3
From: Fuhs, Bryan - DOA To: Steve Adkins ; Steve Srubas ; Stuewer, Gary A - DOA Cc: Al Sigmund ; Ian Griffiths ; [email protected] ; [email protected] ; Jason Pampuch ; [email protected] Subject: RE: 08K3J - UWO NRH - Shower Drains Date: Friday, December 09, 2011 8:15:57 AM Attachments: SHOWER DRAIN.PDF Noble Seal TS Installation Instructions.pdf image008.png image002.png image011.png image007.png image014.png image015.png image016.png image017.png Importance: High The specifications are clear as to what the plumbing contractor has to install. The execution of the safing material is also defined in the specifications. The safing will be installed per the manufacturer installation instructions. 1/4 inch per foot pitch to the substrate is required before the safing material is to be installed. Upon completion of the specified safing material a standing water test will be required and will be witnessed at each built up shower by DSF. The plumbing contractors scope of work ends upon completion of the specified safing material. Any topping required to to level or pitch the floor prior to terrazzo is specified to be done by the terrazzo contractor per 09 66 23-5 & 09 66 23-6 enclosed below. I do not feel it necessary to have a meeting on site as this issue has been discussed previously with the plumbing contractor. Any questions or concerns please feel free to call me. Thank you, Bryan 09 66 23-5 09 66 23-6 Bryan R. Fuhs From: Steve Adkins [mailto:[email protected]] Sent: Thursday, December 08, 2011 2:41 PM To: Steve Srubas; Stuewer, Gary A - DOA Cc: Fuhs, Bryan - DOA; Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch; [email protected] Subject: RE: 08K3J - UWO NRH - Shower Drains Steve, I’m requesting that we have a meeting to discuss the attached revised detail for the showers. Can we schedule this after the 12-13-2011 meeting? Steven D. Adkins CornerStone Plumbing, LLC 1305 Poplar Drive, Waukesha, WI 53188 Office: (262)896-9006 Fax: (262)896-9004 Cell: (414)467-9506

Steven D. Adkinswisbuild.doa.state.wi.us/Dfd_img/rfi_attachments/8K3J - UWO NRH... · From: Steve Srubas [mailto:[email protected]] Sent: Thursday, December 08, 2011 9:46 AM To: Steve

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • From: Fuhs, Bryan - DOATo: Steve Adkins; Steve Srubas; Stuewer, Gary A - DOACc: Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch; [email protected]: RE: 08K3J - UWO NRH - Shower DrainsDate: Friday, December 09, 2011 8:15:57 AMAttachments: SHOWER DRAIN.PDF

    Noble Seal TS Installation Instructions.pdfimage008.pngimage002.pngimage011.pngimage007.pngimage014.pngimage015.pngimage016.pngimage017.png

    Importance: High

    The specifications are clear as to what the plumbing contractor has to install. The execution of the safing material is also defined in the specifications. Thesafing will be installed per the manufacturer installation instructions. 1/4 inch per foot pitch to the substrate is required before the safing material is tobe installed. Upon completion of the specified safing material a standing water test will be required and will be witnessed at each built up shower by DSF.The plumbing contractors scope of work ends upon completion of the specified safing material. Any topping required to to level or pitch the floor prior toterrazzo is specified to be done by the terrazzo contractor per 09 66 23-5 & 09 66 23-6 enclosed below. I do not feel it necessary to have a meetingon site as this issue has been discussed previously with the plumbing contractor. Any questions or concerns please feel free to call me. Thank you, Bryan

     09 66 23-5

    09 66 23-6

    Bryan R. Fuhs

    From: Steve Adkins [mailto:[email protected]] Sent: Thursday, December 08, 2011 2:41 PMTo: Steve Srubas; Stuewer, Gary A - DOACc: Fuhs, Bryan - DOA; Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch;[email protected]: RE: 08K3J - UWO NRH - Shower Drains

    Steve, I’m requesting that we have a meeting to discuss the attached revised detail for the showers. Can we schedule this after the 12-13-2011 meeting?   

    Steven D. AdkinsCornerStone Plumbing, LLC1305 Poplar Drive, Waukesha, WI 53188Office: (262)896-9006Fax:       (262)896-9004Cell:      (414)467-9506 

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 3/8"

    3/8"

    DRAIN BY PLUMBING TRADE.LOWEST SETTING POSSIBLE ONSTRAINER FOR MAXIMUM DRAINAGE.

    SAFING BY PLUMBING TRADE.INSTALLED PER MANUFACTURER'SINSTRUCTIONS.

    TURN SAFING UP FILLER ATOPEN END OF SHOWER

    1"

    TURN SAFING UPWALL 6" MIN.

    CAST-IN-PLACEINTEGRAL BASE SMOOTHED AND

    ROUNDED TRANSITION

    SEALANT

    ABRASIVE EPOXYTERRAZZO

    1/4" SOLID SURFACE WALL PANELS.SET IN SILICON SEALANT. HARD SEAMWITH COLOR MATCHED JOINTADHESIVE.

    3/8" x 1 1/2" FILLER

    TOILET ROOM WITH SHOWER:PERIMETER OF SHOWER

    DRAIN BY PLUMBING TRADE.LOWEST SETTING POSSIBLEON STRAINER FOR MAXIMUMDRAINAGE.

    SLOPE TERRAZZO FOR DRAINAGE

    3/8" x 1 1/2" FILLER

    LATEX FOR SMOOTHTRANSITION.

    SAFING BY PLUMBING TRADE.INSTALLED PER MANUFACTURER'SINSTRUCTIONS.

    ABRASIVE EPOXYTERRAZZO

    MODIFY UNDERCUT OFDOOR AS REQUIRED.

    SLOPE TERRAZZO FOR DRAINAGE

    TURN SAFING UP FILLER ATOPEN END OF SHOWER

    SHOWER ROOM:PERIMETER OF SHOWER

    SHOWER DRAIN3" = 1'-0"

    SHOWER ROOM

    TOILET ROOM WITH SHOWER

    SEE BELOW FORBASE CONDITION

    FOR REVIEW ONLY - NOT FOR CONSTRUCTION.05dec2011

    NumberSheet

    IssuedDateTypeSet

    Scale

    Number

    Graphic

    DSF

    Project Location:

    Project Title:

    Sheet Title:Agency / Institution: ARCHITECTS BUILDING310 PINE STREETGREEN BAY, WI 54301(920)-432-4865

    NEW RESIDENCE HALLState of WisconsinDepartment of Administration

    Division of State Facilities

    December 5, 2011

    SD

    08K3J

    ----

    ALGOMA BOULEVARD, OSHKOSH WI

    SHOWER DRAINUNIVERSITY OF WISCONSIN - OSHKOSH

    fuhsb

    Highlight

    fuhsb

    Highlight

    fuhsb

    Highlight

    fuhsb

    Highlight

    fuhsb

    Highlight

    fuhsb

    Highlight

    fuhsb

    Highlight

  • NOBLESEAL® TS iNSTALLATiON iNSTrucTiONSINDEX1. General Information ..............................12. Materials ..................................................13. Planning & Layout ..................................24. Preparation & Procedures ....................2 - Inspection ...............................................2 - Substrates ..............................................25. Bonding Sheet to Substrate ..................2 - NobleBond EXT ....................................2

    - NobleBond 21 ......................................2 -LatexModifiedThin-Set .....................2

    - Seaming & Joining...............................3 - Flashings, Upturns, & Corners ............3 - Drains .....................................................3 - Protection of Sheet ..............................4

    1. GENERAL INFORMATION1.1 NobleSeal TS is a composite sheet membrane that

    providesthin-bedwaterproofingandcrackisolationfor thin-set tile applications. NobleSeal TS may also be used to bridge control joints. It is suitable for interior applications in new construction and renovation projects.

    NOTES:a) Install in strict compliance with these instructions,

    and comply with applicable ANSI standards, Tile Council of North America (TCNA) recommendations and building codes.

    b) For any procedure not covered by these instructions, contact Noble Company.

    2. MATERIALS2.1 MEMBRANE:NobleSealTSisathin0.030”(.75mm)loadbearing,bonded,sheetmembraneforwaterproofingapplications. 2.1.a COMPOSITION: NobleSeal TS is a composite sheet made from an alloy of Chlorinated Polyethylene (CPE) with non-woven fabric laminated to both sides.

    2.2 BOND COAT: NobleSealTSshouldbebondedtosubstratewithNobleBondEXTorlatexmodifiedthin-setmortar.Thin-setsmustconformtoANSIA118.4ortheappropriatestandards,andTCNAHandbookrecommendations. Follow manufacturer’s instructions.

    NOTE: a) Job-site mortar mixes must conform to ANSI A108.5 and A118.4 and to manufacturer’s instructions.2.3 WATERPROOF SEALANT: Use NobleSealant 150 to seam sheets, seal penetrations (i.e., pipes, wire), drains, and terminal edges. Seal preformed corners to sheet (see Figure 8).2.4 PREFORMED CORNERS: 2.4.a OUTSIDE/DAM CORNERS:Usetoflashcurb/dam(seeFigure8). 2.4.b INSIDE CORNERS:InstalloverLAPstylecornerstopreventpotentialleaks(seeFigure8).2.5 TOOLS: Normaltilesettingtoolsplusscissorsorutilityknife,rubberhandroller,andlinoleumroller(75-100lbs.

    recommendedforfloors).ApplicationofNobleSealant150requiresacommercialgradecaulkgun.1

    6. Additional Applications .........................4 -CrackIsolation......................................4 - Steam Rooms ........................................5

    7. Tile Installation ........................................58. Limitations ................................................59. Warranty .................................................5 10. CAD Details ..........................................5

    STANDARD: ASTM E 96 Procedure E ANSI A118.10 IAPMO/UPC ANSI A118.12 ASTM C 627

    Description:Moisture/Vapor

    Transmission Rate

    Load Bearing, Bonded, Waterproof Membranes for

    Thin-Set Ceramic Tile and Dimension Stone Installations

    Shower ReceptorWaterproofing

    Crack Isolation Standard: "System Crack Resistance"

    (Jig Test)

    Standard Test Method for Evaluating Ceramic Floor Tile Installation Systems using the

    Robinson Type Floor Tester

    Rating: 0.050 Perms Passed File #4339 High Performance (> 1/8") Extra Heavy

    Figure 1.

    NOBLESEAL TS

    A. CERAMIC, TERRAZZO TILE OR DIMENSION STONEB. THIN-SET APPROPRIATE FOR APPLICATIONC. NOBLESEAL TS MEMBRANE - 0.030” (.75MM)D. SHEET BONDING AGENTE. SUBSTRATE: CONCRETE, PLYWOOD, BACKER BOARD (BB),

    PRIMED GYPSUM UNDERLAYMENT AND RADIANT HEAT SYSTEMS*

    *NOBLESEAL TS R-value = 0.8

    AB

    CD

    E

  • 3. PLANNING & LAYOUT3.1 MEMBRANE:QuantityofNobleSealTSsheetrequiredshouldincludewaste,upturnsandseams.Usepreformedcornersasnecessary.

    NOTE:Waterproofingrequiresa2”overlapofsheetmembrane(refertosection5.9). 3.1.a SHEET DIMENSION: 5’x100’=500sq.ft.(1.5mx30.5m=46m2).Nominalthickness0.030”(.75mm).3.2 SHEET BOND AGENT: 3.2.a NobleBond EXT: Porosity and condition of the substrate can affect coverage, but NobleBond EXT will generally providethefollowingcoverage:90to110sq.ft./gallon.

    NOTE: NobleBond EXT allows for more movement than cement based mortar. It also allows tile to be installed immediatelyaftersheetplacementasitdoesnotrequirefurthercuring.Refertoinstallationinstructionsonlabel. 3.2.b Latex Modified Thin-Set:Seemanufacturer’scoverageratefor1/8”to1/4”v-notchedtrowel 3.2.b.1 Cold Weather Procedure: Consult bond agent manufacturer for safe low-temperature limits and cure times. NobleCompanysheetproductsremainflexibleto-25oF. 3.2.b.2 Hot Weather Procedure: Consult bond agent manufacturer for safe high-temperature limits and mixing proceduresforthesespecificconditions.Controlhightemperaturebyshading,mistingsubstratewithwater,

    workingatnightoranycombinationofthesetechniques.3.3 NOBLESEALANT 150: A 10.3 oz. tube of NobleSealant 150 seams approximately 75 linear feet.3.4 LAY OUT:Installsheetsothatseamsoverlapinthedirectionoftheslope(shingledfashion).Usechalklinestomaintain sheetalignment.Sheetmaybeprefoldedandcuttoaccommodateupturnsandotherrequirementsperindustry guidelinesandspecifications.

    4. PREPARATION & PROCEDURESRECOMMENDED:Testmaterialsandmethodunderjob-siteconditionstoconfirmsuitability.4.1 INSPECTION:SubstratemustmeetrequirementssetforthbytheTCNAandANSIstandards.Reportinwritingany

    deficienciesthatmightaffectperformanceofthesystem. NOTES: a)NobleSealTSwillnotcompensateforstructuraldeficienciesinthesubstrate. b) Review all detail drawings (see section 9 - CAD DETAILS).

    4.2 PROCEDURE: To incorporate NobleSeal TS into a thin-bed installation, prepare substrate and select appropriate bonding agent.4.3 DRAINAGE : Wet areas must have proper slope. CAUTION: All drains must have a suitable membrane clamping device.4.4 SUBSTRATES: SlabsmustbeflatandshouldbetestedformoisturecontentandpH.Floorpreparations(e.g.patching,

    leveling) should be done prior to installation of NobleSeal TS.4.5 INSTALLER:MustbefamiliarwithNobleCompany’scurrentwritteninstructions,TCNAHandbookrecommendationsand ANSI A108 standards.

    5. INSTALLATION PROCEDURES5.1 BONDED: 5.1.a Clean and prepare substrate as if thin setting tile without sheet. Bond sheet with either of the following: 1) NobleBond EXT: Refer to NobleBond EXT Installation Instructions. 2) Latex Modified Thin-Set: Spreadthin-setwithappropriatetroweltoachievefullcontact(e.g.1/8”to1/4”

    “V”-notch). Trowel an area as wide as the sheet and as deep as can be comfortably reached. In order to avoid trapping air under the sheet, trowel mortar in parallel rows across the width or length of the sheet.

    NOTES: a) Variation in trowel size, angle at which trowel is held, mixing ratio or any

    combination thereof may be necessary to achieve maximum contact. Finenotchedtrowelsincrease“skinning”rate.

    b) All ridges of bond coat must be parallel to allow air under sheet to escape when embedding.

    5.1.b LAY SHEET: Unrollsheetintobondingagentbeforeitbeginstoform“skin”. 5.1.c EMBED SHEET: EmbedNobleSealTSintobondcoat(flattenalltrowelridges).

    Forlargehorizontalareas,use75-100lb.roller.Workfromcenterofsheettoedges.Pullrolleredge-to-edgeinoverlappingpasses.Startatendoffirstsheetinstalled,progressingtoareainstalledlast.Userubberhandrollerorflatsideoftrowel with heavy pressure for vertical or small areas.

    Normal installation conditions - apply bond coat. Trowel an area as wide as the sheet and as deep as can be comfortably reached (comb ridges parallel).

    2

  • 5. INSTALLATION PROCEDURES (con’t.) 5.1.d COVERAGE: Completecoverageofsubstrateandfullpenetrationofbondcoatintothefabricisrequired.Priorto curing, lift sheet and inspect for full contact. If rows or ridges of bonding agent are seen, membrane has not been

    properly embedded and additional rolling or bonding agent is necessary. 100% coverage is desired. NOTE: To prevent outer edges from lifting or curling, use weight (i.e., tile, mortar, etc.). 5.2 SEAMING AND JOINING (For Waterproof Installations): When more than one sheet is needed, use NobleSealant 150 or

    NobleWeld100toseamsheetstogether.NobleSealant150isappliedwithacommercialgradecaulkgun,andrequires2parallelbeadsforseamingandjoining.Seamareasmustbecleanandfreeofbondbreakers(mortar,adhesives,etc.).

    5.2.a NobleSealant 150 (preferred method) - Seams all Noble membranes with or without fabric. 5.2.a.1 Overlap sheets 2” (50mm) minimum.

    5.2.a.2Apply1/8”(3mm)bead1/4”(6mm)fromedgeofsheetbeingoverlapped. 5.2.a.3Applyanotherbeadofsealantparalleland1/2”(12mm)fromthefirstbead. 5.2.a.4Overlapsheetsandflattenwithrollerorbypressingwithflatedgeoftrowelorhandroller. NOTE:Beadsmustbecontinuouswithoutskipsorvoids.Seammaybewatertestedaftercuring(atleast30minutes).

    5.2.b NobleWeld 100 - Seaming requires bare membrane to bare membrane. See (A) END SEAMS below. NOTE: Do not leave NobleWeld 100 open while fabricating seams as the solventquicklydissipates.Applyfromcanwithdobberor1”to2”natural bristle brush, and spread.

    5.2.b.1 Allow 2” for lap seam. 5.2.b.2Onlywork2’to3’ofseamatatime. 5.2.b.3 Clean by lightly applying Xylene or alcohol. Immediately wipe

    with clean, lint-free cloth. 5.2.b.4 Roughen both surfaces to be bonded with copper scrub pad or clean

    wire brush. 5.2.b.5 Apply NobleWeld 100 liberally and evenly to both surfaces

    approximately1”widerthanfinishedseam.DONOTALLOWSOLVENT TODRY.Materialshouldbesoft,wetandtacky.Shouldsolventsdry

    before completing seam, re-apply. 5.2.b.6 Close seam while CPE is soft and still wet with solvent.

    5.2.b.7Useroller,puttyknifeorrubseamwithclothtoremoveexcesssolvent andeliminateairbubbles.Overlapsheetsandflattenwithhandroller orbypressingwithflatedgeoftrowel.

    NOTE: Theapplicationofheatimprovestheefficiencyofseamingatlow temperatures. A hot air gun is recommended to cure seam below

    7oC (45oF).Donotheatwithanopenflame. 5.2.b.8Toinsurecontinuousseam,peelseambackseveralinchesinto

    just completed section before starting next section. 5.2.b.9 Seams must be allowed to cure to develop strength. Do not stress until

    allowed to cure for 24 hours at 21oC (70oF) and 40% relative humidity. Cure times may be reduced by heating with a heat gun.

    (A) END SEAMS: Use NobleSealant 150 (see 5.2.a) or NobleWeld 100 (see 5.2.b) and follow these instructions. NobleSealTSfabricmustberemovedtomakeachemicallyfusedseam(see6.foroptions).Mark2”wideseamarea ontopofbottomsheetand2”onbottomofoverlappingtopsheet.SoakareatobeseamedwithXyleneapproximately1”widerthantheseammarks.Keepwetforatleastoneminute.FabricisreadytopeelifitwillslideontheCPEwhenscuffedneartheedgewithfingernailormargintrowel.Ifsolventdriesorfabricdoesnotdelaminateeasily,re-applyXylene.Peelfabricbacktomark.Cutfabricatthemarkwithscissors(asifslittingopenanenvelope).WhileCPEisstillsoftandwet,strayfabricpieces(orfibers)maybere-bondedtotheCPEwithheavypressureonthehandroller.

    5.3 FLASHINGS, UPTURNS AND CORNERS 5.3.aTurnsheetupverticalsurface1”to2”higherthanfloodplane.Plumbingcodesrequireshowerwaterproofing

    membranebeflashed3”higherthanthefinisheddam,wheninstalledbehindbackerboard. 5.3.b Corners - See Figure 8.

    5.3.b.1 Lap corners. Bond overlap and seal inside corner with NobleSealant 150. 5.3.b.2 BondPreformedCornerstosheetand/orsubstratewithNobleSealant150.5.4 DRAINS:Alldrainsmusthaveclampingringtosecuremembranetodrainbody.Inspectfloortoinsurethatproperslope has been provided to eliminate ponding of water on top of membrane. 5.4.a Remove strainer and clamping ring. 5.4.b Place NobleSeal TS over drain body. Press membrane to feel outline of drain opening. Cut drain opening. 5.4.c Carefully punch or notch openings for clamping ring bolts through sheet. 5.4.d Apply bead of NobleSealant 150 on the drain lip under the NobleSeal TS. 5.4.e Install sheet, see section 5. 5.4.f Installclampingringandfirmlytightenbolts. 5.4.g Install strainer and adjust to proper height for tile.

    Apply first bead of NobleSealant 150 as shown.

    Apply second bead, then press seam.

    3

  • 5. INSTALLATION PROCEDURES (con’t.) 5.4.h FLOOD TESTING: Waterproofinginstallationsshouldbefloodtestedtoinsurethattheyarewatertight.

    The procedure follows: 1. Plug drain with test plug or dam areas to be tested. 2. Fill with water to desired height. 3.Inspectforleakage(allowsufficienttime). 4.Repairanyleaksandre-testuntilwatertight.5.5 PROTECTION OF SHEET: Afterinstallation,sheetmustbekeptcleantoenabletileadhesivetobond.Ifnotcoveredby

    wearingsurface,protecttheinstalledsheetfromdamageandallfootorvehiculartraffic(usemortarskimcoat,rugs,plywood,etc.).

    6. ADDITIONAL APPLICATIONS 6.1 WATERPROOFING/CLEAVAGE MEMBRANE: NobleSealTScanbelooselaidasawaterproofing/cleavagemembrane

    under a full mortar bed installation (see TCNA guidelines). 6.2 ISOLATING CRACKS AND CONTROL JOINTS: Refer to current NobleSeal CIS Installation Instructions.

    Forapplicationsthatdonotrequirewaterproofing,useNobleSealCIS,ormodifyNobleSealTSasfollows:remove the 2” seaming area on each edge. Follow NobleSeal CIS Installation Instructions.

    6.3 STEAM ROOM: NobleSeal TS is suitable for commercial and residential projects. There are two options for placement of thesheetonwallsandfloors.InstallthesheetinfrontorbehindtheBBormortarwall.(RefertoTCNADetails,ANSI standards and industry guidelines.)

    NOTES: 1)Ifinstalledonthebackerboard,NobleSealTSmustbebondedwithalatexportlandcementmortar. 2)Wallscommontoexteriorsrequirespecialdesigntopreventcondensationinwallcavity.Consultwithprojectarchitect. 3)Temperature:Althoughmaximumroomtemperatureislimitedto50°C(120°F)byequipmentsafetycontrols, NobleSeal TS is not affected by that temperature.

    6.3.a INSTALLATION 6.3.a.1 CEILINGS: NobleSeal TS should be installed before (under) the BB. Place heavy bead of NobleSealant 150 on studsandusemechanicalfastenerstoholdsheet.Installbackerboardpermaunfacturer’sinstructions.Sealscrew

    penetrations with NobleSealant 150. 6.3.a.2 FLOORS: FULL MORTAR BED METHOD: Use Chloraloy 240. Refer to current written instructions. See Figure 4.

    THIN BED METHOD: Use NobleSeal TS. See Figure 5. 6.3.a.3 WALLS:NobleSealTScanbeinstalledoneithersideofbackerboard(BB). SHEET BEHIND BB: Refertosection6.3.a.1.SeeFigure6.InstallNobleSealTSonlowerportionfirst. SHEET BONDED TO BB:ProcedureissameasotherNobleSealTSwaterproofingapplicationsusinglatex modifiedthinset.

    4

    Figure 2. JOINT BRIDGING/CRACK ISOLATION

    GROUT JOINT

    SOFT JOINT

    GROUT JOINT

    TILE BOND COAT

    CONTROL JOINT

    NOBLE SHEETMEMBRANE

    (CONSTRUCTION, ISOLATION, CONTRACTION)

    NOTE: One soft joint required, two recommended.

  • 5

    7. TILE INSTALLATION7.1SettileinaccordancewithTCNAHandbookrecommendations,ANSIA108standardsandbondcoatmanufacturer’sdirections.CompletecoverageofNobleSealTSbythebondcoatisrequired.NOTES:a) Refer to bond coat manufacturer’s instructions for cure time and suitability. Allow additional time (approximately 50%)

    when installed over NobleSeal TS. b) Rapid-curing type of thin-set mortar may be used with approval of mortar manufacturer.c) For wood or VCT applications, contact Noble Company.d) For any procedure not covered by these instructions, contact Noble Company.

    8. LIMITATIONSNobleSeal TS is not designed for use as a wearing surface or exposed roof membrane. NobleSeal TS cannot accomodate deflectiongreaterthanindustryguidelinesfortheflooringsurface.Foranyapplicationnotspecificallydetailedintheinstallation instructions, contact Noble Company.

    9. WARRANTY NobleSeal TS brand CPE membrane is guaranteed for the life of the original tile installation by Noble Company against failurecausedbyrotting,crackingandmicroorganismdeteriorationwhenproperlyinstalledintilesystemsforwhichitsuseis recommended by Noble Company. This warranty is limited to replacement of defective material and freight charges to destination only. There are no other expressed or implied warranties, and this warranty is in lieu of any other warranty, including,butnotlimitedto,impliedwarrantiesofmerchantabilityandfitnessforpurpose.NobleCompanyisnotresponsibleforconsequentialdamages.Theremedyofthepurchasersetforthhereinisexclusive.NOTE: NOBLESEAL TS MUST BE INSTALLED IN STRICT COMPLIANCE WITH THESE INSTRUCTIONS, APPLICABLE ANSI STANDARDS, TCNA RECOMMENDATIONS AND ALL APPLICABLE BUILDING CODES.These suggestions and data are based on information Noble Company believes to be reliable. Users should verify by tests thatNobleSealTS,aswellastheseinstallationmethods,aresuitablewiththeproductsbeingusedintheirapplication.Sincespecificuse, materials and handling are not controlled by Noble Company, this warranty is limited to the replacement of defectiveNobleCompanyproducts.NobleCompanydisclaimsanyresponsibilityfor(a)warrantiesofmerchantabilityandfitnessforpurpose;(b)verbalrecommendationsofitsrepresentatives;and(c)consequentialdamages.

    ANT BACKER BOARD

    WALLS: THIN-SET WITH WATER RESISTANT BACKER BOARD

    FLOOR: MORTAR WITH SLOPE OR PRO-SLOPE

    FLASHING/UPTURN (75mm/3" ABOVE FLOOD POINT)

    NOBLESEALANT 150

    6mm (.250") WATER RESISTANT BACKER BOARDOR MORTAR PLUMB WITH BACKER BOARD

    TILE SET ON MORTAR BED OR BOND COAT

    WIRE REINFORCED MORTAR BED

    CHLORALOY 1.0mm (.040")

    SLOPED FILL OR PRO-SLOPE™(PRE-FORMED SLOPE)

    TILE

    BOND COAT

    NOBLESEAL TS

    BOND COAT

    BACKER BOARDS*

    STUDRECOMMENDED BY MANUFACTURER

    *WATER RESISTAS

    FOR APPLICATION( )

    MORTAR AND THIN-BED DETAIL

    OR NOBLESEAL TS

    Figure 4. SHOWER – NOBLESEAL TS MEMBRANE BONDED OVER BB WITH CHLORALOY SHOWER PAN

    Figure 5. THIN-SET METHOD / SHOWER RECEPTORWATERPROOFING

    10. CAD DETAILS - NOT TO SCALE

  • Figure 6. STEAM ROOM (for thin-set floor applications, refer to Figure 7)

    Figure 7. THIN-SET SHOWER

    Figure 9. LAP CORNER

    STEP 1: CREASE SHEET (SOLID LINES). CUT SHEET ON DOTTED LINE.

    STEP 2: FOLD AND SEAL WITH NOBLESEALANT 150.

    LAP CORNER

    Figure 8. FOLDED, TUCKED, PREFORMED INSIDE & OUTSIDE CORNERS10. CAD DETAILS - NOT TO SCALE (con’t.)

    FormNSTSINST01/09SupersedesformNSTS3/08

    P.O. Box 350 · Grand Haven, MI 49417-0350 · 800-878-5788 · Fax: 231-799-8850 · www.noblecompany.com®RegisteredTrademarkofNobleCompany,GrandHaven,MI.™TrademarkofNobleCompany,GrandHaven,MI.

    Figure 10. WHEELCHAIR ACCESSIBLE SHOWER AREA - THIN-SET METHOD

    1/4” (6.4mm) Tile

    3/4” - 1-1/2” (33.8-38.1mm) Mortar

    Latex Mod.Thin-SetNobleSeal TS

    NobleSealant 150

    NobleFlex® DrainFlashingLatex Mod.Thin-SetSloped Mortar Bed

    1/8” (3.2mm)

    7/16” (11.1mm)

    1/16” (1.6mm)

    1/25” (1.0mm)

    1/64” (0.4mm)

    1/32” (0.8mm)

    1/4” per ft.slope

    NobleSealant 150

    (NOT TO SCALE)

    NobleSeal TSNobleSeal TS

    backer board (BB)soft joint soft joint

    drain with clamping ring

    SHOWER AREADRYING AREA

    Ramp floor to createhigh point

    Note: Slope under sheet

    4’ - 0” MIN. CURB TO DRAIN(per code)

    6” APPROX(per code)

    COLLAR IN LOW POSITION

    Install NobleSeal TS to height of shower head if in front of BB or flash a minimum of 3” higher than finished dam if installed behind BBSTUD WALL

    BACKER BOARD

    TILE

    NOBLESEAL TS FLASHED BEHIND BACKER BOARD AND UP WALLS 3” HIGHER THAN FLOOD PLANE OR BONDED TO THE FRONT SIDE OF BACKER BOARD TO THE HEIGHT OF THE SHOWER HEAD. STEAM ROOMS REQUIRE FLOORS, WALLS AND CEILINGS TO BE WATERPROOFED WITH NOBLESEAL TS.

    FILL 1/4” GAP UNDER BACKER BOARD WITH NOBLESEALANT 150 TILE BONDING AGENT (THIN-SET)

    NOBLESEAL TS

    LATEX MODIFIED PORTLAND CEMENT MORTAR (THIN-SET) OR NOBLEBOND EXT

    SLOPED MORTAR (1/4” PER FT.)

    FOLDED CORNER TUCKED CORNER

    PREFORMED DAM CORNER

    PREFORMEDOUTSIDE CORNER

    PREFORMED INSIDE CORNER

  •                

     

    From: Steve Srubas [mailto:[email protected]] Sent: Thursday, December 08, 2011 9:46 AMTo: Steve Adkins; Stuewer, GaryCc: Fuhs, Bryan - DOA; Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch;[email protected]: RE: 08K3J - UWO NRH - Shower Drains Steve, et al:We looked through the submittal – the sloping substrate is required by the manufacturer; this responsibility lies with the contractor providing/installingthe safing.Regards,S.     

    From: Steve Adkins [mailto:[email protected]] Sent: Tuesday, December 06, 2011 10:05 AMTo: Steve Srubas; Stuewer, GaryCc: Fuhs, Bryan - DOA; Al Sigmund; Ian Griffiths; [email protected]; [email protected]; Jason Pampuch;[email protected]: RE: 08K3J - UWO NRH - Shower Drains Steve, It appears that your shower detail is moving in the right direction to correct the original bid documents. Based on your revised detail it states “safing by plumbing trade installed per manufacturer’s instructions”To be clear, which prime contractor is responsible to provide the pitched substrate in the showers? Thank you, 

    Steven D. AdkinsCornerStone Plumbing, LLC1305 Poplar Drive, Waukesha, WI 53188Office: (262)896-9006Fax:       (262)896-9004Cell:      (414)467-9506 

                   

     

    From: Steve Srubas [mailto:[email protected]] Sent: Monday, December 05, 2011 9:31 AMTo: Al Sigmund; 'Stuewer, Gary'; [email protected]; '[email protected]'; Steve AdkinsCc: Ian GriffithsSubject: 08K3J - UWO NRH - Shower Drains Attached are the details we discussed at the last progress meeting. Filler block under the terrazzo for some added protection for containing the showerwater. Per the original bid docs, the safing to be installed per manufacturer’s instructions. Showed the filler strip at the door in the shower rooms.Showed the filler strip at the perimeter of the shower at the toilet rooms. Miron – please share with Terrazzo installer for review and possible coordination of door undercut. Please note – for review only. Thanks, Steve Srubas Project Coordinator BERNERS-SCHOBERarchitecture + engineering + interiors

    http://cstoneplumbing.blogspot.com/https://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbinghttp://cstoneplumbing.blogspot.com/https://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbinghttps://www.facebook.com/CornerstonePlumbing

  • 310 Pine Street | Green Bay, WI | 54301Reception: 920-432-4865 | [email protected] our portfolio: www.bsagb.com or visit our newsfeed: www.bsagb.com/blog  

    mailto:[email protected]://www.bsagb.com/http://www.bsagb.com/blog