Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
SpecificationsYear Built
Max. Pulling Capacity (lbs)
Max. Snubbing Cap acity (lbs)
Stroke (ft)
BOP
Power Slip
Rotary Torque
Rotary Speed
Through Bore
Tubular Handling
Gin Pole Lift (SWL)
Wind Speed
Ladder Type
Skidding Feature (fast skidding from well to well & able to distribute the operating weight
Double Racking System
to the platform skidding beam instead of wellhead)
Yes
6 GAIT 6
2014 460,000 lbs. 225,000 lbs. 10 . Shaffer, 13-5/8”
5,000 psi 500,000 lbs.22,000 /lbs.
60 RPM
11 inch 1.66” - 6-1/2” SWL 10.0 MT
72.0 .(fully extended)
65 knots
Zig Zag
Comes with dualracking for ver calpipestorage &skidding
VELESTO WORKOVER SDN BHD (112187-W)
(formerly known as UMW WORKOVER SDN BHD)Level 18, Block 3A, Plaza Sentral,
Jalan Stesen Sentral 5,50470 Kuala Lumpur, Malaysia
Tel: +6 03 2096 8788Fax: +6 03 2096 8733
Website: www.velesto.com
GAIT 1 2001 340,000 lbs. 150,000 lbs. 12 ft. Hydrill, 11”,5000 psi400,000 lbs. 7,500 ft/lbs. 60 RPM 11-1/16 inch
1.66” – 6-1/2” 3.0 MT 57 ft. (full extension)
65 knots Zig Zag & Spiral Yes
1
GAIT 2
2
GAIT 5 2010 460,000 lbs. 225,000 lbs. 10 ft. Cameron Type U, 11”,5000 psi500,000 lbs. 22,000 ft/lbs. 60 RPM 13-5/8 inch
1.66” – 6-1/2” SWL 10.0 MT 62 ft. (full extension)
65 knots Zig Zag Yes
5
2003 460,000 lbs. 225,000 lbs. 10 ft. Cameron Type U,11” 5M.
400,000 lbs. 20,000 ft/lbs. 60 RPM
11 inch 1.66” – 6-1/2” 3.0 MT 69 ft. (full extension) 65 knots Zig Zag Yes