STATE ESTIMATOR STATE ESTIMATOR QUALITY TRACKING IN QUALITY TRACKING IN BC Hydro EMS BC Hydro EMS IMPLEMENTATION IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Engineering Team Leader, Power system Applications, Grid Operations Support Applications, Grid Operations Support

STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION

  • Upload
    dayton

  • View
    49

  • Download
    0

Embed Size (px)

DESCRIPTION

STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION. Dr. DJORDJE ATANACKOVIC, P.Eng . Engineering Team Leader, Power system Applications, Grid Operations Support. STATE ESTIMATOR GENERAL PERFORMANCE REQUIREMENTS. CONVERGENCE SUCCESS RATE OF 98% - PowerPoint PPT Presentation

Citation preview

Page 1: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

STATE ESTIMATOR STATE ESTIMATOR QUALITY TRACKING IN QUALITY TRACKING IN BC Hydro EMS BC Hydro EMS IMPLEMENTATIONIMPLEMENTATION

Dr. DJORDJE ATANACKOVIC, P.Eng.Dr. DJORDJE ATANACKOVIC, P.Eng.

Engineering Team Leader, Power system Applications, Grid Engineering Team Leader, Power system Applications, Grid Operations SupportOperations Support

Page 2: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

2

STATE ESTIMATOR GENERAL STATE ESTIMATOR GENERAL PERFORMANCE REQUIREMENTSPERFORMANCE REQUIREMENTS

• CONVERGENCE SUCCESS RATE OF 98%

• COST FUNCTION IN THE RANGE OF 8000 – 11000 (~2500 BUSES, 4000 ANALOG MEASUREMENTS)

• TOTAL GENERATION ERROR < 40 MW

• TOTAL INTERCHANGE ERROR < 10MW

• MAX. MW BUS MISMATCH < 50MW

• TOTAL LOAD ALLOCATION ERROR < 400MW

Page 3: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

3

STATE ESTIMATOR QUALITY STATE ESTIMATOR QUALITY MONITORING – NEW INDICESMONITORING – NEW INDICES

• TOTAL LOAD ALLOCATION ERROR

• TOTAL MW, MVAR LINE FLOW RESIDUAL PER MEASUREMENT

• TOTAL MW, MVAR INJECTION RESIDUAL PER MEASUREMENT

• TOTAL VOLTAGE AND CURRENT RESIDUAL PER MEASUREMENT

Page 4: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

4

STATE ESTIMATOR QUALITY MONITORING STATE ESTIMATOR QUALITY MONITORING TOTAL LOAD ALLOCATION ERRORTOTAL LOAD ALLOCATION ERROR

• CALCULATED AS A SUM OF LOAD RESIDUALS FOR ALL LOADS IN BC HYDRO AREA

• LOAD RESIDUAL IS A DIFFERENCE BETWEEN ESTIMATED LOAD AND ALLOCATED LOAD

• BC HYDRO PERFORMANCE CRITERIA :

TOTAL LOAD ALLOCATION ERROR SHOULD NOT EXCEED 600 MW MAXIMUM

AVERAGE LOAD ALLOCATION ERROR OVER A PERIOD OF ONE YEAR SHOULD NOT EXCEED 400 MW

Page 5: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

5

STATE ESTIMATOR QUALITY MONITORING STATE ESTIMATOR QUALITY MONITORING TOTAL MW,MVAR LINE FLOW RESIDUAL TOTAL MW,MVAR LINE FLOW RESIDUAL PER MEASUREMENTPER MEASUREMENT

• CALCULATED AS A SUM OF MW/MVAR LINE FLOW RESIDUALS FOR ALL MEASUREMENTS IN THE CONSIDERED ZONE DIVIDED BY NUMBER OF MEASUREMENTS

• THREE ZONES ARE USED FOR THIS TRACKING: TRANSMISSION (230 KV AND ABOVE) SUBTRANSMISSION (60 – 138KV) DISTRIBUTION (BELOW 60 KV)

• BCTC PERFORMANCE CRITERIA FOR A PERIOD OF ONE YEAR: TRANSMISSION - BELOW 7 MW SUBTRANSMISSION - BELOW 15 MW DISTRIBUTION - BELOW 20 MW

Page 6: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

6

STATE ESTIMATOR QUALITY MONITORING STATE ESTIMATOR QUALITY MONITORING TOTAL MW,MVAR INJECTION RESIDUAL TOTAL MW,MVAR INJECTION RESIDUAL PER MEASUREMENTPER MEASUREMENT

• CALCULATED AS A SUM OF ALL INJECTION RESIDUALS IN A CONSIDERED ZONE DIVIDED BY NUMBER OF MEASUREMENTS IN THE ZONE

• BCH PERFORMANCE CRITERIA FOR A PERIOD OF ONE YEAR: TRANSMISSION – BELOW 3 MW SUBTRANSMISSION - BELOW 7 MW DISTRIBUTION - BELOW 10 MW

Page 7: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

7

STATE ESTIMATOR QUALITY MONITORINGSTATE ESTIMATOR QUALITY MONITORINGNORMALIZED RESIDUALSNORMALIZED RESIDUALS

• ENABLES RANKING OF MEASUREMENTS OF DIFFERENT TYPES (MW, MVAR, AMPS, KV) BASED ON A NORMALIZED INDEX

• BCH PERFORMANCE CRITERION: NORMALIZED RESIDUAL GREATER THAN 10 UNITS INDICATES A

MEASUREMENT OF A LOWER QUALITY

• NEEDS IMPROVEMENT : DOES NOT REFLECT ERRORS OF GENERATOR UNIT MEASUREMENT AND OTHER INJECTION MEASUREMENTS

Page 8: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

8

STATE ESTIMATOR QUALITY MONITORINGSTATE ESTIMATOR QUALITY MONITORINGCONSISTENCY OF VOLTAGE STABILITY REGIONCONSISTENCY OF VOLTAGE STABILITY REGION

Page 9: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

9

STATE ESTIMATOR PERFORMANCE STATE ESTIMATOR PERFORMANCE TRACKINGTRACKING

TRACK SOLUTION QUALITY INDICES IN PI

IMPROVE ONLINE SEQUENCE DISPLAY TO INCLUDE ALERT SIGNALS (FLASHING APPLICATION STATUS BOXES)

MONITOR IMPACT ON OTHER APPLICATIONS E.G. VSA

PERFORM REGULAR REAL TIME TELEMETRY QUALITY ANALYSIS AND PRODUCE TELEMETRY QUALITY REPORTS

ISSUE TELEMETRY CALIBRATION REQUESTS

RTNET SOLUTION INVALIDATED IF QUALITY MEASURES OUTSIDE PERFORMANCE LIMITS

Page 10: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

10

BASIC QUALITY INDICESBASIC QUALITY INDICES

Page 11: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

11

AVERAGE MEASUREMENT RESIDUALS AVERAGE MEASUREMENT RESIDUALS

Page 12: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

12

Page 13: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

13

Page 14: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

14

Page 15: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

15

Page 16: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

16

Page 17: STATE ESTIMATOR QUALITY TRACKING IN  BC Hydro  EMS IMPLEMENTATION

17

QUESTIONS?QUESTIONS?