State Of The Art Digital Operational I&C For Nuclear Power Plants
Bulgarian Atomic ForumInternational Nuclear ConferenceVarna, June 9-11th, 2010
Instrumentation, Controls & Electrical
Page 2 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
Content
11
22
■ SPPA-T2000 – State-of-the-art digital I&C for Nuclear Power Plants
■ SPPA-T2000 – Architecture follows power plant processes
Page 3 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
The four Generations of I&C Technology: From isolated Systems to embedded Functionality
Isolated analogueand binary systems
ISCAMATIC BTELEPRM C
StadeGermany
Isolated digital Sub-systems
TELEPERM M / ME
Amercentrale 9 Netherlands
Interlinked digitalSub-systems
SPPA-T2000(former TELEPERM XP)
Olkiluoto 3 Finland
Fully embeddedFunctionality
SPPA-T3000
Future NPPs
Page 4 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
44 30183
0
200
400
600
800
1.000
1.200
1.400
1.600
1.800
*) Total < (Delivered + Under Commissioning + Under Construction) due to multi counting
SPPA-T2000 a proven Technology> 1,600 Orders in Fossil and Nuclear Power Plants
Biblis A Limit Monitoring Indicator System, Ventilation System
Biblis B Turbine and Bypass Protection System, H2-Gassing
Brokdorf Process Information System, Core Monitoring System, Simulator
Brunsbuettel Process Information SystemCallaway Condensate Polisher System, Water Treatment
System, SimulatorComanche Peak 1&2 Turbine Protection,
Turbine Controls, SimulatorEmsland Process Information System, Core Monitoring
System, SimulatorForsmark 3 Turbine Protection, OM for Rod Controls,
Simulator UpgradeGarching Non Safety I&CGrafenrheinfeld Process Information System, Core Monitoring
System, SimulatorGrohnde Process Information System, Core Monitoring
System, Archive SystemIsar 2 Process Information System, Core Monitoring
System, SimulatorKosloduy 5/6 Water Treatment SystemMochovce 1 & 2 Process Information System, Network System,
Archive System
Atucha II Non Safety I&CBelene 1&2 Non Safety I&C (Concept phase)Flamanville 3 Non Safety I&C, SimulatorGrafenrheinfeld Turbine ControlsGrohnde Process Information System, Core Monitoring
System, SimulatorGundremmingen B/C Water Treatment SystemIsar 2 Cooling tower make-up water treatmentLing Ao II (3&4) Non Safety I&C, SimulatorMochovce 3 & 4 Non Safety I&C (Concept phase), SimulatorOlkiluoto 1/2 Condensate Clean-UpOlkiluoto 3 Non Safety I&C, SimulatorOskarshamn 2 Non Safety I&C, SimulatorsTaishan 1 & 2 Non Safety I&CUnterweser Turbine Controls
Muehleberg Ventilation SystemNeckar 1 Process Information System, Core
Monitoring System, Chilled Water System, Water Treatment System, Simulator
Neckar 2 Process Information System, Core Monitoring System, Simulator
Olkiluoto 1 & 2 Turbine Automation SystemOskarshamn 2 Generator Auxilliary System, Turbine
Automation System, Simulator Upgrade Oskarshamn 3 Turbine ControlsPhilippsburg 1 Process Information System, Advanced
Nuclear Application Computer, Turbine and Bypas Protection System, Simulator
Philippsburg 2 Process Information System, Core Monitoring System, Simulator
St. Maria de Garona Condensate Polisher System
Tianwan 1 & 2 Non Safety I&C, Water Treatment System, Simulator
Trillo Process Information System, Core Monitoring System, Plant Training Simulator, I&C for HV Switch Gear
Unterweser Process Information System, Core Monitoring System
Biblis B Ventilation SystemLoviisa 1 & 2 Non Safety I&C, Simulator
Under Construction:Under Commissioning:
Delivered:~1.620Units
Total *) DeliveredUnder
CommissioningUnder
Construction
plantname All or part of Automation System based on SIMATIC S7
Page 5 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
Operational I&CSPPA-T2000(TELEPERM XP)
Reactor Protection,Reactor-I&C
Priority
AS 620
Gateway
Plant Bus
Process Information and Operating System
Safety-I&C:TELEPERM XS
~
Process Automation
~~
M MM
OM 690
Back-up panel
SPACE
Engineering System
QDSES 680
Engineering System
DS 670
DiagnosticSystem
PP- PPEG RUNT
5 .1 F A O
123.4 bar
PP -P P E G RO B
PPGENERATOR G
5. 1 F A O
123.4 bar
A TB A 7
2 Discharge primW
AT B A 7
1 Supply primA W
AT BA 7
6 Discharge secA
A TB A 7
5 Supply sec
A TB A 7
3 Heat Trans Proc primM
KBC, JDH
KBA A T BA 7
7 Heat Trans Proc sec
A WAT BA 7
4 Primary systemsM
A TB A 7
8
WA TB A 7
9 TurbosetS P D S
T e xt- 4Ze RBYP Te x t-4Z e RTT
T ex t- 4Z eRRxTrip
5. 1 FA O
123.4 MW
5 .1 F A O
123.4 kg/s
5. 1 FA O
123.4 kg/s
5 .1 F A O123.4 mbar5 .1 F A U
123.4 MW
PP-PPEKLOB
PP-PPEKLOB
V TBA 2
Plantparameter
PP- PPEKL OB
A well-balanced Product Portfolio covers all the Applications of a NPP
Nebenanlagen
M
AuxiliarySystems
CM
SPPA-T2000/SIMATIC S7AV42
Specific Computers
office network
routerSafety Safety related and NC
Page 6 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
Additional Features added to standardSPPA-T2000 cover the necessary Applications for NPPs
SPPA-T2000 in NPP
OM 690Process
Information and
Operating System
SimulatorEmulation(AS) and
Stimulation(OM)
Interfaceto 3rd partycomputerand I&C systems
Interface to safety
I&C:TXS gateway,
priority controlmodule
Long-termsupport
Qualification according to
nuclear standards
Page 7 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
SPPA-T2000 fulfils all Requirements of IEC Codes andStandards and is qualified to be used in „safety related“ Functions
■ Important codes and standards:■ IEC 6151 Nuclear power plants - Instrumentation and control for systems important
to safety – General requirements for systems ■ IEC 62138 Nuclear power plants - Instrumentation and control important for safety
- Software aspects for computer-based systems performing category B orC functions
■ IEC 61226 Nuclear power plants - Instrumentation and control systems important tosafety – Classification
According to the ISTec certificate (German Authority) the Automation System AS 620B is generically qualified for applying functions of category B according to IEC 62138,1
■ Qualification basis for HW and SW:■ Documented development process ■ HW-qualification by means of type testing and proof of earthquake (IEC 60780, IEC
60980)■ Field proven HW and SW■ Additional supply of safety documentation
Page 8 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
Content
11
22
■ SPPA-T2000 – State-of-the-art digital I&C for Nuclear Power Plants
■ SPPA-T2000 – Architecture follows power plant processes
Page 9 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
OT OT OT ET DT
External Network
Terminalbus
Automation
Plantbus
AddFEM
IEC 60870
CM
Modbus
SIMATICS7
FUM
AP
Process
Operating &Monitoring
FieldSIM-F
S7-400FH
S7-400H
PROFIBUS-DP
ET 200M
PU SU
XU
ES/DS
TXS- Gateway
SPPA-T2000/ OM 690 in NPPs:Levels of Automation and I&C
Page 10 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
I&C Architecture follows Power Plant Processes
Filling, Venting
UnitOperation
load input
OPERATION
Chilled Water SupplyHeating (Buildings atNPP Site)
Auxiliare Systems
Unit Auxiliary andEmergency PowerSupplyDemineralizationRaw Water SupplyFire Fighting
Deionat Auxiliary SteamEquipment
Chemical SupplyGase SupplyAuxiliary Fluid System
Venting and AirConditioning of Control-led Access Area
Activity- andRadiological Survey
Radioactive GasTreatment System
Leakage Water Collec-tion and Treatment
Radioactive LiquidWaste Treatment andHandling
Waste Processing
Conventional WaterTreatment and Storage System
Heat Removal
Intermediat CoolingWater Circuit
Main Cooling SystemConventional Serviceand intermediateCooling System
Main Steam Systemand Auxiliary SteamSupply
Secondary Circuitand
Auxiliary Systems
Plant Make-Up Water System
Main and AuxiliaryCondensat System
Feedwater System
Emergency FeedwaterSystem
Primary Circuitand
Auxiliary Systems
Main Coolant Circuit
Auxiliary System forPrimary Circuit
Safety Systems
Turbine and Generator
Steam Supply ofTurbine Plant
Generator Unit
Turbine Plant
A B C D E F
Unit Transformer
Service Water forSafety-RelatedConsumers
load change
OPERATION OPERATION OPERATION OPERATION OPERATION
Page 11 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
Example for a process oriented I&C Structure (EPR)
Page 12 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
Process oriented I&C Structure:Assignment of Functional Complexes to Cabinets (EPR)
PAS 1Division 2
PAS 1Division 13 1UJK18 024
PAS 1Division 33 3UJK18 004
PAS 1Division 43 4UJK18 024
PAS 1Diesel Div. 13 1UBP10 002
PAS 1Diesel Div. 23 2UBP10 002
PAS 2Diesel Div. 33 3UBP10 002
PAS 1Diesel Div. 43 4UBP10 002
+3 0CRZ21
+3 0CRZ31
+3 0CRL01
A1, A3, A5, A6 A6 B, C D3, D4 , D5D2FC :
3 2UJK18 004
A1, A3, A5, A6FC : D2, D3, D4 , D5
A1, A3, A5, A6FC : D2, D3, D4 , D5
A1, A3, A5, A6FC : A6 D2 D3, D4 , D5
G1
G2
G3
G4
B, C, F
B, C, F
B, C
111 115 116AP : 112 113
211 215AP : 213
311 315AP : 313
121
221
321+3 0CRA47
+3 0CRA37
+3 0CRA27
+3 0CRA17+3 0CRD12+3 0CRD11+3 0CRB11+3 0CRA12+3 0CRA11
+3 0CRA21
+3 0CRA31
+3 0CRA41 +3 0CRA42 +3 0CRB41 +3 0CRD41 +3 0CRD42
+3 0CRB31 +3 0CRD31
+3 0CRD21+3 0CRB21
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP53
OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP62
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53 ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP53
OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
A
B
C
D
E
F
GSeismicInstrum.
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53 ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP53
OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP62
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP53
OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP62
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53 ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
ITP53 ITP53
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G
ITP62
OLM
F
F
114
+3 0CRB12
+3 0CRB42
414
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G OLM
AP A
FUM
AP BAP A
FUM
FUM
QAS
A
B
C
D
E
F
G OLM
Page 13 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
■ SPPA – T2000 covers all NPP needs on Operational I&C
■ SPPA – T2000 is configurable to NPP Process needs
Page 14 Traditional International Nuclear ConferenceWalter Theis, E F IE 421
Energy • Fossil Power Generation • Instrumentation, Controls & Electrical© Siemens AG 2010. All rights reserved.
Thank you for your attention!
??
?
??