Bank Operations Project

System Project Management Plan

Version: SPMP 1.1

Prepared by

Team #20

Sheldox Team

Mazhar Isık– Cagri Diken – Mehmet Kocak

October 21th, 2009

Page 2: SRS for Bank Proj

BANK OPERATIONS

Preface

This project plan document is designed for

Supervisor – to control team members and their works which is suitable for the

protection or not.

Customer – to explain a project detail and wants something about the project.

Team members – choose the best solution and complete the expected

product.

It covers a summary about the project that includes purpose, scope and objectives,

assumptions and constraints of the project. Deliverables are identified. Add them up,

schedule and budget summary is identified.

Assigning roles and responsibilities to team members are defined in this report. Software

Project Managerial process plans are applied for the estimation, stuffing, resource

allocation, quality control and risk management.

Atılım University

COMPE 491-492

2/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 3: SRS for Bank Proj

BANK OPERATIONS

Version History

Version Status* Date Responsible Version Definition

1 Released 22.08.2009 Cagri Diken, Sadık Mazhar Isık, Mehmet Kocak

Baseline Version of SPMP

2 In Change 22.11.2009 ……. ……

*: Draft, In Review, Released, Approved, Rejected, In Change

Atılım University

COMPE 491-492

3/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 4: SRS for Bank Proj

BANK OPERATIONS

List of Tables

Table 1: Product Function I/O Summary

Table 2: Function Point Metrics

Table 3: Complex Adjustment Values

Table 4: Project Work Activity

Table 5: Resource Allocation for Work Activity

Table 6: Resource Allocation for Customer Meeting

Table 7: Resource Allocation for Preparing SPMP

Table 8: Resource Allocation for Preparing SRS

Table 9: Resource Allocation for Preparing SDD

Table 10: Resource Allocation for Preparing STD

Table 11: Resource Allocation for Coding

Table 12: Resource Allocation for Testing

Table 13: Resource Allocation for Preparing User Manual

Table 14: Resource Allocation for Deployment

Table 15: Schedule and Budget Allocation for Customer Meeting

Table 16: Schedule and Budget Allocation for Preparing SPMP

Table 17: Schedule and Budget Allocation for Preparing SRS

Table 18: Schedule and Budget Allocation for Preparing SDD

Table 19: Schedule and Budget Allocation for Preparing STD

Atılım University

COMPE 491-492

4/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 5: SRS for Bank Proj

BANK OPERATIONS

Table 20: Schedule and Budget Allocation for Coding

Table 21: Schedule and Budget Allocation for Testing

Table 22: Schedule and Budget Allocation for User Manuel

Table 23: Schedule and Budget Allocation for Deployment

Atılım University

COMPE 491-492

5/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 6: SRS for Bank Proj

BANK OPERATIONS

Table of Contents

PREFACE............................................................................................................................2

LIST OF TABLES................................................................................................................4

TABLE OF CONTENTS.......................................................................................................6

1. OVERVIEW................................................................................................................8

1.1. Project Summary.....................................................................................................81.1.1. Purpose, Scope, and Objectives......................................................................81.1.2. Assumptions and Constraints...........................................................................81.1.3. Project Deliverables..........................................................................................91.1.4. Schedule and Budget Summary.....................................................................10

1.2. Evolution of the SPMP..........................................................................................10

2. REFERENCE MATERIALS.....................................................................................12

3. DEFINITIONS, ACRONYMS, AND ABBREVIATIONS...........................................13

4. PROJECT ORGANIZATION....................................................................................14

4.1. External Interfaces................................................................................................144.2. Internal Structure...................................................................................................144.3. Project Responsibilities.........................................................................................14

5. MANAGERIAL PROCESS PLANS.........................................................................16

5.1. Start-up Plan.........................................................................................................165.1.1. Estimation Plan...............................................................................................165.1.2. Resource Acquisition Plan..............................................................................205.1.3. Project Staff Training Plan..............................................................................20

5.2. Work Plan..............................................................................................................205.2.1. Work Activities................................................................................................205.2.2. Schedule Allocation........................................................................................235.2.3. Resource Allocation........................................................................................245.2.4. Budget Allocation............................................................................................29

5.3. Control Plan..........................................................................................................345.3.1. Requirements Control Plan............................................................................345.3.2. Schedule Control Plan....................................................................................345.3.3. Quality Control Plan........................................................................................345.3.4. Reporting Plan................................................................................................355.3.5. Metrics Collection Plan...................................................................................35

5.4. Risk Management Plan.........................................................................................35

6. TECHNICAL PROCESS PLANS.............................................................................38

6.1. Process Model......................................................................................................386.2. Methods, Tools, and Techniques..........................................................................386.3. Infrastructure Plan.................................................................................................386.4. Product Acceptance Plan......................................................................................39

7. TECHNİCAL PROCESS PLANS.............................................................................40

7.1. Configuration Management Plan...........................................................................407.2. Quality Assurance Plan.........................................................................................407.3. Documentation Plan..............................................................................................40

Atılım University

COMPE 491-492

6/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 7: SRS for Bank Proj

BANK OPERATIONS

7.4. Deployment Plan...................................................................................................407.5. Review Plan..........................................................................................................40

Appendices.........................................................................................................................41

Atılım University

COMPE 491-492

7/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 8: SRS for Bank Proj

BANK OPERATIONS

1. Overview

1.1. Project Summary

1.1.1. Purpose, Scope, and Objectives

1.1.1.1 PurposeThe aim of our senior project which is Bank Operations is to design and develop a

software and network system. It provides easy communication between center and

all of the bank agency offices.

1.1.2 Scope

The scope of our project is serving fast service for the bank customers. Add them

up, fast connection between center and all bank offices. If a problem occurs in the

system, all of the bank agency offices will not be affected, because every 5

minutes the system takes backup automatically.

In addition, our network connected from center to the bank agency offices. We

create a special line for this bank system.

As a result, customer takes faster services, and bank employees making

operations in easy user interface.

1.1.2.1 Objectives

When project will finish, our system will be capable of followings;

Bank operator’s will use easily due to visual program.

System can not be interrupt due to the special network.

All of the money currencies are seeing by the user, on the user interface.

All of the bank operations can make from the bank operator’s screen.

The program has a login page, so only authorized people enter the system.

Atılım University

COMPE 491-492

8/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 9: SRS for Bank Proj

BANK OPERATIONS

1.1.2. Assumptions and Constraints

1.1.2.1 Assumptions

We assumed that the following points exist.

All users are familiar to Windows Applications.

All users should have background of bank operations.

All team members of project will know the bank operations so

they are searching bank operations.

All team members will realize their responsibilities.

All team members should apply the SPMP process rules

1.1.2.2 Constraints

The system constraints are

The program will work on the machines which have Windows

Xp/Vista.

Adobe flash player should be installed in users computer.

Developers are expected to obey all the schedule restrictions.

1.1.3. Project Deliverables

There are four major deliverables in the project which are SPMP, SRS,

SDD, and STD. All these documents will be prepared according to the

IEEE standards.

All of the deliverables are downloaded from the project website. If there are

any changes or updates, it will be announcement from us.

SPMP (Software Project Management Plans): It defines all of the

information about the project and team members. This information are

created by assumptions. During the project lifecycle in formations may be

change, and specify roles and responsibilities of team members. It must be

document the deliverables and their deadlines

SRS (Software Requirements Specification): It defines the requirements of

software. Software has two kinds of requirements which are functional and

Atılım University

COMPE 491-492

9/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 10: SRS for Bank Proj

BANK OPERATIONS

non-functional. It documents all of this requirements and includes a set of

use cases which describes the user-system interactions.

SDD (Software Design Description): It defines the description of design of

the software. It must be included all of the information about design and

document it.

STD (Software Test Documentation): It defines the test plans of software.

STD includes verification and validation activity and their results. All in

formations are document such as test cases, test procedures, test plan …

etc.

1.1.4. Schedule and Budget Summary

1.1.4.1 Schedule

Our project schedule becomes two points.

1- Constant deliverables times which is announced by supervisor.

2- Team members’ weekly schedule.

This is the initial version of the first deliverable of the project, and we

don’t have enough experience to predict time. In later versions, time will

estimated to each task of project.

1.1.4.2 Budget

For estimating budget we use function point, and Cocomo model. You can

check our calculation in the table which exists in the estimation plan section.

1.2. Evolution of the SPMP

SPMP will all changes to the project management plan must be agreed to by group

members before they are implemented. . All changes should be documented in

order to keep the project management plan correct and up to date. This report is

the initial version, so it likes to initial plan. In future, there will be other deliverables

such as SRS, SDD, STD. After deciding use cases and preparing SRS, our project

Atılım University

COMPE 491-492

10/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 11: SRS for Bank Proj

BANK OPERATIONS

develops clearly. In future our project can change by customer wants or using

platforms. For this reason, there will be some changes on SPMP. As a result,

SPMP has lots of version. In each version we make changes and updates. Finally,

the last version of SPMP will show the corrects about projects.

Atılım University

COMPE 491-492

11/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 12: SRS for Bank Proj

BANK OPERATIONS

2. Reference Materials

IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans

Pressman, Roger S., Software Engineering, 4th edition, McGraw-Hill, 1997

Fairley, R. E., Workbreakdown Structure, Software Engineering Project Management, IEEE CS Press, 1997

Software Project Management, Bob Hughes&Mike Cotterell, McGraw-Hill Publication, 2006.

http://www.atilim.edu.tr/~aakca/2009/491_492/refs/SPMP_v1.1.doc

http://www.bilmuh.gyte.edu.tr/BIL441/studentfiles/ch7%20-%20Kopya_tr.ppt#14

http://pdfdatabase.com/download_file_i.php?file=10819252&desc=Level+1+Engineering+Requirements+.pdf

Atılım University

COMPE 491-492

12/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 13: SRS for Bank Proj

BANK OPERATIONS

3. Definitions, Acronyms, and Abbreviations

SMPM: Software Project Management Plan

SRS: Software Requirements Specifications

HW: Hardware

SW: Software

B.O: Bank operations

GUI: Graphical user interface

Ns: Network System

DBM: Database Management

DB: Database

DBMS: Database Management System

PM: Project Management

A.S: Application Server

FW: Firewall

IEEE: Institute of Electrical and Electronics Engineers

HTML: Hypertext Markup Language

COCOMO: Constructive Cost Model

WBS: Work Breakdown Structure

SRE: Software Requirement Engineering

SPM: Software Project Management

Atılım University

COMPE 491-492

13/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 14: SRS for Bank Proj

BANK OPERATIONS

4. Project Organization

4.1. External Interfaces

Our main customer is KBC Bank. We arrange a meeting with Levent FEREN who

is in the KBC Bank. The meeting will held twice in a month. All team members

expected to come those meetings. After the meeting we will talk with project

supervisor and we will discuss some points.

4.2. Internal Structure

We are two people who work for this project, so we have only management and

development structures. Each member of team should manage themselves and has to

control the other and also both of us in development team which should work parallel,

fast and productive.

4.3. Project Responsibilities

We indentify the roles and defined below. Add them up, all of the group members

are responsible for every phase in the project life cycle.

Mazhar Isık;

Project Manager

Configuration Manager

Developer

Tester

Cagri Diken;

Web Designer

Configuration Manager

Developer

Tester

Mehmet Kocak;

Database Designer

Atılım University

COMPE 491-492

14/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 15: SRS for Bank Proj

BANK OPERATIONS

Network Developer

Developer

Tester

Project Manager: Manage all parts of the project, coordinates the team.

Configuration Manager: Manage the documents.

Web Designer: Deals with the web aspect of the project

Developer: Responsible for every development activities.

Tester: Check the systems if there is a mistake or not.

Database Designer: Responsible for entire database system.

Network Developer: Responsible for network system.

Atılım University

COMPE 491-492

15/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 16: SRS for Bank Proj

BANK OPERATIONS

5. Managerial Process Plans

5.1. Start-up Plan

This section defines our projects’ plan such as estimation, staffing,

resource acquisition, and training plan. All of them will be defined in details

from the following subsections.

5.1.1. Estimation Plan

We are not gain enough experience for making estimation before the

beginning of project, so it is too hard to estimate. This is the first version of

SPMP and we have not got sufficient date and information for making

estimation. We use function point method for estimation.

Inputs Outputs Inquiries

Name

Surname

Gender

Birth Date

Maiden name

Father name

Education status

TC Identity number

Home Address

Village

Post Code

City

City Location

e-mail

Telephone

GSM

Account number

Pay amount

Information

Credit Card Number

Account number

Account amount

Credit Card user limit

Account amount

# of FON

Account amount

Gaining amount

Account amount

Sender Account amount

Receiver Account amount

Money Transfer Commission

Login True/False

Account Amount/ Foreign Exchange

Account number

Opening office interface

Report Preparation

Product Size Request

Atılım University

COMPE 491-492

16/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 17: SRS for Bank Proj

BANK OPERATIONS

Pay Amount

Account Number

Withdrawn Amount

Account number

Number of FON

Account Number

Pay Amount

Compound Time in months

Name

Surname

Address

Telephone

Money transfer amount

Money type

Information

Sender Account Number

Bank Office Name

Receiver Account Amount

Name

Surname

Username

Password

Foreign Exchange Type

Pay Amount

Account Number

Name

Surname

TC Identity number

Bank Office name

Bank Office code

Table1: Product Function I/O Summary

Atılım University

COMPE 491-492

17/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 18: SRS for Bank Proj

BANK OPERATIONS

Number of inputs: 50

Number of outputs: 16

Number of inquiries: 2

Number of files: There exist no files.

Number of external interface: 2 (Oracle, Windows Server Application)

Measurement Parameter

Count(C) Weighting Factor (W) W*C

Inputs 50 4 200

Outputs 16 5 80

Inquiries 2 4 8

Files 0 10 0

External Interfaces 2 7 14

TOTAL 302

Table 2: Function Point Metrics

Influence Factor Weight

1 Backup and recovery 5

2 Data communications 5

3 Distributed processing 3

4 Performance Critical 5

5 Existing Operating Environment 4

6 On-line data entry 5

7 Input transaction over multiple screens 4

8 ILFs update online 5

Atılım University

COMPE 491-492

18/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 19: SRS for Bank Proj

BANK OPERATIONS

9 Information domain values complex 1

10 Internal processing complex 1

11 Code design for reuse 3

12 Conversion / installation in design 1

13 Multiple installations 0

14 Application Designed for change 0

Sum (Fi) 42

Table3: Complex Adjustment Values

FP = Count-Total * [0.65 +0.01*Sum(Fi)]

FP=302-42*[0.65+0.01*42]

FP=257.06

COCOMO

LOC = FP * Language Factor

We use object oriented language, which is C#, during the developing Bank

Operations System. Language factor C# is 56.

LOC=257.06*56=14395.36

KLOC=14395.36/1000=14.39536

Then we use the basic Cocomo equations. E identifies effort, and D identifies

duration.

E=ab(KLOC)bb

D=cb (E) d

b

Our project is semi-detached, so we use

Atılım University

COMPE 491-492

19/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 20: SRS for Bank Proj

BANK OPERATIONS

ab = 3,0 ; 1,12 bb=1,12 ; 2,5 cb=2,5 and for d

b=0,35

E=3,0*(14.39536)1,12 =59.474457 person-month

D=2,5*(59.474457)0,35=10.44 months

E/D ratio gives the recommended number of people.

E/D=59.474457/10.44=5.706366≈~6 (approximately)

As our group consist of 3 people, so we are not fulfill necessary human resources,

so we must increase our performance, and work more.

5.1.2. Resource Acquisition Plan

During the project we will use personal Computers. We will examine and

choose available solution alternatives and acquire. Following requirements

are enough to instantiate the program.

5.1.3. Project Staff Training Plan

Every group member will make search, revise their knowledge by using book, lecture

notes, internet ... etc in their free times. Every member of the team is responsible for each

phase in the project, so we must spare a suitable time. Our team members meet 3 or 4

day of every week. It depends on our exam schedule. The team will spend one day only

for meeting. The members make conversation and during the meeting new things will be

created, other days are workshops. On the other hand each member works individual in

his free time.

5.2. Work Plan

5.2.1. Work Activities

1.0 CUSTOMER MEETING

1.1 Contact with customer

1.2 Problem Description

1.3 Requirements Gathering

Atılım University

COMPE 491-492

20/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 21: SRS for Bank Proj

BANK OPERATIONS

2.0 PREPARING SPMP

2.1 Work Products & Activities Decomposition

2.2 Product Size Estimation

2.3 Process Model

2.4 Resource Allocation

2.5 Schedule Allocation

2.6 Risk Management Plan

2.7 Technical Process Plans

2.8 Supporting Process Plans

2.9 Documentation

2.10 Review of SPMP

2.11 Revised SPMP

2.12 Approval of SPMP

3.0 PREPARING SRS

3.1 Contact with Customer

3.2 Formal Identification of User Group

3.3 Product Functions

3.4 Behavioral Requirements Specification

3.5 Non-Behavioral Requirements Specification

3.6 Documentation

3.7 Review of SRS

3.8 Revised SRS

3.9 Approval of SRS

4.0 PREPARING SDD

4.1 SDD Basic Concepts

4.2 Database Design

Atılım University

COMPE 491-492

21/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 22: SRS for Bank Proj

BANK OPERATIONS

4.3 Interface Design

4.4 Algorithms Design

4.5 Network System & Security Design

4.6 Documentation

4.7 Review of SDD

4.8 Revised SDD

4.9 Approval of SDD

5.0 PREPARING STD

5.1 V&V Management

5.2 V&V Acquisition

5.3 V&V Supply

5.4 V&V Development

5.5 V&V Operation

5.6 V&V Maintenance

5.7 Documentation

5.8 Review of STD

5.9 Revised STD

5.10 Approval of STD

6.0 CODING

6.1 C#

6.1.1 C# User Interface

6.1.2 C# Windows Applications

6.2 Oracle

6.3 CODE REVIEW

6.3.1 Authorization

6.3.2 User interface design

Atılım University

COMPE 491-492

22/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 23: SRS for Bank Proj

BANK OPERATIONS

6.3.3 C# Oracle Integration

6.3.4 Report Preparation

7 TESTING

7.1 Unit Test

7.2 Integration Test

7.3 System Test

8 USER MANUAL

8.1 Preparation of User Manual

8.2 Revised User Manual

9 DEPLOYMENT

9.1 Approval of the product

Table 4: Project work activity

5.2.2. Schedule Allocation

Work activity has not any defined start and end dates, but SPMP, SRS,

SDD and STD deadlines are defined by supervisor. Product should be

introduced at he end of the first semester which is demo, and product will

produced at the end of the second semester.

Atılım University

COMPE 491-492

23/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 24: SRS for Bank Proj

BANK OPERATIONS

5.2.3. Resource Allocation

WORK ACTIVITY

REQUIRED SKILL BASED ON

Customer Meeting

Communication SkillsFace to face, E-

mail

Preparing SPMP

Knowledge of IEEE Std and Estimation Techniques, Planning And Coordination

IEEE Std

Preparing SRS SPM, SW Engineering, SRE IEEE Std

Preparing SDD SPM,SW EngineeringIEEE Std. 1058-

1998

Preparing STD SPM,SW Engineering IEEE Std

Coding Knowledge of C#, PHP and Oracle IEEE Standards

TestingKnowledge Of Control Engineering and Testing

TechniquesIEEE Standards

User Manual Knowledge of User Manual Standard IEEE Std

Deployment Knowledge of Review Techniques IS Standards

Table 5: Resource allocation for Work Activity

CUSTOMER MEETING

WBSWORK PACKAGES SW TOOLS HUMAN RESOURCES

HW RESOURCES

1.1 Contact with customer - Team -

1.2 Problem Description Ms Office Team PC

1.3 Requirements Gathering

Ms Office,

Mozilla Firefox 3.0

Team PC

Table 6: Resource Allocation for customer Meeting

Atılım University

COMPE 491-492

24/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 25: SRS for Bank Proj

BANK OPERATIONS

PREPARING SPMP

WBS WORK PACKAGES SW TOOLS HUMAN RESOURCES

HW RESOURCES

2.1 Work Products & Activities Decomposition

MS Office, MS Project

Team PC

2.2 Product Size Estimation MS Office Team PC

2.3 Process Model MS Office Team PC

2.4 Resource Allocation MS Office Team PC

2.5 Schedule Allocation MS Office Team PC

2.6 Risk Management Plan MS Office Team PC

2.7 Technical Process Plans MS Office Team PC

2.8 Supporting Process Plans MS Office Team PC

2.9 Documentation MS Office Team PC

2.10 Review of SPMP - Supervisor and Customer

-

2.11 Revised SPMP MS Office Team PC

2.12 Approval of SPMP - - -

Table 7: Resource Allocation for preparing SPMP

PREPARING SRS

WBS WORK PACKAGES SW TOOLS

HUMAN RESOURCES

HW RESOURCES

3.1 Meeting with Customer - Team -

3.2 Product Functions Ms Office Team PC

3.3 Behavioral Requirements Specification

Ms Office Team PC

3.4 Non-Behavioral Requirements Specification

Ms Office Team PC

Atılım University

COMPE 491-492

25/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 26: SRS for Bank Proj

BANK OPERATIONS

3.5 Documentation Ms Office Team PC

3.6 Review of SRS - Supervisor and Customer

PC

3.7 Revised SRS Ms Office Team PC

3.8 Approval of SRS - - PC

Table 8: Resource Allocation for preparing SRS

PREPARING SDD

WBS WORK PACKAGES SW TOOLS

HUMAN RESOURCES

HW RESOURCES

4.1 SDD Basic Concepts - Team -

4.2 Database Design Ms Office Team PC

4.3 Interface Design Ms Office Team PC

4.4 Algorithms Design Ms Office Team PC

4.5 Network System & Security Design

Ms Office Team PC

4.6 Documentation Ms Office Team PC

4.7 Review of SDD - Supervisor and Customer

PC

4.8 Revised SDD Ms Office Team PC

4.9 Approval of SDD - - PC

Table 9: Resource Allocation for preparing SDD

PREPARING STD

WBS WORK PACKAGES

SW TOOLS HUMAN RESOURCES

HW RESOURCES

5.1 V&V Management MS Office Team PC

5.2 V&V Acquisition MS Office Team PC

Atılım University

COMPE 491-492

26/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 27: SRS for Bank Proj

BANK OPERATIONS

5.3 V&V Supply MS Office Team PC

5.4 V&V Development

MS Office Team PC

5.5 V&V Operation MS Office Team PC

5.6 V&V Maintenance MS Office Team PC

5.7 Documentation MS Office Team PC

5.8 Review of STD - - PC

5.9 Revised STD MS Office Team PC

5.10 Approval of STD - - PC

Table 10: Resource Allocation for preparing STD

CODING

WBS WORK PACKAGES

SW TOOLS HUMAN RESOURCES

HW RESOURCES

6.1C#

Visual Studio 2005

Team PC

6.1.1C# user interface

Visual Studio 2005

Team PC

6.1.2 C# Desktop Application

Visual Studio 2005

Team PC

6.2 Oracle Oracle Team PC

6.3CODE REVIEW

Visual Studio 2005

Team PC

6.3.1Authorization

Visual Studio 2005

Team PC

6.3.2User interface design

Visual Studio 2005

Team PC

6.3.3 C# & Oracle integration

Visual Studio 2005

Team PC

6.3.4 Report Preparation MS Office Team PC

Table 11: Resource Allocation for Coding

Atılım University

COMPE 491-492

27/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 28: SRS for Bank Proj

BANK OPERATIONS

TESTING

WBS WORK PACKAGES

SW TOOLS HUMAN RESOURCES

HW RESOURCES

7.1Unit Test

Visual Studio 2005

Team PC

7.2Integration Test

Visual Studio 2005

Team PC

7.3 System Test Team PC

Table 12: Resource Allocation for preparing Testing

USER MANUAL

WBS WORK PACKAGES SW TOOLS

HUMAN RESOURCES

HW RESOURCES

8.1 Preparation of User Manual

MS Office Team PC

8.2 Revised User Manual MS Office Team PC

Table 13: Resource Allocation for preparing User Manual

DEPLOYMENT

WBS WORK

PACKAGES

SW

TOOLS

HUMAN

RESOURCES

HW

RESOURCES

9.1Approval of the

Product

- Team PC

Table 14: Resource Allocation for Deployment

Atılım University

COMPE 491-492

28/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 29: SRS for Bank Proj

BANK OPERATIONS

5.2.4. Budget Allocation

Customer Meeting

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

1.1 Contact with customer

8.10.2009 8.10.2009 2 Team 30

1.2 Problem Description

8.10.2009 8.10.2009 2 Team 50

1.3 Requirements Gathering

8.10.2009 8.10.2009 2 Team 50

Table 15: Schedule and Budget Allocation for Customer Meeting

Preparing SPMP

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

2.1 Work Products & Activities

Decomposition

9.10.2009 12.10.2009 4,5 Team 150

2.2 Product Size Estimation

12.10.2009 13.10.2009 5 Team 120

2.3 Process Model 13.10.2009 14.10.2009 3 Team 120

2.4 Resource Allocation

15.10.2009 15.10.2009 2 Team 100

2.5 Schedule Allocation

15.10.2009 15.10.2009 3 Team 50

2.6 Risk Management

Plan

10.10.2009 10.10.2009 2 Team 75

2.7 Technical Process Plans

11.10.2009 11.10.2009 5 Team 109,9

2.8 Supporting Process Plans

14.10.2009 14.10.2009 2 Team 50

2.9 Documentation 9.10.2009 20.10.2009 15 Team 240

Atılım University

COMPE 491-492

29/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 30: SRS for Bank Proj

BANK OPERATIONS

2.10 Review of SPMP

22.10.2009 29.10.2009 2 Supervisor 20

2.11 Revised SPMP 30.10.2009 1.11.2009 5 Team 180

2.12 Approval of SPMP

1.11.2009 1.11.2009 - - -

Table 16: Schedule and Budget Allocation for Preparing SPMP

Preparing SRS

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

3.1 Contact with Customer

8.10.2009 8.10.2009 1 Team 30

3.2 Formal Identification of

User Group

8.10.2009 8.10.2009 2 Team 50

3.3 Product Functions

3.11.2009 9.11.2009 12 Team 190

3.4 Behavioral Requirements Specification

4.11.2009 4.11.2009 3 Team 100

3.5 Non-Behavioral

Requirements Specification

5.11.2009 5.11.2009 2 Team 75

3.6 Documentation 6.11.2009 17.11.2009 10 Team 210

3.7 Review of SRS 18.11.2009 25.11.2009 1 Supervisor 20

3.8 Revised SRS 26.11.2009 29.11.2009 5 Team 200

3.9 Approval of SRS

29.11.2009 29.11.2009 - - -

Table 17: Schedule and Budget Allocation for Preparing SRS

Preparing SDD

Atılım University

COMPE 491-492

30/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 31: SRS for Bank Proj

BANK OPERATIONS

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

4.1 SDD Basic Concepts

20.11.2009 22.11.2009 5 Team 120

4.2 Database Design

25.11.2009 5.12.2009 15 Team 250

4.3 Interface Design

6.12.2009 10.12.2009 10 Team 150

4.4 Algorithms Design

11.12.2009 14.12.2009 10 Team 350

4.5 Network System & Security Design

10.12.2009 15.12.2009 15 Team 270

4.6 Documentation 20.11.2009 15.12.2009 15 Team 300

4.7 Review of SDD

18.11.2009 25.11.2009 1 Supervisor 20

4.8 Revised SDD 26.11.2009 29.11.2009 5 Team 300

4.9 Approval of SDD

26.12.2009 26.12.2009 - - -

Table 18: Schedule and Budget Allocation for Preparing SDD

Preparing STD

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

5.1 V&V Management

02.01.2010 04.01.2010 4 Team 150

5.2 V&V Acquisition 05.01.2010 07.01.2010 4 Team 150

5.3 V&V Supply 08.01.2010 09.01.2010 4 Team 150

5.4 V&V Development

10.01.2010 12.01.2010 4 Team 150

5.5 V&V Operation 13.01.2010 15.01.2010 4 Team 150

5.6 V&V Maintenance

15.01.2010 17.01.2010 5 Team 177,5

Atılım University

COMPE 491-492

31/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 32: SRS for Bank Proj

BANK OPERATIONS

5.7 Documentation 18.01.2010 25.01.2010 10 Team 350

5.8 Review of STD 12.03.2010 15.03.2010 1 Supervisor 20

5.9 Revised STD 20.03.2010 24.03.2010 10 Team 350

5.10 Approval of STD 24.03.2010 24.03.2010 - - 0

Table 19: Schedule and Budget Allocation for Preparing STD

Coding

WBS Work Packages

Start Date End Date Work Hour

People Assigned

Cost

(TL)

6.1 C# 20.02.2010 15.03.2010 2 Team 500

6.1.1 C# User Interface

20.02.2010 25.02.2010 4 Team 200

6.1.2 C# Desktop Application

25.02.2010 28.02.2010 3 Team 150

6.2 Oracle 01.03.2010 15.03.2010 3 Team 1000

6.3 Code REVIEW

15.01.2010 15.03.2010 3 Team 5000

6.3.1 Authorization 12.03.2010 15.03.2010 1 Team 200

6.3.2 User Interface Design

25.02.2010 28.02.2010 1 Team&Supervisor 200

6.3.3 C# & Oracle

integration01.03.2010 15.03.2010 1 Team 300

6.3.4 Report preparation

22.02.2010 15.03.2010 1 - 20

Table 20: Schedule and Budget Allocation for Coding

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

7.1 Unit Test 10.04.2010 24.05.2010 2 Team 1000

Atılım University

COMPE 491-492

32/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 33: SRS for Bank Proj

BANK OPERATIONS

7.2 Integration Test

15.04.2010 25.05.2010 2 Team 2000

7.3 System Test 20.05.2010 24.05.2010 2 Team 1450

Table 21: Schedule and Budget Allocation for Testing.

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

8.1 Preparation of User Manuel

10.06.2010 10.06.2010 3 Team 100

8.2 Revised User Manuel

10.06.2010 10.06.2010 3 Team 100

Table 22: Schedule and Budget Allocation for User Manuel

WBS Work Packages

Start Date End Date Work Hour People Assigned

Cost

(TL)

9.1 Approval of the product

14.06.2010 16.06.2010 2 Team 0

Table 23: Schedule and Budget Allocation for Deployment

5.3. Control Plan

Any major changes are affected milestones of project and it must be

increase our budget and increase project time. All of the team member will

be responsible for ensuring that projects is completed on time.

Atılım University

COMPE 491-492

33/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 34: SRS for Bank Proj

BANK OPERATIONS

5.3.1. Requirements Control Plan

Before the defining of requirements we will arrange meeting between our

team and our customer. Since the customer is sure about what they want,

there won’t be any modification on the requirements.

5.3.2. Schedule Control Plan

We arrange meetings between our team and our customer when we find

suitable time for us. The progress of the work will be observed by the

customer and our supervisor in those meeting. All team members should

attend the each meeting. If there is a extraordinary situation, he will not

attend, but in future we will tell each discussions about the meeting to him.

The estimated delivery dates are decided by our supervisor.

5.3.3. Quality Control Plan

We arrange meetings above our customers and in each meeting we will

show our works to them. Each project progress will be observed by KBC

Bank employees. In every meeting we should take advices from KBC Bank

and our supervisor. As a result, we want to increase quality of our project.

5.3.4. Reporting Plan

We defined the project deliverables in the section 1.1.3. The deliverables

are announced from our project web site. These deliverables will be

reviewed both our supervisor and KBC Bank. We will announce if there are

any changes in the deliverables. Each version or update or updated of

deliverables are available in our web site. Each of report is checked by our

configuration managers.

5.3.5. Metrics Collection Plan

Metric collection will be made a comparison between what is build and what had built, so

we anticipate the error happening, delay happening and then extra cost estimation. These

will references to us.

Atılım University

COMPE 491-492

34/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 35: SRS for Bank Proj

BANK OPERATIONS

5.4. Risk Management Plan

During the project we will expected some risks. We must cope with these

problems. Otherwise, our project lifecycle become trouble. High probability risks

that occur during project;

Disagreement between team members

During the project lifecycle there are some arguments in the team

members’ opinions. Add them up, one of the project members not attend

the meetings, it will causes arguments between team members. In this

case, we will make a meeting and we will determine the result. If we will not

determine the result, we will discuss with project’s supervisor.

Unavailability of team members

All the team members are irregular, so members take different courses.

Every member has different weekly course schedule. In addition to this, we

will arrange meeting between KBC Bank so; our meeting schedule is set by

KBC Bank. For this reason, all the team members may not be exists in

every meeting. We decide at least one of the team member join meeting

and he will talk us all of the meeting subjects and decisions.

Lack of experience working with customer

Team members do not have enough experience for meeting and

understanding customer’s problems. It will need good communication

between customer and team members. The requirements should be well

defined and understandable by all of the team members. For this kind of

situations we always communicate with customer by e-mail or meetings.

Atılım University

COMPE 491-492

35/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 36: SRS for Bank Proj

BANK OPERATIONS

Lack of training on user panels

Bank operations project software parts depends on c# and oracle. If some

of the team members have no experience on both c# and oracle, we will

face with some problems during the development of software. Learning and

using these concepts will be creating a risk on project. As a result, all of the

team members should make a deep search about these languages and

learn how to create applications so we decrease the probability of risk. If

we face with very big problem during coding, we should take our

supervisors opinion and apply them.

Testing the product

All the end of the coding, we must test our product for bugs and errors

which effected the system directly. It is difficult to test every situation.

Testing has very important role for the project. As a result, we should spare

more time for testing and all team members should do their responsibility

about this part by obey the test plan.

Separation of a team member from the group

The project team composed of 3 members and there is a very big problem

among the group member which is separating. During the project, any team

member may leave the project. It has lots of reason such as illness,

psychological problems, or leaving the school such as economic conditions

or family problems. If one of the member leave from the group our

members should share the remaining works and they strive for finishing the

project on the defined deadline of the project.

Atılım University

COMPE 491-492

36/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 37: SRS for Bank Proj

BANK OPERATIONS

6. Technical Process Plans

6.1. Process Model

In the project, we discuss and determined to use Iterative model because in

our project. We should turn back a lot during the development of software.

It means that the requirements are not stable, so we may change during

the project lifecycle. Since iterative is a model which does allow retrieving

back at any phases, discuss and we think iterative is a model which allows

turning back at any phases, we discuss and we think iterative model is fits

for the project. As a result appropriate process is iterative for our project.

6.2. Methods, Tools, and Techniques

During the first semester, we should finish the documentation. All of the

Software Project Management steps are applied and all revision steps will

be shown in different version of project. There should be some minor and

major changes. In second semester coding and network system will be

completed. We define the tools and techniques which are using during the

project as shown below;

SW Tools: PHP, Oracle, C#, MS Office, MS Project, Mozilla Firefox 3.

HW Tools: Personal computers, laptops and a database server.

6.3. Infrastructure Plan

In order to develop Bank operations system, C# is used in user interfaces, Oracle Is used

for DMBS, HTML & PHP is used for web site. During the project we use some resources

which are free for us such as sources for understanding and learning new things.

Places for studies and developing project will be determined by the Project Manager. PM

talks every member and determines a time which is most suitable for every team member.

These places may be one team members’ house, school’s studying room and a café

which is located in Balgat.

Atılım University

COMPE 491-492

37/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 38: SRS for Bank Proj

BANK OPERATIONS

6.4. Product Acceptance Plan

The project is controlled by the supervisor and the customer. And they determine the

missing points of the project. The project is repeated until supervisor and customer

satisfaction is ensured. So we guarantee to develop the product that the customer really

needs. For the finally we will present to the customer and the supervisor. If it is necessary,

we will change some points of product.

Atılım University

COMPE 491-492

38/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 39: SRS for Bank Proj

BANK OPERATIONS

7. Technical Process Plans

7.1. Configuration Management Plan

The project can have changes. If there is a change requirement from customer or

supervisor, it will be updated to a new version of report. The first deliverable one is version

1 like SPMP V1.0. If changes come, it will be SPMP V2.0 which is updated.

7.2. Quality Assurance Plan

All deliverables should be prepared by following IEEE standard. Meeting frequencies

should be well organized between customer and supervisor. Team members should follow

the schedule strictly. The project steps should be completed in convenient time.

7.3. Documentation Plan

The documentation is based on IEEE standards. The IEEE standard requires SPMP,

SRS, SDD and STD. These deliverables will be received by supervisor.

Deliverable work products will be documented and delivered according to distribution list

on due date.

7.4. Deployment Plan

Firstly, we develop a plot program and we will set up it into two bank agency, then we will

wait for result. Due to the result, we make a decision. If our plot program works perfectly,

we will distribute the system in other bank agencies.

7.5. Review Plan

The team will review the document as deliverables. All deliverables will update at the web

site so the supervisor will take a chance to reach to the deliverables via internet.

Atılım University

COMPE 491-492

39/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 40: SRS for Bank Proj

BANK OPERATIONS

Appendices

Appendix 1

End User Efficiency:

Our system makes easier the usage of user interface for last user. Operations have done

faster. On line operations provided emphasize a design for end user efficiency. They

include:

Menus

Search box

Hard copy user documentation

Easy navigation between user interfaces

Automated cursor movement

It will be updated when the requirements are completed.

Appendix 2

Cocomo:

Coefficients for basic COCOMO:

Software project ab bb cb db

Organic 2.4 1.05 2.5 0.38

Semi-detached 3.0 1.12 2.5 0.35

Embedded 3.6 1.20 2.5 0.32

Atılım University

COMPE 491-492

40/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0

Page 41: SRS for Bank Proj

BANK OPERATIONS

Appendix 3:

Gantt chart

The team will update STD part on web site soon. The team can’t communicate with a

member because of health problem. In addition to this, we can’t estimate the second

semester’s dates.

Atılım University

COMPE 491-492

41/41

Team # 20 (Team Sheldox)

System Project Management Plan

Version: 1.0