SPECIAL THANKS TO DAVE LEESTMA & JOEL WALKER 02-07-14 SUSTAINABILITY PARTNERSHIP TEAM NASA JOHNSON SPACE CENTER SPOCC T E A M MEMBERS BASE LEGS COVER 80/20 STEEL HURRICANE WINDS SHADE SOLAR PANEL BACK END MIKE EWERT TERRY TRI KIM REPPA MADDY GRUSECK LINDSAY McDOWALL GEORG BASTA LYNNE BARENDS LINDSEY FOREMAN JAMES HOLT JODY MUNIZ KATHY PACKARD LAURIE PETERSON IVAN RAMIREZ PENNEY STANCH JO AIKEN CARSON STANCH HENRY WYNDON RUBEN ZAVALA JUSTIN CARTIER MIKE WABAUNSEE CARLO BOCATTO

SPOCC to SPT 3-17-14

Embed Size (px)

Citation preview

Page 1: SPOCC to SPT 3-17-14

SPECIAL THANKS TO DAVE LEESTMA & JOEL WALKER

02-07-14

SUSTAINABILITY PARTNERSHIP TEAM

NASA

JOHNSON SPACE CENTER

SPOCC

T E A M

MEMBERS

BASE LEGS

COVER

80/20

STEEL

HURRICANE WINDS

SHADE

SOLAR PANEL

BACK END

MIKE EWERT TERRY TRI KIM REPPA MADDY GRUSECK LINDSAY McDOWALL GEORG BASTA

LYNNE BARENDS LINDSEY FOREMAN JAMES HOLT JODY MUNIZ KATHY PACKARD

LAURIE PETERSON IVAN RAMIREZ PENNEY STANCH JO AIKEN CARSON STANCH

HENRY WYNDON RUBEN ZAVALA JUSTIN CARTIER MIKE WABAUNSEE CARLO BOCATTO

Page 2: SPOCC to SPT 3-17-14

BACKGROUND

• Sustainability Partnership Team project • 21 members have contributed in addition to their

other duties • First suggested as a “Solar Trees” team project

• Conceived in fall 2012 • Evolved into an outdoor meeting space with charging

capability • To promote sustainability, collaboration and

renewable energy at JSC • Future

• May add temporary displays or new technologies • Replicate if successful

Page 3: SPOCC to SPT 3-17-14

PROGRESS

• Worked early concepts & developed conceptual design • Management go-ahead 7/2/13 • Refined design: NASA cupola theme

• Solar Powered Outdoor Collaboration Cupola (SPOCC) 7/22/13

• Built a prototype at the Sandbox 9/’13 – 2/’14 • Selected location 1/‘14 • Developed cost estimate 3/’14

Page 4: SPOCC to SPT 3-17-14

DESIGN

Page 5: SPOCC to SPT 3-17-14

DESIGN

13.2 ft 15.25 ft

7.5 ft

Page 6: SPOCC to SPT 3-17-14

DESIGN

3.17 ft

Page 7: SPOCC to SPT 3-17-14

FUN IN THE SANDBOX

THANK YOU TO

JAMES BROWN,

JUSTIN CARTIER!

Page 8: SPOCC to SPT 3-17-14

PARTIAL PROTOTYPE

Page 9: SPOCC to SPT 3-17-14

SHEET METAL VS FABRIC

• Prototype includes ½ sheet metal & ½ fabric covering frame so that we can compare

• Sheet metal advantages: looks more like space hardware, longer lasting

• Fabric advantages: lower cost if free fabric is available, potentially easier fabrication, but requires sewing

Page 10: SPOCC to SPT 3-17-14

LOCATION

4S

3

Page 11: SPOCC to SPT 3-17-14

BUDGET

ITEM Option 1 Option 2

Concrete Slab/Complete Job $10,000 – 25,000

(PAE) $TBD

Solar Panels $0 $0

Wiring/Misc. Parts $500 $500

Fans/Lighting $1,000 $1,000

Table and Chairs $1,200 Incl.

Data Collector/Display $800 $800

Frame $0 (80/20) Incl.

Brackets $6,000-20,000 N.A.

Design Cost $3,750 $TBD

Cover of Frame Sheet Metal

$2,000

Fabric

$300 w/ freebies

Incl.

Batteries $0 $0

TOTAL $25,250 - $49,250

Page 12: SPOCC to SPT 3-17-14

OTHER CONSIDERATIONS

• Historic preservation • Maintenance – PAE • ADA compliant • Electrical

• Off-grid solar PV with batteries • Various charging ports

• Fan • Lights

Page 13: SPOCC to SPT 3-17-14

RECOMMENDATIONS

• Fund design by PAE for welded steel frame option (TBR) • SPT/SPOCC team continues to develop electrical design

and data display system • Connect to Energy Dashboard

Page 14: SPOCC to SPT 3-17-14

FORWARD WORK PLAN

Submit to Historical

Committee

Finalize Design

Funding Approval

Start Construction on Pad

SPOCC Team Adds Electrical

Collaborate And Enjoy!

Page 15: SPOCC to SPT 3-17-14

THANK YOU

LIVE LONG AND

COLLABORATE

SUSTAINABLY