18
Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant April 25, 2013 Jim Simmonds King County [email protected] 4/25/2013 1

Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

  • Upload
    ely

  • View
    43

  • Download
    0

Embed Size (px)

DESCRIPTION

Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9. a project funded by an USEPA Watershed Management Assistance Grant April 25, 2013 Jim Simmonds King County [email protected]. What Are Stormwater Retrofits. Construction projects to control stormwater - PowerPoint PPT Presentation

Citation preview

Page 1: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

1

Stakeholder Workshop #3 Stormwater Retrofit Planning

Project for WRIA 9a project funded by an

USEPA Watershed ManagementAssistance Grant

April 25, 2013Jim SimmondsKing County

[email protected]/25/2013

Page 2: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

2

What Are Stormwater Retrofits Construction projects to control

stormwater Locations that have previously been

developed Sited where existing stormwater controls

are inadequate or don’t exist Not part of redevelopment

4/25/2013

Page 3: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

3

Stormwater ParadigmTime Period Paradigm Description

Prior to 1992 Drainage Efficiency

Convey water downhill as efficiently as possible

1992 – Now Minimize New Impacts

Minimize harm from new development with ponds and treatment

Future Restore Capture, detain, treat stormwater everywhere to protect and restore receiving waters

4/25/2013

Page 4: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

4

Stormwater Retrofit Examples

4/25/2013

Ponds

Bioswales

Check Dams

Cisterns

Pervious Pavement Rain Gardens

Green Roofs

Page 5: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

5

Estimated Stormwater Needs

$3B - $15B for treatment in Puget Sound Capital costs, no O&M, no land costs

$1.4B for Juanita Creek basin (7 sq miles) Full lifecycle cost

$1.1B for 64 small basins in unincorporated King County Full lifecycle costs

4/25/2013

Page 6: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

64/2/2013

Page 7: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

7

Stormwater Retrofit Planning for WRIA 9

$1M grant from EPA, $335K match Model stormwater retrofit needs in WRIA 9 Cost effectiveness Work with stakeholders Present retrofit options analysis to WRIA 9

Watershed Ecosystem Forum Extrapolate cost estimates to all Puget

Sound

4/25/2013

Page 8: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

8

Project Area

4/25/2013

WRIA 9 except Headwaters above

Howard Hanson Dam (forested)

City of Seattle (combined system)

Vashon Island Focus on streams

Page 9: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

9

Project Team and FundingOrganization EPA Funding Local Match

USEPA*

King County $707k $300k

University of Washington $243k $20k

Department of Ecology**

City of Auburn 0 $5k

City of Covington 0 $5k

City of SeaTac 0 $5k

Kellogg Consulting $50k 0

* USEPA contributing $1M in grant funding, and staff time to project management team** Ecology contributing staff time to project management team and updating retrofit database

4/25/2013

Page 10: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

10

Project Benefits

WRIA 9 and Puget Sound-wide planning-level estimate of facility and funding needs

Cost vs stream improvement Demonstrate use of modeling tools Influence capital project planning Influence discussion on new funding Influence future NPDES permits

4/25/2013

Page 11: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

Project Schedule2010 2011 2012 2013

Data Collection

Identify Indicators and Target Ranges

Watershed Modeling

Retrofit Modeling

Retrofit Options Analysis

Estimate Puget Sound Costs

Workshop #1

Workshop #3

Workshop #2

Workshop #4

We Are Here

Stakeholder Input4/25/2013 11

Page 12: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

Thank You for you Input! Workshop #1 April 2011

Answered extensive questions about project scope, goals and limitations

Received input on modeling scenarios and in-stream indicators

Workshop #2 January 2012 Received input on indicators and approaches

for defining ranges of possible targets Received input on BMPs to assess

Adjusted scope to address input4/25/2013 12

Page 13: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

13

The Past 15 Months

Watershed modeling Ranges of in-stream targets BMPs to include in model BMP design and cost assumptions SUSTAIN pilot study in a 270-acre

catchment Independent analysis to corroborate

SUSTAIN model

4/25/2013

Page 14: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

14

What Will You Do Today?

Hear updates on in-stream target ranges Hear methods and results of a retrofit

modeling pilot study and provide feedback On BMP design and cost assumptions On how to best report results

Hear the approach for modeling all of WRIA 9 and provide input

Hear updates on other assessments of stormwater retrofit needs

4/25/2013

Page 15: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

15

Review Draft Reports

Indicators and range of targets report and SUSTAIN pilot study report http://www.kingcounty.gov/environment/waters

heds/green-river/stormwater-retrofit-project.aspx

Send comments by May 8 to [email protected]

HSPF watershed modeling report Will notify when posted

4/25/2013

Page 16: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

16

Sprint to the Finish Spring 2013: Finalize HSPF modeling report, in-

stream goal and range of targets report, and SUSTAIN pilot study report

Summer/fall 2013: Draft SUSTAIN modeling report and draft WRIA 9 retrofit options analysis

Fall 2013: Workshop #4 Late 2013: Finalize SUSTAIN modeling report,

WRIA 9 retrofit options analysis, and Puget Sound cost estimate

4/25/2013

Page 17: Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9

17

Opportunities for Participation

Review and comment on draft reports Stakeholder workshop # 4 Review and comment on future reports WRIA 9 Watershed Ecosystem Forum One-on-one outreach Quarterly e-mail updates