LF

Page 7: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 020 6Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 2,707.000 LF

INSTALL WIRELESS NETWORK COMMUNICATIONS LINK BETWEEN TWOSIGNALS (2 RADIOS)

1.000 EA

SAWCUT FOR LOOP DETECTOR 972.000 LF

FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 2.000 EA

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 17.000 EA

F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 2.000 EA

FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION 8.000 EA

FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 1,044.000 LF

F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001 2.000 EA

FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 2.000 EA

FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 12.000 EA

FURNISH & INSTALL PEDESTRIAN PUSH BUTTON AND SIGN (R-10-4B) 4.000 EA

BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 14.000 EA

FURNISH & INSTALL CONCRETE CABINET FOUNDATION 2.000 EA

SPALL REPAIR 65.000 SF

EPOXY CRACK INJECTION 30.000 LF

COMPRESSION SEAL JOINT 144.200 LF

GROOVED SURFACE FINISH 1,258.000 SY

ENVIRONMENTAL AND WORKER PROTECTION 1.000 LS

CLEANING AND PAINTING EXISTING STRUCTURAL STEEL 1.000 LS

CONCRETE DRIVEWAY(10" UNIFORM) 40.000 SY

CONCRETE MEDIAN 859.000 SY

ELASTOMERIC BEARING 42.000 EA

HYDRO-DEMOLITION OF EXISTING SURFACE 1,266.000 SY

PARTIAL DEPTH REMOVAL OF SOUND CONCRETE 126.600 SY

CONCRETE OVERLAY (LATEX) 43.300 CY

VERY EARLY STRENGTH CONCRETE OVERLAY (LATEX) 20.900 CY

JACKING BRIDGE 1.000 LS

STEEL BEAM GUARDRAIL STEEL BEAM GR. 645.500 LF

END ANCHOR-TYPE B 1.000 EA

END TERMINAL - TYPE T 1.000 EA

PERMANENT COVER 0.930 ACRE

TEMPORARY COVER 0.465 ACRE

COMPOST 250.000 CY

FERTILIZER (NITROGEN) 93.000 LB

FERTILIZER (PHOSPHORIC ACID) 93.000 LB

FERTILIZER (POTASH) 93.000 LB

AGRICULTURAL GRANULAR LIME 1,860.000 LB

SELECTIVE WATERING 54,300.000 GAL

MOWING 2.790 ACRE

TURF REINFORCEMENT MATTING (TRM) TYPE 1 0.075 MSY

Page 8: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 020 7Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 0.300 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 2 0.300 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.300 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 4 0.300 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 60.000 LF

SILT FENCE 2,500.000 LF

REPLACE/REPAIR SILT FENCE 250.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 625.000 LF

STABILIZED CONSTRUCTION ENTRANCE 825.000 SY

SURFACE MILLING 001 1,266.000 SY

BRIDGE DECK PATCHING, FULL DEPTH 002 126.600 SY

ANCHOR BOLT REPLACEMENT WITH CONCRETE CORING 5.000 EACH

REMOVE AND RE-BUILD BEAM SEAT BUILD-UPS 4.000 EACH

Page 9: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 030 8Page:

South Carolina Department of Transportation 6/1/2018

0848540SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Berkeley DBE Goal Percent: 0.00%

Completion Date:

Description: RECLAMATION, WIDENING, RESURF

11/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

12.5000

P029715P029715PCN: Project No.:

P031997P031997PCN: Project No.:

P037325P037325PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 6.000 EA

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

UNCLASSIFIED EXCAVATION 1,295.000 CY

BORROW EXCAVATION 6,724.000 CY

EXCAVATION FOR SHOULDER PAVING 25.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 25.000 STA

ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION 4,365.000 TON

CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) 195,275.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 6,837.175 TON

MAINTENANCE STONE 237.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 176.000 TON

LIQUID ASPHALT BINDER PG64-22 2,083.097 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 200.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 5,250.000 SY

MILLED-IN RUMBLE STRIP 11.080 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 31,455.913 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 6,264.720 TON

DRIVEWAY PAVING-SURFACE TYPE C 1,023.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 962.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 60.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 132,550.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 170.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 288.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 2.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 2.000 EA

Page 10: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 030 9Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 2.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 12,000.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 50,855.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 180.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 527,140.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 510.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,112.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 6.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 6.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 12.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 48,000.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 200,780.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 16.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 868.000 EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 730.000 LF

SAWCUT FOR LOOP DETECTOR 300.000 LF

15" SMOOTH WALL PIPE 48.000 LF

24" SMOOTH WALL PIPE 88.000 LF

36" SMOOTH WALL PIPE 48.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 12.122 ACRE

SILT FENCE 2,150.000 LF

Page 11: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 040 10Page:

South Carolina Department of Transportation 6/1/2018

0908820SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Calhoun DBE Goal Percent: 0.00%

Completion Date:

Description: S-158 (COMMUNITY CLUB RD) BRIDGEOVER HUNGERPILLER POND (DR-

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $11.00

Letting Time:

0.0000

P030169P030169PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

SELECTED REMOVAL OF MARKED TREES 1.000 LS

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 24.000 SY

REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS

UNCLASSIFIED EXCAVATION 120.000 CY

BORROW EXCAVATION 240.000 CY

ROCK EXCAVATION FOR BRIDGES 5.000 CY

PERMANENT SHEET PILING 1,200.000 SF

FLOWABLE FILL 20.000 CY

MAINTENANCE STONE 20.000 TON

LIQUID ASPHALT BINDER PG64-22 3.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 40.000 TON

PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 70.000 SF

BARRICADE - TYPE 3 84.000 LF

TYPE B - FLASHING LIGHT 16.000 EA

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 400.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 400.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,100.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 800.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 8.000 EA

CONC. FOR STRUCTURES - CLASS 4000 50.000 CY

REINF. STEEL FOR STRUCTURES (BRIDGE) 8,000.000 LB

REINF. PILE TIPS (HP12 X 53) 14.000 EA

STEEL H BEARING PILING (HP12 X 53) 240.000 LF

CONCRETE CURB (TRANSITION) 30.000 LF

RIP-RAP (CLASS B) 40.000 TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 2,000.000 SY

Page 12: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 040 11Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

STEEL BEAM GUARDRAIL STEEL BEAM GR. 400.000 LF

END TERMINAL - TYPE T 4.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 400.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 1.000 ACRE

TEMPORARY COVER 1.000 ACRE

TEMPORARY EROSION CONTROL BLANKET (ECB) 2.000 MSY

SEDIMENT TUBES FOR DITCH CHECKS 80.000 LF

SILT FENCE 1,000.000 LF

REPLACE/REPAIR SILT FENCE 100.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 300.000 LF

DITCH CHECK 20.000 TON

AGGREGATE NO.5 OR 57 FOR EROSION CONTROL 20.000 TON

STABILIZED CONSTRUCTION ENTRANCE 200.000 SY

TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 12" 100.000 LF

PRESTRESSED CONCRETE BOX GIRDER 960.000 LF

Page 13: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 050 12Page:

South Carolina Department of Transportation 6/1/2018

1014381SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Charleston DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FDP, MILL, RESURFACING

9/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

10.3200

P032295P032295PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,455.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 273.000 LF

BORROW EXCAVATION 1,786.000 CY

MAINTENANCE STONE 62.400 TON

LIQUID ASPHALT BINDER PG64-22 876.003 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,925.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,315.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 17,140.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 7,645.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 15,860.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE B 738.213 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 13,029.188 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 875.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,640.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 300.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 24,400.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,204.000 LF

12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 70.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 40.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,033.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 12.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 2.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 4.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 150.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 53,935.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 600.000 LF

Page 14: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 050 13Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 48,030.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,676.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 70.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,972.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 22.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 7.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 300.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 84,195.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 110.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 18.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 727.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 90.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 5,150.000 LF

SAWCUT FOR LOOP DETECTOR 2,550.000 LF

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 4.000 EA

CONCRETE CURB (9" X 15") 300.000 LF

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 253.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 20.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 1,360.000 SY

DETECTABLE WARNING MATERIAL 440.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 500.000 SY

CONCRETE MEDIAN 45.000 SY

PEDESTRIAN RAMP CONSTRUCTION 550.000 SY

SURFACE APPLIED DETECTABLE WARNING 300.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 8.804 ACRE

ROOT BARRIER 50.000 LF

Page 15: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 060 14Page:

South Carolina Department of Transportation 6/1/2018

1025800SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: DBE Goal Percent: 0.00%

Completion Date:

Description: I-526 SYSTEMS AND TIMINGS PROJECT

10/31/2020

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$98.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.0000

P028928P028928PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,028.000 SY

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 474.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 6,055.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 112.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 964.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 9.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 2.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 130.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 492.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 24.000 EA

REMOVAL OF PAVEMENT MARKINGS 1,722.000 LF

REMOVAL OF PAVEMENT MARKINGS 5.000 EA

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 36.000 SF

Flat Sheet, Type XI, Size Determined by MSG, Overhead 667.000 SF

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 89.000 EA

REMOVAL OF MOUNTING ASSEMBLY FOR FS.SIGN ON SPAN WIRE 7.000 EA

F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM 3.000 EA

U-SECTION POST FOR SIGN SUPPORTS - 3P 120.000 LF

U-SECTION POST FOR SIGN BRACING - 2P 0.000 LF

REMOVAL OF U-SECTION POST 0.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,052.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 10,268.000 LF

FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 175.000 LF

FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE 382.000 LF

FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) 1,940.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 20,940.000 LF

Page 16: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 060 15Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 46,395.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 22,555.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 36,145.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 79,235.000 LF

FURNISH & INSTALL FIBER OPTIC CABLE-SINGLE MODE 1,570.000 LF

FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER 6.000 EA

FIBER OPTIC TRANSCEIVER (SMFO) 2.000 EA

OTDR TEST FOR EXISTING FIBER BETWEEN SIGNALS PER 677.3 14.000 EA

INSTALL WIRELESS NETWORK COMMUNICATIONS RADIO AT SIGNAL CABINET (1RADIO) 001

4.000 EA

FURNISH & INSTALL WIRELESS DETECTION SYSTEM PER SIGNAL 4.000 EA

SAWCUT FOR LOOP DETECTOR 30,763.000 LF

FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 10.000 EA

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 20.000 EA

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 157.000 EA

F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 7.000 EA

FURNISH & INSTALL 40' WOOD POLE - CLASS II-CCA TREATED(0.60) 8.000 EA

FURNISH & INSTALL 3/8" SIDEWALK GUY 3.000 EA

FURNISH & INSTALL 13" X 28' STEEL STRAIN POLE AND FOUNDATION 10.000 EA

FURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE 260.000 LF

FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 2,617.000 LF

FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 56.000 EA

F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 17 17.000 EA

FURNISH AND INSTALL BATTERY BACK-UP INCLUDING FOUNDATION 4.000 EA

FURNISH & INSTALL 2070L CONTROLLER UNIT IN EXISTING CABINET 4.000 EA

INSTALL 2070L CONTROLLER UNIT &/OR CONFLICT MONITOR IN EXISTINGCABINET

2.000 EA

FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD 10.000 EA

FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 50.000 EA

FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 150.000 EA

F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD 114.000 EA

F&I - 16" 1-WAY-1SECT.HAND/MAN/COUNTDOWN LED PEDESTRIAN SIGNALHEAD - LEFT

3.000 EA

F&I - 16" 1-WAY-1SECT.HAND/MAN/COUNTDOWN LED PEDESTRIAN SIGNALHEAD - RIGHT

1.000 EA

F&I-PED PUSH BUT.SOLID STATE W/ LIGHT&TONE ASSEM 9"X15"&SIGN (R-10-3Eor R10-4a)

116.000 EA

F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM 20.000 EA

BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 283.000 EA

F&I-PEDESTRIAN TRAF. SIGNAL HEAD MOUNTING ASSEM FOR POST TOP 2.000 EA

F&I-PED. TRAF. SIGNAL HEAD MOUNT. ASSY FOR DUAL POST TOP 3.000 EA

REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS

TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT 1.000 LS

Page 17: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 060 16Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN 1.000 EA

INSTALL 12" 1-WAY-3 SECTION(R.Y.G.)VEHICLE TRAFFIC SIGNAL 7.000 EA

INSTALL 12" 1-WAY-1 SECTION(RA)VEHICLE TRAFFIC SIGNAL 2.000 EA

FURNISH & INSTALL CONCRETE CABINET FOUNDATION 10.000 EA

FURNISH & INSTALL 332 SIGNAL CABINET - BASE MOUNTED 12.000 EA

INSTALL PEDESTRIAN SIGNAL HEAD 4.000 EA

CONCRETE SIDEWALK(4" UNIFORM) 154.000 SY

DETECTABLE WARNING MATERIAL 503.000 SF

CONCRETE MEDIAN 71.000 SY

PEDESTRIAN RAMP CONSTRUCTION 1,292.000 SY

SURFACE APPLIED DETECTABLE WARNING 464.000 SF

Page 18: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 070 17Page:

South Carolina Department of Transportation 6/1/2018

1048430SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Charleston DBE Goal Percent: 0.00%

Completion Date:

Description: I-26 PAVEMENT MARKINGS - CHARLESTONCOUNTY

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$22.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

10.3200

P037415P037415PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

6" WHITE BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 2,200.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 152,000.000 LF

8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION-EPOXY PAINT 2,575.000 LF

12" WHITE SOLID LINES (GORE MARKINGS) EPOXY PAINT 23,625.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)EPOXY PAINT 175.000 LF

24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) EPOXY PAINT 2,025.000 LF

WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT 35.000 EA

WHITE WORD MESSAGE "ONLY" - EPOXY PAINT 31.000 EA

WHITE COMBINATION ARROW (STR.&RT.OR STR.&LT) EPOXY PAINT 11.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT) EPOXY PAINT 4.000 EA

6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE - EPOXY PAINT 149,500.000 LF

PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 4,440.000 EA

REMOVAL OF PAVEMENT MARKINGS 415,600.000 LF

EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL8"WH.CONTRAST BROKEN 66,600.000 LF

Page 19: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 080 18Page:

South Carolina Department of Transportation 6/1/2018

1048440SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Charleston DBE Goal Percent: 0.00%

Completion Date:

Description: SC-30 PAVEMENT MARKINGS

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$8.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

3.0500

P037416P037416PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 910.000 EA

REMOVAL OF PAVEMENT MARKINGS 124,600.000 LF

EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL8"WH.CONTRAST BROKEN 11,800.000 LF

POLYUREA 12"X18" WHITE YIELD BAR 100.000 LF

POLYUREA 6" WHITE SOLID LINES (PVT. EDGE LINES) 52,400.000 LF

POLYUREA 8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION 225.000 LF

POLYUREA 12" WHITE SOLID LINES (GORE MARKINGS) 8,325.000 LF

POLYUREA 24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) 850.000 LF

POLYUREA WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) 11.000 EA

POLYUREA WHITE WORD MESSAGE "ONLY" 2.000 EA

POLYUREA WHITE COMBINATION ARROW (STR.&RT.OR STR.&LT) 4.000 EA

POLYUREA 6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE 47,600.000 LF

Page 20: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 090 19Page:

South Carolina Department of Transportation 6/1/2018

1209150SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Chester DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB, MILLING, HMA BASE/SURFACE

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

3.6200

P030042P030042PCN: Project No.:

P030050P030050PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 300.000 LF

UNCLASSIFIED EXCAVATION 5,247.000 CY

BORROW EXCAVATION 724.000 CY

CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B 30,067.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 902.010 TON

MAINTENANCE STONE 29.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 12,250.187 TON

LIQUID ASPHALT BINDER PG64-22 1,029.466 TON

MILLING EXISTING ASPHALT PAVEMENT 6.0" 22,106.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 800.000 SY

MILLED-IN RUMBLE STRIP 7.240 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 2,578.987 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 2,608.987 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 2,202.300 TON

DRIVEWAY PAVING-SURFACE TYPE C 250.250 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 30,067.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 714.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 534.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 114,690.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 480.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,740.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 90,120.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 178.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 38,230.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 160.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,580.000 LF

Page 21: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 090 20Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 30,040.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 246.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 4,325.000 LF

GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 300.000 LF

END TERMINAL - TYPE T 34.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 519.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 4.000 ACRE

Page 22: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 100 21Page:

South Carolina Department of Transportation 6/1/2018

1309230SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Chesterfield DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB AND OVERLAY

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.4300

P030051P030051PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

UNCLASSIFIED EXCAVATION 86.000 CY

BORROW EXCAVATION 86.000 CY

CEMENT MODIFIED RECYCLED BASE (10" UNIF)-CURING METHOD B 6,000.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 180.000 TON

MAINTENANCE STONE 27.500 TON

LIQUID ASPHALT BINDER PG64-22 51.119 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,000.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE C 654.987 TON

DRIVEWAY PAVING-SURFACE TYPE C 197.000 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 6,000.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 552.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 320.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 9,200.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 380.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 9,200.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 160.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 4,600.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 190.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 2.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 2.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 2.000 EA

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 4,600.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 4.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 30.000 EA

Page 23: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 100 22Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 750.000 LF

SAWCUT FOR LOOP DETECTOR 250.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 0.500 ACRE

Page 24: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 110 23Page:

South Carolina Department of Transportation 6/1/2018

1808900SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Dorchester DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB-12 UNIF STC STB

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

1.5700

P030036P030036PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

UNCLASSIFIED EXCAVATION 150.000 CY

BORROW EXCAVATION 950.000 CY

ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION 392.500 TON

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 24,000.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,080.000 TON

MAINTENANCE STONE 150.000 TON

LIQUID ASPHALT BINDER PG64-22 253.999 TON

MILLED-IN RUMBLE STRIP 2.600 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 4,243.354 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 100.000 TON

DRIVEWAY PAVING-SURFACE TYPE C 385.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 320.000 SF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 16,880.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 40.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 2,500.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 16,880.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 52,640.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 160.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 7,500.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 52,640.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 104.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 1.522 ACRE

Page 25: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 120 24Page:

South Carolina Department of Transportation 6/1/2018

1908190SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Edgefield DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB AND OVERLAY

10/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

7.4200

P029984P029984PCN: Project No.:

P030390P030390PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 2.000 EA

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 105.000 SY

REMOVAL OF EXIST. GUARDRAIL 3,207.000 LF

BORROW EXCAVATION 2,187.000 CY

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 115,340.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 4,153.000 TON

MAINTENANCE STONE 5.350 TON

LIQUID ASPHALT BINDER PG64-22 673.632 TON

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 535.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,500.000 SY

MILLED-IN RUMBLE STRIP 8.380 MI

HOT MIX ASPHALT SURFACE COURSE TYPE C 10,846.360 TON

DRIVEWAY PAVING-SURFACE TYPE C 300.000 TON

DRIVEWAY PAVING-SURFACE TYPE D 77.000 TON

ASPHALT SURFACE TREATMENT (TRIPLE TREATMENT) TYPE 2 44,380.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 732.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 462.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 134,961.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 276.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 6,390.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 132,657.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 154.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 45,409.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 30.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 92.000 LF

Page 26: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 120 25Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,130.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 44,620.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 7.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 520.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,212.000 LF

SAWCUT FOR LOOP DETECTOR 404.000 LF

13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 1.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 4,910.000 LF

GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 96.000 LF

STEEL BEAM GUARDRAIL (THRIE) 500.000 LF

END TERMINAL - TYPE T 28.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 304.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 5.420 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 1,110.000 LF

SILT FENCE 11,080.000 LF

REPLACE/REPAIR SILT FENCE 1,108.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 2,770.000 LF

Page 27: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 130 26Page:

South Carolina Department of Transportation 6/1/2018

2009160SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Fairfield DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB AND OVERLAY

11/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

6.9800

P030044P030044PCN: Project No.:

P030052P030052PCN: Project No.:

P033598P033598PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 1,100.000 LF

UNCLASSIFIED EXCAVATION 968.000 CY

BORROW EXCAVATION 12,800.000 CY

STATION GRADING 109.570 STA

CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) 25,009.600 SY

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 84,217.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 3,688.016 TON

MAINTENANCE STONE 227.000 TON

LIQUID ASPHALT BINDER PG64-22 923.920 TON

MILLING EXISTING ASPHALT PAVEMENT 2.0" 36,468.000 SY

MILLING EXISTING ASPHALT PAVEMENT 3.0" 33,229.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,125.000 SY

MILLED-IN RUMBLE STRIP 9.900 MI

HOT MIX ASPHALT SURFACE COURSE TYPE C 14,768.667 TON

DRIVEWAY PAVING-SURFACE TYPE C 630.000 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 25,009.600 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,346.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 824.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 246,050.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 920.000 LF

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 12,350.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 179,045.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 296.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 73,710.000 LF

Page 28: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 130 27Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 430.000 LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,700.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 48,465.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 475.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 10,162.500 LF

GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 90.000 LF

END TERMINAL - TYPE T 80.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 2,751.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 19.000 ACRE

SILT FENCE 2,000.000 LF

REPLACE/REPAIR SILT FENCE 200.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 200.000 LF

Page 29: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 140 28Page:

South Carolina Department of Transportation 6/1/2018

2109550SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Florence DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 CMRB AND SURFACE COURSE

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

4.0900

P030492P030492PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 818.000 CY

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 47,989.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,727.000 TON

LIQUID ASPHALT BINDER PG64-22 292.303 TON

MILLED-IN RUMBLE STRIP 8.180 MI

HOT MIX ASPHALT SURFACE COURSE TYPE C 4,225.317 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 615.625 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 378.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 150.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 129,600.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 120.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 14,400.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 10,800.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 50.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 43,200.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 40.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,800.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 3,600.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 270.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 3.966 ACRE

Page 30: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 150 29Page:

South Carolina Department of Transportation 6/1/2018

2688710SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Horry DBE Goal Percent: 17.50%

Completion Date:

Description: US 17 BUSINESS ACCESS MANAGEMENTPROJECT

11/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$253.00

$67.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

3.0770

P028288P028288PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

UTILITY RELOCATION NO. ____ 001 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS

REMOVAL & DISPOSAL OF HIGH LEVEL CONTAMINATED SOIL 250.000 TON

REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 10,170.000 SY

REMOVAL & DISPOSAL OF EXISTING CONCRETE 20.000 CY

UNCLASSIFIED EXCAVATION 11,000.000 CY

BORROW EXCAVATION 19,200.000 CY

MUCK EXCAVATION 3,000.000 CY

SELECT MATERIAL FOR LANDSCAPING 500.000 CY

FLOWABLE FILL 65.000 CY

MAINTENANCE STONE 300.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 4,585.000 TON

LIQUID ASPHALT BINDER PG64-22 1,085.000 TON

MILLING EXISTING ASPHALT PAVEMENT 2.0" 133,015.000 SY

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,260.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 15,355.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,140.000 SF

BARRICADE - TYPE 3 204.000 LF

PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 28,620.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 70,710.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 70,890.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES 6,520.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 11,750.000 LF

Page 31: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 150 30Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"YELLOW SOLID LINES 800.000 LF

PAVEMENT MARKINGS (TEMPORARY PAINT) 12"X18" WHITE TRIANGLE YIELDBAR

32.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW 318.000 EA

PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE COMBINATION ARROWS 12.000 EA

PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE LANE DROP ARROWS 22.000 EA

PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE WORD 'ONLY 230.000 EA

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,985.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 14,310.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 35,355.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 3,260.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 16.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 5,875.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 159.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 115.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 6.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 11.000 EA

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 35,445.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 400.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 585.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 425.000 EA

REMOVAL OF PAVEMENT MARKINGS 4,350.000 LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 1,127.500 SF

Flat Sheet, Type XI, Size Determined by MSG, Overhead 396.000 SF

FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 36.000 SF

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 12.000 EA

F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM 54.000 EA

U-SECTION POST FOR SIGN SUPPORTS - 3P 1,920.000 LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 410.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 5,081.000 LF

FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 210.000 LF

FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE 1,723.000 LF

FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) 1,723.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 5,610.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 9,110.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 10,840.000 LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 6,960.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 26,398.000 LF

FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER 1.000 EA

FIBER OPTIC TRANSCEIVER (SMFO) 1.000 EA

SAWCUT FOR LOOP DETECTOR 9,461.000 LF

FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 3.000 EA

Page 32: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 150 31Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 48.000 EA

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 27.000 EA

F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 7.000 EA

FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION 2.000 EA

FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 610.000 LF

FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 23.000 EA

F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 002 7.000 EA

FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD 1.000 EA

FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 13.000 EA

FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 003 68.000 EA

F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD 36.000 EA

F&I-PED PUSH BUT.SOLID STATE W/ LIGHT&TONE ASSEM 9"X15"&SIGN (R-10-3Eor R10-4a)

36.000 EA

F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM 64.000 EA

BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 82.000 EA

REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS

TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT 1.000 LS

F&I - VIDEO DETECTION SYSTEM W/ ONE CAMERA, HARDWARE & LEAD-IN 4.000 EA

FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN 18.000 EA

TRAFFIC ADAPTIVE SYSTEM 3.000 EA

FURNISH & INSTALL FACTORY TERMINATED PATCH PANEL 1.000 EA

INSTALL WIRELESS NETWORK COMMUNICATIONS LINK BETWEEN TWOSIGNALS 001

2.000 EA

POWDERCOATING PER MAST ARM OVER GALVANIZED 17.000 EA

DESIGN, FURNISH & INSTALL STEEL POLE WITH TWIN MAST ARMS INCLUDINGFOUNDATION 001

6.000 EA

DESIGN, FURNISH & INSTALL STEEL POLE WITH MAST ARM INCLUDINGFOUNDATION

11.000 EA

POWDERCOATING OPTION FOR 10' ALUMINUM PEDESTAL POLE 23.000 EA

PERMANENT CONCRETE BOLLARD 2.000 EA

15" SMOOTH WALL PIPE 344.000 LF

18" SMOOTH WALL PIPE 7,312.000 LF

24" SMOOTH WALL PIPE 2,828.000 LF

30" SMOOTH WALL PIPE 2,533.000 LF

CLEANING EXISTING PIPE 2,730.000 LF

BRICK SIDEWALK (MORTARLESS) 23.000 SY

CATCH BASIN -TYPE 16 15.000 EA

DROP INLET (24" X 36") 18.000 EA

DROP INLET TYPE 112 64.000 EA

DROP INLET TYPE 112 WITH 4X4 BOX 14.000 EA

DROP INLET TYPE 115 WITH STANDARD 6' X 6' BOX 11.000 EA

TRENCH DRAIN-4" INTERIOR DIMENSION WITH 2.0' CURB & GUTTER 1,585.000 LF

MANHOLE WITH STANDARD 5' X 5' BOX 2.000 EA

Page 33: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 150 32Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

MANHOLE WITH STANDARD 6' X 6' BOX 2.000 EA

48" X 48" JUNCTION BOX 4.000 EA

ADJUST MANHOLE 2.000 EA

ADJUST DROP INLET ADJUST D. I. 3.000 EA

ADJUST JUNCTION BOX 1.000 EA

JUNCTION BOX - CONVERT CB T-16 1.000 EA

BEVELING OF PIPE END 20.000 EA

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 560.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 300.000 SY

CONCRETE SIDEWALK(6" UNIFORM) 55.000 SY

DETECTABLE WARNING MATERIAL 300.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 105.000 SY

CONCRETE MEDIAN 855.000 SY

CONCRETE FLUME 1.000 EA

PEDESTRIAN RAMP CONSTRUCTION 200.000 SY

SURFACE APPLIED DETECTABLE WARNING 60.000 SF

RIP-RAP (CLASS B) 90.000 TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 110.000 SY

MOVING ITEM NO. 007 1.000 LS

MOVING ITEM NO. 008 1.000 LS

MOVING ITEM NO. 009 1.000 LS

MOVING ITEM NO. 010 1.000 LS

RIGHT OF WAY MARKER(REBAR AND CAP) 11.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT COVER 9.850 ACRE

TEMPORARY COVER 13.900 ACRE

FERTILIZER (NITROGEN) 985.000 LB

FERTILIZER (PHOSPHORIC ACID) 985.000 LB

FERTILIZER (POTASH) 985.000 LB

AGRICULTURAL GRANULAR LIME 19,700.000 LB

SELECTIVE WATERING 135,750.000 GAL

MOWING 47.500 ACRE

LANDSCAPING ITEM NO. 001 40.000 EA

LANDSCAPING ITEM NO. 002 36.000 EA

LANDSCAPING ITEM NO. 003 604.000 EA

LANDSCAPING ITEM NO. 004 480.000 EA

LANDSCAPING ITEM NO. 005 373.000 EA

LANDSCAPING ITEM NO. 006 530.000 EA

LANDSCAPING ITEM NO. 007 28.000 EA

LANDSCAPING ITEM NO. 008 2,960.000 EA

LANDSCAPING ITEM NO. 009 495.000 EA

LANDSCAPING ITEM NO. 010 3,466.000 EA

Page 34: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 150 33Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

LANDSCAPING ITEM NO. 011 232.000 EA

LANDSCAPING ITEM NO. 012 1,062.000 EA

LANDSCAPING ITEM NO. 013 6,316.000 EA

DOUBLE-SHREDDED HARDWOOD MULCH 50,000.000 SF

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 47.000 ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.880 ACRE

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 112.000 LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 104.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 1,956.000 LF

SILT FENCE 7,195.000 LF

REPLACE/REPAIR SILT FENCE 720.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 1,800.000 LF

CLEANING INLET STRUCTURE FILTERS 148.000 EA

INLET STRUCTURE FILTER - TYPE A 4,460.000 LF

STABILIZED CONSTRUCTION ENTRANCE 1,650.000 SY

Page 35: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 160 34Page:

South Carolina Department of Transportation 6/1/2018

2747710SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Jasper DBE Goal Percent: 0.00%

Completion Date:

Description: RESURFACING SC 3 JASPER

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

1.5200

P030693P030693PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 604.000 CY

EXCAVATION FOR SHOULDER PAVING 161.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 161.000 STA

MAINTENANCE STONE 29.000 TON

HMA SHOULDER WIDENING COURSE 802.560 TON

LIQUID ASPHALT BINDER PG64-22 283.903 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,900.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 500.000 SY

MILLED-IN RUMBLE STRIP 3.040 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 2,318.507 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 2,368.507 TON

DRIVEWAY PAVING-SURFACE TYPE C 180.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 176.000 SF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 16,050.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 15.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 520.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 13,600.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 48,150.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 45.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,560.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 40,800.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 100.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 1.474 ACRE

Page 36: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 170 35Page:

South Carolina Department of Transportation 6/1/2018

3291930SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Lexington DBE Goal Percent: 17.50%

Completion Date:

Description: SUMMIT SIDEWALK PROJECT

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$27.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.3410

P028138P028138PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 004 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 005 1.000 LS

REMOVAL & DISPOSAL ITEM NO. 006 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 5.000 SY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 20.000 SY

UNCLASSIFIED EXCAVATION 181.000 CY

FLOWABLE FILL 50.000 CY

MAINTENANCE STONE 10.000 TON

LIQUID ASPHALT BINDER PG64-22 2.646 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 42.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 344.000 SF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 322.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 30.000 LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 24.750 SF

U-SECTION POST FOR SIGN SUPPORTS - 3P 48.000 LF

15" SMOOTH WALL PIPE 4.000 LF

BEVELING OF PIPE END 1.000 EA

CONCRETE SIDEWALK(4" UNIFORM) 937.000 SY

DETECTABLE WARNING MATERIAL 100.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 47.000 SY

PEDESTRIAN RAMP CONSTRUCTION 200.000 SY

Page 37: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 170 36Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

MOVING ITEM NO. 001 1.000 LS

MOVING ITEM NO. 002 1.000 LS

RIGHT OF WAY MARKER(REBAR AND CAP) 8.000 EA

RIGHT OF WAY PLAT 1.000 LS

PERMANENT GRASSING FOR SMALL PROJECTS 0.264 ACRE

TEMPORARY COVER 0.132 ACRE

MOWING 0.793 ACRE

SODDING 1.000 MSY

SEDIMENT TUBES FOR DITCH CHECKS 10.000 LF

SILT FENCE 1,200.000 LF

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 38: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 180 37Page:

South Carolina Department of Transportation 6/1/2018

3748160SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Oconee DBE Goal Percent: 0.00%

Completion Date:

Description: RESURFACING/RECONSTRUCTION

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

2.3600

P037223P037223PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

UNCLASSIFIED EXCAVATION 438.000 CY

BORROW EXCAVATION 448.000 CY

CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) 29,216.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,169.000 TON

MAINTENANCE STONE 50.000 TON

LIQUID ASPHALT BINDER PG64-22 282.055 TON

MILLING EXISTING ASPHALT PAVEMENT 2.0" 3,098.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 278.000 SY

MILLED-IN RUMBLE STRIP 2.500 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1,161.600 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 3,375.386 TON

DRIVEWAY PAVING-SURFACE TYPE C 396.250 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,004.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 240.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 60,296.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,660.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 216.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 125,660.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 60.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24,921.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 830.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 102.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 1.000 EA

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 26,188.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 14.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 206.000 EA

Page 39: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 180 38Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 210.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 3,770.000 LF

SAWCUT FOR LOOP DETECTOR 1,370.000 LF

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 3.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 2.172 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 40.000 LF

SILT FENCE 80.000 LF

Page 40: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 190 39Page:

South Carolina Department of Transportation 6/1/2018

3805390SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: DBE Goal Percent: 0.00%

Completion Date:

Description: I-26 EB/WB OVER SC 33 & CSX RR BRIDGEREHABILITATION

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $36.00

Letting Time:

0.0560

P029541P029541PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

LIQUID ASPHALT BINDER PG76-22 64.000 TON

MILLING EXISTING ASPHALT PAVEMENT 3.0" 6,205.000 SY

MILLED-IN RUMBLE STRIP 0.500 MI

HOT MIX ASPHALT SURFACE COURSE TYPE A 621.000 TON

OPEN-GRADED FRICTION COURSE 376.000 TON

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 3.000 EA

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,200.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 2,000.000 LF

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 1,150.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 2,200.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 2,000.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,150.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 30.000 EA

POLYMER MODIFIED ASPHALT EXPANSION JOINT 294.000 LF

Page 41: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 200 40Page:

South Carolina Department of Transportation 6/1/2018

4048260SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Richland DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 RICHLAND COUNTY CTC

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

5.0400

P037228P037228PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 802.000 CY

EXCAVATION FOR SHOULDER PAVING 250.280 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 250.280 STA

MAINTENANCE STONE 85.650 TON

HMA SHOULDER WIDENING COURSE 1,210.293 TON

LIQUID ASPHALT BINDER PG64-22 450.335 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 6,885.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,680.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 13,650.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 2,600.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,380.000 SY

MILLED-IN RUMBLE STRIP 1.400 MI

HOT MIX ASPHALT SURFACE COURSE TYPE C 2,081.973 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 4,204.860 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,382.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 40.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 82,880.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 130.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 551.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 1.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 1.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 1.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 480.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 81,780.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 20.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 41,440.000 LF

Page 42: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 200 41Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 130.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 547.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 1.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 1.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 1.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 240.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 41,090.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 2.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 290.000 EA

ADJUST DROP INLET ADJUST D. I. 11.000 EA

PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS 2.650 ACRE

MOWING 3.888 ACRE

Page 43: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 210 42Page:

South Carolina Department of Transportation 6/1/2018

4325780SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Sumter DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA RECLAM SUMTER 4/5/2018 12:10:50PM

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

3.7100

P033680P033680PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 40.000 SY

BORROW EXCAVATION 742.000 CY

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 53,180.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,870.000 TON

LIQUID ASPHALT BINDER PG64-22 333.188 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 800.000 SY

MILLED-IN RUMBLE STRIP 5.000 MI

HOT MIX ASPHALT SURFACE COURSE TYPE C 5,062.640 TON

DRIVEWAY PAVING-SURFACE TYPE C 490.500 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 871.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 300.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 158,800.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 756.000 LF

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,940.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 163,300.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 300.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 39,700.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 204.000 LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,780.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 29,450.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 392.000 EA

DETECTABLE WARNING MATERIAL 12.500 SF

PEDESTRIAN RAMP CONSTRUCTION 25.000 SY

PERMANENT GRASSING FOR SMALL PROJECTS 3.598 ACRE

Page 44: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 220 43Page:

South Carolina Department of Transportation 6/1/2018

4409240SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Union DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB AND OVERLAY

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

1.4200

P030054P030054PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

UNCLASSIFIED EXCAVATION 284.000 CY

BORROW EXCAVATION 284.000 CY

CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B 20,000.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 900.000 TON

MAINTENANCE STONE 32.000 TON

LIQUID ASPHALT BINDER PG64-22 202.802 TON

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 750.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.25" 1,000.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,300.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE C 3,089.040 TON

DRIVEWAY PAVING-SURFACE TYPE C 291.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 360.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 450.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 45,000.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 730.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 480.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,850.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 30,150.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 150.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 15,000.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 730.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 160.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 2.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4.000 EA

Page 45: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 220 44Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

WHITE WORD MESSAGE "STOP AHEAD" -THERMOPLASTIC - 125 MIL. 1.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 950.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 10,050.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 8.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 100.000 EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 690.000 LF

SAWCUT FOR LOOP DETECTOR 230.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 1.500 ACRE

Page 46: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 230 45Page:

South Carolina Department of Transportation 6/1/2018

4606001SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: York DBE Goal Percent: 10.00%

Completion Date:

Description: I-77 OVER CATAWBA RIVER - YORKCOUNTY

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $124.00

Letting Time:

P029556P029556PCN: Project No.:

P037446P037446PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

OFF-DUTY LAW ENFORCEMENT OFFICER 1,656.000 HR

REMOVAL & DISPOSAL OF EXISTING CONCRETE 43.000 CY

REMOVAL & DISPOSAL OF CONCRETE MEDIAN BARRIER 2,400.000 LF

REMOVAL & DISPOSAL OF DESIGNATED PORTIONS OF EXISTING BRIDGE 1.000 LS

LIQUID ASPHALT BINDER PG64-22 4.500 TON

LIQUID ASPHALT BINDER PG76-22 163.000 TON

FULL DEPTH ASPH. PAV. PATCHING 12"UNIF 667.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.0" 45,925.000 SY

MILLED-IN RUMBLE STRIP 0.480 MI

HOT MIX ASPHALT SURFACE COURSE TYPE E 75.000 TON

OPEN-GRADED FRICTION COURSE 2,710.000 TON

PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE 4"WH.SOLID 5,425.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE4"YEL.SOLID 4,300.000 LF

TEMPORARY CONCRETE BARRIER 5,650.000 LF

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(60 MPH) 1.000 EA

REMOVAL OF PAVEMENT MARKINGS (LINES) (TRAFFIC CONTROL) 18,475.000 LF

REMOVAL OF PAVEMENT MARKINGS(HIGH PRESSURE WATER)(ARROWS,WORDS, RR CROSSING SYMBOLS, TRIANGLE YIELD)(TRAFFIC CONTROL)

50.000 SF

TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4" 450.000 EA

TEMPORARY YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X4" 450.000 EA

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 9,350.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 17,050.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 2.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 2.000 EA

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 20,450.000 LF

0.0000

Page 47: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 230 46Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 50.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,800.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 6,800.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 6,800.000 LF

PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 400.000 EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL6"WH.BROKEN 1,880.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID 2,150.000 LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL. 2,150.000 LF

2.0" SCHEDULE 40 PVC CONDUIT 1,092.000 LF

INSTALL 12" 1-WAY-4 SECTION(R.Y.G.GA)VEHICLE TRAFFIC SIGNAL 2.000 EA

INSTALL 12" 1-WAY-3 SECTION(RA.YA.GA.)VEHICLE TRAFFIC SIGN 2.000 EA

CONC. FOR STRUCTURES - CLASS 4000 2,486.200 CY

PARTIAL DEPTH PATCHING OF EXISTING DECK 504.000 SY

GROOVED SURFACE FINISH 11,188.000 SY

REINF. STEEL FOR STRUCTURES (BRIDGE) 815,048.000 LB

CONCRETE BRIDGE BARRIER PARAPET 521.200 LF

CONCRETE BRIDGE BARRIER PARAPET TRANSITION 1.000 EA

CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING 36.000 CY

CONCRETE MEDIAN BARRIER (TYPE-2) 2,400.000 LF

CONCRETE BARRIER EXTENSION 2,400.000 LF

MAINT REPAIR OF JERSEY TY 2 W GLARE 110.000 LF

CATCH BASIN 15 AND PLUG WITH TEMPORARY TRAFFIC 15.000 EACH

Page 48: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 240 47Page:

South Carolina Department of Transportation 6/1/2018

4609190SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: York DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB AND OVERLAY

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

3.5900

P030048P030048PCN: Project No.:

P030055P030055PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CONCRETE 1.000 CY

UNCLASSIFIED EXCAVATION 718.000 CY

SITE EXCAVATION 1.000 LS

BORROW EXCAVATION 718.000 CY

CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B 53,000.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 2,385.000 TON

MAINTENANCE STONE 40.500 TON

LIQUID ASPHALT BINDER PG64-22 285.535 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,900.000 SY

MILLED-IN RUMBLE STRIP 7.180 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 1,623.387 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 3,000.430 TON

DRIVEWAY PAVING-SURFACE TYPE C 322.000 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 53,000.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 924.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 642.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 113,760.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 705.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,250.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 103,260.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 214.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 37,920.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 235.000 LF

Page 49: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 240 48Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 4.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 750.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 34,420.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 4.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 244.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 100.000 LF

END TERMINAL - TYPE T 8.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 160.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 5.000 ACRE

Page 50: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 250 49Page:

South Carolina Department of Transportation 6/1/2018

4648250SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: York DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB, FDP, RESURF

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

4.6700

P037230P037230PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 500.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 750.000 LF

REMOVAL & DISPOSAL OF EXISTING CONCRETE 5.500 CY

UNCLASSIFIED EXCAVATION 2,213.440 CY

BORROW EXCAVATION 792.000 CY

STATION GRADING 9.500 STA

FLOWABLE FILL 10.000 CY

CEMENT MODIFIED RECYCLED BASE (8" UNIF)-CURING METHOD A 30,061.800 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 901.854 TON

MAINTENANCE STONE 514.250 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 2,704.387 TON

LIQUID ASPHALT BINDER PG64-22 545.574 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,500.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 350.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.0" 2,137.330 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 1,690.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 8,937.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 5,156.110 SY

HOT MIX ASPHALT SURFACE COURSE TYPE C 5,247.224 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 1,180.080 TON

DRIVEWAY PAVING-SURFACE TYPE C 754.875 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,024.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,008.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 86,704.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 200.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,100.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA

Page 51: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 250 50Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 700.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 100,762.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 496.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 34,960.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 100.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,050.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 1.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 350.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 43,361.000 LF

8" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 50.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 20.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 402.000 EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 150.000 LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 600.000 LF

DETECTABLE WARNING MATERIAL 225.000 SF

PEDESTRIAN RAMP CONSTRUCTION 450.000 SY

BITUMINOUS CURB 200.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 3.842 ACRE

Page 52: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 260 51Page:

South Carolina Department of Transportation 6/1/2018

5125690SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Lexington Richland DBE Goal Percent: 5.00%

Completion Date:

Description: 2018 FED AID REHAB RICH AND LEX

10/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

15.8200

P030531P030531PCN: Project No.:

P033673P033673PCN: Project No.:

P033674P033674PCN: Project No.:

P033675P033675PCN: Project No.:

P033683P033683PCN: Project No.:

P033684P033684PCN: Project No.:

P036898P036898PCN: Project No.:

P036899P036899PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 3,868.000 SY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 20.000 SY

REMOVAL OF EXIST. GUARDRAIL 425.000 LF

UNCLASSIFIED EXCAVATION 100.000 CY

BORROW EXCAVATION 1,176.400 CY

EXCAVATION FOR SHOULDER PAVING 367.120 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 367.120 STA

MAINTENANCE STONE 223.080 TON

HMA SHOULDER WIDENING COURSE 1,840.960 TON

LIQUID ASPHALT BINDER PG64-22 2,893.389 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,150.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 21,408.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 31,350.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 429,678.330 SY

MILLING EXISTING ASPHALT PAVEMENT 4.0" 3,300.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,260.000 SY

MILLED-IN RUMBLE STRIP 3.100 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,997.600 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 44,561.303 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 5,044.807 TON

Page 53: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 260 52Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

HOT MIX ASPHALT SURFACE COURSE TYPE D 556.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 8,200.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 49,230.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 214,086.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 7,578.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 30,014.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 468.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 15,641.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 275.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 144.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 26.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 38,170.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 337,375.000 LF

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 8,962.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 13,186.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 392.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 1,034.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 176.000 LF

WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT 7.000 EA

WHITE WORD MESSAGE "ONLY" - EPOXY PAINT 6.000 EA

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 26,643.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 88,802.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 3,789.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 15,910.000 LF

12" WHITE SOLID LINES - THERMO. - 125 MIL. 562.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 181.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 7,765.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 140.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 73.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 15.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 14,850.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 143,840.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 4,481.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 196.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,328.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 910.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 3,670.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 2,374.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 95,930.000 LF

SAWCUT FOR LOOP DETECTOR 27,677.000 LF

ADJUST DROP INLET ADJUST D. I. 1.000 EA

Page 54: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 260 53Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

CATCH BASIN T-17 (CONVERT C.B. TYPE 5) 1.000 EA

CATCH BASIN T-18 (CONVERT C.B. TYPE 7) 4.000 EA

DETECTABLE WARNING MATERIAL 1,887.500 SF

PEDESTRIAN RAMP CONSTRUCTION 3,775.000 SY

SURFACE APPLIED DETECTABLE WARNING 142.500 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 425.000 LF

REMOVE AND REPLACE W BEAM GUARDRAIL 1,100.000 LF

REMOVE AND REPLACE END ANCHOR-TYPE B 2.000 EA

END TERMINAL - TYPE T 8.000 EA

REMOVE AND REPLACE END TERMINAL - TYPE T 3.000 EA

THRIE BEAM G.R.BRIDGE CONN. 3.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 7.908 ACRE

MOWING 3.879 ACRE

Page 55: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 270 54Page:

South Carolina Department of Transportation 6/1/2018

5148310SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Lexington Richland DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 RICH LEX CTY RECLAM

10/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

15.5700

P030323P030323PCN: Project No.:

P030326P030326PCN: Project No.:

P033676P033676PCN: Project No.:

P033687P033687PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 97.000 SY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 100.000 SY

REMOVAL OF EXIST. GUARDRAIL 375.000 LF

UNCLASSIFIED EXCAVATION 1,266.000 CY

BORROW EXCAVATION 3,618.000 CY

EXCAVATION FOR SHOULDER PAVING 15.840 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 15.840 STA

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 219,064.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 9,634.000 TON

MAINTENANCE STONE 1.600 TON

HMA SHOULDER WIDENING COURSE 79.200 TON

LIQUID ASPHALT BINDER PG64-22 1,372.613 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 50.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 110.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 5,600.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,230.000 SY

MILLED-IN RUMBLE STRIP 31.080 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 7,917.573 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 14,270.340 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 100.000 TON

DRIVEWAY PAVING-SURFACE TYPE C 992.250 TON

DRIVEWAY PAVING-SURFACE TYPE D 433.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,578.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,302.000 LF

Page 56: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 270 55Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 404,861.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,007.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 6.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 50,942.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 362,445.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 360.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 50.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,412.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 165,074.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 495.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 6.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,299.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 138,779.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 26.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,124.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 17.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,350.000 LF

SAWCUT FOR LOOP DETECTOR 459.000 LF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 100.000 LF

END TERMINAL - TYPE T 6.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 13.913 ACRE

Page 57: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 280 56Page:

South Carolina Department of Transportation 6/1/2018

5413331SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: ChesterfieldLancaster

DBE Goal Percent: 0.00%

Completion Date:

Description: '18 PRIM IMP IN C'FIELD AND LANC PM

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

2.0700

P031959P031959PCN: Project No.:

P031961P031961PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CURB 200.000 LF

REMOVAL & DISPOSAL OF EXISTING CONCRETE 18.500 CY

BORROW EXCAVATION 120.000 CY

MAINTENANCE STONE 15.000 TON

LIQUID ASPHALT BINDER PG64-22 404.921 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 4,800.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 8,475.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 31,235.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 21,950.000 SY

MILLED-IN RUMBLE STRIP 1.200 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 7,640.013 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 78.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,252.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 13,560.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 14,316.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,200.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,600.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 84.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 48.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5,000.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 49,860.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,780.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 7,158.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,600.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 800.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 42.000 EA

Page 58: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 280 57Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 24.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,500.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 24,930.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 382.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 248.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 524.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 50.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 50.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 930.000 LF

SAWCUT FOR LOOP DETECTOR 310.000 LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 200.000 LF

SURFACE APPLIED DETECTABLE WARNING 475.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 0.582 ACRE

Page 59: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 290 58Page:

South Carolina Department of Transportation 6/1/2018

5413922SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Fairfield LancasterYork

DBE Goal Percent: 0.00%

Completion Date:

Description: NFA MICROSURFACING

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

P032203P032203PCN: Project No.:

P032204P032204PCN: Project No.:

P032206P032206PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,150.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 350.000 SY

MICRO SURFACING SURFACE COURSE 96,000.000 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 792.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 484.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 84,200.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 60.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 452.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,700.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 75,420.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 484.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 84,200.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 60.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 452.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,700.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 75,420.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 533.000 EA

7.9700

Page 60: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 300 59Page:

South Carolina Department of Transportation 6/1/2018

5610012SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Beaufort CharlestonColleton Jasper

DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 FA MICRO SURFACING

10/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

18.0300

P030576P030576PCN: Project No.:

P030581P030581PCN: Project No.:

P030583P030583PCN: Project No.:

P030691P030691PCN: Project No.:

P030697P030697PCN: Project No.:

P030698P030698PCN: Project No.:

P030699P030699PCN: Project No.:

P030713P030713PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 240.000 SY

MAINTENANCE STONE 30.650 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,065.000 SY

SURFACE PLANE ASPHALT PAVEMENT - VARIABLE 700.000 SY

MILLED-IN RUMBLE STRIP 10.720 MI

MICRO SURFACING SURFACE COURSE 619,739.607 SY

MICRO SURFACING LEVELING 1,382.420 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,986.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 38,585.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 700.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 118,692.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 44,420.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 5,839.000 LF

12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 390.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 45.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 3,940.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 158.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 186.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 46.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 6.000 EA

Page 61: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 300 60Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 14,880.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 178,637.000 LF

12" YELLOW SOLID LINES - PERM.PVMT.MARKING 445.000 LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 230.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 85,730.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 381,464.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12,888.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 780.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 8,880.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 365.000 EA

WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 45.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 361.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 92.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 72.000 EA

BIKE LANE SYMBOL - FAST DRY PAINT 38.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 31,660.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 390,584.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 3,695.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 450.000 LF

12" YELLOW SOLID LINES - FAST DRY PAINT 785.000 LF

BIKE LANE SYMBOL -PREFORMED THERMO - 60MIL 60.000 EA

BIKE LANE ARROW - PREFORMED THERMO - 60MIL 67.000 EA

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 3,094.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,638.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 3,166.000 EA

DELINEATORS, SINGLE, BI., INCL. SUPPORTS 10.000 EA

Page 62: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 310 61Page:

South Carolina Department of Transportation 6/1/2018

5613762SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Berkeley CharlestonDorchester

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FDP, MICRO SURFACING

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

16.2500

P032158P032158PCN: Project No.:

P032170P032170PCN: Project No.:

P032209P032209PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

MAINTENANCE STONE 38.950 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,895.000 SY

MICRO SURFACING SURFACE COURSE 214,366.600 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 324.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 590.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 58,200.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 200.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,002.000 LF

12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 126.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 76.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,152.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 21.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 9.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 5.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 5,400.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 110,020.000 LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 40.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,180.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 116,280.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 400.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,974.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 252.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,294.000 LF

Page 63: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 310 62Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 38.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 18.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 10.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 16.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,800.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 219,490.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 270.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 52.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 40.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,147.000 EA

SURFACE APPLIED DETECTABLE WARNING 10.000 SF

Page 64: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 320 63Page:

South Carolina Department of Transportation 6/1/2018

5709650SC File NO(S).:

July 10, 2018

02:00 PM

Letting Date: CO(S).: Bamberg Barnwell DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 FA PIP - 03,05,06,25

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

2.4000

P030404P030404PCN: Project No.:

P030575P030575PCN: Project No.:

P030671P030671PCN: Project No.:

P030672P030672PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,150.000 SY

MAINTENANCE STONE 18.600 TON

LIQUID ASPHALT BINDER PG64-22 354.799 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 110.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,750.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 61,828.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE B 6,430.585 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 160.000 TON

DRIVEWAY PAVING-SURFACE TYPE D 61.875 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,416.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 134.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 2,790.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 820.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 620.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 84.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 26,080.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 164.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 5,580.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,640.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,240.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 168.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 52,160.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 3.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 201.000 EA

Page 65: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

Call No.: 320 64Page:

South Carolina Department of Transportation 6/1/2018

Description Quantity Units

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 120.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,000.000 LF

SAWCUT FOR LOOP DETECTOR 350.000 LF

DETECTABLE WARNING MATERIAL 575.000 SF

PEDESTRIAN RAMP CONSTRUCTION 1,150.000 SY

SURFACE APPLIED DETECTABLE WARNING 200.000 SF

Page 66: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.

1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC 29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service.

2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No._______", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice.

PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeff Elliott at (803)737-1253.

STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.

MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.

In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "SupplementalSpecifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:

Page 67: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE …info2.scdot.org/currentletting/ConstructionDocs/07102018... · 2018-06-05 · • ebs (electronic bidding system) ... description

TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.

Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, andthe bidder should check with the SCDOT Engineering Publications office for the cost of plans when theplans are indicated to be available.

THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

Prepared by L. Stuckey

Issued by:

J.Brian Parnell

Contract Administrator