4

Click here to load reader

Standardcost Estimate

Embed Size (px)

DESCRIPTION

HR INFotypes

Citation preview

Sample Integration Test Procedure

SCENARIO:Standard Cost Estimate for MaterialsOWNER: Nanda

BUSINESS CASE:Test case to verify the process of running standard cost estimate of a material.

Standard cost with quantity structure method will be used for costing run.

Standard cost estimate will be used for updating the material master standard price and it will used for inventory valuation.

STATUS:OK

DESCRIPTION:RUN NO.:01

EXPECTED RESULTS:RUN DATE: 24.08.2009

PRE-REQUISITE

DATA OBJECTVALUE/CODE

Controlling Area0100

PP BOMValid BOM for material (Quantity structure should be available)

PP Routing

Valid routing for material (Quantity Structure should be available)

Overhead KeyOverhead key should be available in Material master

SETUP DATA

DATA OBJECTVALUE/CODEDESCRIPTIONCOMMENTS AND NOTES

Controlling Area0100JBMG Controlling Area

Company code1000JBML

Material Master

Plant/Profit center1011 BIW

Costing VariantZPC1JBM: Standard Cost Estimate

Version No:001

TRANSACTIONAL STEPS

No.BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODEINPUT DATA / SPECIAL INFORMATIONOUTPUT DATA / RESULTTESTER / TEAMOK /ERROR

1Run Standard Cost EstimateCK11NMaterial: A58309M67K00D00Plant: 1011

Costing Variant:ZPC1Costing Verison: 1

Costing Date From: Current date

Costing Date To: 31.12.999

Qty Structure Date: Current date

Valuation Date: Current Date

Costing Run Save.Standard cost estimate with breakup of: 1. Cost component split

2. Itemization

3. Cost Component Group

4. Costing Run Log Valuation of: a. Components at the price as per price control in material master b. Activities at price planned on cost center c. Overhead as per costing sheet

FICOOK

2Standard Cost Estimate DisplayCK13NMaterial: A58309M67K00D00

Plant: 1011Costing Variant: ZPC1

Costing Version: 1

Valid On: Current dateFICOOK

3Price Update: MarkingCK24(Ensure the heading shows as Price update: Mark standard price. If the heading shows Price update: release, click on "marking" icon to take you to the marking screen)

Posting Period/Fiscal Year: 5 2009

Company Code: 1000

Plant: 1011

Material: A58309M67K00D00With List output: XMarking allowance has been done for the material after which marking has been done by which the future planned price got updated in the material master

FICOOK

4Price Update: ReleaseEnsure the heading shows as Price update: Release standard price. If the heading shows Price update: Mark standard price, click on "release" icon to take you to the release screen

Company Code: 1000

Plant: 1011

Material: A58309M67K00D00With List output: XReleasing has been done for the material by which the current price of the material got updated.

Document No. 3000000079

Comments:

_________________________________________________________________________________________________________________________

_________________________________________________________________________________________________________________________

_________________________________________________________________________________________________________________________

Approval:

Page 1 of 310