52
SSMC WoW for BUSINESS EXCELLENCE Jagadish CV, CEO

SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

SSMC WoW for

BUSINESS

EXCELLENCE

Jagadish CV, CEO

Page 2: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

AGENDA

• Organisation Profile

• The phases SSMC goes through…

• WoW for Business Excellence

Page 3: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Organisation Profile

Page 4: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Organisation Profile

● Incorporated on 4th Dec 1998

● Joint Venture of NXP & TSMC

● Share Capital of US$404 million

SSMC : A wafer foundry for NXP and TSMC, chartered to produce deep sub-micron

processes systems-on-chip silicon.

NXP N.V. (NXP): Established in 2006, it was formerly a division of Philips.

It has over 50 years of semiconductors experience.

TSMC : Founded in 1987, it is the world’s largest dedicated semiconductor foundry.

Page 5: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Organisation Profile

Page 6: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Organisation Profile

● Excellent Location – World-class infrastructure + strong supporting industries

Page 7: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Organisation Profile

Page 8: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

● Dedicated Manufacturer of

Advanced 8”

Semiconductor Wafers

● Main Product: 0.25 …. 0.11

micron with Derivatives

ranging

● Logic, RF, mixed-mode

● Embedded Flash

● EEPROM, BCD, High Voltage

● 55K Wafers Capacity per

month

Organisation Profile

Page 9: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

● Total Space: 78,000 m2

● Total Build Up Area: 92,000 m2

● Production Space: 11,500 m2

● Staff Strength: 1683

Organisation Profile

Page 10: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

The Phases

SSMC goes

through…

Page 11: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

The Phases SSMC goes through

Page 12: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

SSMC Company Culture – Together W Raise Value

Page 13: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

WoW for Business

Excellence

Page 14: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

OUR Excellence Journey

…, advance to

reach the

silver line in

the cloud of

999 points on

SQA scoring

scale in the

years to come.

Page 15: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

High Performance Mixed Signal

More-than-Moore to go hand in hand for High Value Systems and new business

Page 16: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Lighting Industrial

Computing Automotive Identification Consumer

Mobile Wireless infra

SSMC Silicon in a wide range of applications

Page 17: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

SSMC Silicon in Trendy Applications

Interface Products

USB3, Opto Electronics, LED Drivers, Display

Silicon Tuner

Automotive Security

NFC Authentication

Automotive Safety Sensors &

Networks (LIN/CAN/Flexray)

Green Electronics, Smart Home

Immobilization Remote Keyless Entry

RF Link

Keyless Entry/Start

Future Key

System ownership stretches from Theft Hindrance,

Keyless Entry, Push-to-Start towards Connectivity

Page 18: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Million Wafer Shipment

1M

2M

3M4M

5M

0

1

2

3

4

5

6

2000 2004 2005 2008 2010 2012 2013

in M

illio

n W

afe

r S

hip

me

nt

SSMC

Million Wafer Milestone

Year

~60 mths

~40 mths

~30 mths

~30 mths

~25 mths

Page 19: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Customer Results

● Customer Satisfaction ≥ 94%

● Automotive Quality ≤ 0.1ppm

Page 20: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Financial & Market Results

● Sales : USD$ ~500M

● Utilization: 99%+

● Value Add ≥ USD$170K

Page 21: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

● LSS : 2,149 Teams

● 10k ideas: 6,787 implemented

● Patents/Trade Secret : 96

● Employee Engagement : comparable to APAC High Tech Norm

People Results

Page 22: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

● Yield: 99.5+%

● Productivity ≥ 9.5% improvement

● Ecovision ≥ 10% improvement

Operation Results

Page 23: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

• Organizational Profile

• The phases SSMC goes through…

• WoW for Business Excellence

Agenda

Page 24: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

24

Operation

ExcellenceOperation

Excellence

Cost

ExcellenceCost

Excellence

Service

ExcellenceService

Excellence

Business Transformation

Self-Sufficiency in Sustained Performance

Comparison & Benchmarking

Pe

op

le

Ex

ce

lle

nce

Inn

ova

tio

n

Ex

ce

lle

nce

Page 25: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Leadership

Page 26: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Leadership

Committed Senior Leadership

• Company Level

• Division Level

• Individual Level

– CEO Tea Session

– CEO & Divisional Town

Meeting

– Skip-Level Dialogues

– Keynote addresses at

company-wide, supplier,

customer as well as

community events

– Chairmanship, advisor and

member of internal and

external committees

– BBS (Business Balance

Scorecard) performance

review meetings

Page 27: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Leadership

Committed Global Corporate Citizen

Page 28: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Leadership

Committed Global Corporate Citizen

Page 29: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Planning

Page 30: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Planning

Rigorous Strategic Planning & Deployment

Page 31: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Information

Page 32: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Information Knowledge Management

• SSMC DNA

• Documentation • SSMC Internal Document,

• Mother-Fab (NXP, TSMC)

• External Organization

• Nurturing

• Training & e-learning

• Department Lesson

Learnt, WoW

• Analytical • Transform Portal

• Benchmarking Portal

Page 33: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

• Comparison

• Financial & Market

• Customers

• Process

• Learning & Growth

• Benchmarking

• Internal

– Operations Front

End Team

– Best Known

Methods (BKM)

• External

– Within Industry

– Outside Industry

Frequency : Weekly/

Monthly/Quarterly/ Yearly

Information Comparison & Benchmarking

Page 34: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

People

Page 35: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

People Building Deep Core Competence

Page 36: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

People Employee Learning & Development Personal Effectiveness – TOEIC/EDO Program

Page 37: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

People Employee Engagement

Page 38: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Process

Page 39: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Passionate Innovations Process

Page 40: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Value People • Integrity • Raising the Bar • Working Together • Innovate • Taking Initiative

INTERNAL

Page 41: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Passionate Innovations Process

• Establish Technology Development department since 2007

• Developed ≥ 25 new technologies / options

• TD technology strength and capabilities

– characterization, simulation, PCM design and Product/Test Analysis

– In house software and hardware for development needs

Page 42: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Excellence in Risk Management

Process

Page 43: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

43

11 Mar 2011

arrived @ Singapore Changi Airport

Page 44: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile
Page 45: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

High Risk Installation drill with Singapore Civil Defense Force

• 2 scenarios involving 60 SCDF staffs and 12 vehicles

– chemical spill in CUP building WWTP, TMAHD waste collection tank

– small fire in tank farm Silane storage bunker (Dry exercise since 2008)

Page 46: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Excellence in Risk Management

Process

Response to 311 Japan Earthquake & Tsunami • 2011 National Security Dialogue

– Annual event attended by Deputy PM & 3 Ministers • Theme “Securing your business competitive advantage with BCM”

– CEO in panel discussion sharing benefits of BCM – SSMC featured in Singapore Business Federation (SBF) BCM

booklet & Promotion Standees

Page 47: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Excellence in Productivity Process

Page 48: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Excellence in Productivity Process

Page 49: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Customers

Page 50: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

SSMC’s Customer-Centric Excellence

Customers

Page 51: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile

Results

Page 52: SSMC WoW for - FTPI · Total Space: 2 78,000 m Total Build Up Area: 292,000 m Production Space: 11,500 m2 Staff Strength: 1683 Organisation Profile