10
53 Regional Drive Tel: (603) 225-2978 Concord, NH 03301 Fax: (603)225-0095 McFARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS An Employee-Owned Company CONFERENCE REPORT STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN PROJECT: Plaistow-Kingston 10044E NH Route 125 DATE OF CONFERENCE: June 20, 2019 LOCATION OF CONFERENCE: Kingston Town Hall, 163 Main Street, Kingston, NH ATTENDED: Loretta Girard Doughty, NHDOT Kathy Corliss, NHDOT Maggie Baldwin, NHDOT Darren Blood, GM2 Seth Hill, GM2 Jennifer Zorn, McFarland Johnson David Walker, Rockingham Planning Commission Michael Dorman, Town of Plaistow Richard St. Hilaire, Kingston Road Agent Donald Briggs, Jr., Kingston Police/Selectmen Glenn Coppelman, Kingston Planning Board Glenn Greenwood, Kingston Planner Ellen Faulconer, Kingston Planning Board Brian Craven, Kingston Collision SUBJECT: Working Group Meeting #2 NOTES ON CONFERENCE: D. Blood provided a brief overview of the Working Group Meeting #1 and requested comments on the draft conference report from that meeting. At this time, there were no comments from the Working Group members. Final comments were request by June 28, 2019. As a recap of the action items from meeting #1, D. Blood stated that the safety data requested was still being compiled and would be provided as soon as possible. According to Chief Briggs,

STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David

53 Regional Drive Tel: (603) 225-2978

Concord, NH 03301 Fax: (603)225-0095

McFARLAND JOHNSON Established 1946

PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS

An Employee-Owned Company

CONFERENCE REPORT

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION

BUREAU OF HIGHWAY DESIGN

PROJECT: Plaistow-Kingston 10044E

NH Route 125

DATE OF CONFERENCE: June 20, 2019

LOCATION OF CONFERENCE: Kingston Town Hall, 163 Main Street, Kingston, NH

ATTENDED:

Loretta Girard Doughty, NHDOT

Kathy Corliss, NHDOT

Maggie Baldwin, NHDOT

Darren Blood, GM2

Seth Hill, GM2

Jennifer Zorn, McFarland Johnson

David Walker, Rockingham Planning Commission

Michael Dorman, Town of Plaistow

Richard St. Hilaire, Kingston Road Agent

Donald Briggs, Jr., Kingston Police/Selectmen

Glenn Coppelman, Kingston Planning Board

Glenn Greenwood, Kingston Planner

Ellen Faulconer, Kingston Planning Board

Brian Craven, Kingston Collision

SUBJECT: Working Group Meeting #2

NOTES ON CONFERENCE:

D. Blood provided a brief overview of the Working Group Meeting #1 and requested comments

on the draft conference report from that meeting. At this time, there were no comments from the

Working Group members. Final comments were request by June 28, 2019.

As a recap of the action items from meeting #1, D. Blood stated that the safety data requested

was still being compiled and would be provided as soon as possible. According to Chief Briggs,

Page 2: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David

Page 2 CONFERENCE REPORT June 20, 2019

the sidewalk matter was discussed with the Selectboard and it was determined that a pedestrian

crossing at the intersection of NH Route 125 and Newton Junction would be desirable. It was

stated that there is no safe way for pedestrians to cross NH Route 125 at Newton Junction. The

concentrated residential land use at this location generates pedestrian traffic.

D. Blood led the discussion on the potential typical section and concepts designs of the key

intersections within the project corridor. These intersections include: Kingston Road and Granite

Road; Diamond Oaks Boulevard; Roadstone Drive and Dorre Road; Colonial Road and Happy

Hollow Lane; and Debra Road. A typical section for these side roads was provided as well as

concept designs to the members of the Working Group to augment the discussion.

Numerous questions and comments were provided by the Working Group. A summary follows:

• It was inquired whether overhead lighting could be incorporated. The NHDOT stated that

the request would need to be worked through the DOT process. It was recommended that

the town make a formal request to the DOT.

• There was a discussion on whether the town typical section or the DOT typical section

would be appropriate for the side roads. It was determined that the DOT typical would

be appropriate since it provides a wider pavement width including paved shoulders.

• An inquiry was made on placing a traffic signal at the Roadstone intersection. D. Blood

stated that the traffic data does not support a signal at this location.

• It was stated that a gas line is proposed on NH Route 125 to Roadstone via the state right

of way. NHDOT stated that this was District 6 and the Utility Section is coordinating

with this proposed utility.

• Trucks at and near Dorre Road was raised as a concern and whether widening at this

location was appropriate due to the concern of head-on vehicle collisions. D. Blood

stated that the hill is likely not long enough for a dedicated truck lane.

• It was inquired why the shoulder was wider at the intersection of Colonial Road. D.

Blood stated this was due to a sight distance issue and the widen shoulder would allow

for the required sight distance.

• It was stated that school buses that now turn around (reverse direction on NH Route 125)

on Kingston Road will be unable to turnaround in the current manner based upon the

proposed concept.

• An inquiry was made on the two proposed gravel driveways of Granite Road and how the

future maintenance would occur since one of the proposed driveways utilizes the existing

roadway. D. Blood stated that the decision would be up to the town since that is town

right of way.

• An inquiry was made on the ownership of Kingston Road, whether state or town owned?

A consensus was not reached at this meeting and further research is needed to confirm.

• It was reiterated that a truck problem was present at Dorre Road especially between slow

moving trucks traveling up the hill and the faster cars traveling though. D. Blood stated

the hill was likely not long enough for a truck only lane, however, wider shoulders may

be an option in this location.

• It was stated that a new development in the corridor was being proposed and that it would

bring additional residential development to the project corridor.

• Driveway conflicts throughout the project corridor was raised as a concern.

Page 3: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David

Page 3 CONFERENCE REPORT June 20, 2019

Five members of the general public attended this meeting and had comments and questions. A

summary follows:

• Will the road (NH Route 125) be widened? Yes, but it is unlikely to be the five-lane

section proposed in 2004. The current proposal will widen NH Route 125 to

accommodate a three-lane section, included two travel lanes and a center turn lane. A

raised median is not favored based on the feedback from the Working Group to date.

• Regarding the property takings proposed in 2004, it was stated that these may or may not

occur for this current project.

• Driveway conflicts were a concern.

• It was inquired whether curbing would be proposed and where.

Regarding the next Working Group Meeting, the question was raised by D. Blood whether to

have a 3rd meeting or to create the concepts based upon the input thus far and show these at a

Public Information Meeting. It was determined that one more Working Group meeting would be

held after a Public Informational Meeting in September.

It was also stated that another formal public hearing is not anticipated for this project because the

impacts will be less than what was previously proposed.

Action items prior to next meeting

• NHDOT will provide safety data based on a three-lane section.

• Concept plans would be further advance based upon the feedback received from Working

Group Meeting #1 and #2.

Next meeting

The next Working Group meeting was not set at this time.

Submitted By:

Jennifer L. Zorn, AICP

McFarland-Johnson, Inc.

ATTACHMENTS:

1. Meeting Agenda

2. Multi-sheet handout showing typical section of a sideroad and concept designs of the key

intersections

3. NHDOT email correspondence, dated September 9, 2019, detailing the results of the

research conducted on potential driveway conflicts.

Page 4: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David
Page 5: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David
Page 6: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David
Page 7: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David
Page 8: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David
Page 9: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David

2387 2388 2389 2390 2391 2392 2393 2394 2395 2396 2397 2398 2399 2400 2401 2402 2403 2404 2405 2406

400

401

402

403

404

405

406

407

E = 15.72'

L = 105.46'

T = 58.23'

R = 100.00'

E = 1139904.08

N = 136074.33

PI= 406+63.02

CURVE #2 - HAPPY HOLLOW LANE

E = 29.26'

L = 176.44'

T = 99.33'

R = 154.00'

E = 1139922.81

N = 135762.92

PI= 403+73.27

CURVE #1 - HAPPY HOLLOW LANE

PRC 46+08.02

PC 48+98.51

PT 49+64.64

PC 402+73.93

PT 404+50.38

PT 407+10.25

PC 406+04.80

CURVE #3

CURVE #4

CU

RV

E #1

CU

RV

E #2

#5

CURVE

40

41

42

43 4445

46 4748

49

PT 40+91.29

PC 41+60.85

PCC 43+70.28

PT 46

+92.99

CURVE #1

CURVE #2

E = 3.98'

L = 91.29'

T = 46.10'

R = 265.00'

E = 1139396.16

N = 135063.91

PI= 40+46.10

CURVE #1 - COLONIAL ROAD

E = 16.27'

L = 209.42'

T = 107.95'

R = 350.00'

E = 1139584.48

N = 135184.50

PI= 42+68.80

CURVE #2 - COLONIAL ROAD

E = 1.50'

L = 237.74'

T = 118.90'

R = 4700.00'

E = 1139673.042

N = 135393.19

PI= 44+89.17

CURVE #3 - COLONIAL ROAD

E = 1.81'

L = 84.97'

T = 42.59'

R = 500.00'

E = 1139729.14

N = 135544.75

PI= 46+50.61

CURVE #4 - COLONIAL ROAD

E = 5.73'

L = 66.14'

T = 34.33'

R = 100.00'

E = 1139870.02

N = 135789.54

PI= 49+32.84

CURVE #5 - COLONIAL ROAD

5.0'

6.0'6.0'

11.0'

11.0'

5.0'5.0'

12.0' 12.0'

5.0'

283

BURTT, IRENE M.

280

& SANDRA J.

SEAMAN, NELSON W. III

275

KINNEY, WAYNE E.

Exist R.O.W.

Exist R.O.W.

Approx. Exist R.

O.W.

Approx.

Exist

R.

O.

W.

Approx.

Exist

R.

O.

W.

Appr

ox.

Exist

R.O.

W.

279

REALTY TRUST

CARA MARIA

Approx. Exist

R.O.W.

282

REV. TRUST OF 2008PHYLLIS L. CROWELL

278

KINGSTON

TOWN OF

& LLOYD G.

SWANBURG, JUDITH A.

Exist R.O.W.

Exist R.O.W.

Exist R.O.W.

282

LEATE, KATHLEEN A.

SHANNON L.

LEATE-VARNEY,

59

ROGER S.YOUNG,

59

ROGER S.YOUNG,

Exist R.O.W.

Exist R.O.W.

OF 2008

REV. TRUST

CROWELL

PHYLLIS L.

R.O.W.

Exist

281

REVOCABLE TRUST

LESLIE A. WEISKOPF

277

IRREVOCABLE TRUSTAND MADELINE K. RADFORDLAURENCE F. RADFORD, SR.

REALTY LLC

FIELDSTONE MEADOW

180

(DOT)STATE OF NEW HAMPSHIRE

(DOT)STATE OF NEW HAMPSHIRE

w

mp mp

mp

mb

jb

ip

dh

cb

cb

cb cbcb

an

an

anan

an

NU

LL

NU

LL

NU

LL

NU

LL

6mb's

bnd

conc

nhhd

ip

1.5'h

bnd

conc

nhhd

w

mb

mb

lp lp

an

an

an

an

an

an

an

an

cb

cb an

an

an

an

catv

pb

catv

pb

mb#5

mb#9

brush

bldrs

bldrs

nail"Coloni

al rd"

brush

brush

#s

no

brush/hrdwds

crushed stone

crushed stone

crushed stonecrushed stone

hdr

stone

jb

broken

over

paved

structure

drainage

post

15"

1489

14

1'c oak

wood door

of slope w/

to inside

entrance way

conc block

4'w x 5'h

brick skorn

orn

maple

2'cmaple

2'c tri

bldrs

7

brush

brush

ledge

2

25

1-2R

197

net

w/mtl gate

2 mtl posts

posts

2 mtl

lawn

oak5.

4'c

NULL

NULL

15"c

mp

boulder

buried

hdr

stone

buried

(buried)

not found

driveway

residential

under

3_15

SPPA.3

E1 12

MC

in pole:

engraved

scattered boulders

wood RR ties

"JDL Construction"

"Delta Stone Inc"

"Pope Housing LLC"

4mb's

I-200LP5

not 6mb's

5mb's

w/stairs

deck

net/7

"Colonial Rd"

"stop"bgr

6

net

bgr

net/197/5

"mile 4.2"

entering"

"trucks

mixed woods mixed woods

mixed woods

"no passing zone"

drive

asph

ks

hp

sa

stpscnc

padcnc conc rw

wood

story

1•lawn

1

234

5

1

97

1491

"speed limit 30"

15amp

4

197

net

22

154

197A€ net3

23

2246

24

2

net

2245

25

154

2244

1

197

net

bgr

1

26

1512

197S

net

mixed woods

Debra

Road

Debra Rd"

"stop"

4.4"

"mile Rd"

"Colonial

"Speed limit 30

"

asph dr

w/gatechnlnk6'h wood

2 story

cvr

3'd"stop"

Center"

Collision

"Kingston

asph drive

stn r

w

stpscnc a

sp

h

dr

stn r

w

wood

1 story

pad

cnc

27

154

196

net

1510

wall

mrm

asph drive

oak

6'c

pole

light

metal

NH RTE 125

ledgeledge

mixed woodswoods

mixed

ledge

mxd wds

12"c

mp

gravel drive

15"rcp

15"rcp

6"pvc

brkn

pvc6

"

8"pvc

oak

9'c

rcp

18"

cmp

18"

hdr

stone

12"spp

18"rcp

18"rcp

97A-26

disk

28

154

1509

195

1

net

195-1L•

1

exhaust

Custom

Lou's

1511/26

asph sluice

5-3'c pine

4-3.5 dbl oak

3-2'c ash

2-3'c quad oak

1-1.5'c spruce

rcp

pole

guy

4-3'h wood posts

Colonial

Roa

d

daoR l

aino

loC

Hap

py

Hollo

w

Lan

e

asph drive

mixed woods

mixed woods

mixed woods

mixed woods

mixed woods

mixed woods

mixed woods

mixe

d wo

ods

1054

4

206net

97/2/51

wd gar

1-2 story

asph drive

asph

1055J

ehe

1055

3

207

net"sto

p"

"stop"

Ln"

Hollow

"Happy

26391011•net

1

61

202

1

nynex

1011

125 amp

8

7

997

1049

201net

asph dri

ve

asph dr

205fp 1

asph

ceder hedge6

fp 204

sk

asph

sps

brk

stuck

grate

mixed woods

mixed woods

2net

22688

14 large boulders

gravel drive

gravel drive

gate

metal

6501

1056J

ehe

208

net

2

1099

1099J

ehe

204S

net

6/1

50 amp123601011net

2

trucks""no thr

u"speed

limit 30"

1

25

1-1R

fp197

blrds

metal

(2)4'h

1048ehe20

1net10

97

50amp

1

155

687

1

1951

net

6/20/19

SUBJECT TO CHANGE

PRELIMINARY PLANS

DATE6/20/2019

WORKING GROUP MEETING #2

NH ROUTE 125

10044E PLAISTOW-KINGSTON

GRID

STATE PROJECT NO. SHEET NO. TOTAL SHEETS

10044E

DGN

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION

SH

EE

T

CH

EC

KE

D

AS

BUI

LT

DE

TAI

LS

DA

TE

DA

TE

DA

TE

DA

TE

NU

MB

ER

DA

TE

ST

ATI

ON

ST

ATI

ON

DE

SC

RI

PTI

ON

RE

VI

SI

ON

S

AF

TE

R

PR

OP

OS

AL

SD

R

PR

OC

CE

SS

ED

NE

W

DE

SI

GN

XX

XX

XX

XX

XX

XX

GEOTECHNICAL SECTION

SCALE IN FEET

50 0 10050

AND COLONIAL ROAD

HAPPY HOLLOW LANE

H.P.

janatone
Text Box
5
janatone
Image
janatone
Image
janatone
Image
Page 10: STATE OF NEW HAMPSHIRE DEPARTMENT OF …McF ARLAND JOHNSON Established 1946 PLANNING, ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANTS ... Jennifer Zorn, McFarland Johnson David