SRLDC 1
POWER SYSTEM OPERATION
A FRESH PERSPECTIVE
Power Grid Corporation of India LimitedNew Delhi, India
SRLDC 2
SYSTEM EVOLUTIONSYSTEM EVOLUTION LIKE ALL MAJOR POWER SYSTEMS, THE LIKE ALL MAJOR POWER SYSTEMS, THE
INDIAN POWER SYSTEM EVOLVED BY INDIAN POWER SYSTEM EVOLVED BY INTEGRATING SMALL ISOLATED SYSTEMSINTEGRATING SMALL ISOLATED SYSTEMS
PRESENTLY, THREE MAJOR GRIDS ARE IN PRESENTLY, THREE MAJOR GRIDS ARE IN OPERATION – CONNECTED OPERATION – CONNECTED ASYNCHRONOUSLY – MEETING A DEMAND ASYNCHRONOUSLY – MEETING A DEMAND OF OVER 85000 MWOF OVER 85000 MW
OUR TARGET – A NATIONAL GRID BY 2010OUR TARGET – A NATIONAL GRID BY 2010
SRLDC 3
LOOKING BACKLOOKING BACKWHAT WAS WRONGWHAT WAS WRONG
FREQUENT GRID DISTURBANCES / FREQUENT GRID DISTURBANCES / BLACKOUTSBLACKOUTS
WIDE FREQUENCY/VOLTAGE EXCURSIONSWIDE FREQUENCY/VOLTAGE EXCURSIONS TRANSMISSION BOTTLENECKSTRANSMISSION BOTTLENECKS SUB-OPTIMAL OPERATIONSUB-OPTIMAL OPERATION STRESSED EQUIPMENTS AND OPERATORSSTRESSED EQUIPMENTS AND OPERATORS
SRLDC 4
LOOKING BACKLOOKING BACKWHAT WENT RIGHTWHAT WENT RIGHT
POWERGRID DECLARED POWERGRID DECLARED CTUCTU (CENTRAL TRANSMISSION UTILITY).(CENTRAL TRANSMISSION UTILITY).
VESTED WITH TASK OF SYSTEM VESTED WITH TASK OF SYSTEM OPERATION.OPERATION.
LOAD DISPATCH CENTRES GIVEN ‘LOAD DISPATCH CENTRES GIVEN ‘APEXAPEX’ ’ STATUS.STATUS.
SYSTEM AUGMENTATION WORKS SYSTEM AUGMENTATION WORKS STARTED WITH RIGHT EARNESTSTARTED WITH RIGHT EARNEST
A SCIENTIFIC BULK POWER TARIFF AND A SCIENTIFIC BULK POWER TARIFF AND SETTLEMENT MECHANISM PUT IN PLACESETTLEMENT MECHANISM PUT IN PLACE
A GRID CODE WAS ENFORCEDA GRID CODE WAS ENFORCED
SRLDC 5
RELIABILITY FOCUSRELIABILITY FOCUS
RELIABLE POWER SYSTEM IS THE RELIABLE POWER SYSTEM IS THE BACKBONE OF A DEVELOPING BACKBONE OF A DEVELOPING ECONOMYECONOMY
SYNERGISE POLICIES AND SYNERGISE POLICIES AND DECISIONS TO PROMOTE DECISIONS TO PROMOTE RELIABILITYRELIABILITY
SRLDC 6
STRATEGIES FOR STRATEGIES FOR RELIABILITYRELIABILITY
ROBUST TRANSMISSION PLANNING ROBUST TRANSMISSION PLANNING AND INVESTMENT FRAMEWORKAND INVESTMENT FRAMEWORK
SYSTEM AUGMENTED EXCLUSIVELY SYSTEM AUGMENTED EXCLUSIVELY FOR RELIABILITY AND STABILITYFOR RELIABILITY AND STABILITY
AGGRESSIVE CONSTRUCTION AGGRESSIVE CONSTRUCTION SCHEDULESSCHEDULES
SCHEDULING AND SETTLEMENT SCHEDULING AND SETTLEMENT MECHANISM COMPLEMENTS GRID MECHANISM COMPLEMENTS GRID SECURITY.SECURITY.
SRLDC 7
STRATEGIES FOR STRATEGIES FOR RELIABILITYRELIABILITY
GRID CONTROL CENTERS GRID CONTROL CENTERS MANNED BY SPECIALISED MANNED BY SPECIALISED SENIOR PERSONNELSENIOR PERSONNEL TRAINED IN ALL ASPECTS TRAINED IN ALL ASPECTS
(TECHNICAL , MANAGEMENT AND (TECHNICAL , MANAGEMENT AND COMMUNICATION SKILLS)COMMUNICATION SKILLS)
EMPOWERED FOR EXIGENCIESEMPOWERED FOR EXIGENCIES LOOSE POWER POOL LOOSE POWER POOL
PHILOSOPHYPHILOSOPHY FLEXIBILITY IN OPERATIONFLEXIBILITY IN OPERATION
SRLDC 8
OPERATING IN OPERATING IN THE REAL TIMETHE REAL TIME
SRLDC 9
REAL TIME OPERATIONREAL TIME OPERATION SIMPLE, BUT EFFECTIVE TOOLS SIMPLE, BUT EFFECTIVE TOOLS HOLISTIC APPROACH RATHER HOLISTIC APPROACH RATHER
THAN RELYING ONLY ON THAN RELYING ONLY ON ELABORATE CODIFIED ELABORATE CODIFIED PROCEDURESPROCEDURES
CO-OPERATIVE CULTURECO-OPERATIVE CULTURE
SRLDC 10
REAL TIME OPERATIONREAL TIME OPERATION
IEGC ABT
REAL TIME OPERATION
REAL TIME OPERATION STANDS ON TWO REAL TIME OPERATION STANDS ON TWO FIRM FOOTINGSFIRM FOOTINGS IEGC – THE INDIAN ELECTRICITY GRID CODEIEGC – THE INDIAN ELECTRICITY GRID CODE ABT – AVAILABILITY BASED TARIFFABT – AVAILABILITY BASED TARIFF
SRLDC 11
INDIAN ELECTRICITY GRID CODE INDIAN ELECTRICITY GRID CODE (IEGC)(IEGC)
SIMPLE, COMPREHENSIVE AND SIMPLE, COMPREHENSIVE AND EFFECTIVE EFFECTIVE
JUST ABOUT 50 PAGESJUST ABOUT 50 PAGES DYNAMIC DOCUMENTDYNAMIC DOCUMENT ADAPTIVE TO GRID ADAPTIVE TO GRID
REQUIREMENTSREQUIREMENTS CLARITY IN ROLES OF STAKE CLARITY IN ROLES OF STAKE
HOLDERSHOLDERS
SRLDC 12
IEGC ENCOMPASSES…..IEGC ENCOMPASSES…..
Role of Stakeholders, statutory bodies Role of Stakeholders, statutory bodies and their Organisational linkages and their Organisational linkages
Planning Code for Inter State Planning Code for Inter State TransmissionTransmission
Connection Conditions Connection Conditions Operating Code for Regional Grids Operating Code for Regional Grids Scheduling and Despatch CodeScheduling and Despatch Code Management of Indian Electricity Grid Management of Indian Electricity Grid
Code Code
SRLDC 13
AVAILABILITY AVAILABILITY BASED TARIFFBASED TARIFF
SRLDC 14
AVAILABILITY BASED AVAILABILITY BASED TARIFFTARIFF
A RATIONAL TARIFF STRUCTUREA RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEMSCIENTIFIC SETTLEMENT SYSTEM COMPLEMENTS GRID RELIABILITYCOMPLEMENTS GRID RELIABILITY ENCOURAGE THOSE WHO HELP THE ENCOURAGE THOSE WHO HELP THE
GRID AND DISCOURAGE THOSE WHO GRID AND DISCOURAGE THOSE WHO UNDERMINE RELIABILITYUNDERMINE RELIABILITY
SIMPLE AND EFFECTIVESIMPLE AND EFFECTIVEIMPLEMENTED SUCCESSFULLY IN INDIAIMPLEMENTED SUCCESSFULLY IN INDIA
SRLDC 15
WHAT IS AVAILABILITY WHAT IS AVAILABILITY TARIFF?TARIFF?
FIXED COST FIXED COST αα PLANT AVAILABILITY. PLANT AVAILABILITY. VARIABLE COST VARIABLE COST αα SCHEDULED SCHEDULED
GENERATIONGENERATION DEVIATIONS :- UNSCHEDULED DEVIATIONS :- UNSCHEDULED
INTERCHANGE(UI), ATTRACT A FREQUENCY INTERCHANGE(UI), ATTRACT A FREQUENCY LINKED CHARGE.LINKED CHARGE.
SRLDC 16
FREQUENCY vs UI PRICE
0
28
56
84
112
140
168
196
224
252
280
308
336
364
392
420
448
51
50.9
50.8
50.7
50.6
50.5
50.4
50.3
50.2
50.1 50
49.9
49.8
49.7
49.6
49.5
49.4
49.3
49.2
49.1 49
48.9
48.8
48.7
48.6
48.5
FREQUENCY
PAIS
E/UN
IT
49 HZ
50.5 HZ
49.5 HZ
50 HZ
49.5 HZ CORRESPONDS TO RS.2.80
UI PRICE AND UI PRICE AND FREQUENCYFREQUENCY
SRLDC 17
THE POWER OF UITHE POWER OF UI LINKED TO FREQUENCY – LINKED TO FREQUENCY –
COLLECTIVELY CONTROLLED , DEMOCRATICALLY STABILISEDCOLLECTIVELY CONTROLLED , DEMOCRATICALLY STABILISED KNOWN ONLINE TO ALL – TRANSPARENCYKNOWN ONLINE TO ALL – TRANSPARENCY
A ‘A ‘WIN-WINWIN-WIN’ PLATFORM’ PLATFORM SELF-HEALING PROPERTYSELF-HEALING PROPERTY SIMPLE – SIMPLE – NO ELABORATE CALCULATION REQUIREDNO ELABORATE CALCULATION REQUIRED
NO FEAR OF PRICE RIGGINGNO FEAR OF PRICE RIGGING NO NEED FOR NEGOTIATINGNO NEED FOR NEGOTIATING PROMOTES DISCIPLINEPROMOTES DISCIPLINE STRONG NASH EQUILIBRIUMSTRONG NASH EQUILIBRIUM DOVETAILS WITH THE LOOSE POWER DOVETAILS WITH THE LOOSE POWER
POOL PHILOSOPHYPOOL PHILOSOPHY PLATFORM FOR A PLATFORM FOR A POWER MARKETPOWER MARKET
SRLDC 18
THE POWER OF UITHE POWER OF UI
UI VECTOR SENDS THE SIGNALS UI VECTOR SENDS THE SIGNALS FORFOR OPTIMISATION IN THE CONTROL AREAOPTIMISATION IN THE CONTROL AREA REALISTIC LOAD-GENERATION REALISTIC LOAD-GENERATION
PLANNINGPLANNING TRADE , BILATERALS AND CONTRACTSTRADE , BILATERALS AND CONTRACTS
INDIAN EQUIVALENT OF THE SPOT AND INDIAN EQUIVALENT OF THE SPOT AND BALANCING MARKETBALANCING MARKET
SRLDC 19
POWER SYSTEM POWER SYSTEM RESTORATIONRESTORATION
PHILOSOPHY PHILOSOPHY
AND AND
STRATEGIESSTRATEGIES
SRLDC 20
……IF SOMETHING CAN GO WRONG, IT IF SOMETHING CAN GO WRONG, IT WILL!WILL!
MEN EQUIPMENT
PROCEDURE
PREPAREDNESS OF THE THREE VITAL PREPAREDNESS OF THE THREE VITAL ELEMENTS ARE THE KEY FOR ELEMENTS ARE THE KEY FOR SUCCESSFUL RESTORATIONSUCCESSFUL RESTORATION
SRLDC 21
RESTORATION RESTORATION PHILOSOPHYPHILOSOPHY
EMPOWEREMENT OF SYSTEM OPERATORSEMPOWEREMENT OF SYSTEM OPERATORS SYNERGISTIC CONFLUENCE OF SYNERGISTIC CONFLUENCE OF
PROCEDURES AND OPERATOR JUDGEMENTPROCEDURES AND OPERATOR JUDGEMENT PERIODIC REVIEWPERIODIC REVIEW MOCK DRILLSMOCK DRILLS ‘‘COMMANDO’ FORCECOMMANDO’ FORCE RIGHT PERSON AT THE RIGHT PLACERIGHT PERSON AT THE RIGHT PLACE HOLISTIC APPROACHHOLISTIC APPROACH
SRLDC 22
PITFALLS TO AVOIDPITFALLS TO AVOID
FOCUS ON FOCUS ON PROCESSPROCESS RATHER THAN RATHER THAN THE THE GOALGOAL
PERVASIVE AUTOMATIONPERVASIVE AUTOMATION COMMERCIAL TRANSACTIONS COMMERCIAL TRANSACTIONS
OVER-RIDING RELIABILITY ISSUESOVER-RIDING RELIABILITY ISSUES TIGHT CONTROL OF PARAMETERSTIGHT CONTROL OF PARAMETERS COMPLEX CONTROL HIERARCHYCOMPLEX CONTROL HIERARCHY
EVERYONE IS CONNECTED – EVERYONE IS CONNECTED – …………………..NO ONE IS IN …………………..NO ONE IS IN
CONTROLCONTROL
SRLDC 23