    Site Picture

    SITE AUDIT REPORT

    Site Name / Site ID

    Lead Engineer

  • 8/10/2019 SQI PM Check List-5679

    2/12

    New/Old Site Macro/Micro

    Environment Equipment

    AZIMUTH AZIMUTH AZIMUTH AZIMUTH

    Antenna OTHER RELEVANT PHOTOS OTHER RELEVANT PHOTOS

    Transmission Power BTS - GSM NodeB - UMTS

    OBSTRUCTION PHOTOS

    Site type Site ID (UMTS)

    City Name

    Area

    PHOTOS

    Structure

    OTHER RELEVANT P

    IMPLEMENTATION REVIEW

    GENERAL INFORMATION

    Date Site Name

    Site ID (900 MHz)

  • 8/10/2019 SQI PM Check List-5679

    3/12

    IMPLEMENTATION REVIEW

    PHOTOS OF FOUND PROBLEMS

  • 8/10/2019 SQI PM Check List-5679

    4/12

    Site ID Site Name Department Category SQI Root Cause

  • 8/10/2019 SQI PM Check List-5679

    5/12

    Description Suggested Rectification

  • 8/10/2019 SQI PM Check List-5679

    6/12

    S/N GF RT IBS Micro Description

    1

    Earthing Pit # 1Provided for "lightening and tower"- Required for grounding of TMA,RF

    feeders,Antenna,MW & cable tray via Bus bars)

    The Roof Top (RT) sites to be connected to the Earth Pit for Lightening Down conductor either p

    by building Landlord or by Etisalat -

    2 Earthing Pit # 2 Provided for "DC earth" - Grounding for Equipments

    3 Earthing Pit # 3 Provided for "DEWA /SEW A/ FEWA/ADDC " - Required for grounding of shelte

    Main DB.

    For RT Sites /IBS /Micro , DC is connected to AC earth.

    4 Earthing Pit # 4 Provided - Required for Generator earth

    5 Mains power cables (DEWA /SEWA/ FEWA/ADDC/Generator) routed properly and protected.

    6 Grounding Bar/Strip Provided inside the room/Shelter

    7 Grounding Bar/Strip Connected to DC/Main Ground

    8 Rectifier installed as per layout

    9 Rectifier installed properly (Fixed / Bolted to floor)

    10 Alarm status in rectifier

    11 +ve bus bar in rectifier is connected to ground

    12 Rectifier body grounded

    13 DC cables from rectifier to DC-DB installed/laid properly

    14 Power cables and switches labeled

    15 Power cables laid and secured properly

    16 Battery rack and batteries installed properly.

    17 Temperature sensor installed on each battery mono block

    18 The locking arrangement for Room /shelter is provided

    FEROZ

    FM12265

    BUILDING

    MICRO

    Site Type

    Cell Type

    Auditor Name

    Auditor Emp. No.

    SQI Check List (Telecom/Non-Teleco

  • 8/10/2019 SQI PM Check List-5679

    7/12

    19 Boundary/fencing provided (exceptions may apply if not approved by Munciplaity)

    20 Generator working properly (Applicable for sites without commercial power & If genara

    21 Grounding provided for Generator

    22 PDB (AC & DC) provided with permanent labeling.

    23 PDB (AC & DC) installed properly & as per the layout

    24 Labeling of grounding cables

    25 No interconnection between bus bars for DC earth, AC earth with Lightening Earth

    26 Intruder alarm installed

    27

    High Temperature alarm installed

    28 Power alarm(s) installed

    29 Fire alarm system installed properly

    ( Items to be checked are panel, smoke detectors, Noozle, cables, pipes, etc) if available

    30 Fire Alarm Extended

    31 Generator alarm extended

    32 Fuel tank alarm installed

    33 Fire extinguishers available at site

    34 Fire system including FM200 pipes grounded to AC earth if available

    35 Gantry/cable tray between antenna and equipment is provided if distance between Mono

    Shelter /Equipment room is more than 2 Metres

    36 External Gantry/cable tray between antenna and equipment connected to lightning earth

    37 Grounding bars provided at Antenna side, every 40-50 meters, & near feeder entry.

    38 Grounding bars in point 37 above are connected to lightening earth.

    39 Lightning finial provided on top of Antenna structure.

    40 Functional Status of Air Conditioner(s)

    41 Extra installation materials related to FMC/PP or PS are removed from the site

    42 Fuel tank grounded

    43 Batteries Connections greasing

  • 8/10/2019 SQI PM Check List-5679

    8/12

    44 ACWL (Outdoor and Indoor unit) installed properly & as per layout

    45 ACWL cable installed and routed properly

    46 ODU installed properly

    47 ODU grounded

    48 ODU provided with permanent labeling

    49 IDU to ODU cables properly fixed

    50 IDU Provided with Labeling (Site Name and Site ID)

    51 IDU to ODU cables provided with permanent labeling

    52 IDU/ODU connectors tightened properly

    53 Rack(s)/IDU installed at specified position

    54 Rack(s)/IDU secured i.e. fixed properly and bolted to floor / wall as required

    55 Rack(s)/IDU grounded & labeled

    56 IDU power cables properly routed

    57 IDU power cables provided with permanent labeling

    58 No active alarms on the link

    59 E1/Ethernet & FO cables routed properly as applicable depending on site

    60 DDF Modules for site working with radio is Installed properly

    61 DDF E1 directory provided (Labels of circuit designation details)

    62 Physical condition of E1/Ethernet & FO cable

    63 Extra installation materials related to RTN are removed from the site

    64 RF, BNC, PG-43, RJ-45 connectors etc. made/crimped properly using proper tools.

    65 Extra installation materials related to CS are removed from the site

    66 Indoor Fiber Properly terminated "Applicable for equipment Within the building"

    67 Indoor Fiber neatly routed & Protected "Applicable for equipment Within the building"

    68 ODF for indoor fiber properly installed "Applicable for equipment Within the building"

  • 8/10/2019 SQI PM Check List-5679

    9/12

    69 Labeling of indoor fiber "Applicable for equipment Within the building"

    70 I/D copper DP for copper is Installed properly ."Applicable for equipment Within the bui

    71 DDF Modules for site working with Fiber is installed properly

    72 Fiber Properly terminated

    73 Fiber neatly routed & Protected

    74 Labeling of fiber

    75 ODF and Fiber installed as per layout

    76 O/D copper DP for site working with copper is Installed properly

    77 Extra installation materials related to OSP are removed from the site

    78 MODEM installed properly & Protected (Should not be exposed to outdoor environmen

    79 MODEM free of alarms

    80 MODEM power cable routed and terminated properly

    81 E1/Ethernet & FO cables routed properly

    82 DDF E1 directory provided (Labels of circuit designation details)

    83 Physical condition of E1/Ethernet & FO cables

    84 Extra installation materials related to ISN are removed from the site

    85 BNC, PG-43, RJ-45 connectors etc. made/crimped properly using proper tools.

    86 Internal jumpers properly routed and permanent labeling both sides.

    87 RF, BNC, PG-43, RJ-45 connectors etc. made/crimped properly using proper tools.

    88 Installation of Combiner / splitter

    89 RF connectors (inside equipment & RF jumpers both sides) tightened correctly.

    90 Cabinets installed properly & as per layout/survey report?

    91 Cabinets fixed properly to f loor/base.

    92 BTS physical condition. (Cabinet Door locks properly, No damages)

    93 BTS grounded and connected to grounding Bar properly.

    94 Power cables "DC/AC" to P-DB routed properly.

    95 Power cables provided with permanent and correct labeling in both sides.

    96 All required alarms terminated and routed properly to DF (Distribution Frame).

    97 All required alarms have correct & permanent labels at DF?

    98 BTS internal cables routed and proper connectors used.

    99 All modules inside BTS are properly installed including dummy covers.(As per Vendor spec

    requirement applicable to Ericsson)

  • 8/10/2019 SQI PM Check List-5679

    10/12

    BSS-PM GENERAL INFORMATION Mobile Access Operations

    E N

    OK

    OK

    SERVICES:

    Others:

    COMMENTS/RECOMMENDATION:

    Antenna Type JEYBEAM

    TMA Type

    RF Feeder Type 1/2"

    Antenna Details

    Items 2G 3G 4G Remarks

    1 A9110-DB5E 2G 2 1 AC ALCATEL

    MS Equipment Details

    Sector/

    Cab #EQUIPMENT TYPE

    SERVICE

    TYPECONFIG No of Cab

    Power Type

    [AC/DC]VENDOR REMARKS

    NO

    Generator Customer Remarks:

    Solar Du

    Base load Gen. Contractor

    Power Details

    Power Source Ownership Yes/NoNO

    Commercial Etisalat Standby Gen Set

    3G

    4G

    Others

    FO Status/ Details NOT READY

    TXM/ Backhaul Details

    Service Link Type Power Type Remarks

    2G SHDSL

    INSTALLATION TYPE: INDOOR COORDINATES: 24.40439 54.450417

    LOCATION: ROOFTOP LIFT ROOM Site Sharing Lead Operator

    Site Antenna [DAS]

    SITE ID: AUH5679 SITE NAME: SH SULTHAN NEW PALACE PVT (MAIN) VILLA

    REGION: AUH STRUCTURE TYPE: BUILDING

    ZONE: AUH STRUCTURE HT:

    SITE TYPE: BUILDING ACCOMMODATION TYPE LIFT ROOM

    SERVICES:Others:

    2G - GSM 3G - UMTS 4G - LTE

    2G - GSM 3G - UMTS 4G - LTE

    STAFF NAME: FEROZ SIGNATURE: ................................DATE: 22.12.2014

  • 8/10/2019 SQI PM Check List-5679

    11/12

    BSS-PM GENERAL INFORMATION Mobile Access Operations

    2

    #

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    Remarks

    SHDSL

    Margin dB

    REMARKS:

    L2

    Errors

    HDSL/SHDSL LNE TEST L1

    RX POWER LEVEL (dBm)

    Attenuation

    Account #

    GPON Power Type

    AGC Level (dBm)/ Rx1 & Rx2

    EID

    Tx Power in dBm

    GPON SYSTEM ROUTINE CHECK

    Radio configuration

    Defined Used Alarm Name [Optional] Tx frequency in Mhz

    Rx frequency in Mhz

    STA - A STA - B

    M SB M SB

    Link Id

    Radio Type/ Capacity

    RADIO SYSTEM ROUTINE CHECK

    TESTS

    EXTERNAL ALARM AVAILABILITY & CONNECTIVITYTo be performed without Outage - Online

    EXT. ALARM DP/DF EXTERNAL ALARMS

    Ant.6 Ant.7 Ant.8 REMARKS

    VSWR MEASUREMENT BY LMT/OMT AS APPLICABLE FOR 2G & 3G

    Cab # System Ant.1 Ant.2 Ant.3 Ant.4 Ant.5

    Outdoor Cabinet Additional Cleaning

    Remarks:

    Site/Shelter Additional Cleaning

    6

    5

    4

    1 BTS DB5E 2G OK OK OK

    N/A

    3

    OKNOT

    OKN/A OK

    NOT

    OKN/AOK

    NOT

    OK

    MS & TXM EQUIPMENT MAINTENANCE

    GENERAL

    Sr #

    Equipment Type

    BTS/ Node B/ GPON/RADIO/ Etc.

    CABINET TYPE /

    MODEL:

    SERVICE

    TYPEVISUAL INSPECTION CLEANING

    FILTER CHANGE/

    CLEANED

    2G/ 3G/

    TXM

    SITE ID: AUH 5679 SITE NAME: SH SULTHAN NEW PALACE

    REGION: AUH ZONE: AUH

    Extended

    Not Extended

    Not Applicable

    Connected to 2G

    Connected to 3GNot Connected

    Not Applicable

    Checked Not Applicable

    Checked Not Applicable

    Checked Not Applicable

    Required Not RequiredRequired Not Required

    STAFF NAME: FEROZ SIGNATURE: ......... ......... .......... ....DATE: 22.12.2014

  • 8/10/2019 SQI PM Check List-5679

    12/12

    BSS-PM GENERAL INFORMATION Mobile Access Operations

    .

    STAFF NAME FEROZ SIGNATURE DATE 22 12 2014