STRAWBERRY HILL NEIGHBORHOOD MEETING Mount Auburn Street Bus Priority Pilot March 27, 2018 City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018 1

STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

STRAWBERRY HILL NEIGHBORHOOD MEETING

Mount Auburn Street Bus Priority Pilot

March 27, 2018

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

1

Page 2: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Meeting Overview

• Introductions and opening remarks

• Presentation (approx. 30 min)

•Questions and Answers (approx. 30 min)

• Proposed end at 7:15 with time for additional conversation

Purpose of meeting: to provide an update to Strawberry Hill residents and hear comments and concerns about neighborhood needs before a larger public meeting to discuss the Mt Auburn Bus Priority pilot in more detail (scheduled for May 1).

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

2

Page 3: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Presentation Contents

•Overview of planning projects

•Mt Auburn Street Bus Priority pilot• Purpose and context• Conceptual layout• Public process and evaluation timeline• Additional neighborhood concerns

•Next steps

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

3

Page 4: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

OVERVIEW OF PLANNING PROJECTS

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

4

Page 5: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

5

Page 6: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

DCR Mt. Auburn Corridor Study

Goals:• Slow traffic speeds, provide clarity, reduce crashes and severity of crashes• Measure people, reduce transit delays• Address cut‐through traffic • Offer short‐term and long‐term solutions • Acknowledge enforcement and special uses

(BB&N, Mt. Auburn Cemetery, Mt. Auburn, Shady Hill, and Tufts Health Plan)

Process:• 7 stakeholder meetings, 3 public meetings (final public meeting December 13th, 2017)• City‐organized Strawberry Hill neighborhood meeting May 8, 2017

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

6

Page 7: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Mt. Auburn St. Bus Priority Pilot

• Implement some recommendations from the DCR Study

• Test and refine a design that makes bus travel more reliable, predictable, faster

• Enhance safety for people walking and cycling on the corridor

• Keep driving travel time similar overall and improve safety

• Inform the upcoming Belmont St. design

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

7

Page 8: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Belmont Street Design/Construction

• New sidewalks and paving, improve accessibility, make improvements for all users• Belmont St and Holworthy St (up to #37‐39)

Schedule• Design: 2018 – early 2019• Bid: July 2019• Construction: summer 2019 – 2021

Contact• Melissa A. Miguel, P.E., Supervising Engineer 

617‐349‐9351 , [email protected]• Daniel Vallee, P.E., Project Manager

617‐349‐4813, [email protected]

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

8

Page 9: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

9

Page 10: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

MOUNT AUBURN STREET BUS PRIORITY PILOT

Purpose and Context

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

10

Page 11: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Policies

2016 Cambridge Complete Streets policy:Complete Streets are designed and operated to enable safe access for all users – regardless of age, ability, or mode of transportation.

2016 Vision Zero policy:Calls for the elimination of fatalities and serious injuries resulting from traffic crashes, and emphasizes that they can and should be prevented. 

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

11

Page 12: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Density map of crashes requiring EMS transport to a hospital as reported by responding officer

2015 and 2016 

See City of Cambridge Crash Analysis Summary, http://www.cambridgema.gov/cpd/Publications/2017/05/cityofcambridgecrashanalysissummary

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

12

Page 13: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Plans

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

13

Page 14: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Watertown High School

Hosmer Elementary SchoolWatertown Square

Harvard Square

Coolidge Square

Mount Auburn Cemetery

Mount Auburn Hospital

MBTA Route 73 (Harvard to Waverly Square)MBTA Route 71 (Harvard to Watertown Square)

73

71

71/73

Tufts Health Plan

Mount Auburn Street: typically two travel lanes in each direction and carries approximately 19,000 vehicles per dayRoute 71 and 73: 12,000 weekday daily passenger trips combinedShuttles: Mt. Auburn Hospital, athenahealth, Bentley, etc.

Context

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

14

Page 15: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Vehicle Volumes vs. People Volumes on Mt. Auburn St. Between Brattle Street and Coolidge Avenue

(Source: DCR Public Presentation, January 10, 2016, Slide 70)http://www.mass.gov/eea/agencies/dcr/conservation/planning‐and‐resource‐protection/projects/mount‐auburn‐street‐corridor‐study.html

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

15

Page 16: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Analysis of Transit Reliability and Delay (2014) (Data for Route 73, morning peak rush hour)

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

16

Page 17: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

BostonBRT Bus Priority Pilot Project

• Cambridge and Watertown Barr Foundation grant

• Bus priority Mt. Auburn Street west of Fresh Pond Parkway:• Bus‐only lanes and signal priority eastbound (toward Harvard)• Bike lanes westbound (toward Watertown)

• “Pilot” with minimal or no construction, intended to test and evaluate

• Materials: Paint, signal changes, signs, education and enforcement

• MUST be implemented in conjunction with DCR’s short‐term design:• Minor construction and signal improvements at Coolidge Ave and Fresh Pond Pkwy• Improve traffic flow and improve pedestrian and bicycle safety

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

17

Page 18: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

DCR Short‐term DesignDesign in progress. Existing conditions shown.

https://www.mass.gov/service‐details/mount‐auburn‐street‐corridor‐study

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

18

Page 19: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

MOUNT AUBURN STREET BUS PRIORITY PILOT

Conceptual Layout

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

19

Page 20: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Existing Conditions

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

20

Page 21: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Conceptual Layout – Bus Lanes

Proposed Bus Lanes and Queue Jumps

Existing

Source: DCR Mt Auburn Corridor Project, presented at May 8, 2017 Strawberry Hill public meeting

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

21

Page 22: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Conceptual Layout – Narrower lanes

• Lanes will likely be narrowed slightly ‐widths will still accommodate buses / truck traffic

• Wide lanes encourage faster speeds

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

22

Page 23: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Estimated Impacts, Morning Rush Hour

Bus (AM Peak) – Passenger Travel Time Impacts

502

257

662

289

360

301

438

323

0

100

200

300

400

500

600

700

EASTBOUND WESTBOUND

AVERAGEEASTBOUND WESTBOUND

90TH PERCENTILE

AM Pea

k Travel Tim

e (sec)

Existin

g

Existin

g

Existin

g

Existin

g

Prop

osed

Prop

osed

Prop

osed

Prop

osed

2.4 minutes faster

44 seconds slower

3.7 minutes faster

34 seconds slower

486

179

437

191

0

100

200

300

400

500

EASTBOUND WESTBOUND

AM Pea

k Travel Tim

e (sec)

Existin

g

Existin

g

Prop

osed

Prop

osed

49 seconds faster

12 seconds slower

AVERAGE

Auto (AM Peak) –Travel Time Impacts

Source: DCR Mt Auburn Corridor Project, presented at May 8, 2017 Strawberry Hill public meeting

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

23

Page 24: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

MOUNT AUBURN STREET BUS PRIORITY PILOT

Public Process and Evaluation

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

24

Page 25: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Current Public Outreach / Evaluation Timeline

• Jan‐March:  City Transit, Bicycle, and Pedestrian Advisory Committees

• February 15:  Watertown Mt. Auburn corridor transit meeting 

• March 27:  Strawberry Hill Neighborhood Meeting (TONIGHT)

• March/April:  Outreach to stakeholders (businesses, institutions) 

• April/May: Gather additional data

• May 1:  Joint Watertown/Cambridge public meeting

• May/June:  Street teams, implementation, education and enforcement

• June: Implementation

• July/August:  Evaluate and refine into the Fall

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

25

Page 26: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Possible / Example Evaluation Measures 

• Speeds (main streets and side streets)

• Travel time (cars and buses)

• Turns onto / out of side streets

• Wait times / queues at side streets

• Number of people using each mode

• Surveys / perception (all users)

• Others?

2 expected evaluation phases: 1. Summer immediately after implementation (when traffic is lighter) 

2. Fall (when traffic will be heavier)

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

26

Page 27: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

MOUNT AUBURN STREET BUS PRIORITY PILOT

Neighborhood Concerns

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

27

Page 28: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Additional Neighborhood Questions / Comments / ConcernsAdditional questions /comments received from neighbors:

• “We can’t all take the bus or ride a bike to work” • Travel time by car should not be significantly affected 

• The region is growing economically and regional traffic is increasing

• Encouraging use of transit is smart and efficient and can help reduce congestion, relieve parking pressure, for those who still want/need to drive

• A goal to improve safety for EVERYONE, including drivers 

• Maintaining access in and out of Cushing and Holworthy, without encouraging cut‐through traffic• Proposed changes should make this less confusing

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

28

Page 29: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Bus only

Existing Proposed

Cushing

Belmont

Diagram of expected impact to exiting vehicles

Additional Neighborhood Questions / Comments / Concerns

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

29

Page 30: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

• Idea from the public: stripe a left and right turn lane at the end of Cushing

Approx. 25’

2 hr parking

Approx. 25’

Additional Neighborhood Questions / Comments / Concerns

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

30

Page 31: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Additional Neighborhood Questions / Comments / Concerns• Access to Star Market parking – no decisions made in advance, ongoing discussion• No changes to the “plaza”/parking are being proposed

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

31

Page 32: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Additional ideas from the public:

• Remove parking on Belmont Street for a bus lane and/or neighborhood left turn “circulator lane” (Cushing to Belmont to Holworthy)• The City is NOT proposing removing parking on Belmont as part of the pilot project• More conversation with businesses would be needed regarding parking, loading• Consider possibility of attracting additional cut‐through traffic

• Morning only bus only lanes, allow HOV vehicles, “smart lane” lane activated by bus• Other times of day, there is less congestion and drivers likely wouldn’t gain from the extra lane• Consider enforcement challenges

More concerns, ideas, questions?

Additional Neighborhood Questions / Comments / Concerns

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

32

Page 33: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

NEXT STEPS

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

33

Page 34: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Next Steps

• Continue developing communications materials, outreach, and coordination

• Refine design through public process

• May 1 public meeting

• Implement in June with DCR

• July/August evaluate and refine

• Continue to evaluate throughout fall

• Fall/Winter 2018 begin Belmont Street design process

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018

34

Page 35: STRAWBERRY HILL NEIGHBORHOOD MEETING - …/media/Files/CDD/...2018/03/27  · 2016 Cambridge Complete Streets policy: Complete Streets are designed and operated to enable safe access

Thank you!

• Tegin Teich, [email protected], 617‐349‐4615

• Website: cambridgema.gov/MtAuburnBusPriority

City of Cambridge, Strawberry Hill Neighborhood Meeting Presentation, March 27, 2018