SPA COMMANDERDan Latuszek

Ken ChouMatt Bergsma

Michelle OchitwaSulien Wong

Page 2: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Team Introduction• 5 dedicated engineering students focused on improving people’s lives

– Dan Latuszek – Chief Executive Officer• Systems Engineering

– Sulien Wong – Chief Financial Officer• Systems Engineering

– Matt Bergsma, DipT – Chief Technical Officer• Systems Engineering

– Michelle Ochitwa – Vice President Operations/acting secretary• Systems Engineering

– Ken Chou – Chief Marketing Officer• Biomedical Engineering

• Wouldn’t mind getting rich

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 3: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Engineering Roles• Market analysis

– Ken Chou, Dan Latuszek, Michelle Ochitwa, Sulien Wong• Software control and electrical design

– Ken Chou, Dan Latuszek, Sulien Wong• Mechanical and fluid system design

– Matt Bergsma, Michelle Ochitwa• Chassis

– Ken Chou, Matt Bergsma

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 4: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Presentation Overview

• Goal• Market analysis and consumer needs• Budget and time management• Mechanical and sensors• Electrical and control• Cost of production, marketability, and viability• Future considerations• Acknowledgements• Final thoughts

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 5: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Project Goals

• Design a chemical test and delivery system for spas and pools

• Create a portable solution• Fabricate a working prototype• Capture an unused market niche• Get rich

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 6: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

MARKET AND DESIGN CONSIDERATIONS

Page 7: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Market Analysis• In North America alone:

– Over 6 million existing private spas/hot tubs• Annual sales exceed 300,000 units

– Over 8 million existing private pools• Annual sales exceed 300,000 units

– Majority of both markets require manual chemical calibration• Currently available products:

– Expensive inline systems costing well over $1000

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 8: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Consumer Needs

• Easy to use and automatic• Not overly expensive• Durable• Aesthetically pleasing

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 9: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Budget

• Upper limit of $500 CAD• No lower limit (Yay, profits!)• Find a golden mean between low cost and high

reliability

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 10: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Time Management

• In 3 months– Complete documentation– Complete hardware and software design

• Piping, motors, PIC programming– Test and debug

• Analyze operation and proof of concept

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 11: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Time Management Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 12: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

MECHANICAL AND SENSORS

Page 13: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Safety Requirements• Importance of chemical levels:

– High chlorine concentration causes• Skin irritation, eye irritation, respiratory problems

– Low of a chlorine concentration• Infections, bacterial growth

– pH needs to be maintained at 7.5, that of a human eye• The Spa Commander maintains chemical levels at:

– Between 1 ppm and 3 ppm for chlorine– Between 7.4 and 7.6 for pH

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 14: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Mechanical

• 3 servo motors control the gates of the chemical containers

• Submersible pump to move the pool water• PVC piping for light weight, low cost control of water

flow• 300 mL chemical containers

– Approximately one month’s worth of chemical for a spa

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 15: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Mechanical Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 16: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Servo Motor Specifications• Model: HS-82MG• 0 degrees

– Square wave, 20 ms period @ 5% duty cycle• 90 degrees

– Square wave, 20 ms period @ 10% duty cycle

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 17: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Sensors

• Current implementation – current based electrolytic sensors– Operates under similar principles as ORP sensors

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 18: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

CONTROL, ELECTRICAL, AND INTERFACE

Page 19: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Control

• Microchip PIC16F690 microcontroller– Servo motor pulse width modulation– Controls LED interface

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 20: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Chlorine Flowchart Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 21: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

pH Flowchart Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 22: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Electrical

• Converted 100W AT power supply– Rails:

• 5V (red)• +/- 12V (yellow, blue)• 3.3V (orange)• 5V standby (purple)

• Filter, op-amp, sensor

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 23: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Interface

• 7 LEDs– Rationale: simplicity

• No user input

Power Pool Safe

pH- Low

pH+ Low

Cl/BrLow

Tank Level

pHUnbalanced

SanitizerUnbalanced

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 24: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

POST-DESIGN THOUGHTS

Page 25: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Actual Cost of Production• Assuming we are able to attain bulk prices

– Motors: $60– pH and Cl sensors: $100 (different from current

implementation)– Casing: $20-30– Piping/containers: $10– Microcontroller: $2– Pump: $20-30– Power supply: $30– Other electronic components: <$10– Total: $250-270 + Labour

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 26: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Marketability

• Very marketable product– Greatly reduces the burden of spa owners

• Relatively inexpensive, depends on how much consumers are willing to pay

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 27: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

FINAL THOUGHTS

Page 28: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Future Considerations

• Improve chassis aesthetics and shrink dimensions– Very integral to consumer decisions

• Improve interface aesthetics– Maybe a small LCD display

• Improve Sensor Performance– Use higher quality ORP sensors

• Much more accurate• Much more expensive

• Implement shocking feature• More waterproofing and failsafe

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 29: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Acknowledgements

• Dr. Andrew Rawicz, Steve Whitmore• Duncan Chan, Ali Ostafar, Sara Mogahddamjoo• Dan Bergsma• Masih Hosseini• Friends and Family

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 30: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Final Thoughts

• Completed proof of concept design• Gained valuable experience

– Documentation, team dynamics, interdisciplinary process

Team IntroOverviewGoalsMarket and DesignMarket StatsNeedsBudgetTimeTechnical OverviewMechanicalSensorsControlElectricalInterfacePost-DesignCost of Prod.MarketabilityFinal ThoughtsFuture Consid.ThanksFinal Thoughts

Page 31: SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong

Questions?