5
Steps to check the E1 in case of Abis Optimization

Steps to Check E1 in Case of Abis Optimization

Embed Size (px)

DESCRIPTION

Steps to Check E1 in Case of Abis Optimization

Citation preview

  • Steps to check the E1 in case of Abis Optimization

  • Table of Contents:

    Check the SCGR connected to the TG ........................................................................... 2

    Check the SC and the Device connected to the SCGR ................................................... 3

    Get the SNT that contains the specified device(s) .......................................................... 3

    Get the RBL from the SNT ............................................................................................. 4

    Check the RBL status...................................................................................................... 4

    Check the SCGR connected to the TG

    You can use command RXMOP to check the SCGR connected to the TG.

  • Check the SC and the Device connected to the SCGR

    You can use command RRSCP to get the number of SC connected and the device specified for

    each SC.

  • Get the RBL from the SNT

    Use command NTCOP to get the RBL connected in this SNT

  • COMMAND SUMMARY

    RXMOP:MO=RXOTG-2; RRSCP:SCGR=2; RADEP:DEV=RBLT2-65; NTCOP:SNT=ETM2-4; DTSTP:DIP=2RBL2;

    Hope you find this KO useful.

    For any help please contact me on

    [email protected]

    MOATAZ YOUSRY

    mailto:[email protected]