11
NSD ROAD REHABILITATION PROJECT PHASE 3 SUBIC BAY METROPOLITAN AUTHORITY

SUBIC BAY METROPOLITAN AUTHORITY BLDG. 229 …brms.e-subicbay.com/docs/bids/304/Qe3... · mains, d.8 the groove or crack above joint (longitudinalirrigation channels, telephone post

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • NSD ROAD REHABILITATION

    PROJECT PHASE 3

    SUBIC BAY METROPOLITAN AUTHORITY

    AutoCAD SHX TextBLDG. 229 WATERFRONT ROAD, SUBIC BAY FREEPORT ZONE

  • ARGO

    NAUT

    HIG

    HWAY

    RIZAL HIGHWAY

    ENGINEERING

    PROJECT TITLE: SHEET NO.

    LOCATION: SUBIC BAY FREEPORT ZONE

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    G-1

    1 OF 10

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    IG

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    CHAIRPERSON & ADMINISTRATOR

    SCALEA

    G-1 G-1

    VICINITY MAP

    JEROME M. MARTINEZ

    GEN. MANAGER, SEAPORT DEPT.

    NTS

    SATISFACTORY TO:

    N

    LAYOUT MAP

    THIS

    SITE

    INDEX OF DRAWINGS

    COVER PAGE

    VICINITY MAP, LOCATION MAP, INDEX OF DRAWINGS

    GENERAL NOTES, SUMMARY OF QUANTITIES

    SITE DEVELOPMENT PLAN (BLOCKS AREA)

    TYPICAL SECTION OF PCCP PAVEMENT (A)

    TYPICAL SECTION OF PCCP PAVEMENT (B)

    CONCRETE PAVEMENT PLAN

    TITLE / DESCRIPTION SHEET NO.

    G-1

    SITE DEVELOPMENT PLAN (YELLOW LANE AREA)

    G-2

    B-1

    B-2

    B-3

    B-4

    C-1

    C-2

    C-3

    PROJECT SIGNBOARD DETAILSSB-1

    SITE PLAN FOR REMOVAL WORKS (BLOCKS AREA)

    SITE PLAN FOR REMOVAL WORKS (YELLOW LANE AREA)

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • ENGINEERING

    PROJECT TITLE: SHEET NO.

    LOCATION: SUBIC BAY FREEPORT ZONE

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    G-2

    2 OF 10

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    IG

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    CHAIRPERSON & ADMINISTRATOR

    JEROME M. MARTINEZ

    GEN. MANAGER, SEAPORT DEPT.

    SATISFACTORY TO:

    GENERAL NOTES:

    A. SPECIFICATIONS:

    THE SPECIFICATIONS OF ITEMS WORK FOR THIS

    PROJECT SHALL BE THE DPWH STANDARD

    SPECIFICATIONS FOR HIGHWAYS, BRIDGES & AIRPORTS

    2013 EDITION VOLUME II OR SPECIAL PROVISION AS

    PRESENTED IN THE TENDER DOCUMENTS OF THE

    PROJECT.

    B. AS-STAKED PLAN

    BEFORE THE START OF ACTUAL CONSTRUCTION, THE

    AS-STAKED PLAN SHOULD BE SUBMITTED TO

    ENGINEERING DEPARTMENT IN ORDER THAT IMMEDIATE

    STEPS THAT MAY BE UNDERTAKEN TO CORRECT OR

    ADJUST APPREACIABLE DEVIATION THERE MAY BE FROM

    THE ORIGINAL PLAN.

    THESE PLAN ARE INTENDED FOR BIDDING AND

    CONTRACTING PURPOSES AND THE REQUIRED SURVEY

    DATA AND TECHNICAL INFORMATION IN ACCORDANCE

    WITH DPWH GUIDELINES WILL BE DETERMINED /

    VERIFIED DURING PRE-CONSTRUCTION SURVEY. THE

    BASIS OF THE IMPLEMENTATION SHALL BE THE

    "AS-STAKED PLAN".

    C. REMOVAL OF EXISTING STRUCTURES, OBSTRUCTIONS

    AND MISCELLANEOUS ROADWAY STRUCTURES

    C.1 PORTIONS OF EXISTING UTILITIES, SUCH AS WATER

    MAINS, IRRIGATION CHANNELS, TELEPHONE POST AND

    TRUNK LINES, ETC. THAT MAY CAUSE OBSTRUCTION TO

    THE CONSTRUCTION OF THIS PROJECT SHALL BE

    RELOCATED BY THE ENTITY OR OWNER CONCERNED.

    EXTREME PRECAUTIONS SHALL BE EXERCISED BY THE

    CONTRACTOR NOT TO DAMAGE ANY SECTION OF THE

    EXISTING PUBLIC UTILITIES DURING CONSTRUCTION,

    ANY DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF

    THE CONTRACTOR.

    C.2 ANY REMOVAL OF MISCELLANEOUS STRUCTURES

    THAT MAY BE REQUIRED INCLUDING ANY EXISTING

    CONCRETE PAVEMENT AFFECTED BY THE PROPOSED

    GRADE AND / OR ALIGNMENT SHALL BE CONSIDERED AS

    SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT

    ITEMS. NO DIRECT PAYMENT SHALL BE MADE FOR THIS

    WORK EXCEPT FOR SPECIFIC ITEMS EXPLICITLY

    IDENTIFIED FOR PAYMENT IN THE BID SCHEDULE.

    C.3 CUTTING AND TRIMMINGS OF TREES SHALL BE IN

    ACCORDANCE WITH THE SBMA GUIDELINES FOR

    ALLOWABLE TREE CUTTING AND TRIMMING WITHIN SUBIC

    BAY FREEPORT ZONE.

    D. CONCRETING

    D.1 MATERIALS & WORKMANSHIP SHALL CONFORM WITH

    THE DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS,

    BRIDGES & AIRPORTS 2013 EDITION VOLUME II.

    D.2 CONSTRUCTION (CONTACT) JOINTS ARE FORMED

    WHEN CONCRETE ON THE ONE SIDE OF THE JOINT IS

    POURED AHEAD & ALLOWED TO SET BEFORE POURING ON

    THE OTHER SIDE.

    D.3 AT CONSTRUCTION JOINTS (LONGITUDINAL OR

    TRAVERSE) CARE SHOULD BE TAKEN THAT NO CONCRETE

    FROM THE LAST SLAB FACE OVERHANGS ANY PORTION

    OF THE LAST SLAB.

    D.4 TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL

    DOWEL BARS SHALL BE SMOOTH ROUND STEEL.

    D.5 TYPE OF WEAKEND PLANE JOINT TO BE USED SHALL

    BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE

    SHALL BE USED FOR THE WHOLE PROJECT.

    D.6 FORMS SHALL BE OF STEEL, OF AN APPROVED

    SECTION, AND DEPTH EQUAL TO THE THICKNESS OF THE

    PAVEMENT AT THE EDGE.

    D.7 ATLEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS

    AT NORMAL JOINT SPACING SHALL BE PROVIDED BEFORE

    OR AFTER AN EXPANSION JOINT.

    D.8 THE GROOVE OR CRACK ABOVE JOINT (LONGITUDINAL

    OR TRAVERSE) SHALL BE SEALED WITH 30-50

    PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID

    RUBBER COMPOUND. AFTER THE CONCRETE HAD BEEN

    CURED & BEFORE OPENING THE PAVEMENT TO TRAFFIC.

    PENETRATION ASPHALT SEAL OR CONCRETE PAVEMENT

    SHOULD BE POURED IN SUCH A MANNER THAT SPILLING

    WILL BE ELIMINATED / PREVENTED THUS, PROVIDE A

    SMOOTH LEVELING SURFACE.

    D.9 ALL TRAVERSE JOINTS, EXCEPT CONSTRUCTION

    JOINT SHALL BE CONTINIOUS FROM EDGE TO EDGE.

    D.10 ALL LONGITUDINAL JOINTS SHALL MEET AT

    INTERSECTION WITH NO GAPS & OFFSETS.

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • BLDG. 1074

    BLOCK B

    BLDG 1022

    BLOCK C

    BLDG 1027NEW

    WAREHOUSE

    BLOCK D

    BLDG. 1

    076

    BLDG. 1

    075

    BLDG 1034

    BLOCK J

    BLOCK F BLOCK H BLOCK I

    BLOCK E

    MSTSIWAREHOUSE

    BLD

    G.

    10

    55

    EM

    WP

    EM

    EM

    BLOCK K

    EM

    AMERASIAWAREHOUSE

    ELECT. POST

    ELEC. MAIN

    FIRE HYDRANT

    TELEPHONE MANHOLE

    SEWERAGE MANHOLE

    TREE

    LIFT STATION

    EX - EXISTING

    EP - ELECT. POST

    EM - ELEC. MAIN

    FH - FIRE HYDRANT

    TMH - TELEPHONE MANHOLE

    SMH - SEWERAGE MANHOLE

    GH - GUARDHOUSE

    CP - CONCRETE POST

    WP - WOODEN POST

    SIM - SURFACE INLET MANHOLE

    CIM - CURB INLET MANHOLE

    CB - CATCH BASIN

    MH - MANHOLE

    BLDG 1026

    BLOCK A

    EM

    PCCP

    A.2

    EX-ROAD NETWORK PHASE 1

    EX-ROAD NETWORK PHASE 2

    (A.1)

    B.3B.2

    B.4

    B.5

    B.6

    B.7B.8B.9

    B.10

    B.11B.12

    C.2C.3

    C.4

    C.5

    C.6C.7

    C.8

    C.9

    C.10

    (B.1) (C.1) (D.1) (E.1)

    (J.1)

    (K.1)

    D.2 E.3

    E.2E.2

    E.4

    E.5

    E.6

    E.7

    K.2

    K.3K.4

    K.5

    K.5

    SIM SIM

    SIM SIM

    SIM SIM

    SIM

    SIM

    SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM

    CIM

    CIM

    CIM

    SIM SIMSIM SIM SIM

    SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM SIM

    SIM

    SIM

    SIM SIM

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CBEX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CBEX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-CB

    EX-SIM

    EX-SIM

    EX-MH

    EX-CB

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM EX-SIM

    EX-MH

    EX-MH EX-900MM Ø RCP

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-CB

    EX-SIM

    EX-SIMEX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIMEX-SIMEX-SIM

    EX-SIM

    EX-SIMEX-SIM

    EX-SIM

    EX-MH

    EX-CB

    CIM

    CIM

    CIM

    E.8

    ENGINEERING

    PROJECT TITLE: SHEET NO.

    LOCATION: SUBIC BAY FREEPORT ZONE

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    B-1

    3 OF 10

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    IG

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    CHAIRPERSON & ADMINISTRATOR

    N

    SCALEA

    B-1 B-1

    SITE DEVELOPMENT PLAN (BLOCKS AREA)

    JEROME M. MARTINEZ

    GEN. MANAGER, SEAPORT DEPT.

    SATISFACTORY TO:

    SEE SECTION

    AB-1 C-1

    SEE SECTIONB

    B-1 C-2

    NTS

    NOTE:

    EXISTING PAVEMENT TO BE

    REPAVED WITH NEW 300MM

    THICK PCCP. ELEVATION TO

    MATCH WITH EXISTING (SEE C-3)

    NOTIFY ENGINEERING

    DEPARTMENT PRIOR TO

    IMPLEMENTATION / LAYOUT OF

    PROJECT ON SITE.

    EXTREME PRECAUTION SHALL

    BE EXERCISED BY THE

    CONTRACTOR NOT TO DAMAGE

    ANY SECTION OF THE EXISTING

    STRUCTURES DURING

    CONSTRUCTION, ANY DAMAGE

    THEREOF SHALL BE ON THE

    ACCOUNT OF THE

    CONTRACTOR.

    REFER TO ENGINEERING

    DEPARTMENT FOR SITE

    REFERENCES.

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextLEGEND :

    AutoCAD SHX TextLEGEND :

    AutoCAD SHX TextEM

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextABBREVIATION :

    AutoCAD SHX TextT

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • BLD

    G.

    10

    55

    EM

    ELECT. POST

    ELEC. MAIN

    FIRE HYDRANT

    TELEPHONE MANHOLE

    SEWERAGE MANHOLE

    TREE

    LIFT STATION

    EX - EXISTING

    EP - ELECT. POST

    EM - ELEC. MAIN

    FH - FIRE HYDRANT

    TMH - TELEPHONE MANHOLE

    SMH - SEWERAGE MANHOLE

    GH - GUARDHOUSE

    CP - CONCRETE POST

    WP - WOODEN POST

    SIM - SURFACE INLET MANHOLE

    CIM - CURB INLET MANHOLE

    CB - CATCH BASIN

    MH - MANHOLE

    PCCP

    A.2

    EX-ROAD NETWORK PHASE 1

    EX-ROAD NETWORK PHASE 2

    B.6

    B.11

    B.12

    C.8

    C.9

    E.2

    E.2

    E.4

    E.5

    E.6

    CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM

    CIM

    CIM

    CIM

    EX-CB

    EX-CB

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM EX-SIM

    EX-MHEX-MH EX-900MM Ø RCP

    EX-CB

    CIM

    CIM

    CIM

    ÏÏ

    Ï

    #

    W

    A

    R

    E

    H

    O

    U

    S

    E

    W

    A

    R

    E

    H

    O

    U

    S

    E

    M

    A

    R

    I

    N

    E

    T

    E

    R

    M

    I

    N

    A

    L

    S

    A

    T

    T

    L

    E

    R

    P

    I

    E

    R

    W

    A

    R

    E

    H

    O

    U

    S

    E

    B

    L

    D

    G

    1

    0

    1

    5

    1

    0

    3

    5

    V

    A

    L

    V

    E

    P

    I

    T

    VA

    LV

    E P

    IT

    APL

    1

    0

    1

    2

    M

    H

    M

    H

    S

    E

    P

    T

    I

    C

    T

    A

    N

    K

    C

    R

    G

    A

    T

    E

    Ï

    Ï

    Ï

    Ï

    Ï

    Ï

    Ï

    GA

    TE

    S

    H

    M

    E

    T

    A

    L

    P

    L

    A

    T

    E

    S

    H

    S

    H

    AP

    L

    CO

    NT

    AIN

    ER

    TANK

    DRAINAGE

    SEPTIC TANK

    CR

    VALVE PIT

    VALVE PIT

    HOUSE

    MH

    MH

    MH

    H

    O

    U

    S

    E

    M

    E

    T

    A

    L

    P

    L

    A

    T

    E

    HO

    US

    E

    CANAL

    PIPE

    METAL PLATE

    S

    C

    A

    L

    I

    N

    G

    W

    E

    I

    G

    H

    T

    OIL DEPOT

    HOUSE

    SEPTIC TANK

    #

    #

    #

    #

    #

    E

    M

    M

    H

    G

    H

    E

    M

    E

    M

    METAL PLATE

    CONTAINER

    CHB FENCE

    EM

    AC PAD

    O

    FF

    IC

    E

    C

    O

    N

    T

    A

    I

    N

    E

    R

    O

    F

    F

    I

    C

    E

    E

    M

    M

    H

    M

    H

    M

    H

    M

    H

    M

    H

    M

    H

    M

    H

    M

    -

    2

    OFFICE

    MA

    IT

    EN

    AN

    CE

    T

    A

    N

    K

    O

    V

    E

    R

    H

    E

    A

    D

    P

    I

    P

    E

    S

    LAMP POST

    BOLLARD

    FENCELINE

    R

    O

    A

    D

    T

    O

    S

    A

    T

    T

    L

    E

    R

    P

    I

    E

    R

    G

    A

    T

    E

    R

    O

    A

    D

    T

    O

    S

    A

    T

    T

    L

    E

    R

    P

    I

    E

    R

    (

    A

    .

    1

    )

    (

    A

    .

    2

    )

    (

    A

    .

    3

    )

    ARGO

    NAUT

    HIG

    HWAY

    RIZAL HIGHWAY

    ENGINEERING

    PROJECT TITLE: SHEET NO.

    LOCATION: SUBIC BAY FREEPORT ZONE

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    B-2

    4 OF 10

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    IG

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    CHAIRPERSON & ADMINISTRATOR

    N

    SCALE1

    B-2 B-2

    SITE DEVELOPMENT PLAN (YELLOW LANE)

    JEROME M. MARTINEZ

    GEN. MANAGER, SEAPORT DEPT.

    SATISFACTORY TO:

    NTS

    KEY MAP

    NOTE:

    EXISTING PAVEMENT TO BE REPAVED WITH

    NEW 300MM THICK PCCP. ELEVATION TO

    MATCH WITH EXISTING (SEE C-3)

    NOTIFY ENGINEERING DEPARTMENT PRIOR

    TO IMPLEMENTATION / LAYOUT OF PROJECT

    ON SITE.

    EXTREME PRECAUTION SHALL BE

    EXERCISED BY THE CONTRACTOR NOT TO

    DAMAGE ANY SECTION OF THE EXISTING

    STRUCTURES DURING CONSTRUCTION, ANY

    DAMAGE THEREOF SHALL BE ON THE

    ACCOUNT OF THE CONTRACTOR.

    REFER TO ENGINEERING DEPARTMENT FOR

    SITE REFERENCES.

    AutoCAD SHX TextS

    AutoCAD SHX TextLEGEND :

    AutoCAD SHX TextLEGEND :

    AutoCAD SHX TextEM

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextABBREVIATION :

    AutoCAD SHX TextE

    AutoCAD SHX TextT

    AutoCAD SHX TextE

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • BLDG. 1074

    BLDG 1026

    BLOCK A BLOCK B

    BLDG 1022

    BLOCK C

    BLDG 1027NEW

    WAREHOUSE

    BLOCK D

    BLDG. 1

    076

    BLDG. 1

    075

    BLDG 1034

    BLOCK J

    BLOCK F BLOCK H BLOCK I

    BLOCK E

    MSTSIWAREHOUSE

    BL

    DG

    .

    1055

    C.5

    EM

    GH

    1

    2

    EM

    EX

    IS

    TIN

    G S

    LA

    B

    KS

    PA

    N

    EM

    EM

    EM

    1

    BLOCK K

    EM

    AMERASIAWAREHOUSE

    1

    3

    2

    5

    6

    4

    7

    8

    9

    10

    10

    10

    10

    10

    11

    11

    12

    13

    15

    14

    16

    17

    18

    19

    19

    20 20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    11A

    20A

    32B

    32A

    32C

    LOADING

    DOCK

    ELECT. POST

    ELEC. MAIN

    FIRE HYDRANT

    TELEPHONE MANHOLE

    SEWERAGE MANHOLE

    TREE

    LIFT STATION

    ABBREVIATION :

    EX - EXISTING

    TMH - TELEPHONE MANHOLE

    SMH - SEWERAGE MANHOLE

    GH - GUARDHOUSE

    CP - CONCRETE POST

    WP - WOODEN POST

    SIM - SURFACE INLET MANHOLE

    CIM - CURB INLET MANHOLE

    CB - CATCH BASIN

    MH - MANHOLE

    LEGEND:

    32A.1

    NOTES:

    TREES WITH DIAMETER OF LESS THAN

    0.15M AND ALL VEGETATED AREAS SHALL

    BE INCLUDED IN ITEM 100 (2) - CLEARING

    AND GRUBBING.

    REFER TO ENGINEERING DEPARTMENT

    FOR ACTUAL SITE LOCATIONS.

    ENGINEERING

    PROJECT TITLE: SHEET NO.

    LOCATION: SUBIC BAY FREEPORT ZONE

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    B-3

    5 OF 10

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    IG

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    CHAIRPERSON & ADMINISTRATOR

    JEROME M. MARTINEZ

    GEN. MANAGER, SEAPORT DEPT.

    SATISFACTORY TO:

    SCALE NTSA

    B-3 B-3

    SITE PLAN FOR REMOVAL WORKS (BLOCKS AREA)

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    ./ECOLOGY/1022/1.jpgAutoCAD SHX TextS

    AutoCAD SHX TextS

    AutoCAD SHX TextEM

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • ARGO

    NAUT

    HIG

    HWAY

    RIZAL HIGHWAY

    BLD

    G.

    10

    55

    EM

    ELECT. POST

    ELEC. MAIN

    FIRE HYDRANT

    TELEPHONE MANHOLE

    SEWERAGE MANHOLE

    TREE

    LIFT STATION

    EX - EXISTING

    EP - ELECT. POST

    EM - ELEC. MAIN

    FH - FIRE HYDRANT

    TMH - TELEPHONE MANHOLE

    SMH - SEWERAGE MANHOLE

    GH - GUARDHOUSE

    CP - CONCRETE POST

    WP - WOODEN POST

    SIM - SURFACE INLET MANHOLE

    CIM - CURB INLET MANHOLE

    CB - CATCH BASIN

    MH - MANHOLE

    PCCP

    A.2

    EX-ROAD NETWORK PHASE 1

    EX-ROAD NETWORK PHASE 2

    B.6

    B.9

    B.11

    B.12

    C.8

    C.9

    E.2

    E.2

    E.4

    E.5

    E.6

    CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM CIM

    CIM

    CIM

    CIM

    EX-CB

    EX-CB

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM

    EX-SIM EX-SIM

    EX-MHEX-MH EX-900MM Ø RCP

    EX-CB

    CIM

    CIM

    CIM

    ÏÏ

    Ï

    #

    W

    A

    R

    E

    H

    O

    U

    S

    E

    W

    A

    R

    E

    H

    O

    U

    S

    E

    M

    A

    R

    I

    N

    E

    T

    E

    R

    M

    I

    N

    A

    L

    S

    A

    T

    T

    L

    E

    R

    P

    I

    E

    R

    W

    A

    R

    E

    H

    O

    U

    S

    E

    B

    L

    D

    G

    1

    0

    1

    5

    1

    0

    3

    5

    V

    A

    L

    V

    E

    P

    I

    T

    VA

    LV

    E P

    IT

    APL

    1

    0

    1

    2

    M

    H

    M

    H

    S

    E

    P

    T

    I

    C

    T

    A

    N

    K

    C

    R

    G

    A

    T

    E

    Ï

    Ï

    Ï

    Ï

    Ï

    Ï

    Ï

    GA

    TE

    S

    H

    M

    E

    T

    A

    L

    P

    L

    A

    T

    E

    S

    H

    S

    H

    AP

    L

    CO

    NT

    AIN

    ER

    TANK

    DRAINA

    GE

    SEPTIC TANK

    CR

    VALVE PIT

    VALVE PIT

    HOUSE

    MH

    MH

    MH

    H

    O

    U

    S

    E

    M

    E

    T

    A

    L

    P

    L

    A

    T

    E

    HO

    US

    E

    CANAL

    PIPE

    METAL PLATE

    E

    X

    I

    S

    T

    I

    N

    G

    S

    L

    A

    B

    S

    C

    A

    L

    I

    N

    G

    W

    E

    I

    G

    H

    T

    OIL DEPOT

    HOUSE

    SEPTIC TAN

    K

    #

    #

    #

    #

    #

    #

    #

    E

    M

    M

    H

    G

    H

    E

    M

    E

    M

    METAL PLATE

    CONTAINER

    CHB FENCE

    EM

    AC PAD

    O

    FF

    IC

    E

    C

    O

    N

    T

    A

    I

    N

    E

    R

    O

    F

    F

    I

    C

    E

    E

    M

    M

    H

    M

    H

    M

    H

    M

    H

    M

    H

    M

    H

    M

    H

    M

    -

    2

    OFFICE

    MA

    IT

    EN

    AN

    CE

    T

    A

    N

    K

    O

    V

    E

    R

    H

    E

    A

    D

    P

    I

    P

    E

    S

    LAMP POST

    BOLLARD

    FENCELINE

    R

    O

    A

    D

    T

    O

    S

    A

    T

    T

    L

    E

    R

    P

    I

    E

    R

    G

    A

    T

    E

    R

    O

    A

    D

    T

    O

    S

    A

    T

    T

    L

    E

    R

    P

    I

    E

    R

    A

    B

    ENGINEERING

    PROJECT TITLE: SHEET NO.

    LOCATION: SUBIC BAY FREEPORT ZONE

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    B-4

    6 OF 10

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    IG

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    CHAIRPERSON & ADMINISTRATOR

    N

    SCALE1

    B-4 B-4

    SITE PLAN FOR REMOVAL WORKS (YELLOW LANE AREA)

    JEROME M. MARTINEZ

    GEN. MANAGER, SEAPORT DEPT.

    SATISFACTORY TO:

    NTS

    KEY MAP

    AutoCAD SHX TextS

    AutoCAD SHX TextLEGEND :

    AutoCAD SHX TextLEGEND :

    AutoCAD SHX TextEM

    AutoCAD SHX TextT

    AutoCAD SHX TextS

    AutoCAD SHX TextABBREVIATION :

    AutoCAD SHX TextE

    AutoCAD SHX TextT

    AutoCAD SHX TextE

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextW

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextT

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • EXISTING SUBGRADE TO BE

    COMPACTED TO 95% OF MAX DENSITY

    PCCP, 300mm THK

    SUBBASE COURSE, 200mm THK

    100mm THK EXISTING AC PAVEMENT TO BE REMOVED

    400mm THK EXISTING BASE MATERIAL TO BE REMOVED

    2%2%

    EXISTING SUBGRADE TO REMAIN

    EXISTING WAREHOUSE

    EXISTING WAREHOUSE

    EXISTING

    CATCH BASIN

    EXISTING

    CATCH BASIN

    EXISTING

    CATCH BASIN

    C-1

    7 OF 10

    SHEET NO.

    ENGINEERING

    PROJECT TITLE:

    LOCATION: SUBIC BAY FREEPORT ZONE

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    I

    G

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    ADMINISTRATOR & CEO

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    DETAIL SECTION OF PCCP

    SCALE NTS

    A

    C-1

    REMOVAL OF EXISTING A.C. PAVEMENT

    B-1

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • EXISTING SUBGRADE TO BE

    COMPACTED TO 95% OF MAX DENSITY

    PCCP, 300mm THK

    SUBBASE COURSE, 200mm THK

    500mm THK EXISTING BASE MATERIAL TO BE REMOVED

    2%2%

    EXISTING SUBGRADE TO REMAIN

    EXISTING

    CATCH BASIN

    EXISTING

    CATCH BASIN

    EXISTING

    CATCH BASIN

    NOTE: SECTION FOR BLOCK F,H & I

    C-2

    8 OF 10

    SHEET NO.

    ENGINEERING

    PROJECT TITLE:

    LOCATION: SUBIC BAY FREEPORT ZONE

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    I

    G

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    ADMINISTRATOR & CEO

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    DETAIL SECTION OF PCCP

    SCALE NTS

    B

    C-2

    REMOVAL OF EXISTING A.C. PAVEMENT

    B-1

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • (TIE BARS)

    25mmØ x 600mm @ 130mm o.c.

    4500 mm4500 mm

    WID

    TH

    in

    m

    m

    LONGITUDINAL CONSTRUCTION JOINT

    (SEE SECTION DETAIL - A)

    60

    0m

    m

    25

    mm

    Ø x 6

    00

    mm

    @ 1

    30

    mm

    o

    .c.

    (T

    IE

    B

    AR

    S)

    1500 mm

    (minimum)

    TRANSVERSE CONSTRUCTION JOINT

    (SEE SECTION DETAIL - C)

    WEAKEND PLAIN / CONTRACTION JOINT

    (SEE SECTION DETAIL - B)

    25mmØ x 600mm @ 130mm o.c.

    (TIE BARS)

    25mm Ø Tie bar

    t =

    in m

    m

    t / 3

    t / 3

    t / 3

    600 mm

    LONGITUDINAL CONSTRUCTION JOINT

    t =

    200m

    m

    IT

    EM

    200

    t =

    in m

    m

    25mm Ø Tie bar

    WEAKEND PLAIN / CONTRACTION JOINT

    130 mm

    t =

    200m

    m

    IT

    EM

    200

    t =

    in

    m

    m

    25mm Ø Dowel bar (plain bar)

    spaced @ 130mm o.c.

    t / 3

    t / 3

    t / 3

    600 mm

    TRANSVERSE CONSTRUCTION JOINT

    t =

    2

    00

    mm

    IT

    EM

    2

    00

    CONCRETE PAVEMENT PLAN

    SCALE NTS

    A

    SECTION DETAIL - A1 SECTION DETAIL - B2SECTION DETAIL - C3

    C-3 C-3

    ENGINEERING

    PROJECT TITLE: SHEET NO.

    LOCATION: SUBIC BAY FREEPORT ZONE

    C-3

    9 OF 10

    DRAFTED/ CADD:

    DESIGNED:

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    I

    G

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    CHAIRPERSON & ADMINISTRATOR

    C-3 C-3

    C-3 C-3C-3 C-3

    NSD ROAD REHABILITATION

    PROJECT PHASE 3

    MDD / RGH

    MDD / AMM

    SCALE SCALE

    SCALE NTS

    NTSNTS

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

  • SUBIC BAY METROPOLITAN AUTHORITY

    BLDG 229 WATERFRONT ROAD, CENTRAL BUSINESS DISTRICT, SUBIC BAY FREEPORT

    PROJECT :

    LOCATION:

    FUNDS/SOURCE/S:

    NAME OF PROJECT

    IMPLEMENTING AGENCY/IES :

    DEVELOPMENT PARTNER/S:

    BRIEF DESCRIPTION OF PROJECT :

    DURATION STARTED

    TARGET DATE OF

    COMPLETION

    PERCENTAGE OF

    COMPLETION

    AS OF (DATE) COST INCURRED

    TO DATE

    DATE COMPLETED REMARKS

    P R O J E C T D A T E P R O J E C T S T A T U S

    CONTRACTOR/SUPPLIER:

    PROJECT DETAILS:

    FOR PARTICULARS OR COMPLAINTS ABOUT THIS PROJECT, PLEASE CONTACT THE REGIONAL OFFICE OR CLUSTER WHICH

    HAS AUDIT JURISDICTION ON THIS PROJECT.

    COA Regional Office No./Cluster: CGS-B Water Districts andother CGS SAA'sADDRESS:

    CONTACT NO: OR TEXT COA CITIZEN'S DESK AT 0915-5391-957

    3" MAIN INFORMATIONHELVETICA FONT, BLACK

    70 dpi RESOLUTION

    8'

    6" 6"

    8' x 8' TARPAULIN:WHITE BACKGROUND: on2" x 4" WOOD MAIN FRAME;2" x 2" HOR'L AND VERT'L STUD

    1" SUB-INFORMATION;HELVETICA FONT; BLACK70 dpi RESOLUTION

    1" thk BLACK LINE

    1/2" thk BLACK LINE

    2" x 4" WOOD STAND

    3" MAIN INFORMATIONHELVETICA FONT, BLACK

    70 dpi RESOLUTION

    8'

    2'

    COST:

    6"

    PROJECT SIGNBOARD

    SB-1

    NOT

    10 OF 10

    TO SCALE

    A

    SB-1 SB-1

    SHEET NO.

    ENGINEERING

    PROJECT TITLE:

    LOCATION: SUBIC BAY FREEPORT ZONE

    DRAFTED/ CADD:

    DESIGNED:

    MDD / RGH

    MDD / AMM

    T

    NE

    M

    A

    P

    G

    R

    T

    E

    T

    S

    I

    E

    E

    N

    I

    G

    N

    E

    R

    P

    W

    G

    N

    D

    DEPARTMENT

    SUBIC BAY

    METROPOLITAN

    AUTHORITY

    CHECKED BY: REVIEWED BY: RECOMMENDED: APPROVED:

    EDISON D. ICO

    CHIEF - PDD DA FOR PWTSG

    MARCO A. ESTABILLOGARY P. FERNANDEZ

    MNGR-ENG'G DEPT.

    ATTY. WILMA T. EISMA

    ADMINISTRATOR & CEO

    ROAD REHABILITATION

    PROJECT 2018

    AutoCAD SHX TextPUBLIC WORKS & TECHNICAL SERVICES GROUP BLDG. 255 BARRYMAN ROAD, SUBIC BAY FREEPORT ZONE

    Sheets and ViewsCOVER

    Sheets and ViewsG-1

    Sheets and ViewsG-2

    Sheets and ViewsB-1

    Sheets and ViewsB-2

    Sheets and ViewsB-3

    Sheets and ViewsB-4

    Sheets and ViewsC-1

    Sheets and ViewsC-2

    Sheets and ViewsC-3

    Sheets and ViewsSB-1