Upload
quinn-willet
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
1
Southern Natural Gas Company2013 Outage Review Meeting
Customer con call and Lync Online Meeting
September 18, 2013
Agenda
• Review of Unscheduled Outages
• Review of Current and Upcoming Outages–October through December• North System
• South System
• South Louisiana
• Contacts
3
Disclaimers
• Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary.
• Unless otherwise stated, all scheduled dates represent gas days as defined in the Southern Natural Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time).
• Scheduled dates are subject to change.
• Projects may be added, altered, delayed or cancelled.
• SNG will provide notice of such additions or changes via SoNet Premier postings.
• Dates as posted on SoNet should be deemed correct in the event of conflicts between SoNet posted dates and dates within this presentation.
4
Color Key for Maps
• Green– No Impact Anticipated
• Yellow– Restrictions are possible– With extended duration, restrictions could be
necessary from time to time– Meter(s) affected are denoted with (M)
• Red– Restrictions are probable
5
6
Southern Natural Gas Pipeline
LA
MS
AL
GA
FL
Enterprise
White Castle
Bear Creek
Muldon
Chattanooga
Atlanta
Thomaston
Albany
Elba
SCAiken
Elba Express
North System
South Louisiana
South System
Compressor Station
Storage FieldLNG
Pearl River
Franklinton
Gwinville
Toca
7
Southern Natural Gas PipelineUnscheduled Outage Update
LA
MS
AL
GA
FL
Enterprise
White Castle
Bear Creek
Muldon
Chattanooga
Atlanta
Thomaston
Albany
Elba
SCAiken
Elba Express
Compressor Station
Storage FieldLNG
Pearl River
Franklinton
Gwinville
20” Duck Lake – Franklinton Line Anomaly repairs under way. Return
to service First of DecemberCap reduced up to 65 MMcf/d
Toca
8
SNG North System Maintenance Review October through December
LA
MS
AL
GA
Logansport
Bienville
Bear Creek Storage
Onward
Pickens
Rankin
Louisville
Muldon Storage
Reform
McConnells
ProvidenceTarrant
Pell City
DeArmanville
Bell Mills
Rome
Compressor Station
Storage Field
Huntsville
Chattanooga
Atlanta
Bear Creek Fall Shut-in Test 10/15/13 thru 10/21/13
DIQ and DWQ allocated 64%
Muldon Fall Shut-in Test 10/01/13 thru 10/07/13
DIQ and DWQ allocated 36%
Southern will be conducting other general maintenance during this
period
Pressure Test 2nd North MainEast of Reform
10/13 thru 11/13Capacity reduced significantly
Pipe replacement North Main Loop Line west of Dearmanville
OctoberNo Capacity reductions
anticipated
Pressure Test 2nd North MainEast of Louisville thru 09/30/13
North system receipts may be reducedMuldon inj & w/d could be limited
Anomaly repairs on the Gadsden Loop Line. Now
thru end of October.Customers may experience
lower pressures.
Dearmanville Engine maintenance thru mid
October.No additional impact
anticipatedBienville Station 8-10 hour
outage 10-8-13 receipt points west of Bienville impacted
Bear Creek Engine maintenance-one unit at a
time. 10-15-13 thru mid November
9
SNG South SystemMaintenance Review October through December
MS
AL
GA
Enterprise
Gwinville
SelmaAuburn
Ellerslie
Thomaston
Ocmulgee
Hallgate
Wrens
Elmore
York
Gallion
Bay Springs
Compressor Station
Storage FieldLNG
Atlanta
Elba
Hartwell
Elba ExpressAiken
Holy Trinity
Albany
Pavo
Brookman
Riceboro
Southern will be conducting other general maintenance during this period
Enterprise Station Outageuntil sometime in October
Rose Hill (M) 504002Cap reduced up to 400 MMcf/d
Rose Hill (504001 and 504002) Station shut-in 7/29/13 until
mid October.
Pipeline work related to DOT highway relocation
10-25-13 thru 11-9-13Capacity reductions may occur
Selma and Auburn unit maintenance
mid October through mid November
Maintenance on the 16” South Main Loop. 4 weeks in OctoberCap reduced up to 50 MMcf/d
Ocmulgee Station outage for two days mid November
Cap reduced up to 200 MMcf/d
Anomaly repairs North Clay line in October-
Customers may experience lower
pressures
10
SNG South Louisiana System Maintenance Review October through December
Shadyside
White Castle
Franklinton
Toca
Gwinville
LAMS
Compressor Station
Storage Field
West Leg
East Leg
Pearl River
Southern will be conducting other general maintenance during this period
20” Duck Lake – Franklinton Line Anomaly repairs continue. Return to
service first of DecemberCap reduced up to 65 MMcf/d
White Castle, ShadysideUnit Maintenance
Mid September - mid October
TOCA
11
Gas Control Contacts • Nancy Barton – Manager
(713) – 420 – 6191 (office) (713) – 204 – 4815 (cell) [email protected]
• Kal Dankovich – Outage Coordinator (713) – 420 – 7522 (office) (205) – 325 – 7305 (Gas Control) [email protected]
• Jerry Peterson – Operations Analyst (205) – 325 – 7345 (office) (205) – 325 – 7305 (Gas Control) [email protected]
• Paul Reed – Operations Analyst (205) – 325 – 7655 (office) (205) – 325 – 7305 (Gas Control) [email protected]