SITE AUDIT REPORT
Site Name / Site ID
Lead Engineer
8/10/2019 SQI PM Check List-5679
2/12
New/Old Site Macro/Micro
Environment Equipment
AZIMUTH AZIMUTH AZIMUTH AZIMUTH
Antenna OTHER RELEVANT PHOTOS OTHER RELEVANT PHOTOS
Transmission Power BTS - GSM NodeB - UMTS
OBSTRUCTION PHOTOS
Site type Site ID (UMTS)
City Name
Area
PHOTOS
Structure
OTHER RELEVANT P
IMPLEMENTATION REVIEW
GENERAL INFORMATION
Date Site Name
Site ID (900 MHz)
8/10/2019 SQI PM Check List-5679
3/12
IMPLEMENTATION REVIEW
PHOTOS OF FOUND PROBLEMS
8/10/2019 SQI PM Check List-5679
4/12
Site ID Site Name Department Category SQI Root Cause
8/10/2019 SQI PM Check List-5679
5/12
Description Suggested Rectification
8/10/2019 SQI PM Check List-5679
6/12
S/N GF RT IBS Micro Description
1
Earthing Pit # 1Provided for "lightening and tower"- Required for grounding of TMA,RF
feeders,Antenna,MW & cable tray via Bus bars)
The Roof Top (RT) sites to be connected to the Earth Pit for Lightening Down conductor either p
by building Landlord or by Etisalat -
2 Earthing Pit # 2 Provided for "DC earth" - Grounding for Equipments
3 Earthing Pit # 3 Provided for "DEWA /SEW A/ FEWA/ADDC " - Required for grounding of shelte
Main DB.
For RT Sites /IBS /Micro , DC is connected to AC earth.
4 Earthing Pit # 4 Provided - Required for Generator earth
5 Mains power cables (DEWA /SEWA/ FEWA/ADDC/Generator) routed properly and protected.
6 Grounding Bar/Strip Provided inside the room/Shelter
7 Grounding Bar/Strip Connected to DC/Main Ground
8 Rectifier installed as per layout
9 Rectifier installed properly (Fixed / Bolted to floor)
10 Alarm status in rectifier
11 +ve bus bar in rectifier is connected to ground
12 Rectifier body grounded
13 DC cables from rectifier to DC-DB installed/laid properly
14 Power cables and switches labeled
15 Power cables laid and secured properly
16 Battery rack and batteries installed properly.
17 Temperature sensor installed on each battery mono block
18 The locking arrangement for Room /shelter is provided
FEROZ
FM12265
BUILDING
MICRO
Site Type
Cell Type
Auditor Name
Auditor Emp. No.
SQI Check List (Telecom/Non-Teleco
8/10/2019 SQI PM Check List-5679
7/12
19 Boundary/fencing provided (exceptions may apply if not approved by Munciplaity)
20 Generator working properly (Applicable for sites without commercial power & If genara
21 Grounding provided for Generator
22 PDB (AC & DC) provided with permanent labeling.
23 PDB (AC & DC) installed properly & as per the layout
24 Labeling of grounding cables
25 No interconnection between bus bars for DC earth, AC earth with Lightening Earth
26 Intruder alarm installed
27
High Temperature alarm installed
28 Power alarm(s) installed
29 Fire alarm system installed properly
( Items to be checked are panel, smoke detectors, Noozle, cables, pipes, etc) if available
30 Fire Alarm Extended
31 Generator alarm extended
32 Fuel tank alarm installed
33 Fire extinguishers available at site
34 Fire system including FM200 pipes grounded to AC earth if available
35 Gantry/cable tray between antenna and equipment is provided if distance between Mono
Shelter /Equipment room is more than 2 Metres
36 External Gantry/cable tray between antenna and equipment connected to lightning earth
37 Grounding bars provided at Antenna side, every 40-50 meters, & near feeder entry.
38 Grounding bars in point 37 above are connected to lightening earth.
39 Lightning finial provided on top of Antenna structure.
40 Functional Status of Air Conditioner(s)
41 Extra installation materials related to FMC/PP or PS are removed from the site
42 Fuel tank grounded
43 Batteries Connections greasing
8/10/2019 SQI PM Check List-5679
8/12
44 ACWL (Outdoor and Indoor unit) installed properly & as per layout
45 ACWL cable installed and routed properly
46 ODU installed properly
47 ODU grounded
48 ODU provided with permanent labeling
49 IDU to ODU cables properly fixed
50 IDU Provided with Labeling (Site Name and Site ID)
51 IDU to ODU cables provided with permanent labeling
52 IDU/ODU connectors tightened properly
53 Rack(s)/IDU installed at specified position
54 Rack(s)/IDU secured i.e. fixed properly and bolted to floor / wall as required
55 Rack(s)/IDU grounded & labeled
56 IDU power cables properly routed
57 IDU power cables provided with permanent labeling
58 No active alarms on the link
59 E1/Ethernet & FO cables routed properly as applicable depending on site
60 DDF Modules for site working with radio is Installed properly
61 DDF E1 directory provided (Labels of circuit designation details)
62 Physical condition of E1/Ethernet & FO cable
63 Extra installation materials related to RTN are removed from the site
64 RF, BNC, PG-43, RJ-45 connectors etc. made/crimped properly using proper tools.
65 Extra installation materials related to CS are removed from the site
66 Indoor Fiber Properly terminated "Applicable for equipment Within the building"
67 Indoor Fiber neatly routed & Protected "Applicable for equipment Within the building"
68 ODF for indoor fiber properly installed "Applicable for equipment Within the building"
8/10/2019 SQI PM Check List-5679
9/12
69 Labeling of indoor fiber "Applicable for equipment Within the building"
70 I/D copper DP for copper is Installed properly ."Applicable for equipment Within the bui
71 DDF Modules for site working with Fiber is installed properly
72 Fiber Properly terminated
73 Fiber neatly routed & Protected
74 Labeling of fiber
75 ODF and Fiber installed as per layout
76 O/D copper DP for site working with copper is Installed properly
77 Extra installation materials related to OSP are removed from the site
78 MODEM installed properly & Protected (Should not be exposed to outdoor environmen
79 MODEM free of alarms
80 MODEM power cable routed and terminated properly
81 E1/Ethernet & FO cables routed properly
82 DDF E1 directory provided (Labels of circuit designation details)
83 Physical condition of E1/Ethernet & FO cables
84 Extra installation materials related to ISN are removed from the site
85 BNC, PG-43, RJ-45 connectors etc. made/crimped properly using proper tools.
86 Internal jumpers properly routed and permanent labeling both sides.
87 RF, BNC, PG-43, RJ-45 connectors etc. made/crimped properly using proper tools.
88 Installation of Combiner / splitter
89 RF connectors (inside equipment & RF jumpers both sides) tightened correctly.
90 Cabinets installed properly & as per layout/survey report?
91 Cabinets fixed properly to f loor/base.
92 BTS physical condition. (Cabinet Door locks properly, No damages)
93 BTS grounded and connected to grounding Bar properly.
94 Power cables "DC/AC" to P-DB routed properly.
95 Power cables provided with permanent and correct labeling in both sides.
96 All required alarms terminated and routed properly to DF (Distribution Frame).
97 All required alarms have correct & permanent labels at DF?
98 BTS internal cables routed and proper connectors used.
99 All modules inside BTS are properly installed including dummy covers.(As per Vendor spec
requirement applicable to Ericsson)
8/10/2019 SQI PM Check List-5679
10/12
BSS-PM GENERAL INFORMATION Mobile Access Operations
E N
OK
OK
SERVICES:
Others:
COMMENTS/RECOMMENDATION:
Antenna Type JEYBEAM
TMA Type
RF Feeder Type 1/2"
Antenna Details
Items 2G 3G 4G Remarks
1 A9110-DB5E 2G 2 1 AC ALCATEL
MS Equipment Details
Sector/
Cab #EQUIPMENT TYPE
SERVICE
TYPECONFIG No of Cab
Power Type
[AC/DC]VENDOR REMARKS
NO
Generator Customer Remarks:
Solar Du
Base load Gen. Contractor
Power Details
Power Source Ownership Yes/NoNO
Commercial Etisalat Standby Gen Set
3G
4G
Others
FO Status/ Details NOT READY
TXM/ Backhaul Details
Service Link Type Power Type Remarks
2G SHDSL
INSTALLATION TYPE: INDOOR COORDINATES: 24.40439 54.450417
LOCATION: ROOFTOP LIFT ROOM Site Sharing Lead Operator
Site Antenna [DAS]
SITE ID: AUH5679 SITE NAME: SH SULTHAN NEW PALACE PVT (MAIN) VILLA
REGION: AUH STRUCTURE TYPE: BUILDING
ZONE: AUH STRUCTURE HT:
SITE TYPE: BUILDING ACCOMMODATION TYPE LIFT ROOM
SERVICES:Others:
2G - GSM 3G - UMTS 4G - LTE
2G - GSM 3G - UMTS 4G - LTE
STAFF NAME: FEROZ SIGNATURE: ................................DATE: 22.12.2014
8/10/2019 SQI PM Check List-5679
11/12
BSS-PM GENERAL INFORMATION Mobile Access Operations
2
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Remarks
SHDSL
Margin dB
REMARKS:
L2
Errors
HDSL/SHDSL LNE TEST L1
RX POWER LEVEL (dBm)
Attenuation
Account #
GPON Power Type
AGC Level (dBm)/ Rx1 & Rx2
EID
Tx Power in dBm
GPON SYSTEM ROUTINE CHECK
Radio configuration
Defined Used Alarm Name [Optional] Tx frequency in Mhz
Rx frequency in Mhz
STA - A STA - B
M SB M SB
Link Id
Radio Type/ Capacity
RADIO SYSTEM ROUTINE CHECK
TESTS
EXTERNAL ALARM AVAILABILITY & CONNECTIVITYTo be performed without Outage - Online
EXT. ALARM DP/DF EXTERNAL ALARMS
Ant.6 Ant.7 Ant.8 REMARKS
VSWR MEASUREMENT BY LMT/OMT AS APPLICABLE FOR 2G & 3G
Cab # System Ant.1 Ant.2 Ant.3 Ant.4 Ant.5
Outdoor Cabinet Additional Cleaning
Remarks:
Site/Shelter Additional Cleaning
6
5
4
1 BTS DB5E 2G OK OK OK
N/A
3
OKNOT
OKN/A OK
NOT
OKN/AOK
NOT
OK
MS & TXM EQUIPMENT MAINTENANCE
GENERAL
Sr #
Equipment Type
BTS/ Node B/ GPON/RADIO/ Etc.
CABINET TYPE /
MODEL:
SERVICE
TYPEVISUAL INSPECTION CLEANING
FILTER CHANGE/
CLEANED
2G/ 3G/
TXM
SITE ID: AUH 5679 SITE NAME: SH SULTHAN NEW PALACE
REGION: AUH ZONE: AUH
Extended
Not Extended
Not Applicable
Connected to 2G
Connected to 3GNot Connected
Not Applicable
Checked Not Applicable
Checked Not Applicable
Checked Not Applicable
Required Not RequiredRequired Not Required
STAFF NAME: FEROZ SIGNATURE: ......... ......... .......... ....DATE: 22.12.2014
8/10/2019 SQI PM Check List-5679
12/12
BSS-PM GENERAL INFORMATION Mobile Access Operations
.
STAFF NAME FEROZ SIGNATURE DATE 22 12 2014