Page 1: spinning Training Reprot

YARN MANUFACTURING PROCESS

M.B.O

SORTING

BALE PRESSING M/C

BLOW ROOM

CARDING

BREAKER D/FRAME SLIVER LAP M/C

LAP FORMER RIBBON LAP M/C

COMBER

FINISHER D/FRAME

SPEED FRAME

RING FRAME

WINDING M/C

CONDITIONING

PACKING

KINDS OF COTTON USED :-

Page 2: spinning Training Reprot

• INDIAN COTTON

• IMPORTED COTTON

INDIAN COTTON TYPE

S-6 100%

S-6 ONGIN

S-6 ORGANIC

J-34 100%

DCH32 100%

DCH32 ONGIN

DCH32 ORGANIC

MCU-5 FAIR TRADE

MCU-5 100%

MCU-5 ORGANIC

IMPORTED COTTON

GIZA-86 EGYPT

GIZA-88 EGYPT

AKDLA AUSTERLION

ULTIMA U.S.A

PIMA U.S.A

SICALA _

DISCRIPTION OF M.B.O. :-

MANUFACTURE - LAKSHMI

Page 3: spinning Training Reprot

MODEL - LB3/4 (YEAR 1997)

NO. OF M/C - 1

OBJECT OF M/C :-

• To make homogeneous mixture of different types of fibers.

• Opening & cleaning of the material.

• Mixing & blending of the fibers.

• Removal of dust as a percentage of dust content of the fibers.

M/C PARTS:-

• Feed lattice with conveyer belt,

• Bottom feed lattice with conveyer belt,

• Inclined lattice,

• Stripper roller,

• Evener roller,

• Feed roller,

• Saw tooth beater.

SORTING OBJECT :-

To remove the contamination like hair, colour yarn, jute plastic, polythin, sutli,etc.

PROCEDURE OF SORTING :-

FOR COTTON SORTING {PROCESS} -

1.To hold the cotton in one hand & open the cotton slightly by other hand.

Page 4: spinning Training Reprot

2. Then, to separated the contamination like hair, pouch, sutli, white plasti ,etc in different places.

3. Kept the contamination in different places.

4. And after this procedure count to the register.

This process is done by manually.

No. of worker or sorter required for process= 30-40.

• PROCESS SEQUENCE -

BALE (TO BE SORTED)--M.B.O. (MIXING BALE OPENER)-FIRST SORTING -SECOND SORTING -TUFT IS FED TO BALE PRESS M/C

Sorting load acc. to mixing of cotton fibers-

MIXING A B C D ELOAD 90 60 45 35 30

NOTE:- Sorting load in kg/shift/ sorter.

CALCULATION:- If we have 32 sorter in a shift & work load is 90kgs , then how to calculate the no. of bale.

No. of sorter = 32

Work load = 90kgs/sorter

Wt. of one bale = 170kgs

So, No. of sorter = no. of bale *wt. of one bale /work load

No. of bale = 32*90/170

=17 (approx.)

• COTAMINATION SORTOUT IN 45KGS.

Page 5: spinning Training Reprot

VARITY TOTAL STANDARD EFFICINCY(%)J-34 123 131 94S-6 149 169 94S-6 OG 105 114 93DCH32 255 271 94MCU-5 461 495 93MCU-5 SUPER 234 252 93DCH32 178 189 94

• CONTAMINATION STANDARD IN KGS.

VARITY TOTAL STANDARD EFFICINCY(%)J-34 113 131 86S-6 135 169 85S-6 OG 101 114 89DCH32 237 271 87MCU-5 405 495 82MCU-5 SUPER 208 252 83DCH32 154 189 81

BLOW ROOM DEPTT.OBJECT :-

Page 6: spinning Training Reprot

• Opening of the raw material.

• Cleaning of the raw material.

• Mixing of the raw material.

• To achieve the uniform yarn quality.

• To avoid lot to lot variation.

• Removal of magnetic material.

MATERIAL PROCESS FLOW IN BLOW ROOM M/C’s-

BLENDOMAT (BDT)

SP-MF

MAXI FLOW

MPM8 MPM-8

CVT-1 CVT-1

SP-F SP-F

The Factors which influence the opening and cleaning efficiency-

• Position of m/c in blowroom sequence.

• Penetration of opening spikes.

• Angle of grid bars.

• Speed of opening rollers.

• Area of the grid surface.

• Pre-opening of material.

• Thickness of feed web.

Page 7: spinning Training Reprot

TYPES OF PIPE USED IN B/R LINE -

• Fire pipes

• Material transfer pipes

• Micodust pipes

• Dropping waste pipes

• & some ventilators

• NO. OF WORKER IN blowroom = 3

• Collection of waste from blow room =6%

• Hygrometer type sensor is used in blowroom for atmospheric conditions.

• Relative Humidity (RH%)= 63*F

• Temp. in blowroom = 29*c

DESCRIPTION OF EACH M/C IN BLOW ROOM LINE –

BDT(BLENDOMAT)

Manufacture - TRUTZSCHLER

Page 8: spinning Training Reprot

Model - BO-A-2300(YEAR-2005)

No of m/c - 1

Operation Performed -

• Bale opening

• Blending

• Transfer of material to next m/c

Machine Parts :

• Suction duct system

• Truck

• Suction duct for system covering

• Tarret

• Light burries station

• Operator’s console

• Detacher

• Working area safeguard system or safety system for working area

TECHNICAL DATA :

M/C HEIGHT =2.90 mtr

M/C WIDTH = 5.16 mtr

Working height =1.70 mtr

Working length =5.81-45.41 mtr

Working width =1.60-2.20 mtr

Working speed =5-15 m/min.

Page 9: spinning Training Reprot

Lifting speed = 0.85-7.0 m/min.

Speed of toothed disc roll =1.5 rev./min.

Speed of supporting roll =12-36rev./min.

Suction duct unit has length = 2475 mm.

Air fan suction pressure =600-1050 Pa

No of sensor in m/c = 6

Wt. of machine = 2700kgs

Production of m/c =1000 kgs /hr.

The setting of BDT depending upon two factors :

• Overall production of the unit,

• Length of belt.

• Suction duct

• Truck :- It give way or it is help in moving to the machine from left to right & right to left on laydown in straight manner.

• Suction duct covering consist –

• Cover belt

• Wind up device

• Cover belt : one end is fitted at suction station & other end is on winding roller.

• Wind up device – it is fitted on the truck.

• Turret :- In inner suction system ,transformation of tufts from detacher to inner suction system.

Page 10: spinning Training Reprot

Pressure =0.6 kpa

• Two guide rollers,

• Two disc tooth rollers,

• Two grid bar used below disc tooth rollers.

SP-MF (MULTI FUNCTION SEPRATOR)

MANUFATURER - TRUSTZSCHLER

MODEL - SP-MF(YEAR-2005)

NO. OF MACHINE - 1

OPERATION PERFORMED :-

• The pneumatic transport of open tuft material through pipe lines.

• The intensive extraction of dust from draw in tuft material.

• The separation of heavy material or particals from suction air stream.

• Separation of metal particals.

MACHINE PARTS :-

• Frame

• Sheet metal cover

• Doors

• Fan (BR-FD 500)Drive

• Metal detector

• Sensor

• Fire sensor/ detector

• CO 2 Extinguish system

Page 11: spinning Training Reprot

• Dust cage & finned stripper roller drive

• Exhaust

TECHNICAL DATA :-

Inner frame width = 1000 mm

Machine width = 1464 mm

Machine length = 1100mm

Fan speed = 1360-2960 rpm

Weight of machine = 580 kgs.

MAXI FLOW PRE-CLEANER

MANUFACTURER - TRUTZSCHLER

MODEL - 0532501 (YEAR-2005)

NO. OF MACHINE - 1

OPERATION PERFORMED –

• Removal of microdust particals.

• Heavy impurities.

• Removal of trash from fibers like – seed, chaff(leaf ,stalk),dirt &dust,etc.

• Removal of dropping waste.

MACHINE PARTS : -

• Two beater (pin type) with drive

• Grid bar

• A/c motor

• Frame

• Material suction device

Page 12: spinning Training Reprot

• Waste suction device

• Inner sheet metal casing

• Outer sheet metal casing

TECHNICAL DATA :-

Inner frame width =1300 mm

Machine height = 2100 mm

Machine width =1464 mm

Machine length = 1830 mm

Machine weight =1500 mm

Dia. Of beater roller = 605 mm

Maximum output = 850 kg/hr.

Fan speed =1200 rpm

Beater speed =780 rpm

Rotation speed limit roll = 1180 rpm

Inlet & outlet pressure difference = 100-320 Pa

Motor speed = 1450 rpm

Motor rating = 7.5 kw

Motor frequency = 50 Hz.

The Grid Bar setting is adjustable & is adjusted acc. to the requirement of running

Generally it is 2-3 mm.

CALCULATION : - Suppose rotation of beater is x in one min.& dia. of beater is y Then, how to calculate the no. of beats/inch.

3.14 *y*no. of beats/inch =x

Page 13: spinning Training Reprot

So, no. of beats/inch =x/3.14*y

MPM-8[MULTI PURUSE MIXER-8]

MANUFACTURER - TRUTZSCHLER

MODEL - MPM-8 (YEAR-2005)

NO. OF MACHINE - 2

OPERATION PERFORMED –

• Mixing to different type of cotton,

• Stock to material into eight chamber.

Working details : -

The second concepts are multi mixer MPM-8 , it is available with eight chambers. The tufts are once again into a m/c by a fan. The filling procedure & control of the flaps are identical to the working of multi mixer MPM-8. The difference between the blending channel underneath the opening rolls, there is no conveyer belt. The MPM-8 works on the basis of a closed air circulation, i.e the conveyer air entering the m/c also carries the material & feeds it into the next m/c .

MACHINE PARTS :-

This machine is made up of three parts;

Page 14: spinning Training Reprot

1.A storage unit /section ,

• Eight chamber

2. An intermediate section ,

• Two feed roll , One beater, Sensor

3.A delivery section ,

Air pressure are used for deliver to the material ,conveyer.

TECHNICAL DATA :- Air fan suction pressure =500 Pa

CVT-1( CLEANOMAT)

MANUFACTURER - TRUTZSHLER

MODEL - CVT-1 (YEAR-2005)

NO. OF MACHINE - 2

OPERATION PERFORMED -

• Cleaning of the material,

• Removal of dust particals.

MACHINE PARTS : -

• Feed lattic

• Pressure roller

• Feed roller

• Roller [with two separating wings , two suction hood & one carding segment].

• Pressure roller.

TECHNICAL DATA: -

M/c Height = 1250 mm & M/c width = 1800 mm

Page 15: spinning Training Reprot

M/c length = 2400 mm

Connection pressure = 450 Pa [Project planning data]

Feed belt speed = 0.75-15.17 mtr./min

Inside frame width [IFM] = 1200 & 1800 mm

Roll speed = 1191-1213 rpm

Beater speed [fine tooth beater] = 900-1300 rpm

Inlet pressure[P1] = 138 Pa & outlet pressure[P2] = 868 Pa

Suction duct pressure = 100-750 Pa

SP-F [FOREIGN FIBRE SEPRATER]

MANUFACTURER - TRUTZSCHLER

MODEL - SP-F (YEAR-2005)

NO. OF MACHINE - 2

OPERATION PERFORMED –

• Removal of dust particals,

• Removal of dry & colored materials in fibers ,

• Removal of all types of contamination like hair, colored yarn,etc.

MACHINE PARTS :-

• Feed lattic

• Pressure roll

• Cylinder 1 (with two mote knives, two suction hoods, one carding segment)

• Cylinder 2 (with one mote knives, one suction hood, one carding segment)

• Cylinder 3 (with one mote knives, one suction hood)

Page 16: spinning Training Reprot

TECHNICAL DATA : -

Maximum detection rate = 100-5000/hr.

Valve delay angle = 90-180 degree

Beater speed = 740 rpm

Detection/hr. per color –

Red+ = 5000/hr.

Green+ = 1000/hr.

Blue+ = 5000/hr.

BLOW ROOM F.D.P. –

LUWA ROTATARY PRE-FILTER -

• Dopping waste (maxi flow)

• SP-F waste (line-1)

• Microdust (CVT-1 line-2)

• SP-F waste (line-2)

• SP-MF (microdust)

• CVT-1 dropping waste (line-1)

• CVT-1 dropping waste (line-2)

• CVT-1 (microdust)

• M/F Microdust

VENTILATOR IN BLOW ROOM -

SP-MF - ventilator

MAXI FLOW - waste ventilator

Page 17: spinning Training Reprot

MPM-8 - front ventilator

CVT-1 - waste ventilator

SP-F - ventilator

Fire - ventilator

VENTILATOR SPEED =MOTOR RPM* MOTOR PULLY /M/C PULLY

MACHINE MATERIAL SUPPLY PRESSURE(Pa)BDT-019 600-1000 MPM-8 500CVT-1 500SP-F 500

Dust supply pressure = 50-200 Pa

Dropping waste pressure = 750-1000 Pa

Pipe line used in blow room –

Material pipe line (from-to) Diameter (mm)BDT-SP-MF 330SP-MF –MAXI FLOW 300MAXI FLOW-MPM8 300MPM8-CVT1 300CVT1 –SP-F 300SP-F - CARD 300

Dropping waste line (from-to) Diameter (mm)CVT –Pre-filtter 250CVT –Microdust 300SP-F –Microdust 280SP-MF & LVSB 300MAXI FLOW waste pipe 150Maxi flow microdust 300Fire system 300

Page 18: spinning Training Reprot

CARDING SECTION

M/C SPECIFICATION –

MANUFACTURER - TRUTZSCHLER

MODEL - DK800 (YEAR-2006)

NO OF MACHINE - 9+1[DK780]=10

OBJECTIVES OF CARDING -

• High degree of opening of fibers.

• Removal of minute dust particals,

• Disentangling of neps,

• Fiber blending,

• Elimination of impurities,

• Elimination of short fibers,

• Sliver formation.

Carding is the heart of spinning because above 90% impurities are removed during carding.

Page 19: spinning Training Reprot

MACHINE PARTS : -

• Feed chute

• Feed roller

• Feed table

• Licker-in

• Mote knives

• Stationary flats

• Cylinder

• Flates

• Doffer

• Grid

• Stripper roller

• Flat cleaning brush

• Top plate

• Suction hood

• Cross roller

• Trumpet

• SFL [STATIONARY FLATS LICKER-IN SIDE]

• SFD [Stationary flats doffer side ]

MACHINE PARAMETER -

Feed roller diameter =100 mm

Licker in diameter = 253 mm

Cylinder diameter = 1290 mm

Page 20: spinning Training Reprot

Doffer diameter = 680 mm

Cylinder speed = 401-531 rpm

Doffer speed = 851-1125 rpm

Flats speed = 80-320 mm/min

No. of flats = 84

No. of working flats = 30

Feed system = chute feed

Can diameter = 40 inch

Can height = 45 inch

Width of web = 830 mm

Delivery speed = 115 m/min

SPECIAL FEATURES OFV DK800 CARD -

• HIGH PERFORMANCE CARD.

• AUTO LEVELLER IS USED.

CARD GAUGE SETTING

S.NO.

SET POINT GAUGE(Thou)

1. Feed plate to feed roll 42. Feed plate to licker-in 403. Licker-in to wing 404. Licker-in to mote knives 405. Licker-in to cylinder 7,86. Cylinder to SFL 187. Cylinder to back suction 558. Cylinder to flat 10,8,8,89. Cylinder to SFD 64 PPSI 1210. Cylinder to front top plate 4011. Cylinder to doffer 512. Cylinder to front bottom plate 14

Page 21: spinning Training Reprot

13. Cylinder to back bottom plate 4014. Doffer to stripper 615. Stripper roller to cross roller 616. Cross roller to web plate 4017. Top calendar roll to bottom calendar roll 618. Cylinder pulley 21019. Licker-in pulley 26020. Flat pulley 180

CARD SETTING

S.NO. WRAPPING FBK PRESSURE(Pa) 1 0.160 4002 0.190 220

• No. of motor in a CARD = SEVEN

• TEMP. in carding section is 30.2 degree

• Relative humidity (RH%) in carding is 56.9 %

S.NO. WRAPPING PRODUCTION (KG/HR.)

DELIVERY SPEED(IN RPM)

1. 0.160 15 672. 0.160 18 813. 0.160 20 904. 0.160 22 995. 0.160 25 1126. 0.160 30 1357. 0.160 35 1378. 0.190 10 539. 0.190 15 8010. 0.190 20 10711. 0.190 22 11712. 0.190 25 133

TECHNICAL DATA –

Page 22: spinning Training Reprot

Cylinder pulley diameter = 175 mm

Licker-in pulley diameter = 260 mm

Stripper roller diameter = 120 mm

Cross roller diameter = 90 mm

Working width of card = 1020 mm

Working width of tuft feeder = 920 mm

Machine weight = 7300 kgs.

Machine width = 1994 mm

Machine length = 5650 mm

Production/SHIFT = 275.25 kgs/shift

Production/hour = 34.40 kg/hr.

Height of FBK = 2625 mm

Height of machine upto flats = 1900 mm

Width of coiler = 1940 mm

Draft given by card = 60-200 Fold

Length of sliver per can = 8100 mtr.

Wt. of sliver per can = 25.17 kgs

Hank of sliver = 0.190 Ne

Linear density of sliver = 3.21 gms/mtr.

Fineness = 0.084-0.295 Ne

FBK Pressure = 0-999 Pa

Floor load = 8520 N/m2

Operating pressure = 600-1200 Pa

Page 23: spinning Training Reprot

Flat & licker-in suction pressure = 400 & 700 Pa

CARD CLOTHING DETAILS

• Cylinder wire - T20.30.040.0950

Height =2 mm Angle = 40 *

Thickness = 0.04 mm No. of teeth = 950/sq. inch

• Doffer wire - N.40.30*0.9

Height = 4 mm Angle = 30*

Thickness = 0.09 mm No. of teeth = 367/sq. inch

• Flat wire - Nova 55

No. of teeth = 150/sq. inch

• Licker in - E.5010-8VG

[ Saw tooth type ]

No. of teeth = 210/sq. inch

• SFL Teeth = 240/sq. inch

• SFD Teeth = 640/sq. inch

• Life expectancy-

• Licker in = 225 ton

• Doffer = 1500 ton

• Flat = 700 ton

• SFL = 250 ton

• SFD = 450 ton

Page 24: spinning Training Reprot

DRAW FRAME SECTION

BREAKER D/FRAME –

MANUFACTURER - LAKSHMI RIETER

MODEL - LD0/6 (YEAR-2000)

NO. OF MACHINE - 2

FEATURES OF LD0/6 -

• Automatic can changing mechanism.

• It has 3/3 pressure bar with pneumatic loading .

• The sliver delivered from pneumatic loading calendar roller through coiler into revolving can.

• Top stripper to clean top roller.

• Bottom stripper with suction hood are used to clean the bottom roller.

Page 25: spinning Training Reprot

MACHINE PARTS –

• Creel

• Feed roller

• Auto leveler

• Feed plate

• Drafting roller’s

• Condenser funnel

• Coiler trumpet

• Pressure arm (Pneumatic)

• Two coiler heads

TECHNICAL DATA –

Input material = card sliver

No. of doubling = up to 8

No. of coiling heads = 2

Total no. of cans = 12

Roll gauge = 46/50

Creel tension gear wheel = 70,71,72 Teeth

Draft range = 2-12

Feeding speed = up to 42.5 gm/mtr.

Delivery speed = 240-500 m/min.

Draft tension :

Page 26: spinning Training Reprot

Main draft = 40-80 mm

Break draft = 36-90 mm

Trumpet size = 3.5 mm

Production = 180-360 kgs/hr.

Machine weight = 2440 kgs

Can size at feed :- Can diameter = 600 mm

Can Height = max. 1200 mm

Can size at delivery :-

Can diameter = 350[,400,450,500 ] mm

Can height = 914-1200 mm

Output material = draw sliver

DRAFTING : -

Drafting system = 3/3

Pressure supply = Pneumatic [6 bar ]

Load on drafting rollers –

On 1st & 2nd top front roller = 3-4 bar

On 3rd top back roller = 2-3 bar

Pressure on calendar roller = 0.5-2.5 bar

Can changer = 4-5 bar

Drafting roller’s : -

Top roller cot size (mm) :- 39*39*39 [ T1, T2, T3 ]

Bottom roller’s size (mm) :- 52*28*28 [ B1, B2, B3 ]

Top roller hardness : = 70* SHORE

Page 27: spinning Training Reprot

• Top rollers rubber coated,

• Bottom roller are of hardness steel fluted rollers

CHANGE POINTS AT D0/6 -

• Draft change gear[DCCP]

• Draft range change gear [CP]

• Break draft change gear ‘’A’’ & ‘’B’’.

• Feed change gear

• Can change gear ‘’E’’ &’’F’’ .

• Delivery change gear, coiler wheel change gear ‘’C’’ & ‘’D’’.

• Motor belt pulley.

DRAFT RANGE CHANGE GEAR

DRAFT DCCP GEAR 3.7-5.1 82 TEETH 4.9-7.0 63 TEETH6.3-9.1 48 TEETH8.0-11.0 38 TEETH

MAIN DRAFT = 4.9

CHANGE PINION = 92 T

E/F COMBINATION =52-110 T

E/F COMBINATION CHART COUNT RANGE E/F COMBINATION GEARS20 40/7325-30 50/63

Page 28: spinning Training Reprot

30-40 38/7550-78 35/7870-80 35/78ABOVE 80 27/86

BREAK DRAFT CHANGE GEAR

DRAFT A/B GEAR BREAK DRAFT61/65 1.2865/61 1.5156/70 1.7170/56 2.0

DRAFT = FEED WPG. *NO. OF DOUBLING / DEL. WPG

DEL. SPEED = WT. OF SLIVER FEED* DOUBLING /DRAFT

SPECIAL FEATURES OF DO/6 LMW :-

• Mainly use for synthetic & also use to cotton

• Use for blending

• Double line feeding

• Double delivery

• Easy to operate

Auto doffing system is used , pneumatic loaded calendar roller for delivery hence compression takes place , flies on suction fan hence it is necessary to clean up to 45 min.

Stop motion checking –

Creel stop motion

Coiler stop motion

Roll lapping stop motion.

Page 29: spinning Training Reprot

Machine cleaning schedule –

PARTS SCHEDULE TOOLSRoll interchange 2hrs By hand Coiler cleaning 24hrs Water & cloth Fan waste 30min. By handRoll washing 24hrs Water & cloth Drafting zone 2hrs Cleaning gun Creel cleaning Every batch Cloth & Cleaning gun

LAP FORMER LH-10

MANUFACTURER - LAKSHMI

MODEL - LH-10 (YEAR-2005)

NO. OF MACHINE - 1

FEATURES OF LH-10 --

• Double feeding creel

• Two feeding heads

• 11/11 doubling of draw sliver’s

• Auto doffing system

MACHINE DATA --

Drafting system = 4/4 (with pressure bar)

Total draft = 1.2 -2.26

Page 30: spinning Training Reprot

Top roller loading = spring loading system

No. of drafting heads = 2

Doubling = up to 28 slivers

Del. Speed (max.) = 120 m/min [Depending on raw material ]

Can size -- can diameter =up to 40 inch

Can height = up to 48 inch

Lap width = 300 mm

Max. lap diameter = 600 mm

Lap sheet weight = 60-80 gm/mtr.

Lap weight = 15.40 kgs(with spool)

Break draft = 1.042

Draft distance --

MAIN DRAFT = 40-60 mm

BREAK DRAFT = 40-60 mm

Compressed air requirement :-

System pressure = 7 bar

Operating pressure = 6 bar

Air consumption pressure = 3 Nm3/hr

Top rollers buffing :

Hardness = 83*

Color = grey

Quality = antistatic

Quality code = Lakshmi day 890

Page 31: spinning Training Reprot

Minimum dia. = 36 mm

Maximum dia. = 39 mm

Grinding dia. in mm = 0.2 mm

Total draft = Doubling * feed in gm/mtr./del. Lap wt. in gm/ mtr

Ex. T.D. = 26*4.54/80 =1.48

SUCTION POINT IN MACHINE :-

• Spool suction

• Main cylinder roller suction suction

• Anti lap licking suction

• Table calendar roller suction

• Drafting roller suction .

CLEANING SCHEDULE OF MACHINE –

PARTS SCHEDULE TOOLS Drafting zone & stripper 8hrs Cleaning gun Drum cleaning stripper 24hrs By hand Fan waste 8hrs By hand Creel & table cleaning 8hrs Cloth & cleaning gun Lap forming unit 8hrs Bamboo stick Head stock inside the cover

24hrs Cleaning gun

Creel After a batch Cloth & cleaning gun Ball washing 24hra By cloth

Page 32: spinning Training Reprot

SLIVER LAP MACHINE

MANUFACTURER - LAKSHMI

MODEL - LE2/4a (YEAR-2000)

NO. OF MACHINE - 1

FEATURES OF SLM –

• Drafting is pneumatically weighted.

• Lap weighted is performed on a patented automatically system.

• Antifriction bearing with continuous lubrication have been used wherever possible

MACHINE TECHNICAL DATA –

SLIVER FED WRAPPING = 0.120-0.180

Wt. of sliver fed = 75-120 gm/mtr

Cleaning efficiency = 70%

Page 33: spinning Training Reprot

Draft = 1.5-2.0

Lap weight = 50-75 gm/mtr

Lap width = 250mm in case of feeding to RLM

& 300mm in case of feeding to comber

direct

Lap weight = upto 13 kgs

Working speed = 65 m/ min

Drafting system = (pneumatic)4/6

Draft constant = 1.35

Throttle disc dia. = 1.8-2.00mm

Doubling = 21 [11+10]

WEIGHT OF THE MACHINE & ITS COMPONENTS :-

Auto lap = 1440 kg

Drafting system = 490 kg

Table = 240 kg

Total m/c weight = 2170 kg

Compressed air pressure = 6 atu

Del. Speed = 50-65 m/min

Page 34: spinning Training Reprot

Motor pulley dia. = 140,170,185 mm

Total draft = input in gm/mtr /output in gm/mtr

Motor speed = 1440 rpm

Frequency = 50 hz

M/c width = 2260 mm

Can dimensions =>16-40 inch & upto 50 inch (1250mm) high

Machine cleaning schedule –

PARTS SCHEDULE TOOLS

CREEL & TABLE

CLEANING

8 HRS. WATER & CLOTH

BOTTOM PATELI &

DISC SIDES

8 HRS. WATER & CLOTH

DRAFTING ZONE 2 HRS. CLEANING GUN

TOP ROLL WASHING 24 HRS. WATER & CLOTH

BELOW &

SURROUNDING M/C

8 HRS. CLEANING GUN

STOP MOTION CHECKING –once in a shift

• Creel stop motion

• Drafting stop motion

Page 35: spinning Training Reprot

• Roll lapping stop motion.

RIBBON LAP MACHINE

MANUFACTURER - LAKSHMI

MODEL - LE2/4a

NO. OF MACHINE - 1

MACHINE PARTS :-

• Lap feed roller

• ¾ Drafting system

• Feed table

• Feed roller calendar roller

• Lap roll

• Spool supporting plate

• Guide roll

Machine technical data : -

Length of machine = 5275 mm

Width of machine = 2907 mm

Machine weight :

Auto lap = 1450 kg

Head stock = 550 kg

Roller & its support = 900 kg

Total m/c weight = 2900 kg

Page 36: spinning Training Reprot

Weight of lap fed = 50-75 gm/mtr

Weight of lap deliver = 50-75 gm/mtr

Working speed = 50-65 m/min

Draft = 5-8

Max. lap dia. = 450 mm

Lap width = 300 mm

Drafting system = pneumatic

Compressed air pressure = 6 ate

Quantity required =1.2 Nm3/hr.

Motor speed = 960 rpm

The v-pulley are changed on the for changing the delivery speed –

Delivery speed (mtr/min) Motor pulley mean dia. (mm) 50 14060 17065 185

Change wheels & change gears :-

Change gear position –

Chain wheel at calendar roller =24-25 T

Chain wheel at rear lap roller = 76 T

Chain wheel at front lap roller = 77-78-79 T

Draft change gear (Wn) =53-75 T (4TH roller)

Feed change gear (We) = 60 -64 T

Page 37: spinning Training Reprot

Table draft change gear (Wt) = 79-83 T

Del. Tension change gear(Wa) = 79,80,81 T

Double gear for break draft = 35/40

Break draft =1.34,1.02

Chain wheel –

For lap roll drive , the following different chain wheels are sent –

Chain wheel at coupling = 24/25 T

Chain wheel at lap roller = 77/78/79 T

As per experience , we select the following chain wheels –

For coupling (1) = 25 T

Rear lap roll = 76 T

Front lap roller = 78 T

If the machine is operated with light drafting , the wheels 24 , 76 & 77 are to be used .

Distance between top edge of the saddle top cleaning device shaft =95T

DRAFTING ARRANGEMENT :-

These rows of top roller with synthetics covering are loaded over four rows of bottom fluted rollers. The nipping distance are adjustable between 3& 55mm in the break draft zone so that all the fiber length can be processed & in main zone it is 30 & 54 mm are adjusted .

Page 38: spinning Training Reprot

FORMULA –

Total draft = feed gm/m *doubling/del. gm/m

Draft change gear = total draft / break draft *constant of main draft

Cleaning schedule of RLM M/c -

Creel & table cleaning 2 hrs Cloth &cleaning gunDrafting zone 2 hr Cleaning gun Top & bottom clearer cloth

8 hrs By hand

Disc sides lap formation unit

8 hrs Cleaning gun

Top roll washing 24 hrs Water & cloth Below & surrounding m/c

8 hrs Cleaning gun

COMBER

Page 39: spinning Training Reprot

Name of machine

Model No. of machine Manufacturer(RIETER)

Comber E 65 2 Year- 2004 E 66 1 Year – 2010E 60 H 3 Year -1997

OBJECTIVES OF M/C –

• The main object of comber is to remove short fibers.

• Straightening & parallization on fiber

• Upgrade raw material

• Yarn evenness

• Strength

• Cleanliness

• Visual appearance

• Smoothness

• Requires less twist than carded

• Removal of neps .

MACHINE PARTS : -

• Lap roller

• Feed roller

• Nipper

• Top comb

• Bottom roller

Page 40: spinning Training Reprot

• Detaching roller

• Web condensing tray

• Sliver plate

• Delivery roller

• Table cylinder

• Sliver guide

• Trumpet drafting zone

• Calender roller

• Coiler trumpet

• Unilap

TECHNICAL DETAILES OF COMBER E65 RIETER –

• 420V 50 HZ 6 BAR

MXG. = PIMA 100 %

Sliver hank = 0.180

Feed system = backward

Roller gauge = 46

Coiler trumpet = 4.0

Production = 30 kg/ hr

Delivery speed = 158 mtr/ min

No. of laps feed per machine = 8

Page 41: spinning Training Reprot

Drafting arrangement =3/3

Noil (%) = 20%

Top comb depth = + 0.5

Top deteching roller dia. = 23 mm

Circular comb brush dia. 110 mm

Speed of comber =350 nips/min (250-500nips/min)

Noil Index = 10.5

Feed per nip = 4.7 mm (4.3-5.9 mm )

Total Draft (GV) = 9.12-25.12

M/c efficiency = upto 75 %

Top comb teeth = 35 teeth/cm.

Sliver wt. at delivery = 3-6 ktex

Noil extraction ( % ) = 8-25 %

Drafting system load per top roll = 650-900 N

Break draft ( VV) = 1.13-2.0

Main draft distance :-

Setting gauge = 41-60 mm

Gauge dimensions ‘A’= Nipping line distance minus 41 mm.

Break draft gauge dimensions =44-66 mm

Feeding :-

Page 42: spinning Training Reprot

Lap outside dia. = 650 mm

Tube/spool outside dia. = 250 mm

Tube length = 300 mm

Can dimensions :-

Can table (C) = 25 mm

Can dia.(D) = 600 mm

Can height (h) = 1200 mm

Total machine weight = 4600 kg

Batt tension = 60-80 ktex

Floor load = 10600 N/m2

Force of can spring = 855 N

Can length = 10000 mtr

Feed tension = 10 %

Top comb density = 3.5

Piecing index = +0.3

Drafting trumpet = 7.0 mm

Table trumpet = 4.0 mm

Drafting rollers –

Top rollers dia. : - T1 = 39 mm

T2 = 39 mm

T3 = 39 mm

Page 43: spinning Training Reprot

Bottom rollers dia. : -

B1 = 35 mm , B2 = 27 mm , B3 = 27 mm

Break draft change gear –

Gear C Break draft 59.0 1.1364.9 1.2471.9 1.3478.8 1.5086.9 1.6596 1.82105.7 2.0

Main draft change gear -

Main draft Change gear A Change gear B 12.04 38 3812.67 40 3812.84 48 4513.54 45 4014.25 45 3814.59 40 3315.20 48 3815.89 33 2516.55 33 2417.27 33 2317.51 48 3318.30 38 2519.26 40 25

Feed per nip change gear Ratchet Wheel -

Page 44: spinning Training Reprot

Feed /nip R.W. Feed change gear 4.3 22 624.7 20 565.2 18 525.9 16 45

Change places in comber –

All change places in the delivery assemble are really accessible they are as follows –

N –COUNT CHANGE

Z - FEED CHANGE

S - RATCHET WHEEL TO FEED ROLLER

V - WEB TRAY DRAFT CHANGE

Prduction of the comber is dependent upon the following :-

N- Nips per min

S – Feed in mm/ nip

K- Tension draft between lap & feed roller [1.05-1.1 ]

G- lap wt. in gm/ mtr

Stop motions –

• Lap exhaust stop motion

• Opened up detaching roller

• Sliver break at coiler

• Jam in detaching roller

• Sliver break at condensing roller

Page 45: spinning Training Reprot

• Sliver break at condensing roller

Cleaning schedule of E 65 RIETER -

Parts Schedule ToolsCoiler cleaning 24 hrs Water & cloth Top comb 4 hrs Top comb brush Nipper 24 hrs Cleaning gunDetaching roller area 8 hrs Cleaning gun Roll washing 24 hrs Water & cloth Wash duct,front&back

8 hrs ----------

Side cover 48 hrs VacuumDrafting zone 2 hrs ----------

SPECIAL FEATURES OF E 65 -

• Latest machine

• 3/3 drafting arrangement

• Better reducing the noil %

• Easy to operate

• Upgraded monitoring display.

COMBING CYCLE IN CASE OF BACKWARD MOVEMENT –

• Detaching

• Nipper move in backward

• Same time feeding

• Gripping

• Combing

Page 46: spinning Training Reprot

In backward movement or feeding system the removal of short fiber are higher as compare to forward feed system .

In comber there are two important index which give improvement in efficiency of machine –

• NOIL INDEX – This index is used to control %age of short fiber in material .

• PIECING INDEX – It is use for maintaining length of cut lap before detaching roller for over lapping.

PRODUCTION CALCULATION :-

PRODUCTION =feed/nip *nip/min*60*8*efficiency*no. of heads*(1-noil%/100)*(1-bett tension/100)/36*840*2.2*wpg.

DRAW FRAME FINISHER

MANUFACTUER -- RIETER

MODEL -- RSB-D40[YEAR-2006]

NO. OF M/C -- 3

• OBJECT

• To reduce weight per unit length of sliver.

• To improve the regularity of fibers by drafting & doubling

• To parauelize them to their neighbours

• To straightened out the fibers into fibers exient

• To mixing different type of fibers so as to give a homogeneous blending

Page 47: spinning Training Reprot

• TECHINCAL DATA

• Drafting system -- 4/3

• Doubling -- 10

• Efficiency -- 75%

• Production -- 30-80kg/h

• Front roll dia. -- 38mm

• Middle roll dia. -- 30mm

• Back roll dia. -- 30mm

• m/c height -- 1860-2515mm

• Roll gauge -- 46/50

• Del. Speed -- 250-1100mtr./min

• Feed sliver wt. -- 12-50ktex

• Del. sliver wt. -- 1.25-7.00ktex

• Draft (v) -- 4.54-11.56

• Fibre length -- max. 80mm

• Can dia. -- 210-1000mm

• Can height -- 900-1520mm

• Scaning roller dia. -- 60mm

• Feeding rate -- 300-400mm/min.

• Main draft distance (hvd) -- 35.5mm

Page 48: spinning Training Reprot

• Break draft distance (vvd) -- 36-40mm

• Drafting system pressure in newton -

Back ,middle & del. top roll pressure -- 320-440n

• Top roll cot dia. -- 36-38mm

• Top roll length -- 100-160mm

• Grinding disc dia. -- 200-500mm

• Grinding disc width -- 25-45mm

• Circumference speed of grinding disc -- 1800-2000mtr./min

• Rpm of spindle shaft -- 300-500u/min.

• Trumpet size -- 28

• Pressure bar setting -- 6.0

• Nw 1 / Nw 2 -- 39/52

• Width of scaning roll -- 4.0-11.0 mm

W1 98 99 100 101 102 103VZW 0.93 0.99 1.00 1.01 1.02 1.03

W2 52 51.5 51VZ 1.00 1.01 1.02

W8 75.2 74.4 73.7 72.9 72.2VA 0.99 1.00 1.01 1.02 1.03

Page 49: spinning Training Reprot

W4 (54.6) (57.2) 59.8 (62.4) 68.0 (67.6) 72.8 (78.0)VV (1.05) (1.10) 1.15 (1.20) 1.25 (1.30) 1.40 (1.50)

W4 83.2 88.4 93.6VV 1.60 1.70 1.80

WHERE , VV -- Break draft

V&GV -- Total draft

HV -- main draft

SPEED FRAME

MANUFACTURER - LAKSHMI

MODEL - LF1660(YEAR-2005)

NO. OF MACNINE - 4

OBJECT :-

The object of the speed frame is to produce out of the draw sliver to a well prepared roving of required hank of a well built bobbin for ring spinning frame.

FUNCTION OF SPEED FRAME :-

• DRAWING - To parallise the fibers upto optional level.

• TWISTING – To impart necessary strength to roving .

Page 50: spinning Training Reprot

• WINDING- To pul;l the suceesive layer on the bobbin at a proper rate of speed.

• Building – To shorted successive layers to make conical ends on the package of roving.

MACHINE PARTS :-

• CREEL

• PATELI CLOTH

• CRADLE

• TOP & BOTTOM R

• TOP & BTTOM APRONS

• SPACER

• TWIST MASTER

• FLYER WITH BOBBIN SUPPORRTING ROLL

• SPINDLE

• LIFTER RAIL

• SLIVER GUIDE

• CONDENSOR

• TOP ARM/SADDLE

• NOSE BAR

• TENSIO PULLY

TECHNICAL DATA OF LF1660 :-

Page 51: spinning Training Reprot

These m/c’s are only built with the drive to the right i.e. the head stock is on the right when looking at the delivery.

Spindle gauge = 121.83

No.of spindle = 120

Bobbin size = 16*6 inch

Flyer speed mechanically possible = 1400 rpm (max.)

Production = 50 m/min

[under favourable marginal condition ]

Draft = 9-24

Count = >

English (Ne) = 0.5 to 3.0

Metric (Nm) = 0.85 to 5.0

Drafting arrangement – Guide saddle

Drafting arrangement with 3 or 4 rollers, weighing arm for two spindle ,double aprons , 36,43 & 50 mm cage .

Positively revolving clearer cloth for both top & bottom rollers

Top apron size = 37*30 mm

Bottom apron size = 86*30 mm

Total weight of machine = 12950 kg

Motor speed = 700-1400 rpm

Flyer speed = 800 rpm

Supply pressure of drafting system 5-6 kg/cm2

Page 52: spinning Training Reprot

Meaning of lamps when flickering –

• Green – Doffing or trough manual operation

• Orange – Roving break

• White – Sliver break

Bottom apron thichness = 0.86 to 1.04 mm

Top apron thichness = 0.86 to 1.04 mm

Top roll hardness = 83* Shore

Roll gauge = 47-55-48

Top roll dia. = 30 mm

Break draft = 1.05 to 1.10 (for cotton) [& max. 3.0]

Delivery condenser = 7.5 mm (Green)

Wt. of empty bobbin = 200 gm

Length of roving on one bobbin = 2020-5300 mtr

Twist per inch = 1.51

Spacer = 3.5 mm

Bottom roller type = fluted

Bobbin dia. = 152 mm

Tension draft = 1.086

Main draft = 10

Preliminary draft (between 3rd & 4th roll ) = 1.66

Page 53: spinning Training Reprot

Machine length = 7*1461 mm (96-120 spindle)

Machine width = 3643 mm

Set tension = 3.12

Cop content = 1616 gm/spindle

Doff length = 5200 mtr

No. of layers on bobbin = 118

Lifting wheel = 20 to 42 T

Twist wheel = 30 to 55T

Twist combination wheel = 65/35 T

BDCP GEAR = 50 to 72 T

Change pinion = 30 to 56T

TPI/TM = 1.166/1.951

Creel wheel = 40 to 48 T

Flyer gear belt length = 960 & 840 mm

Pateli cloth length = 815 mm

Main formulae :-

Creel tension draft = 40.88 *creel wheel

Break draft = 66.82/BDCP

T.W. = 34.552(h/g)/TPI, where (h+g=102)

Main draft = 63.48*(r/l)/C.P.

Where ,r/l = draft combination & r+l =150

Page 54: spinning Training Reprot

Middle draft zone = 1.087

Total draft = main draft * break draft

L.W. = 12.18 *E/F *B1/root count

STOP MOTION AT SPEED FRAME -

• Sliver break stop motion

• Bobbin brust stop motion

• Full doff automatic stop motion

CHANGE POINTS-

• Twist change change gear

• Lifter change gear

• Main draft change gear

• Break draft change gear

• Creel tension draft change gear

RING FRAME

MANUFACTURER - LAKESHMI [SUSSEN ELITE COMPECT SET]

Page 55: spinning Training Reprot

MODEL - LR6/A (YEAR-2006)

NO. OF MACHINE - 17

MACHINE PARTS:-

• CREEL

• HOLDER

• HANGER

• ROVING GUIDE 3 IN 1

• DRAFTING ROLLERS

• APRON

• CRADLE

• SPACER

• LAPPET

• SPINDLE

• TOP ARM/SADDLE

• RING

• ABC RING

• FLY CATCHER

• TRAVELLER

• DOFFING RAIL

• SPINDLE TAPE BELT

• TIN ROLLER

Page 56: spinning Training Reprot

• SUCTION TUBE

• ELI TUBE & ELIED APRON

• COTS ROLLER

• JOCKEY PULLY

• NOSE BAR

• SPINDLE WHARVE

• POSITIVE CLIP RING

• RAIL RING

• SEPARATER PLATE

• SPINDLE BRAKE

M/C TECHNICAL DATA :-

Bottom roller dia.(In mm) => B1=30 , B2 =27 ,B3 =30

Top roller dia. (in mm) => T1 =32 , T2 27 ,T3 =32

Cradle length = 36 mm

Total draft = up to 60

Break draft = 1.07 to 2.24

Spindle gauge = 70 & 75 mm

LOADING TOP ARMS :-

The loading top arm are loaded pneumatically. The hose pressure can be adjusted with reducing value in the head stock .

The pressure indicated in table below give a loading of 150-180 N(15-18 kp) per front top roller shaft .

Page 57: spinning Training Reprot

Spacer = 2.5-7.0 mm

Top apron length & width = 37*30 mm

Bottom apron length & width = 73*30 mm

Spindle pitch Pressure 70 2.1-2.375 2.0-2.2

Twist change gear (A+B) = 165 T

Twist range change gear (C+D) =137 T

Total draft constant = 10.519

Change gear for winding length (E+F) = 113 T

Break draft change gears std. = 32-62 T

Draft change gear (G+H) = 130-175 T

Spindle wharve dia. = 21,19 & 18.5 mm

Twists :-

TPM (Twist per meter) = 140- 2550

TPI ( Twist per inch) = 3.55-64.77

SPINDLE SPEEDS :-

Mechanically up to 18000 to 25000 rpm.

Drafting system = 3/3

Spindle taper = 1:40 & 1:64

Spindle tube l;ength = 180 250 mm

Ring dia. Standard (in mm) =>

Page 58: spinning Training Reprot

36,38,40,42 & 45

Ring flange width =>

Flange No. 1 ( b=3.2 mm )

Flange No. 2 ( b =4.0 mm)

Pendulum gauge =>

Long spinning angle = 440 mm

Short spinning angle = 375 mm

Inclination of drafting arrangement = 60* (degree)

Height of separator’s plate = 233.90 & 185 mm

Material of top roller = synthetic rubber

Material of bottom roller = stainless steel

Surface of top roller = plain

Surface of bottom roller = fluted

Total No. of ring frames = 17

No. of spindle ( in one R/F) = 864

COUNT SPUN = 50, 60, 70, 80, 100, 120 & 140 Ne

Hank of roving fed = 0.8-1.5

Delivery speed = 6-17 m/min

Fly catcher gauge = 1.6 mm

Ring dia. = 38 mm

ABC RING DIA. USED = 36.7 mm

Page 59: spinning Training Reprot

Eli tube length = 180-260 mm

STANDARD SUPPLY ALONG WITH EACH MACHINE :-

BREAK DRAFT

BREAK DRAFT CHANGE GEAR FOR FLUTED ROLLERS

DIA. 27 (B1 ) DIA. 30 (B3)

1.14 59 53

1.24 54 49

CHANGE POINTS AT R/F M/C =>

• Twist change geart A/B & twist range change gear C/D

• Change gear E/F for winding length

• Ratchet wheel for ring rail drive

• Draft chnge gear G & maitin g gear H

• CP & BRW – for total draft

• Changing the spindle twist direction Z or S

• SPINDLE RPM.

CALCULATION OF R/F =>

TPI = TM UNDER ROOT COUNT ,where TM = Twist multiplier

TPM = TPI *39.37

Twist constant = TPI*Twist wheel

F.R. Del. SPEED =SPINDLE SPEED/TPI

Page 60: spinning Training Reprot

PRODUCTION = F.R. DELIVERY *60*8*EFFICIENCY/36*840*2.2*COUNT (IN KG/SPINDLE/SHIFT)

BOBBIN CONTENT (GMS) = 3.25*LD square , where l =lift in inch ,D= dia.of bobbin in inch

MAIN DRAFT = B/W FRONT ROLLER & BACK ROOLER

BREAK DRAFT = B/W MIDDLE ROLLER & BACK ROLLER

TOTAL DRAFT = B/W FRONT ROLLER & BACK ROLLER

DRAFT CONSTANT = DRAFT*C.P. where, C.P. = change pinoin

SPACER:-

Spacer adjust distance b/w the top & bottom aprons is adjusted with snap on spacers.

SPACER COLOUR 2.50 Brown 2.75 Dark Grey 3.00 Natural White 3.25 Yellow 3.50 Black 3.75 Cream 4.00 Red 4.50 Green 5.00 Blue 5.50 Grey 6.00 Cream 7.00 Yellow

APRON DIMENSION TABLE :-

Page 61: spinning Training Reprot

TOP APRON BOTTOM APRON

CRADLE

INSIDE DIA.

THICHNESS

WIDTH

INSIDE DIA.

THICHNESS

WIDTH

36 39.2 1.05 29.75 80.5 1.05 30

43 43.3 1.05 29.75 82 1.05 30

59 53.8 1.05 29.75 89 1.05 30

Twist range change gear

Twist change gear (B+A= 165T)

B 76 77 78 79 80

D & C= 137 T

A 89 88 87 86 85

D C TWIST PER METER (TPM)

102 35 2439 2499 2561 2624 2688

98 39 2103 2155 2262 2262 2318

91 46 1656 1696 1738 1781 1825

82 55 1248 1279 1310 1341 1375

72 85 927 950 973 947 1022

65 72 756 774 793 813 800

Break draft change gear :-

Page 62: spinning Training Reprot

BDCP 32 33 34 35 55 56Br.draft 2.09 2.03 1.97 1.91 1.22 1.20BDCP 57 58 59 60 61 62Br.draft 1.17 1.15 1.13 1.11 1.09 1.08

Signal lamps (Tail stock & head stock )=>

RED OFF – M/C normal running/mains off

RED ON - Machine fault or machine off

RED Short flash (1sec)- doff

RED LONG flash (2sec) – emergency off