39
 LAPORAN PERHITUNGAN SALURAN (U-DITCH & TOP-BOTTOM)  Mei 2015 

STANDARISASI BOX CULVERT.pdf

Embed Size (px)

DESCRIPTION

PRECAST

Citation preview

Page 1: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 1/38

 

LAPORAN PERHITUNGAN 

SALURAN 

(U-DITCH & TOP-BOTTOM) 

Mei 2015 

Page 2: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 2/38

 

DAFTAR ISI 

DAFTAR ISI......................................................................................................................

DAFTAR TABEL ............................................................................................................iii 

DAFTAR GAMBAR .......................................................................................................iv 

BAB- 1 

PENDAHULUAN ...........................................................................................1 

1.1 

Latar Belakang ....................................................................................................1 

1.2 

Tujuan .................................................................................................................1 

1.3 

Ruang Lingkup ....................................................................................................1 

1.4  Sistem Struktur dan Sistem Permodelan Pondasi ...............................................2 

1.5  Tata Cara Perencanaan Bangunan Dan Referensi Perencanaan Bangunan ........2 

BAB- 2 

DATA-DATA PERENCANAAN DAN PEMBEBANAN...............................3 

2.1 

Data – Data Perencanaan ....................................................................................3 

2.2 

Data dan Spesifikasi Material Rencana ..............................................................4 

2.3  Data – Data Perencanaan Pembebanan (SNI T02-2005) ....................................4 

2.3.1  Pembebanan Struktur Atas (Super Structure) ...........................................4 

2.3.2 

Pembebanan Struktur Bawah (Super Structure) ....................................... 6 

2.3.3 

Koefisien Pembebanan ............................................................................. 7 

2.3.4 

Kombinasi Pembebanan ........................................................................... 7 

BAB- 3 

PERHITUNGAN STRUKTUR U-DICTH DAN COVER  ............................8 

3.1  Permodelan Struktur U-DITCH dan COVER dalam Perhitungan ......................8 

3.2 

Permodelan Beban Statik ....................................................................................9 

3.3 

Perhitungan Penulangan Cover ...........................................................................9 

3.4 

Perhitungan Penulangan Dinding Samping U-Ditch ........................................12 

3.5  Perhitungan Penulangan Sisi Bawah U-Ditch ..................................................13 

Page 3: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 3/38

 

ii 

3.6  Desain Elemen Struktur U-Ditch dan Cover .....................................................15 

BAB- 4  PERHITUNGAN STRUKTUR TOP-BOTTOM .........................................26 

4.1 

Permodelan Struktur Top-Bottom dalam Perhitungan ......................................26 

4.2 

Permodelan Beban Statik Top-Bottom..............................................................27 

4.3  Desain Elemen Struktur Top-Bottom ................................................................28 

Page 4: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 4/38

 

iii 

DAFTAR TABEL 

Tabel 2.1 Dimensi U-Ditch dan Cover yang akan direncanakan .....................................

Tabel 2.2 Dimensi Top-Bottom yang akan direncanakan .................................................3 

Tabel 3.1 Perhitungan Momen Ultimit Cover ................................................................ 10 

Tabel 3.2 Perhitungan Tulangan Utama Cover ...............................................................10 

Tabel 3.3 Perhitungan Kontrol Lendutan Cover ..............................................................11 

Tabel 3.4 Perhitungan Tulangan Susut Melintang Cover ................................................11 

Tabel 3.5 Perhitungan Tulangan Susut Memanjang Cover  .............................................11 

Tabel 3.6 Perhitungan Momen Ultimit Dinding .............................................................12 

Tabel 3.7 Perhitungan Tulangan Utama Dinding ........................................................... 12 

Tabel 3.8 Perhitungan Kontrol Lendutan Dinding ......................................................... 13 

Tabel 3.9 Perhitungan Tulangan Susut Melintang Dinding ............................................13 

Tabel 3.10 Perhitungan Tulangan Susut Melintang Dinding ..........................................13 

Tabel 3.11 Perhitungan Momen Ultimit Sisi Bawah ...................................................... 14 

Tabel 3.12 Perhitungan Tulangan Utama Sisi Bawah .................................................... 14 

Tabel 3.13 Perhitungan Tulangan Susut Melintang Sisi Bawah .....................................15 

Tabel 3.14 Perhitungan Tulangan Susut Memanjang Sisi Bawah .................................. 15 

Tabel 3.15 Tulangan U-Ditch dan Cover ........................................................................17 

Tabel 4.1 Tulangan Top-Bottom .....................................................................................28 

Page 5: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 5/38

 

iv 

DAFTAR GAMBAR  

Gambar 2.1 Sketsa Beban Hidup UDL............................................................................

Gambar 2.2 Ilustrasi Beban Hidup Truck “T” ..................................................................6 

Gambar 2.3 Ilustrasi Pembebanan Tekanan Tanah Aktif ..................................................6 

Gambar 3.1 Model Pembebanan U-Ditch dan Cover .......................................................8 

Gambar 3.2 Model Pembebanan Terbagi Rata pada Cover ............................................10 

Gambar 3.3 Model Pembebanan Terpusat pada Cover  .................................................. 10 

Gambar 3.4 Model Pembebanan Segitiga pada Dinding ................................................12 

Gambar 3.5 Model Pembebanan Terbagirata pada Dinding ...........................................12 

Gambar 3.6 Model Pembebanan Reaksi Tanah pada Sisi Bawah .................................. 14 

Gambar 3.7 U-Ditch & Cover Type 1 ............................................................................ 16 

Gambar 3.8 U-Ditch & Cover Type 2 ............................................................................ 16 

Gambar 3.9 U-Ditch & Cover Type 3 ............................................................................ 16 

Gambar 3.10 Notasi Dimensi U-Ditch (kiri) dan Notasi Penulangan U-Ditch (kanan) . 17 

Gambar 3.11 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran 400x600x1200

Beban 30% (6.75 Ton) ...................................................................................18 

Gambar 3.12 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran 400x600x1200

Beban 50% (11.25 Ton) .................................................................................18 

Gambar 3.13 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran 800x800x1200

Beban 30% (6.75 Ton) ...................................................................................19 

Gambar 3.14 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran 800x800x1200

Beban 50% (11.25 Ton) .................................................................................19 

Gambar 3.15 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran 800x800x1200

Beban 70% (15.75 Ton) .................................................................................20 

Gambar 3.16 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1000x1200x1200 Beban 30% (6.75 Ton) ...................................................... 20 

Page 6: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 6/38

 

Gambar 3.17 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1000x1200x1200 Beban 50% (11.25 Ton) .................................................... 21 

Gambar 3.18 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1000x1200x1200 Beban 70% (15.75 Ton) .................................................... 21 

Gambar 3.19 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1000x1200x1200 Beban 100% (22.50 Ton) .................................................. 22 

Gambar 3.20 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1200x1500x1200 Beban 50% (11.25 Ton) .................................................... 22 

Gambar 3.21 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1200x1500x1200 Beban 70% (15.25 Ton) .................................................... 23 

Gambar 3.22 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1200x1500x1200 Beban 100% (22.50 Ton) .................................................. 23 

Gambar 3.23 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1500x1500x1200 Beban 50% (11.25 Ton) .................................................... 24 

Gambar 3.24 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

1500x1500x1200 Beban 100% (22.50 Ton) .................................................. 24 

Gambar 3.25 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

2000x2000x1200 Beban 50% (11.25 Ton) .................................................... 25 

Gambar 3.26 Dimensi dan Detail Penulangan U-Ditch dan Cover Ukuran

2000x2000x1200 Beban 100% (22.50 Ton) .................................................. 25 

Gambar 4.1 Model Pembebanan Top-Bottom ................................................................26 

Gambar 4.2 Notasi Dimensi Top-Bottom (kiri) dan Notasi Penulangan Top-Bottom

(kanan) ...........................................................................................................28 

Gambar 4.3 Dimensi dan Detail Penulangan Top-Bottom Ukuran 1200x1200x1200

Beban 75% (15.75 Ton) .................................................................................29 

Gambar 4.4 Dimensi dan Detail Penulangan Top-Bottom Ukuran 1200x1200x1200

Beban 100% (22.50 Ton) ...............................................................................29 

Gambar 4.5 Dimensi dan Detail Penulangan Top-Bottom Ukuran 1500x1500x1200

Page 7: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 7/38

 

vi 

Beban 100% (22.50 Ton) ...............................................................................30 

Gambar 4.6 Dimensi dan Detail Penulangan Top-Bottom Ukuran 1500x2000x1200

Beban 100% (22.50 Ton) ...............................................................................30 

Gambar 4.7 Dimensi dan Detail Penulangan Top-Bottom Ukuran 2000x2000x1200

Beban 100% (22.50 Ton) ...............................................................................31 

Page 8: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 8/38

Perencanaan Desain Saluran 

BAB- 1 

PENDAHULUAN 

1.1  Latar Belakang

Struktur saluran ini direncanakan bedasarkan Standar Perencanaan Pembebananan

Jembatan agar selama masa layannya dapat memenuhi beban yang ada. Tata cara perencanaan

yang digunakan dalam perencanaan ini menggunakan BMS 1992, SNI 2847-2002 dan SNI

1726-2002. Lingkup pekerjaan disini meliputi perencanaan U-Ditch, Penutup U-Ditch, dan

stutktur Top-Bottom. Modul saluran yang akan didesain dapat dilihat pada Tabel 2.1. 

1.2  Tujuan 

Tujuan pekerjaan adalah detailed engineering design U-Ditch, Penutup U-Ditch, dan

stutktur Top-Bottom yang disesuaikan dengan Standar Perencanaan Pembebanan Jembatan

(RSNI 2005) dan Standar Perencanaan Beton Bertulang (SNI 2847-2013) yang hasilnya

dituangkan dalam bentuk gambar rencana dan spesifikasi teknis struktur. 

1.3  Ruang Lingkup 

Ruang lingkup Perencanaan U-Ditch, Penutup U-Ditch, dan stutktur Top-Bottom ini

difokuskan pada : 

a.  Perencanaan pembebanan yang meliputi beban mati, beban hidup lalu lintas jembatan

dan beban tekanan tanah aktif. 

 b.  Perencanaan struktur utama yang terdiri dari struktur beton bertulang berupa U-Ditch,

Penutup U-Ditch, dan stutktur Top-Bottom. 

Page 9: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 9/38

Perencanaan Desain Saluran 

1.4  Sistem Struktur dan Sistem Permodelan Pondasi 

Saluran ini didesain menggunakan perhitungan manual yang diperhitungkan setiap

elemennya dengan memperhitungkan berbagai macam kombinasi pembebanan yang sudah

ditetapkan di dalam peraturan yang berlaku. 

1.5  Tata Cara Perencanaan Bangunan Dan Referensi Perencanaan Bangunan 

Dalam melakukan analisa dan desain struktur jembatan mengacu pada beberapa tata

cara perencanaan bangunan dan juga pada beberapa referensi khusus yang lazim digunakan.

Beberapa acuan tersebut adalah : 

a.  Peraturan Pembebanan Indonesia Untuk Gedung (PPIUG) 1987. 

 b. 

Tata Cara Perencanaan Struktur Beton Dan Bahan Bangunan Gedung (SNI-03-2847-

2002). 

c.  Uniform Building Code 1997 (UBC 1997). 

d.  Building Code Requirements For Structural Concrete (ACI 318-99) and Commentary

(ACI 318R-99). 

e.  BMS 1992, Bridge Management System 1992. 

f.  SNI T02-2005, Standar Pembebanan Untuk Jembatan 2005. 

Page 10: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 10/38

Perencanaan Desain Saluran 

BAB- 2 

DATA-DATA PERENCANAAN 

DAN PEMBEBANAN 

2.1  Data – Data Perencanaan 

Dalam perencanaan saluran ini ada beberapa data umum perencanaan yang berupa

dimensi elemen struktur dan data beban gandar truk yang bersdasarkan SNI T02-2005 sebesar

22.5 ton. Didalam perencanaannya, struktur saluran ini akan direncanakan dengan beban 100%,

70%, 50%, dan 30% yang nantinya dalam aplikasinya bergantung pada kelas jalan. Dimensi

yang akan direncanakan dapat dilihat pada Tabel 2.1 dan Tabel 2.2. 

Tabel 2.1 Dimensi U-Ditch dan Cover yang akan direncanakan 

Tabel 2.2 Dimensi Top-Bottom yang akan direncanakan 

22.50 Ton 15.75 Ton 11.25 Ton 6.75 Ton

100% 70% 50% 30%

400x600x1200 - - 1 1 2

800x800x1200 - 1 1 1 3

1000x1200x1200 1 1 1 1 4

1200x1500x1200 1 1 1 - 3

1500x1500x1200 1 - 1 - 2

2000x2000x1200 1 - 1 -   2

16

U-DITCH + COVER

Ukuran (mm)

Beban Gandar

Jumlah

Item

(Prosentase Beban)

TOTAL U-DITCH

22.50 Ton 15.75 Ton 11.25 Ton 6.75 Ton

100% 70% 50% 30%

1200x1200x1200 1 1 - - 2

1500x1500x1200 1 - - - 1

1500x2000x1200 1 - - - 1

2000x2000x1200 1 - - - 1

5TOTAL TOP-BOTTOM

Beban Gandar

TOP-BOTTOM

Ukuran (mm)Jumlah

Item

(Prosentase Beban)

Page 11: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 11/38

Perencanaan Desain Saluran 

2.2  Data dan Spesifikasi Material Rencana 

Beberapa material yang digunakan dapat dilihat sebagai berikut : 

a.  Material elemen struktur balok dan kolom direncanakan menggunakan beton K350

setara dengan kekuatan tekan silinder karakteristik (f’c) 29 MPa. 

 b.  Material elemen struktur tulangan baja polos mempunyai tegangan leleh sebesar

240 MPa untuk diameter tulangan 8 mm hingga 12 mm. 

c.  Material elemen struktur tulangan baja deform mempunyai tegangan leleh sebesar

400 MPa untuk diameter tulangan 13 mm hingga 25 mm. 

2.3  Data – Data Perencanaan Pembebanan (SNI T02-2005) 

Data – data perencanaan pembebanan pada struktur jembatan ini diambil dari SNI T02-2005. Beban – beban yang bekerja akan dibagi menjadi dua yaitu beban yang bekerja pada

struktur atas (SuperStructure) dan beban yang bekerja pada struktur bawah. 

2.3.1  Pembebanan Struktur Atas (Super Structure) 

  Beban Mati 

Beban mati pada perencanaan ini meliputi berat sendiri dari masing – masing elemen

struktur seperti berat sendiri struktur dan dan berat mati tambahan berupa aspal. Besarnya

 beban – beban mati tersebut dapat dilihat sebagai berikut : 

a.  Beton : 2400 kg/m3 

 b.  Aspal : 2200 kg/m3 

  Beban Hidup “D” UDL [Uniform Dead Load] 

Pembebanan sesuai dengan SNI T02-2005, untuk beban hidup UDL diambil sebagai

fungsi terhadap panjang jembatan dimana besarnya beban hidup UDL yang diambil dapat

direncanakan sebagai berikut : 

a.  Untuk panjang bentang jembatan (L) lebih kecil sama dengan 30 m maka besarnya

 beban hidup UDL dapat diambil sebesar 9 kPa. 

 b.  Untuk panjang bentang jembatan (L) lebih besar dari 30 m maka besarnya beban hidup

UDL dapat diambil sebesar 9 (0.5+15/L) kPa. 

Page 12: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 12/38

Perencanaan Desain Saluran 

Berdasarkan SNI T02-2005, ilustrasi pembebanan UDL dapat dilihat pada Gambar 2.1.

Konfigurasi pembebanan tertentu untuk elemen-elemen struktur tertentu juga harus

diperhatikan untuk mendapatkan bentuk pembebanan yang memberikan gaya paling

maksimum (Maksimum-Maksimorum).

Gambar 2.1 Sketsa Beban Hidup UDL

  Beban Hidup “D” KEL [Knife Edge Load] 

Pembebanan Menurut SNI T02-2005 untuk beban hidup KEL diambil sebagai fungsi

terhadap panjang jembatan dimana besarnya beban hidup KEL diambil sebesar 49 kN/m. 

Berdasarkan SNI T02-2005, ilustrasi pembebanan KEL dapat dilihat pada Gambar 2.1.

Konfigurasi pembebanan tertentu untuk elemen-elemen struktur tertentu juga harus

diperhatikan untuk mendapatkan bentuk pembebanan yang memberikan gaya paling

maksimum (Maksimum-Maksimorum). Besarnya Dynamic Load Allowance (DLA) untuk

 beban UDL ini diambil sebesar 40 % untuk panjang bentang kurang dari 50 m. 

Page 13: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 13/38

Perencanaan Desain Saluran 

  Beban Hidup Truk “T” (Truck Load) 

Pembebanan sesuai dengan SNI T02-2005, untuk beban hidup Truck konfigurasi

 pembebanan dapat dilihat pada Gambar 2.2. Besarnya jarak beban gandar variable antara 4

hingga Sembilan meter. Untuk jembatan yang memiliki bentang yang panjang umumnya

kondisi pembebanan menggunakan Truck tidak dominan tetapi yang dipakai umumnya

menggunakan beban UDL. 

Gambar 2.2 Ilustrasi Beban Hidup Truck “T” 

2.3.2  Pembebanan Struktur Bawah (Super Structure) 

Gambar 2.3 Ilustrasi Pembebanan

Tekanan Tanah Aktif  

Pembebanan struktur bawah meliputi

 pembebanan akibat tekanan tanah aktif berdasarkan

teori Rankine seperti yang ditunjukkan pada

Gambar 2.3 

dimana, 

 

  

 2

45tan2    

a K   (koefisien tekanan tanah aktif) 

 = sudut geser tanah 

 = berat jenis tanah 

 H  K a  

Page 14: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 14/38

Perencanaan Desain Saluran 

2.3.3  Koefisien Pembebanan 

Koefisien pembebanan pada jembatan dimaksudkan agar perencanaan mencapai

kondisi ultimate maka beban tersebut harus dikalikan dengan koefisen pembebanan ultimate.

Koefisien pembebanan berdasarkan SNI T02-2005 dapat dilihat sebagai berikut : 

a.  Koefisien pembebanan beban T (K UTT ) = 1.8 

 b.  Koefisen berat material beton (K UMS ) = 1.3 

c.  Koefisen beban lajur lalu lintas (K UTD ) = 1.8 

d.  Koefisen beban tekanan tanah aktif (K UTA ) = 1.25 

2.3.4  Kombinasi Pembebanan 

Kombinasi pembebanan menurut SNI T02-2005 adalah kombinasi dari beberapa beban

dengan faktor kombinasi yang telah disebutkan sebelumnya. Kombinasi pembebanan yang

digunakan dalam perhitungan ini adalah, 

  1.3 Dead (Beban Mati) + 1.8 Live (Beban Hidup “D”) + 1.25 Ka (Tekanan Tanah) 

  1.3 Dead (Beban Mati) + 1.8 Live (Beban Hidup “T”) + 1.25 Ka (Tekanan Tanah) 

Page 15: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 15/38

Perencanaan Desain Saluran 

BAB- 3 

PERHITUNGAN STRUKTUR

U-DICTH DAN COVER  

3.1  Permodelan Struktur U-DITCH dan COVER dalam Perhitungan 

Permodelan struktur U-Ditch dan Cover dimodelkan berdasarkan dari beberapa asumsi

untuk mempermudah perhitungan manual. Cover diasumsikan sebagai sendi-rol dengan beban

mati dan hidup yang bekerja vertical kebawah. Dinding U-Ditch dimodelkan sebagai struktur

 jepit bebas dengan asumsi jepit pada bagian bawah dinding dan bebas pada bagian atas dinding

yang menahan gaya horisontal tekanan tanah aktif (asumsi tanah lempung lunak). Sisi bawah

U-Ditch dimodelkan sebagai struktur yang menerima gaya reaksi total dari berat sendiristruktur dan reaksi akibat beban hidup yang bekerja merata sepanjang bentang. Sketsa

 pembebanan struktur U-Ditch dan Cover dapat dilihat pada Gambar 3.1 

Gambar 3.1 Model Pembebanan U-Ditch dan Cover 

BEBANTEKANAN TANAH

KEL

BERAT SENDIRI

 ASPAL

UDL

TRUCK

REAKSI TANAH

LATERAL AKTIFKENDARAAN

BEBAN TEKANAN TANAHLATERAL AKTIF

KENDARAAN

Page 16: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 16/38

Perencanaan Desain Saluran 

3.2  Permodelan Beban Statik  

Permodelan input beban terdiri dari beban mati tambahan berupa aspal, beban tekanan

tanah, beban hidup “D” dan beban hidup “T” serta beban reaksi tanah akibat pembebanan

grafitasi yang ditimbulkan oleh beban mati dan beban hidup. Besarnya beban-beban tersebut

dapat dilihat pada perhitungan dibawah ini : 

  Beban mati sendiri struktur dengan berat jenis 24 kN/m3. 

  Beban mati tambahan berupa aspal setebal 5 cm sebesar 1.1 kN/m2. 

  Beban hidup “D” terdiri dari beban UDL sebesar 9 kN/m2 dan beban KEL sebesar 49

kN/m’ yang akan dikalikan faktor sebesar 1.4 untuk beban kejut. (digunakan koefisien

30% 50%, 70%, 100% dalam desain struktur saluran ini bergantung pada jenis saluran

yang didesain). 

  Beban hidup “T” truk dengan besar beban terpusat 1 roda sebesar 112.5 kN yang akan

dikalikan faktor sebesar 1.3 untuk beban kejut. (digunakan koefisien 30% 50%, 70%,

100% dalam desain struktur saluran ini bergantung pada jenis saluran yang didesain). 

  Beban tekanan tanah aktif yang bekerja pada dinding diasumsikan tanah lempung

dengan berat jenis tanah γ = 1.8 ton/m3, sehingga besarnya tekanan tanah aktif sebesar

γ x h x ka dengan ka = 1 untuk tanah lempung. 

 

Beban tekanan tanah akibat beban merata kendaraan sebesar q x ka = 9 kN/m2. 

  Beban reaksi tanah yang dihitung berdasarkan beban gravitasi total pada struktur (beban

mati sendiri, aspal dan beban hidup) 

3.3  Perhitungan Penulangan Cover 

Perhitungan pada cover meliputi besarnya momen yang terjadi akibat beban mati dan

 beban hidup (bergantung pada koefisien yang digunakan) dengan kombinasi ultimit. Beban

yang diperhitungkan berupa beban mati sendiri, beban mati tambahan dan beban hidup “D”

UDL yang merupakan beban terbagirata dengan perletakkan sederhana (sendi-rol) yang

ditunjukkan pada Gambar 3.2. Serta beban hidup “D” KEL dan beban hidup “T” Truck yang

merupakan beban terpusat pada tengah bentang dengan perletakkan sederhana (sendi-rol) yang

ditunjukkan pada Gambar 3.3. 

Page 17: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 17/38

Perencanaan Desain Saluran 

10 

2

8

1 Lq M  uu    

Gambar 3.2 Model Pembebanan Terbagi

Rata pada Cover 

 L P  M  uu  

4

Gambar 3.3 Model Pembebanan Terpusat

pada Cover 

Detail perhitungan gaya momen ultimit dengan memperhitungkan kombinasi

 pembebanan yang terjadi pada cover dapat dilihat pada Tabel 3.1.  Kemudian dengan

memperhitungkan momen ultimit yang terjadi, dihitunglah kebutuhan tulangan cover. Detail

 penulangan utama cover dapat dilihat pada Tabel 3.2.  Setelah didapatkan dimensi dan

 penulangan cover, maka cover perlu dikontrol terhadap lendutan yang terjadi akibat momen

layan. Detail perhitungan kontrol lendutan cover dapat dilihat pada Tabel 3.3. 

Tabel 3.1 Perhitungan Momen Ultimit Cover 

Tabel 3.2 Perhitungan Tulangan Utama Cover 

qu

L

 

Pu

L

B entang Te bal Le bar Se ndiri As pal UDL KEL T RUCK Se ndiri As pal UDL KEL T RUCK  

mm mm mm kN/m kN/m2 kN/m2 kN kN kNm kNm kNm kNm kNm

400 100 1200   30   2.88 1.32 10.80 24.70 43.88 0.06 0.03 0.22 2.47 4.39 6.72 10.38

800 100 1200   30   2.88 1.32 10.80 24.70 43.88 0.23 0.11 0.86 4.94 8.78 14.44 20.97

1000 110 1200   30   3.17 1.32 10.80 24.70 43.88 0.40 0.17 1.35 6.17 10.97 18.72 26.40

400 100 1200   50   2.88 1.32 10.80 41.16 73.13 0.06 0.03 0.22 4.12 7.31 10.87 17.22

800 120 1200   50   3.46 1.32 10.80 41.16 73.13 0.28 0.11 0.86 8.23 14.63 22.80 34.721000 130 1200   50   3.74 1.32 10.80 41.16 73.13 0.47 0.17 1.35 10.29 18.28 29.18 43.60

1200 140 1200   50   4.03 1.32 10.80 41.16 73.13 0.73 0.24 1.94 12.35 21.94 35.87 52.59

1500 160 1200   50   4.61 1.32 10.80 41.16 73.13 1.30 0.37 3.04 15.44 27.42 46.53 66.33

2000 190 1200   50   5.47 1.32 10.80 41.16 73.13 2.74 0.66 5.40 20.58 36.56 66.00 89.97

800 130 1200   70   3.74 1.32 10.80 57.62 102.38 0.30 0.11 0.86 11.52 20.48 31.12 48.44

1000 140 1200   70   4.03 1.32 10.80 57.62 102.38 0.50 0.17 1.35 14.41 25.59 39.60 60.76

1200 160 1200   70   4.61 1.32 10.80 57.62 102.38 0.83 0.24 1.94 17.29 30.71 48.45 73.25

1000 170 1200   100   4.90 1.32 10.80 82.32 146.25 0.61 0.17 1.35 20.58 36.56 55.30 86.57

1200 180 1200   100   5.18 1.32 10.80 82.32 146.25 0.93 0.24 1.94 24.70 43.88 67.26 104.19

1500 200 1200   100   5.76 1.32 10.80 82.32 146.25 1.62 0.37 3.04 30.87 54.84 85.85 130.92

2000 240 1200   100   6.91 1.32 10.80 82.32 146.25 3.46 0.66 5.40 41.16 73.13 118.79 176.46

Beban

(%)

Dimensi Beban Momen Service Momen Ultimit

1.3D+1.8L

"D"

1.3D+1.8L

"T"

P   10

D   13

D   13

D   13

D   16

D   16

D   16

D   16

D   16

D   16

D   16

D   19

D   19

D   19

D   19

D   19

Cover 800 (50%)   1200 120 20   92   34.72   0.0018 0.0138 15260.0104 0.0138 1723400 0.9 3.798 158   140

139   120Cover 1000 (50%)   1200 130 20   102   43.60   0.0018 0.0142 1732400 0.9 3.880 0.0106 0.0142 2011

0.0018 0.9 3.505400 0.0095 0.0127 0.0127 1269 126   100

Dia Tul

(mm)

s perlu

(mm)

As

Perluh

fy

(MPa)

As

Pasang b

Cover 800 (30%)   1200 100 20   73.5   20.97   0.0018 0.9 3.594

s

 pasang

0.0098 0.0130 0.0130 1148 139   120400

ρ pakai4/3 ρ

perluρ perlu

Rn

(MPa)

Assum

e Øρmin

Mu

(kNm)dcover 

Dimensi (mm) Nama

Cover 1000 (30%)   1200 110 20   83.5   26.40

0.0106 0.0142 0.0142 1903 127   120Cover 1200 (50%)   1200 140 20   112   52.59   0.0018 0.9 3.882400 2011

0.0096 0.0127 0.0127 2018 120   1102193Cover 1500 (50%)   1200 160 20   132   66.33   0.0018 0.9 3.525400

0.0085 0.0114 0.0114 2210 109   1002413Cover 2000 (50%)   1200 190 20   162   89.97   0.0018 0.9 3.174400

0.0119 0.0159 0.0159 1947 124   1202011Cover 800 (70%)   1200 130 20   102   48.44   0.0018 0.9 4.311400

0.0125 0.0166 0.0166 2235 108   1002413Cover 1000 (70%)   1200 140 20   112   60.76   0.0018 0.9 4.485400

0.0109 0.0146 0.0146 2281 149   1402430Cover 1200 (70%)   1200 160 20   130.5   73.25   0.0018 0.9 3.983400

2835   120

2835

Cover 1000 (100%)   1200 170 20   140.5   86.57   0.0018 0.9 4.060400

Cover 1200 (100%)   1200 180 20   150.5   104.19

Cover 1500 (100%)   1200 200 20   170.5   130.92   0.0018 0.9 4.170400

0.0112 0.0149 0.0149 2509 136

0.0018 0.9 4.259400 0.0118 0.0157 0.0157 2835 120

Cover 2000 (100%)   1200 240 20   210.5   176.46   0.0018 0.9 3.687400

0.0115 0.0153 0.0153 3137 108   100

0.0100 0.0134 0.0134 3380 101   100

3402

3402

1327

1593

120

Cover 400 (30%)   1200 100 20   75   10.38   240 0.002 0.9 1.708 0 .0074 0.0098 0.0098 886 942 106   100

Cover 400 (50%)   1200 100 20   73.5   17.22   400 0.0018 0.9 2.952 0.0079 0.0105 0.0105 927 995 172   160

Page 18: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 18/38

Perencanaan Desain Saluran 

11 

Tabel 3.3 Perhitungan Kontrol Lendutan Cover 

Tulangan susut perlu ditambahkan pada daerah yang belum dihitung penulangannya

untuk menantisipasi susut yang terjadi pada beton. Kebutuhan tulangan susut melintang dan

memanjang ditunjukkan oleh Tabel 3.4 dan Tabel 3.5. 

Tabel 3.4 Perhitungan Tulangan Susut Melintang Cover 

Tabel 3.5 Perhitungan Tulangan Susut Memanjang Cover 

B entang Te bal Le bar As d-e ff    Kombinasi

D+L"D"

Kombinasi

D+L"T"Mcr Ig Icr

  Ie

(D+L"D")

Ie

(D+L"D")

Yang Terjadi

D+L"D"

Yang Terjadi

D+L"D"Ijin

mm mm mm mm2 mm kNm kNm kNm mm4 mm4 mm4 mm4 mm mm mm

400 100 1200 942 75   30   2.77 4.47 1.67 1 00000000 20581606 38018705 24725090 0. 04 0.10 0.80 OK  

800 100 1200 1327 73.5   30   6.14 9.11 1.67 1 00000000 24261531 25788343 24728645 0. 53 0.78 1.60 OK  

1000 110 1200 1593 83.5   30   8.09 11. 53 2.02 133100000 36639178 38147420 37159235 0. 74 1.03 2.00 OK  

400 100 1200 995 73.5   50   4.42 7.40 1.67 1 00000000 20336697 24651644 21254996 0. 10 0.18 0.80 OK  

800 120 1200 1723 92   50   9.48 15. 01 2.41 172800000 48416242 50450913 48928828 0. 41 0.65 1.60 OK  

1000 130 1200 2011 102   50   12.27 18. 91 2.82 219700000 67840423 69689923 68345711 0. 60 0.92 2.00 OK  

1200 140 1200 2011 112   50   15.26 22. 90 3.27 274400000 84969340 86843279 85523286 0. 87 1.28 2.40 OK  

1500 160 1200 2193 132   50   20.14 29.09 4.28 409600000 132593837 135247534 133474524 1.17 1.64 3.00 OK 

2000 190 1200 2413 162   50   29.38 39.96 6.03 685900000 228786338 232743393 230358591 1.79 2.33 4.00 OK 

800 130 1200 2011 102   70   12.79 20. 88 2.82 219700000 67840423 69473083 68216007 0. 40 0.65 1.60 OK  

1000 140 1200 2413 112   70   16.43 26. 26 3.27 274400000 94285602 95713197 94634823 0. 58 0.92 2.00 OK  

1200 160 1200 2430 130.5   70   20.30 31.78 4.28 409600000 137071024 139621151 137735523 0.71 1.10 2.40 OK 

1000 170 1200 2835 140.5   100   22.71 37.34 4.83 491300000 178970514 181974041 179645983 0.42 0.69 2.00 OK 

1200 180 1200 2835 150.5   100   27.81 45.05 5.41 583200000 211342020 214084729 211987460 0.63 1.01 2.40 OK 

1500 200 1200 3402 170.5   100   35.90 56.84 6.68 800000000 317222224 320337478 318007249 0.86 1.33 3.00 OK 

2000 240 1200 3402 210.5   100   50.68 77.24 9.62 1 382400000 526681082 532542408 528336315 1.31 1.95 4.00 OK 

Ket

DETAIL LENDUTAN

Beban

(%)

Dimensi Beban Momen Service

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

Mu

(kNm)

fy

(MPa)ρmin

  Assum

e Ø

Rn

(MPa)ρ perlu Nama

  Dimensi (mm)

 b h cover d

Cover 800 (30%)   1200 100 20   76

s

 pasang

s perlu

(mm)

Dia Tul

(mm)

4/3 ρ

perluρ pakai

  As

Perlu

As

Pasang

0.0005 0.0007Cover 1000 (30%)   1200 110 20   86   1.00

331   1200.0009 0.0020 182 5031.00   240 0.002 0.9 0.160 0.0007

292   1000.0020 206 603240 0.002 0.9 0.125

96   1.00

Cover 1000 (50%)   1200 130 20   106

262   1400.0020 230 431240 0.002 0.9 0.100 0.0004 0.0006Cover 800 (50%)   1200 120 20

0.0003 0.0004Cover 1200 (50%)   1200 140 20   116   1.00

237   1200.0005 0.0020 254 5031.00   240 0.002 0.9 0.082 0.0003

1.00   240 0.002 0.9 0.050 0.0002Cover 1500 (50%)   1200 160 20   136

217   1200.0020 278 503240 0.002 0.9 0.069

185   1100.0003 0.0020 326 548

Cover 800 (70%)   1200 130 20   106

151   1000.0020 398 603240 0.002 0.9 0.034 0.0001 0.0002Cover 2000 (50%)   1200 190 20   166   1.00

116   1.00

237   1200.0005 0.0020 254 5031.00   240 0.002 0.9 0.082 0.0003

Cover 1200 (70%)   1200 160 20   136

217   1000.0020 278 603240 0.002 0.9 0.069 0.0003 0.0004Cover 1000 (70%)   1200 140 20

185   1400.0003 0.0020 326 4311.00   240 0.002 0.9 0.050 0.0002

Cover 1000 (100%)   1200 170 20   146 0.0002 0.0020 350 5031.00   240 0.002 0.9 0.043 0.0002

Cover 1500 (100%)   1200 200 20   176

161   1200.0020 374 503240 0.002 0.9 0.038 0.0002 0.0002Cover 1200 (100%)   1200 180 20   156   1.00

216   1.00240 20

143   1000.0002 0.0020 422 6031.00   240 0.002 0.9 0.030 0.0001

116   1000.0020 518 603240 0.002 0.9 0.020 0.0001 0.0001Cover 2000 (100%)   1200

Cover 400 (30%)   1200 100 20   76   1.00   240 0.002 0.9 0.160 0.0007 0.0009 0.0020 182 603

Cover 400 (50%)   1200 100 20   76   1.00   240 0.002 0.9 0.160 0.0007 0.0009 0.0020 182 377

331   100

172   120

331   160

P   8

P   8

P   8

P   8

P   8

P   8P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

 Nama  Dimensi (mm) Dia Tul

(mm)

4/3 ρ

perluρ pakai

  As

Perlu

As

Pasang

Mu

(kNm)

fy

(MPa)ρmin

  Assum

e Ø

Rn

(MPa)ρ perlu

1.00   240 0.002 0.9 0.160 0.0007

 b h cover d

Cover 800 (30%)   1200 100 20   76

s

 pasang

s perlu

(mm)

331   2300.0009 0.0020 182 262

292   2300.0020 206 262240 0.002 0.9 0.125 0.0005 0.0007Cover 1000 (30%)   1200 110 20   86   1.00

Cover 1000 (50%)   1200 130 20   106

262   2300.0020 230 262240 0.002 0.9 0.100 0.0004 0.0006Cover 800 (50%)   1200 120 20   96   1.00

116   1.00 237   2300.0005 0.0020 254 2621.00   240 0.002 0.9 0.082 0.0003

Cover 1500 (50%)   1200 160 20   136

217   1900.0020 278 317240 0.002 0.9 0.069 0.0003 0.0004Cover 1200 (50%)   1200 140 20

0.0001 0.0002Cover 2000 (50%)   1200 190 20   166   1.00

185   1600.0003 0.0020 326 3771.00   240 0.002 0.9 0.050 0.0002

1.00   240 0.002 0.9 0.082 0.0003Cover 800 (70%)   1200 130 20   106

151   1400.0020 398 431240 0.002 0.9 0.034

237   2300.0005 0.0020 254 262

Cover 1200 (70%)   1200 160 20   136

217   1900.0020 278 317240 0.002 0.9 0.069 0.0003 0.0004Cover 1000 (70%)   1200 140 20   116   1.00

185   1600.0003 0.0020 326 3771.00   240 0.002 0.9 0.050 0.0002

Cover 1000 (100%)   1200 170 20   146

0.0002Cover 1200 (100%)   1200 180 20   156   1.00

172   1600.0002 0.0020 350 3771.00   240 0.002 0.9 0.043 0.0002

240 0.002 0.9 0.030 0 .0001Cover 1500 (100%)   1200 200 20   176

161   1600.0020 374 377240 0.002 0.9 0.038 0 .0002

116   1100.0020 518 548240 0.002 0.9 0.020 0.0001 0.0001Cover 2000 (100%)   1200 240 20   216   1.00

0.0002 0.0020 422 4311.00

Cover 400 (30%)   1200 100 20   76   1.00   240 0.002 0.9 0.160 0.0007 0.0009 0.0020 182 262

331   230

143   140

331   230

Cover 400 (50%)   1200 100 20   76   1.00   240 0.002 0.9 0.160 0.0007 0.0009 0.0020 182 262

Page 19: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 19/38

Perencanaan Desain Saluran 

12 

3.4  Perhitungan Penulangan Dinding Samping U-Ditch 

Perhitungan pada dinding meliputi besarnya momen yang terjadi akibat tekanan aktif

tanah dan beban lateral kendaraan dengan kombinasi ultimit. Beban tekanan tanah aktif

diperhitungkan dengan beban segitiga dengan besaran nol di sisi atas dan γ x h x ka pada sisi

 bawah dengan asumsi tanah lempung, sketsa pembebanan dapat dilihat pada Tabel 3.4. Serta,

 beban lateral kendaraan yang berupa beban terbagirata pada sisi dinding dari atas hingga dasar

dinding yang besarannya diambil sebesar beban UDL dikalikan dengan ka, sketsa pembebanan

dapat dilihat pada Gambar 3.5 

2

6

1  Lq M  uu    

Gambar 3.4 Model Pembebanan Segitiga

pada Dinding 

2

2

1  H q M  uu    

Gambar 3.5 Model Pembebanan Terbagirata

pada Dinding 

Tabel 3.6 Perhitungan Momen Ultimit Dinding 

Tabel 3.7 Perhitungan Tulangan Utama Dinding 

qu

     H

 

qu

     H

Tinggi Tebal Lebar Beban Force Moment Beban Force Moment

mm mm mm kN/m kN kNm kN/m kN kNm kNm

800 80 1200 17.28 6.91 1.84 10.80 8.64 3.46 6.62

1200 130 1200 25.92 15.55 6.22 10.80 12.96 7.78 17.50

1500 160 1200 32.40 24.30 12.15 10.80 16.20 12.15 30.38

2000 210 1200 43.20 43.20 28.80 10.80 21.60 21.60 63.00

Dimensi Moment

Ult (1.25)

Tekanan Tanah Aktif Beban Lateral Kendaraan

P   10

D   13

D   13

D   13

Dia Tul

(mm)

s perlu

(mm)

As

Perluh

fy

(MPa)

As

Pasang b

s

 pasangρ pakai

4/3 ρ

perluρ perlu

Rn

(MPa)

Assum

e Øρmin

Mu

(kNm)dcover 

Dimensi (mm) Nama

2.028 0.0088 0.0118 0.0118 777 942

Side U 1200   1200 130 20   103.5   17.50   400 0.0018 0.9 1.512 0.0039 0.0052 0.0052 647 838

Side U 800   1200 80 20   55   6.62   2 40 0.002 0.9

246   190

121   100

Side U 2000   1200 210 20   183.5   63.00   400 0.0018 0.9 1.732 0.0045 0.0060 0.0060 1320 1593

Side U 1500   1200 160 20   133.5   30.38   400 0.0018 0.9 1.578 0.0041 0.0054 0.0054 872 995

121   100

183   160

Page 20: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 20/38

Perencanaan Desain Saluran 

13 

Detail perhitungan gaya momen ultimit dengan memperhitungkan kombinasi

 pembebanan yang terjadi pada dinding dapat dilihat pada Tabel 3.6.  Kemudian dengan

memperhitungkan momen ultimit yang terjadi, dihitunglah kebutuhan tulangan dinding. Detail

 penulangan utama dinding dapat dilihat pada Tabel 3.7.  Setelah didapatkan dimensi dan

 penulanga, maka dinding perlu dikontrol terhadap lendutan yang terjadi akibat momen layan.

Detail perhitungan kontrol lendutan dinding dapat dilihat pada Tabel 3.8. 

Tabel 3.8 Perhitungan Kontrol Lendutan Dinding 

Tulangan susut perlu ditambahkan pada daerah yang belum dihitung penulangannya

untuk menantisipasi susut yang terjadi pada beton. Kebutuhan tulangan susut melintang dan

memanjang ditunjukkan oleh Tabel 3.9 dan Tabel 3.10. 

Tabel 3.9 Perhitungan Tulangan Susut Melintang Dinding 

Tabel 3.10 Perhitungan Tulangan Susut Melintang Dinding 

3.5  Perhitungan Penulangan Sisi Bawah U-Ditch 

Perhitungan pada sisi bawah meliputi besarnya momen yang terjadi akibat reaksi total

dari beban mati dan beban hidup (bergantung pada koefisien yang digunakan) dengan

kombinasi ultimit. Beban yang diperhitungkan berupa beban mati sendiri, beban mati tambahan

dan beban hidup “D” UDL, beban hidup “D” KEL dan beban hidup “T” Truck. Reaksi total

yang diterima oleh struktur akan diteruskan ke bagian bawah struktur menjadi reaksi

terbagirata. Pembebanan sisi bawah berdasarkan beban terbagirata yang diperoleh dari reaksi

ultimit struktur seperti yang digambarkan oleh Gambar 3.6. 

Tinggi Tebal Lebar As d-eff     Mcr Ig Icr Ie Terjadi Ijin

mm mm mm mm2 mm kNm   kNm mm4 mm4 mm4 mm mm

800 80 1200 942 55 5.30 1.07 51200000 9919044.2 10258249.9 3.04 3.2   OK

1200 130 1200 838 103.5 14.00 2.82 219700000 39874566.5 41351052.2 4.38 4.8   OK

1500 160 1200 995 133.5 24.30 4.28 409600000 80402971.8 82198372.0 5.91 6   OK

2000 210 1200 1593 183.5 50.40 7.37 926100000 232131779.1 234300322.1 7.52 8   OK

KET

LendutanDimensi Moment

Service

DETAIL LENDUTAN

P   8

P   8

P   8

P   8

Rn

(MPa)ρ perlu Nama

  Dimensi (mm)

 b h cover d

s

 pasang

s perlu

(mm)

Dia Tul

(mm)

4/3 ρ

perluρ pakai

  As

Perlu

As

Pasang

Mu

(kNm)

fy

(MPa)ρmin

  Assum

e Ø

Side U 800   1200 80 20   56

106   1.00

449   2000.0017 0.0020 134 3021.00   240 0.002 0.9 0.295 0.0012

Side U 1500   1200 160 20   136

237   1900.0020 254 317240 0.002 0.9 0.082 0.0003 0.0005Side U 1200   1200 130 20

186   1.00

185   1600.0003 0.0020 326 3771.00   240 0.002 0.9 0.050 0.0002

135   1000.0020 446 603240 0.002 0.9 0.027 0.0001 0.0001Side U 2000   1200 210 20

P   8

P   8

P   8

P   8

Rn

(MPa)ρ perlu Nama

  Dimensi (mm)

 b h cover d

s

 pasang

s perlu

(mm)

Dia Tul

(mm)

4/3 ρ

perluρ pakai

  As

Perlu

As

Pasang

Mu

(kNm)

fy

(MPa)ρmin

  Assum

e Ø

Side U 800   1200 80 20   56

106   1.00

449   2300.0017 0.0020 134 2621.00   240 0.002 0.9 0.295 0.0012

Side U 1500   1200 160 20   136

237   2300.0020 254 262240 0.002 0.9 0.082 0.0003 0.0005Side U 1200   1200 130 20

186   1.00

185   1600.0003 0.0020 326 3771.00   240 0.002 0.9 0.050 0.0002

135   1200.0020 446 503240 0.002 0.9 0.027 0.0001 0.0001Side U 2000   1200 210 20

Page 21: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 21/38

Perencanaan Desain Saluran 

14 

Gambar 3.6 Model Pembebanan Reaksi Tanah pada Sisi Bawah 

Tabel 3.11 Perhitungan Momen Ultimit Sisi Bawah 

Tabel 3.12 Perhitungan Tulangan Utama Sisi Bawah 

qu

L

Wu/2 Wu/2

Cov Side Cov U-Di tch   UDL K EL TRUCK Asp al   "D" "T"

mm mm mm mm mm mm3 mm3 kN kN   kN/m2 kN kN kN/m2   kN/m2 kN/m2 kN/m2 kNm kNm30% 400 600 1200 100 80 56000 96000 1 .61 2.76 9 20.58 43.88 1.1 14.31 129.60 178.84 2.59 3.58 0.29

30% 800 800 1200 100 80 96000 128000 2.76 3.69 9 20.58 43.88 1.1 10.95 76.69 93.21 6.14 7.46 0.88

30% 1000 1200 1200 110 130 138600 312000 3.99 8.99 9 20.58 43.88 1.1 16.68 74.14 82.49 9.27 10. 31 2.09

50% 400 800 1200 100 80 56000 128000 1.61 3.69 9 34.3 73.13 1.1 17.00 194.03 291.21 3.88 5.82 0.34

50% 800 800 1200 100 80 96000 128000 2.76 3.69 9 34.3 73.13 1.1 10.95 107.56 148.06 8.61 11.84 0.88

50% 1000 1200 1200 110 130 138600 312000 3.99 8.99 9 34.3 73.13 1.1 16.68 98.83 126.37 12. 35 15. 80 2.09

50% 1200 1500 1200 110 160 167200 480000 4.82 13.82 9 34.3 73.13 1.1 19.66 91.63 111.07 16. 49 19. 99 3.54

50% 1500 1500 1200 130 160 236600 480000 6.81 13.82 9 34.3 73.13 1.1 17.59 78.41 90.72 22. 05 25. 51 4.95

50% 2000 2000 1200 160 210 387200 840000 11.15 24.19 9 34.3 73.13 1.1 22.16 72.63 77.00 36. 31 38. 50 11.08

70% 800 800 1200 100 80 96000 128000 2.76 3.69 9 48.02 102. 38 1.1 10.95 138.43 202.90 11. 07 16. 23 0.88

70% 1000 1200 1200 110 130 138600 312000 3.99 8.99 9 48.02 102. 38 1.1 16.68 123.53 170.24 1 5. 44 21. 28 2.09

70% 1200 1500 1200 110 160 167200 480000 4.82 13.82 9 48.02 102.38 1.1 19.66 112.21 147.63 20.20 26.57 3.54

100% 1000 1200 1200 110 130 138600 312000 3.99 8.99 9 68.6 146. 25 1.1 16.68 160.57 236.06 2 0. 07 29. 51 2.09

100% 1200 1500 1200 110 160 167200 480000 4.82 13.82 9 68.6 146.25 1.1 19.66 143.08 202.47 25.75 36.45 3.54

100% 1500 1500 1200 130 160 236600 480000 6.81 13.82 9 68.6 146.25 1.1 17.59 119.57 163.84 33.63 46.08 4.95

100% 2000 2000 1200 160 210 387200 840000 11.15 24.19 9 68.6 146.25 1.1 22.16 103.50 131.84 51.75 65.92 11.08

DIMENSION

LOAD

PERCENTAGE

Ult Reaction

1.4 Dead  1.4 D +

1.8 L"D"

1.4 D +

1.8 L"T"

COVER

THICK

SIDE

THICKWIDTH

Self WeightArea  Moment

Bott

kNm

Moment TopOther Load

HEIGHT LENGTH

P   10

P   10

P   10

P   10

D   13

D   13

D   13

D   13

D   13

D   13

D   13

D   13

D   13

D   13

D   13

D   13

Dia Tul

(mm)

s perlu

(mm)

As

Perluh

fy

(MPa)

As

Pasang b

s

 pasangρ pakai

4/3 ρ

perluρ perlu

Rn

(MPa)

Assum

e Øρmin

Mu

(kNm)dcover 

Dimensi (mm) Nama

2.283 0.0100 0.0133 0.0133 880 942800x800x1200 (0.3)   1200 80 20   55   7.46   2 40 0.002 0.9

1000x1200x1200 (0.3)   1200 130 20   105   10.31   240 0.002 0.9 0.866 0 .0037 0.0049 0.0049 617 673 153

107   100

140

1200 100 20   73.5   11.84   400 0.0018 0.9 2.030 0.0053 0.0071 0.0071 624 693

1000x1200x1200 (0.5)

1200x1500x1200 (0.5)

1500x1500x1200 (0.5)

2000x2000x1200 (0.5)

800x800x1200 (0.5)

1000x1200x1200 (1)

1200x1500x1200 (1)

1500x1500x1200 (1)

2000x2000x1200 (1)

1000x1200x1200 (0.7)

1200x1500x1200 (0.7)

800x800x1200 (0.7)

1200 210 20   183.5   38.50

1200 130 20   103.5   15.80   400 0.0018 0.9 1.365 0.0035 0.0047 0.0047 582 693

255   230

1200 160 20   133.5   19.99   400 0.0018 0.9 1.039 0.0027 0.0035 0.0035 567 693 281   230

274   230

219   1901200 160 20   133.5   25.51   400 0.0018 0.9 1.326 0.0034 0.0045 0.0045 728 838

200   160400 0.0018 0.9 1.059 0.0027 0.0036 0.0036 795 995

183   1601200 100 20   73.5   16.23   400 0.0018 0.9 2.782 0.0074 0.0099 0.0099 870 995

0.0048 0.0064 0.0064 792 8381200 130 20   103.5   21.28   400 0.0018 0.9 1.839

1200 160 20   133.5   26.57   400 0.0018 0.9 1.381 0.0036 0.0047 0.0047 759 796 210   200

201   190

0.0067 0.0090 0.0090 1117 11381200 130 20   103.5   29.51   400 0.0018 0.9 2.550

1200 160 20   133.5   36.45   400 0.0018 0.9 1.893 0.0049 0.0066 0.0066 1053 1138 151   140

143   140

118   1101200 160 20   133.5   46.08   400 0.0018 0.9 2.394 0.0063 0.0084 0.0084 1347 1448

0.0047 0.0063 0.0063 1383 15931200 210 20   183.5   65.92   400 0.0018 0.9 1.813 115   100

400x600x1200 (0.3)   1200 80 20   55   3.58   240 0.002 0.9 1.095 0 .0047 0.0062 0.0062 411 496 229   190

400x600x1200 (0.5)   1200 100 20   75   5.82   240 0.002 0.9 0.959 0 .0041 0.0054 0.0054 489 496 193   190

Page 22: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 22/38

Perencanaan Desain Saluran 

15 

Tulangan susut perlu ditambahkan pada daerah yang belum dihitung penulangannya

untuk menantisipasi susut yang terjadi pada beton. Kebutuhan tulangan susut melintang

dihitung dari beban yang terjadi akibat beban sendiri saat pengangkatan dan tulangan susut

memanjang dihitung dari tulangan minimum pelat yang ditunjukkan oleh Tabel 3.13 dan Tabel

3.14. 

Tabel 3.13 Perhitungan Tulangan Susut Melintang Sisi Bawah 

Tabel 3.14 Perhitungan Tulangan Susut Memanjang Sisi Bawah 

3.6  Desain Elemen Struktur U-Ditch dan Cover 

Perhitungan penulangan elemen struktur U-Ditch dan Cover menggunakan spreadsheedseperti yang ditunjukkan dalam lampiran. Dari hasil analisa struktur didapatkan gaya-gaya

dalam maksimum yang bekerja pada struktur. Hasil perhitungan kebutuhan penulangan dapat

dilihat pada Tabel 3.15 dengan keterangan notasi dimensi dan penulangan yang dapat dilihat

 pada Gambar 3.10. Tipe U-Ditch & Cover yang akan digunakan ada 3, yaitu tipe 1 untuk

saluran crossing jalan tanpa bukaan apapun, tipe 2 untuk saluran tepi dengan bukaan untuk

saluran air rumah tangga dan tipe 3 untuk saluran tepi dengan bukaan pelaluan air yang dapat

dilihat pada

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   10

P   8

P   8

P   8

P   8

P   8

P   8

P   8

449   190

400x600x1200 (0.5)   1200   100   20   76   0.34   240 0.002 0.9 0.054 0 .0002 0.0003 0.0020 182 317 331   190

20   56   0.29   240 0.002 0.9 0.084 0.0004 0.0005 0.0020 134 317

Mu

(kNm)

fy

(MPa)ρmin

  Assum

e Ø

Rn

(MPa)ρ perlu Nama

  Dimensi (mm)

 b h cover d

s

 pasang

s perlu

(mm)

Dia Tul

(mm)

4/3 ρ

perluρ pakai

  As

Perlu

As

Pasang

800x800x1200 (0.3)   1200 80 20   56

400x600x1200 (0.3)   1200 80

106   2.09

449   1000.0014 0.0020 134 6030.88   240 0.002 0.9 0.259 0.0011

237   1400.0020 254 431240 0.002 0.9 0.172 0.0007 0.00101000x1200x1200 (0.3)   1200 130 20

1000x1200x1200 (0.5)   1200 130 20   106

331   2300.0020 182 262240 0.002 0.9 0.140 0.0006 0.0008800x800x1200 (0.5)   1200 100   20   76   0.88

136   3.54

237   2300.0010 0.0020 254 2622.09   240 0.002 0.9 0.172 0.0007

1500x1500x1200 (0.5)   1200 160 20   136

185   1150.0020 326 525240 0.002 0.9 0.177 0.0007 0.00101200x1500x1200 (0.5)   1200 160 20

0.0013 0.00172000x2000x1200 (0.5)   1200 210 20   185   11.08

185   1600.0014 0.0020 326 3774.95   240 0.002 0.9 0.248 0.0010

0.88   240 0.002 0.9 0.140 0.0006800x800x1200 (0.7)   1200 100 20   76

212   1600.0020 444 589240 0.002 0.9 0.300

331   1600.0008 0.0020 182 377

1200x1500x1200 (0.7)   1200 160 20   136

237   1900.0020 254 317240 0.002 0.9 0.172 0.0007 0.00101000x1200x1200 (0.7)   1200 130 20   106   2.09

185   1000.0010 0.0020 326 6033.54   240 0.002 0.9 0.177 0.0007

2.09   240 0.002 0.9 0.172 0.00071000x1200x1200 (1)   1200 130 20   106 237   1400.0010 0.0020 254 431

1500x1500x1200 (1)   1200 160 20   136

185   1400.0020 326 431240 0.002 0.9 0.177 0.0007 0.00101200x1500x1200 (1)   1200 160 20   136   3.54

1200 210 20   186   11.08

185   1100.0014 0.0020 326 5484.95   240 0.002 0.9 0.248 0.0010

135   1000.0020 446 603240 0.002 0.9 0.297 0.0012 0.00172000x2000x1200 (1)

P   8

P   8

P   8

P   8

P   8

P   8P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

P   8

400x600x1200 (0.5)   1200   100   20   76   1.00   240 0.002 0.9 0.160 0 .0007 0.0009 0.0020 182 262 331   230

400x600x1200 (0.3)   1200 80 20   56   1.00   240 0.002 0.9 0.295 0.0012 0.0017 0.0020 134 262

 Nama  Dimensi (mm) Dia Tul

(mm)

4/3 ρ

perluρ pakai

  As

Perlu

As

Pasang

Mu

(kNm)

fy

(MPa)ρmin

  Assum

e Ø

Rn

(MPa)ρ perlu

 b h cover d

s

 pasang

s perlu

(mm)

800x800x1200 (0.3)   1200 80 20   56

449   230

106   1.00

449   2300.0017 0.0020 134 2621.00   240 0.002 0.9 0.295 0.0012

237   2300.0020 254 262240 0.002 0.9 0.082 0.0003 0.00051000x1200x1200 (0.3)   1200 130 20

1000x1200x1200 (0.5)   1200 130 20   106

331   2300.0020 182 262240 0.002 0.9 0.160 0.0007 0.0009800x800x1200 (0.5)   1200 100   20   76   1.00

136   1.00237   2300.0005 0.0020 254 2621.00   240 0.002 0.9 0.082 0.0003

1500x1500x1200 (0.5)   1200 160 20   136

185   1600.0020 326 377240 0.002 0.9 0.050 0.0002 0.00031200x1500x1200 (0.5)   1200 160 20

0.0001 0.00012000x2000x1200 (0.5)   1200 210 20   186   1.00

185   1600.0003 0.0020 326 3771.00   240 0.002 0.9 0.050 0.0002

1.00   240 0.002 0.9 0.160 0.0007800x800x1200 (0.7)   1200 100 20   76

135   1200.0020 446 503240 0.002 0.9 0.027

331   2300.0009 0.0020 182 262

1200x1500x1200 (0.7)   1200 160 20   136

237   2300.0020 254 262240 0.002 0.9 0.082 0.0003 0.00051000x1200x1200 (0.7)   1200 130 20   106   1.00

185   1600.0003 0.0020 326 3771.00   240 0.002 0.9 0.050 0.0002

1.00   240 0.002 0.9 0.082 0.00031000x1200x1200 (1)   1200 130 20   106 237   2300.0005 0.0020 254 262

1500x1500x1200 (1)   1200 160 20   136

185   1600.0020 326 377240 0.002 0.9 0.050 0.0002 0.00031200x1500x1200 (1)   1200 160 20   136   1.00

1200 210 20   186   1.00

185   1600.0003 0.0020 326 3771.00   240 0.002 0.9 0.050 0.0002

135   1200.0020 446 503240 0.002 0.9 0.027 0.0001 0.00012000x2000x1200 (1)

Page 23: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 23/38

Perencanaan Desain Saluran 

16 

Gambar 3.7 U-Ditch & Cover Type 1  Gambar 3.8 U-Ditch & Cover Type 2  Gambar 3.9 U-Ditch & Cover Type 3 

Bt2 t2

H

t3

1.20

t1

t2B

t2

 

Bt2 t2

H

t3

1.20

t1

0.14

0.20

0.10

0.05

0.10

t2B

t2

 

0.60

0.40

1.20

t1

0.75

0.75

0.14

0.20

Bt2 t2

H

t3

t2B

t2

Page 24: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 24/38

Perencanaan Desain Saluran 

17 

Gambar 3.10 Notasi Dimensi U-Ditch (kiri) dan Notasi Penulangan U-Ditch (kanan) 

Tabel 3.15 Tulangan U-Ditch dan Cover 

      t       1

t2 t2

      t       3 

      t      c 

      H

B

s

     s 

s

     s 

T1T2T3

S3

S1

S2

B3B2B1

S3

S1

S2

 A A

Gandar % t1 t2 t3 s T1 T2 T3 S1 S2 S3 B1 B2 B3 A

6.75 30 100 80 80 80 - BJTP-24, 10-100 BJTP-24, 8-230 BJTP-24, 10-230 - BJTP-24, 8-230 BJTP-24, 10-190 BJTP-24, 8-190 BJTP-24, 8-230 BJTP-24, 8-190

11.25 50 100 80 100 80 - BJTD-40, 13-160 BJTP-24, 8-230 BJTP-24, 10-230 - BJTP-24, 8-230 BJTP-24, 10-190 BJTP-24, 8-190 BJTP-24, 8-230 BJTP-24, 8-190

6.75 30 100 80 80 80 - BJTD-40, 13-120 BJTP-24, 8-230 BJTP-24, 10-100 - BJTP-24, 8-230 BJTP-24, 10-100 BJTP-24, 8-100 BJTP-24, 8-230 BJTP-24, 8-100

11.25 50 120 80 100 80 BJTP-24, 8-140 BJTD-40, 16-140 BJTP-24, 8-230 BJTP-24, 10-100 - BJTP-24, 8-230 BJTD-40, 13-230 BJTP-24, 8-230 BJTP-24, 8-230 BJTP-24, 8-230

15.75 70 130 80 100 80 BJTP-24, 8-120 BJTD-40, 16-120 BJTP-24, 8-230 BJTP-24, 10-100 - BJTP-24, 8-230 BJTD-40, 13-160 BJTP-24, 8-160 BJTP-24, 8-230 BJTP-24, 8-160

6.75 30 110 130 130 100 BJTP-24, 8-100 BJTD-40, 13-100 BJTP-24, 8-230 BJTD-40, 13-190 BJTP-24, 8-190 BJTP-24, 8-230 BJTP-24, 10-140 BJTP-24, 8-140 BJTP-24, 8-230 BJTP-24, 8-140

11.25 50 130 130 130 100 BJTP-24, 8-120 BJTD-40, 16-120 BJTP-24, 8-230 BJTD-40, 13-190 BJTP-24, 8-190 BJTP-24, 8-230 BJTD-40, 13-230 BJTP-24, 8-230 BJTP-24, 8-230 BJTP-24, 8-230

15.75 70 140 130 130 100 BJTP-24, 8-100 BJTD-40, 16-100 BJTP-24, 8-190 BJTD-40, 13-190 BJTP-24, 8-190 BJTP-24, 8-230 BJTD-40, 13-190 BJTP-24, 8-190 BJTP-24, 8-230 BJTP-24, 8-190

22.50 100 170 130 130 100 BJTP-24, 8-120 BJTD-40, 19-120 BJTP-24, 8-160 BJTD-40, 13-190 BJTP-24, 8-190 BJTP-24, 8-230 BJTD-40, 13-140 BJTP-24, 8-140 BJTP-24, 8-230 BJTP-24, 8-140

11.25 50 140 160 160 130 BJTP-24, 8-120 BJTD-40, 16-120 BJTP-24, 8-190 BJTD-40, 13-160 BJTP-24, 8-160 BJTP-24, 8-160 BJTD-40, 13-230 BJTP-24, 8-115 BJTP-24, 8-160 BJTP-24, 8-115

15.75 70 160 160 160 130 BJTP-24, 8-140 BJTD-40, 19-140 BJTP-24, 8-160 BJTD-40, 13-160 BJTP-24, 8-160 BJTP-24, 8-160 BJTD-40, 13-200 BJTP-24, 8-100 BJTP-24, 8-160 BJTP-24, 8-100

22.50 100 180 160 160 130 BJTP-24, 8-120 BJTD-40, 19-120 BJTP-24, 8-160 BJTD-40, 13-160 BJTP-24, 8-160 BJTP-24, 8-160 BJTD-40, 13-140 BJTP-24, 8-140 BJTP-24, 8-160 BJTP-24, 8-140

11.25 50 160 160 160 130 BJTP-24, 8-110 BJTD-40, 16-110 BJTP-24, 8-160 BJTD-40, 13-160 BJTP-24, 8-160 BJTP-24, 8-160 BJTD-40, 13-190 BJTP-24, 8-160 BJTP-24, 8-160 BJTP-24, 8-160

22.50 100 200 160 160 130 BJTP-24, 8-100 BJTD-40, 19-100 BJTP-24, 8-140 BJTD-40, 13-160 BJTP-24, 8-160 BJTP-24, 8-160 BJTD-40, 13-110 BJTP-24, 8-110 BJTP-24, 8-160 BJTP-24, 8-110

11.25 50 190 210 210 150 BJTP-24, 8-100 BJTD-40, 16-100 BJTP-24, 8-140 BJTD-40, 13-100 BJTP-24, 8-100 BJTP-24, 8-120 BJTD-40, 13-190 BJTD-40, 13-380 BJTP-24, 8-120 BJTD-40, 13-380

22.50 100 240 210 210 150 BJTP-24, 8-100 BJTD-40, 19-100 BJTP-24, 8-110 BJTD-40, 13-100 BJTP-24, 8-100 BJTP-24, 8-120 BJTD-40, 13-100 BJTP-24, 10-100 BJTP-24, 8-120 BJTP-24, 10-1002000x2000x1200

Dimensi (mm)

1200x1500x1200

1500x1500x1200

Beban   TulanganUkuran (mm)

800x800x1200

1000x1200x1200

400x600x1200

Page 25: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 25/38

Perencanaan Desain Saluran 

18 

Gambar 3.11 Dimensi dan Detail Penulangan U-Ditch dan Cover

Ukuran 400x600x1200 Beban 30% (6.75 Ton) 

Gambar 3.12 Dimensi dan Detail Penulangan U-Ditch dan Cover

Ukuran 400x600x1200 Beban 50% (11.25 Ton) 

      8       0 

      2      0 

      6       0       0 

      1      0       0 

      6       8       0 

80 400 80

560

      8 

      0 

80

      8       0 

80

      8       0 

Ø10-100 Ø8-230

Ø10-230

Ø8-230

Ø8-100

Ø8-190 Ø8-230

Ø10-190

Ø10-230

Ø8-230

Ø8-190

 

      8       0 

      2      0 

      6       0       0 

      1      0       0 

      7      0       0 

80 400 80

560

      1      0       0 

80

      8 

      0 

80

      8 

      0 

D13-160 Ø8-230

Ø8-190 Ø8-230

Ø10-190

Ø10-230

Ø8-230

Ø8-230

Ø10-230

Ø8-230

Ø8-190

Page 26: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 26/38

Page 27: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 27/38

Page 28: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 28/38

Page 29: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 29/38

Page 30: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 30/38

Page 31: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 31/38

Page 32: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 32/38

Page 33: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 33/38

Perencanaan Desain Saluran 

26 

BAB- 4 

PERHITUNGAN STRUKTUR

TOP-BOTTOM 

4.1  Permodelan Struktur Top-Bottom dalam Perhitungan 

Permodelan struktur Top-Bottom dimodelkan berdasarkan dari beberapa asumsi untuk

mempermudah perhitungan manual. Struktur ini dibagi menjadi 2 bagian, struktur top dan

struktur bottom. Struktur top dimodelkan dengan beban mati (Berat sendiri dan aspal), beban

hidup (UDL, KEL dan Truck), serta beban lateral (tekanan tanah aktif dan beban lateral

kendaraan). Gaya-gaya total yang terjadi pada struktur top akan diteruskan ke struktur bottom

yang diletakkan pada tanah sehingga akan terjadi reaksi dari tanah. Perhitungan struktur bottomakan diperhitungkan dari beban lateral (tekanan tanah aktif dan beban lateral kendaraan) serta

reaksi tanah. Sketsa pembebanan struktur Top-Bottom dapat dilihat pada Gambar 4.1 

Gambar 4.1 Model Pembebanan Top-Bottom 

KEL

BERAT SENDIRI

 ASPAL

UDL

TRUCK

BEBANTEKANAN TANAH

REAKSI TANAH

LATERAL AKTIFKENDARAAN

BEBAN TEKANAN TANAHLATERAL AKTIF

KENDARAAN

Page 34: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 34/38

Perencanaan Desain Saluran 

27 

4.2  Permodelan Beban Statik Top-Bottom 

Permodelan input beban terdiri dari beban mati tambahan berupa aspal, beban tekanan

tanah, beban hidup “D” dan beban hidup “T” serta beban reaksi tanah akibat pembebanan

grafitasi yang ditimbulkan oleh beban mati dan beban hidup. Besarnya beban-beban tersebut

dapat dilihat pada perhitungan dibawah ini : 

  Beban mati sendiri struktur dengan berat jenis 24 kN/m3. 

  Beban mati tambahan berupa aspal setebal 5 cm sebesar 1.1 kN/m2. 

  Beban hidup “D” terdiri dari beban UDL sebesar 9 kN/m2 dan beban KEL sebesar 49

kN/m’ yang akan dikalikan faktor sebesar 1.4 untuk beban kejut. (digunakan koefisien

30% 50%, 70%, 100% dalam desain struktur saluran ini bergantung pada jenis saluran

yang didesain). 

  Beban hidup “T” truk dengan besar beban terpusat 1 roda sebesar 112.5 kN yang akan

dikalikan faktor sebesar 1.3 untuk beban kejut. (digunakan koefisien 30% 50%, 70%,

100% dalam desain struktur saluran ini bergantung pada jenis saluran yang didesain). 

  Beban tekanan tanah aktif yang bekerja pada dinding diasumsikan tanah lempung

dengan berat jenis tanah γ = 1.8 ton/m3, sehingga besarnya tekanan tanah aktif sebesar

γ x h x ka dengan ka = 1 untuk tanah lempung. 

 

Beban tekanan tanah akibat beban merata kendaraan sebesar q x ka = 9 kN/m2. 

  Beban reaksi tanah yang dihitung berdasarkan beban gravitasi total pada struktur (beban

mati sendiri, aspal dan beban hidup) 

Page 35: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 35/38

Perencanaan Desain Saluran 

28 

4.3  Desain Elemen Struktur Top-Bottom 

Perhitungan penulangan elemen struktur Top-Bottom menggunakan spreadsheed

seperti yang ditunjukkan dalam lampiran. Dari hasil analisa struktur didapatkan gaya-gaya

dalam maksimum yang bekerja pada struktur. Hasil perhitungan kebutuhan penulangan dapat

dilihat pada Tabel 4.1 dengan keterangan notasi dimensi dan penulangan yang dapat dilihat

 pada Gambar 4.2. 

Gambar 4.2 Notasi Dimensi Top-Bottom (kiri) dan Notasi Penulangan Top-Bottom (kanan) 

Tabel 4.1 Tulangan Top-Bottom 

Gandar % t1 t2 t3 s T1 T2 T3 S1 (TOP) S1 (BOTT) S2 (TOP)

15.75 70 160 130 160 130 BJTP-24, 8-140 BJTD-40, 19-140 BJTP-24, 8-160 BJTP-24, 10-230 BJTP-24, 10-230 BJTP-24, 8-230

22.50 100 180 130 160 130 BJTP-24, 8-120 BJTD-40, 19-120 BJTP-24, 8-160 BJTP-24, 10-230 BJTP-24, 10-230 BJTP-24, 8-230

1500x1500x1200 22.50 100 200 160 160 130 BJTP-24, 8-100 BJTD-40, 19-100 BJTP-24, 8-140 BJTP-24, 10-230 BJTP-24, 10-160 BJTP-24, 8-115

1500x2000x1200 22.50 100 200 210 210 150 BJTP-24, 8-100 BJTD-40, 19-100 BJTP-24, 8-140 BJTP-24, 10-160 BJTP-24, 10-160 BJTP-24, 10-160

2000x2000x1200 22.50 100 240 210 210 150 BJTP-24, 8-100 BJTD-40, 19-100 BJTP-24, 8-110 BJTP-24, 10-160 BJTP-24, 10-100 BJTP-24, 10-160

Ukuran (mm)  Dimensi (mm)

1200x1200x1200

Beban Tulangan

Gandar % S2 (BOTT) S3 B1 B2 B3 A

15.75 70 BJTP-24, 8-230 BJTP-24, 8-230 BJTD-40, 13-190 BJTP-24, 8-160 BJTP-24, 8-160 BJTP-24, 8-160

22.50 100 BJTP-24, 8-230 BJTP-24, 8-230 BJTD-40, 13-140 BJTP-24, 8-140 BJTP-24, 8-160 BJTP-24, 8-140

1500x1500x1200 22.50 100 BJTP-24, 8-160 BJTP-24, 8-160 BJTD-40, 13-110 BJTP-24, 8-110 BJTP-24, 8-160 BJTP-24, 8-110

1500x2000x1200 22.50 100 BJTP-24, 8-160 BJTP-24, 8-160 BJTD-40, 13-140 BJTP-24, 10-140 BJTP-24, 8-120 BJTP-24, 10-140

2000x2000x1200 22.50 100 BJTP-24, 8-100 BJTP-24, 8-100 BJTD-40, 13-100 BJTP-24, 10-100 BJTP-24, 8-120 BJTP-24, 10-100

Ukuran (mm)

1200x1200x1200

Beban Tulangan

Page 36: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 36/38

Page 37: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 37/38

Page 38: STANDARISASI BOX CULVERT.pdf

7/16/2019 STANDARISASI BOX CULVERT.pdf

http://slidepdf.com/reader/full/standarisasi-box-culvertpdf 38/38

Perencanaan Desain Saluran 

Gambar 4.7 Dimensi dan Detail Penulangan Top-Bottom

Ukuran 2000x2000x1200 Beban 100% (22.50 Ton) 

      2      4      0 

      2      0       0       0 

      2      1      0 

      2      4      5       0 

210 2000 210

2420

D13-100

150

      1      5       0 

150

      1      5       0 

150

      1      5       0 

150

      1      5       0 

D19-100Ø8-100 Ø8-110

Ø10-100 Ø8-120

Ø8-100

Ø10-160Ø10-160

Ø8-100

Ø10-100

Ø8-100

Ø10-100

Ø10-100

Ø8-600

Ø8-100

Ø10-160Ø10-160

Ø8-100

Ø10-100

Ø8-100

Ø10-100

      1      5       0 

      1      5       0 

      3       0       0 

2420 150

2720

150

      1      0       0 

Ø10-100

D13-230Ø10-230

D13-230Ø10-230

D13D13