October 13, 2015 Subject: Request for Quotation Maintenance Facility- Commission Meeting Room Design The Madison Metropolitan Sewerage District is currently in the process of constructing a new Maintenance Facility on the Nine Springs Wastewater Treatment Plant campus. This project includes what will be the new primary meeting room for the District’s Commission. The 9- member Commission provides oversight and governance of the Madison Metropolitan Sewerage District. The purpose of this letter is to request a quotation for design services for this new meeting room. The goal of these services is to produce a final plan and recommendations for the layout and setup of the new meeting room. A schedule and scope of services for the work is anticipated to be as follows: October-November 2015: 1. Meet with District staff to discuss needs and present initial ideas. 2. Produce recommendations, including alternative options for: a. Meeting room layout b. Video capabilities i. Conferencing ii. Recording iii. Live streaming iv. Web hosting and archiving c. Room lighting and lighting controls i. Control of natural lighting ii. Control of artificial lighting d. Audio capabilities i. Microphones for presenters, staff, and commissioners ii. Integration with video iii. Room speakers e. Presentation Capabilities i. Projector ii. Secondary Screen iii. Integration with video

Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

October 13, 2015 Subject: Request for Quotation Maintenance Facility- Commission Meeting Room Design The Madison Metropolitan Sewerage District is currently in the process of constructing a new Maintenance Facility on the Nine Springs Wastewater Treatment Plant campus. This project includes what will be the new primary meeting room for the District’s Commission. The 9-member Commission provides oversight and governance of the Madison Metropolitan Sewerage District. The purpose of this letter is to request a quotation for design services for this new meeting room. The goal of these services is to produce a final plan and recommendations for the layout and setup of the new meeting room. A schedule and scope of services for the work is anticipated to be as follows: October-November 2015:

1. Meet with District staff to discuss needs and present initial ideas. 2. Produce recommendations, including alternative options for:

a. Meeting room layout b. Video capabilities

i. Conferencing ii. Recording

iii. Live streaming iv. Web hosting and archiving

c. Room lighting and lighting controls i. Control of natural lighting

ii. Control of artificial lighting d. Audio capabilities

i. Microphones for presenters, staff, and commissioners ii. Integration with video

iii. Room speakers e. Presentation Capabilities

i. Projector ii. Secondary Screen

iii. Integration with video

Page 2: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

3. Meet with District staff to discuss recommendations and options

December-January 2015: 4. Utilize feedback from District staff to produce final recommendations. 5. Compile recommendations into a scope specification to be used for bidding. 6. Meet with District staff to discuss if necessary (include this cost in your quotation).

For your reference I have attached a subset of the construction plans for the new Maintenance Facility. On the plans, the meeting room located on the southeast corner of the building and is shown as Meeting/Training, room 102. A full set of plans can be made available electronically (PDF or DWG) upon request. Your proposal should indicate an estimated total price for the work. Also show the unit price rates (time and materials) to be used. Include with your quotation a brief summary of any relevant previous work and project team experience. Note that this project scope includes only the production of a plan. The implementation of the plan is beyond the scope of these services. Please submit a response for this work no later than Friday, October 23, 2015. Please feel free to contact me with any questions or need for clarification in preparing your quotation. Regards, Tim Stieve, P.E. Project Engineer [email protected] Office: 608-222-1201 x293 Cell: 608-286-5549

Page 3: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

Sheet Number:

© 2014 Bray Associates Architects, Inc.

Issued For:

Issue Dates:

Proje

ct Tit

le:

Project Number:

Sheet Title:

CONSTRUCTIONDOCUMENTS

Drawing Index

Office Locations:

www.brayarch.com

Milwaukee173 North Broadway Ave.

Milwaukee, Wisconsin 53202

T: 414.226.0200

Sheboygan1202A North 8th Street

PO Box 955Sheboygan, Wisconsin 53082

T: 920.459.4200

C:\B

ray

Rev

it\31

51 -

MM

SD\3

151

- nst

ark

- M

MSD

Rev

6.rv

t20

14-1

2-16

3:2

7:31

PM

G0.0

CD SET 2014.12.12

1610

Moo

rland

Roa

d

Madis

on M

etro S

ewera

ge D

istric

tMa

inten

ance

Facil

ity

Madis

on, W

i 537

13

3151

Cover Sheet

Madison Metro Sewerage District

Maintenance Facility1610 Moorland Road

Madison, Wi 53713

Construction Set

PlumbingP000 Schedule & DetailsP001 Foundation PlanP101 First Floor PlanP201 Mezzanine PlanP300A Drain and Vent Isometric - Unit AP300B Drain and Vent Isometric - Unit BP301A Water Supply Isometric - Unit AP301B Water Supply Isometric - Unit B

Fire ProtectionFP101 First Floor - Fire Protection PlanFP201 Mezzanine Plan - Fire Protection Plan

HVACH0.1 Exchanger DetailsH1.1 SchedulesH1.2 SchedulesH2.1 First Floor Ductwork PlanH2.2 Second Floor Ductwork PlanH3.1 First Floor Piping PlanH3.2 Second Floor Piping PlanH4.1 SectionsH5.1 Details

ElectricalE1.0 Site Plan, Details, & Symbols ListE1.1L Floor Plan Unit A- LightingE1.1P Floor Plan Unit A- PowerE1.2 Floor Plan Unit B - Lighting & PowerE1.3 Mezzanine- Lighting & PowerE2.0 One Line, Details, & SchedulesE3.0 DetailsE3.1 Details

ArchitecturalA1.1 Ground Floor Plan - Unit 'A'A1.2 Ground Floor Plan - Unit 'B'A1.3 Mezzanine PlanA1.4 Roof PlanA1.4a Roof Plan - Solar Alt.A1.5 Enlarged Toilet Plans & ElevationsA2.0 ElevationsA2.0a Elevations - Alt A-1A3.0 Building SectionsA3.1 Building SectionsA4.0 Wall SectionsA4.1 Wall SectionsA4.2 Wall SectionsA5.0 First Floor RCPA5.1 Mezzanine RCPA6.0 Wall Section DetailsA6.1 Roof DetailsA6.2 Project DetailsA6.3 DetailsA6.4 Elevations and DetailsA7.0 Millwork Plans, Elevations & DetailsA7.2 Casework ElevationsA8.0 Door ScheduleA8.1 Door DetailsA8.2 DetailsA8.3 Window TypesA8.4 Window DetailsA9.0 Room Finish Schedule

General InformationG0.0 Cover SheetG0.1 Code ReviewG0.2 Wall Types

CivilC1.0 Site DemoC1.1 Site PlanC2.0 Grading & Erosion Control PlanC2.1 Grading & Erosion Control PlanC3.0 Utility PlanC3.1 Sanitary Sewer Service PlanC4.0 Site DetailsC4.1 DetailsL1.0 Landscape PlanL2.0 Landscape Details, Notes & Specs

StructuralS0.1 General Notes and AbbreviationsS1.0 Foundation Plan - Unit AS1.1 Foundation Plan - Unit BS2.0 Mezzanine Framing Plan - Unit AS2.1 Roof Framing Plan - Unit AS2.2 Roof Framing Plan - Unit BS2.3 Detailed Roof Framing - Unit AS3.0 Foundation DetailsS3.1 Framing DetailsS3.2 Framing Details

ConsultantsCivil

StructuralJSD Engineering, Inc.161 Horizon Drive, Suite #101Verona, WI 53593Phone: (608) 848-5060FAX: (608) 848-2255

Plumbing & Fire ProtectionMuermann Engineering, LLCW227 N16867 Tillie Lake Court Suite 202Jackson, WI 53037Phone: (262) 677-4588FAX: (262) 677-4830

HVACFredericksen Engineering12308 Corporate Parkway, Suite 400Mequon, WI 53092Phone: (262) 243-9090FAX: (262) 243-9233

ElectricalMuermann Engineering, LLC116 Fremont StreetKiel, WI 53042Phone: (920) 894-7800FAX: (920) 894-7916

Landscape

SustainableSustainable Engineering Group LLC

JSD Engineering, Inc.161 Horizon Drive, Suite #101Verona, WI 53593Phone: (608) 848-5060FAX: (608) 848-2255

JSD Engineering, Inc.161 Horizon Drive, Suite #101Verona, WI 53593Phone: (608) 848-5060FAX: (608) 848-2255

7475 Hubbard Ave, Suite 201Middleton, WI 53562Phone: (608) 836-4488FAX: (608) 836-4477

New Maintenance Building

Page 4: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

UP

FD

FD

FD

FDFDFD

FD

FD

FD

.

.

.

W/D

.

W/D

.

B&G Stor.154

Part Staging141

Elec. Shop148

Mechanical Shop135

B&G Office153

Office152

6A3.0

5A3.0

1A3.0

2A3.0

3A3.0

Vestibule100

Inst. Stor.150

JC149

Aid151

Staging128

Office145

Office147

Office146

Elev.144

Office139

Office140

Part Stor.142

Paint138

Staging137

Sandblasting136

Office132

Collection Sys.Shop133

Collection Sys.Stor.134

Meeting / Training102

Womens108

Mens109

Shop Office114

Reception113

Shop Office115

Conf.112

Data106

Boiler110

Collection Sys.Office

104

Stor105

Mech. Offices117

Library / Records118

Office120

Office119

Elec. Offices121

Men's Lockers125

Women's Lockers126

Corridor101

Water Serv.103

Turnout Gear156

Elec.107

1A3.1

A6.41

3A4.2

Tank Stor.273

Lunch /Multipurpose

122

Stor.111

Corridor116

Vestibule124

Ice127

18'-0 3

/4"3'-4

"2'-9

1/4"

6'-3 5/8" 10'-0" 4'-4" 3'-4" 34'-0" 10'-0" 7'-10" 3'-4" 8'-4" 10'-0" 8'-4" 3'-4" 31'-4 3/8"

38'-3" 140'-6"

23'-8 1

/2"6'-4

"2'-0

"10'

-0"9"

3'-6"

10'-0"

18'-8"

7'-0"

11 7/8

"

19'-10" 7'-4" 8" 5'-4" 6'-1 1/4" 5'-4" 10" 5'-4" 4'-0" 5'-4" 1'-0" 5'-2" 2'-0" 5'-4" 10" 3'-4" 1'-8" 3'-4" 10" 5'-4" 3'-6" 5'-4" 1'-0" 5'-2" 1'-4" 8'-0" 1'-0" 5'-4" 8'-0" 3'-4" 10" 5'-4" 9'-10" 3'-4" 1'-4" 3'-4" 6'-8" 3'-4" 1'-8" 3'-4" 1'-0" 5'-4" 1'-1 3/4" 9'-4"

3'-4"

80" REMOVABLESECTION OF WALL;CMU INFILL

Stairs143

13'-0 1

/8"8'-2

"42'

-4 3/8"

41'-1 1

/2"9'-0

"9'-0

"12'

-8"10'

-8"13'

-8"26'

-10 3/8

"7'-9

1/4"

10'-9" 9'-8" 9'-8" 9'-10" 30'-0" 9'-8" 10'-4" 12'-0 1/4" 7'-3 3/4" 9'-8" 24'-8" 10'-0" 6'-8" 17'-2" 9'-4"

A1.53

A1.52

A1.51

X2

G8

G8

M8

G8

G8

G8

G8

G8

G8

G8

A

A6

A

A

G8

A6

A

G8

G8

G8

G8

G8

A

G8

G8

G8 G8

G8G8G8

G8

G8

G8

G8

A

A

A

A

A6

G8

G8

X2

A

G8

X2

X2G8

X2

X2

X2

L8

A6

A6 A

A6

G8

Z

Z

Z Z

G8

G8

G8

A

A

A

A

A

K8

A

A

X2

71'-4 5/8" 15'-9 5/8" 30'-1 5/8" 4'-0" 36'-11 7/8"

A6.23

Typ.

A7.21

A8.3 16

CHAINLINKFENCE &6' GATE

Vestibule131

4A3.1

G8

G8

G8

M8

G8 G8

A6

C C

A

A

G8

G8

G8

G8

G8

G8

G6G6

G8

G8

2A6.4

9'-4"

8'-1"

3'-0"

6'-4"

3'-0"

18'-8"

8'-2"

11'-10

"8"

16'-0"

8"22'

-8"8"

12'-0"

8"8'-0

"8"

20'-9 1

/2"1'-4

"

A6.44

A6.45

A6.46

A7.01

3A3.1

11'-4" 10'-0" 1'-4" 3'-4" 5'-11 1/4" 7'-7 3/4"

8'-8"

4'-1" 5'-4" 1'-8" 3'-4" 1'-8" 4'-0" 6'-0" 3'-4" 1'-6" 3'-4" 6'-0" 29'-4" 3'-0" 5'-4" 2'-6" 8'-8" 5'-4" 5'-4" 2'-0" 6'-4" 2'-0" 5'-4" 6'-2" 6'-4" 6'-8" 5'-4" 4'-0"

A1.5 109

142C

137B137A

134A

148B

152

146

141

133B

136B

136A

138

114

109 108

118A

112 104

115

153B

126B

122C

106

142B

154A

139148A

135A153A

134B

140

145

147

151

150B

142A

131B

135B

133A

121B

118B 118C

117B

149

120 119

143C

155A

116

102C

148C 135C

143A

154B

132

150A

143B

105A

111

110

155B

100B100A

107

125A

126A

156A

131A

8A3.1

A8.3

9

A8.3

10

A8.3

11

A8.3

12

A8.313

A8.314

CW-1

CW-2

CW-3

CW-4

CW-5

CW-6

A8.3

1

W-1 W-2 W-1

A8.3

2

W-1

W-2

W-2

W-1

A

2'-4" 6'-4" 29'-8 1/4"

PRIME & PAINT ALL EXPOSED STRUCTURAL STEEL; TYP.

A6.27

Typ.

SHADES SHADES SHADES SHADES SHADES SHADES SHADES

SHADES

PRIME & PAINT ALL EXPOSEDSTRUCTURAL STEEL; TYP.

SHADES

SHAD

ESSH

ADES

SHAD

ES

BLINDS BLINDSBLINDSBLINDS

BLINDS BLINDS BLINDS BLINDS BLINDS

BLINDSBLINDS BLINDS

BLIND

S

BLIND

S

BLIND

S

BLIND

S

BLINDS

BLINDS

BLINDS

BLINDS

103A

BLIND

S

(4) BIKESTORAGE

RACK

M8

M8

M8

M8

M8

M8

FEC

FEC

FEC

FEC

FEC

A8.3

8

SF-4 SF-4

12'-0"

8'-0"

A8.3

15SF-5

SF-6

A7.2

6

SF-6

A6

102B

102A

125B

122A

122B

156B

156C

117A121A

100D100C

4'-0" 2'-8" 6'-0" 6'-8" 6'-0" 2'-8" 4'-0"

4'-0"

2'-8"

6'-0"

6'-8"

6'-6"

6'-8"

6'-0"

2'-8"1

'-11 7/8

"

9'-3 3/4

"

1'-8 7/8" 12'-4" 1'-8 7/8"

19'-2 7

/8"

29'-6 7

/8"8'-3

1/2"

3'-4"

1'-10"

3'-4"

4'-6"

8'-0"

4'-8 1/8

"

11A6.2

11A6.2

Sim

15'-7"

METAL STAIRS;(19) 7" RISERS w/11" TREADS

21

A6.2

A6.07

PROJECTIONSCREEN ABOVE

4'-0" x 6'-0"PREFINISHED

METAL TRELLIS

4'-0" x 6'-0"PREFINISHED

METAL TRELLIS

4'-0" x 6'-0"PREFINISHED

METAL TRELLIS

4'-0" x 6'-0"PREFINISHED

METAL TRELLIS

4'-0" x 6'-0"PREFINISHED

METAL TRELLIS

RAINCHAINFROM ABOVE

RAINCHAINFROM ABOVE

RAINCHAINFROM ABOVE

RAINCHAINFROM ABOVE

RAINCHAINFROM ABOVE

RAINCHAINFROM ABOVE

PCT-1

CPT-1

4'-4"

5'-8"

21'-1 1

/2"

RECY

CLING

STOR

AGE

RAINCHAINFROM ABOVE

A6.49

PT-4

PT-4

PT-4

CG1 CG1 CG1CG1

CG2

CG2

6A4.2

A6.021

1'-9 7/8"

2'-3 1/2" 5'-0" 1'-1 1/2"

BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1

BL1

BL1

BL1BL1

BL1

BL1BL1

BL1

BL1

BL2

BL1 BL2

BL1

BL1

10'-4"

9'-11"

5'-2"

15'-2"15'-8" 10'-8 3/8" 10'-8" 15'-9 1/2" 8'-4 7/8" 12'-0" 13'-5 5/8" 12'-0" 7'-4" 7'-6"

10'-8"

14'-8"

14'-4"

WRAP RAILINGUNDER STAIRS

WRAP RAILINGUNDER STAIRS

14'-8"

R

R

BLIND

SBL

INDS

BL1

BL1

42'-8 1

/2"6'-3

"5'-9

"5'-6

"7'-2

"5'-8

"12'

-10"

5'-6"

10'-8"

13'-8"

15'-8"

18'-3 1

/2"

14'-8"

14'-8"

A2.06

FEC36

1

1

Sheet Number:

© 2014 Bray Associates Architects, Inc.

Issued For:

Issue Dates:

Proje

ct Tit

le:

Project Number:

Sheet Title:

CONSTRUCTIONDOCUMENTS

Office Locations:

www.brayarch.com

Milwaukee173 North Broadway

Milwaukee, Wisconsin53202

T: 414.226.0200

Sheboygan1202A North 8th Street

PO Box 955Sheboygan, Wisconsin 53082

T: 920.459.4200

CD Set 2014.12.12

C:\B

ray

Rev

it\31

51 -

MM

SD\3

151

- nst

ark

- M

MSD

Rev

6.rv

t20

15-0

1-07

2:0

6:16

PM

A1.1

Addendum #1 2015.01.07

1610

Moo

rland

Roa

d

Madis

on M

etro S

ewera

ge D

istric

tMa

inten

ance

Facil

ity

Madis

on, W

i 537

13

3151

Ground Floor Plan- Unit 'A'

1/8" = 1'-0"1 Unit A

Page 5: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

Level 1100'-0"

Level 2110'-8"

6A3.0

5A3.0M07

M05

M01

M01

M01

M07

M06

M16 M16

M01

M04M03

M07

M01

M06

M19

M01 M03M03

M05

SF-1 SF-1 SF-1 SF-1

SF-2

W-1 W-1W-2

W-3 W-3 W-3

W-3 W-3 W-3 W-3 W-3 W-3 W-3 W-3 W-3 W-3 W-3 W-3 W-4 W-4 W-4 W-4

M19 M05

CW-1CW-2

CW-3 CW-4

M07

M12

M07

M01

M06 M20

M20M20

M09 M09

M09M09

M09

M09 M09 M09 M09 M09 M09 M09 M09

8" METAL LETTERINGON 1" STANDOFFS

Level 1100'-0"

Level 2110'-8"

6A3.0

5A3.0

W-4

W-3 W-3 W-3

W-4 W-4 W-4 W-4 W-4 W-4 W-4

W-3 W-3 W-3

SF-1 SF-1 SF-1

SF-2

SF-1

M07

M05

M01

M19

M01

M16

M01

M04 M03

M07

M16 M16M16

M01

M06

M04M03

M05

M01

M16M16M16

M19M07

M16M16M16

M19M07

M12

M01

M06

M01

M06

M06

M09M09M09

M09

M09M09

M09M09M09M09

A6.03

Level 1100'-0"

Level 2110'-8"

W-1 W-2

W-5

CW-5 CW-6

W-4

W-3 W-3 W-3

M07

M05

M01

M01

M01

M03

M16 M01 M01

M01

M01 M03

M07

M19M07

M05 M16 M16 M16 M16 M16 M16

M05

M07

M01

M01

M06

M01

M06

M01

M01

M01

M03

M20

M09

M09

M09 M09M09M09M09

Level 1100'-0"

Level 2110'-8"

M07

M05

M01

M01

M16

M01

M04M03 M16

M01

M06

M07

M01

M01

M04M03

M07

M05

M01

M01

M16

M01

M09 M03

M19

SF-1 SF-1 SF-1 SF-1 SF-1 SF-1 SF-1 SF-1 SF-1 SF-1

M19

M04M09M09M09M09M09M09M09

M09

SF-1

M01. - UTILITY BRICK VENEER #1M02. -M03. - 12" CAST STONE BASEM04. - 4" CAST STONE SILLM05. - 8" CAST STONE TRIMM06. - PREFINISHED FIBER CEMENT BOARD; VERTICAL PANEL;M07. - PREFINISHED METAL ROOF EDGEM08. - BRICK SOLDIER COURSE; BRICK VENEER #1M09. - MASONRY CONTROL JOINTM10. - MASONRY REVEAL - 8" VERTICAL -1/2" DEEP - STACK BONDM11. - MASONRY REVEAL - 8" HORIZONTAL - 1/2" DEEP - SOLDIER COURSEM12. - METAL GUTTER & DOWNSPOUTM13. - METAL GUTTER & RAINCHAINM14. - PREFINISHED FIBER CEMENT SOFFITM15. - PREFINISHED METAL FASCIAM16. - STEEL BOLLARD W/ SLEEVEM17. - 8" CAST STONE CORNICEM18. - BLOCK CONTROL JOINTM19. - SOLAR PANELM20. - METAL PANEL

ELEVATION KEYNOTE LEGEND

Level 1100'-0"

Level 2110'-8"

Corridor101

M01

M20

M20

Sheet Number:

© 2014 Bray Associates Architects, Inc.

Issued For:

Issue Dates:

Proje

ct Tit

le:

Project Number:

Sheet Title:

CONSTRUCTIONDOCUMENTS

Office Locations:

www.brayarch.com

Milwaukee173 North Broadway

Milwaukee, Wisconsin 53202

T: 414.226.0200

Sheboygan1202A North 8th Street

PO Box 955Sheboygan, Wisconsin 53082

T: 920.459.4200

C:\B

ray

Rev

it\31

51 -

MM

SD\3

151

- nst

ark

- M

MSD

Rev

6.rv

t20

14-1

2-16

4:5

6:32

PM

A2.0

CD SET 2014.12.12

1610

Moo

rland

Roa

d

Madis

on M

etro S

ewera

ge D

istric

tMa

inten

ance

Facil

ity

Madis

on, W

i 537

13

3151

Elevations

1" = 10'-0"1 South

1" = 10'-0"2 North

1" = 10'-0"3 East

1" = 10'-0"4 West

1" = 10'-0"6 Vestibule Elevation

Page 6: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

T

T

T

T

U U

UU

U

U

U

U

U

U

U

U

U

U

C C

C C

C C

6A3.0

5A3.0

1A3.0

2A3.0

3A3.0

1A3.1

3A4.2

Vestibule100

Loading Dock159

Garage155

Inst. Stor.150

JC149

Aid151

Staging128

Office145

Office147

Office146

Elev.144

Office139

Office140

Part Stor.142

Paint138

Staging137

Sandblasting136

Office132

Collection Sys.Shop133

Collection Sys.Stor.134

Meeting / Training102

Womens108

Mens109

Shop Office114

Reception113

Shop Office115 Conf.

112

Data106

Boiler110

Collection Sys.Office

104

Stor105Mech. Offices

117

Library / Records118

Office120

Office119

Elec. Offices121

Men's Lockers125

Women's Lockers126

Corridor101

Water Serv.103

Elec.107

Tank Stor.273

Lunch /Multipurpose

122

Stor.111

Corridor116

Vestibule124

Ice127

B&G Stor.154

Part Staging141

Elec. Shop148 Mechanical Shop

135

B&G Office153

Office152

A.F.F.AT-1

9'-0" A.F.F.AT-1

10'-2"A.F.F.

AT-110'-2"

A.F.F.AT-1

9'-0" A.F.F.AT-1

9'-0"

A.F.F.AT-1

9'-0"

A.F.F.AT-1

9'-0"

A.F.F.AT-1

9'-0"

A.F.F.AT-2

9'-0"A.F.F.AT-2

9'-0"

A.F.F.AT-2

9'-0"A.F.F.

AT-19'-0"

A.F.F.AT-1

9'-0"

A.F.F.AT-1

9'-0"

A.F.F.AT-1

10'-2"

EXHAUSTVENTILATION WITHINLOCKER SOFFIT

Crane

Acces

s Area

Crane

Acces

s Area

2A3.1

4A3.1

2A6.4

12'-0" 4'-0" 12'-0" 4'-0" 12'-0"

4'-0"

12'-0" 4'-0" 12'-0"

4'-0"

10'-0" 4'-0" 10'-0"

4'-0"

3A3.1

A.F.F.EFS

8'-0"

A.F.F.AT-2

9'-0"

A.F.F.AT-1

10'-2"

A.F.F.AT-2

9'-0"

A.F.F.AT-1

9'-6"

6A3.1

8A3.1

EXHAUSTVENTILATION WITHINLOCKER SOFFIT

A.F.F.EFS

9'-0"

A.F.F.AT-1

8'-0"

A.F.F.AT-1

8'-0"

A.F.F.AT-1

8'-0"

A.F.F.AT-1

8'-0"

A.F.F.AT-1

8'-0"

A.F.F.AT-1

8'-0"

A.F.F.GWB

9'-0"

A.F.F.GWB

9'-0"

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

SUSPENDED AT CLOUDS, PT-5

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

SUSPENDED AT CLOUDS, PT-5

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE SUSPENDED

AT CLOUDS, PT-5

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

PAINT

EXPO

SED D

ECK A

NDST

RUCT

URE A

BOVE

PAINT EXPOSED DECK,DUCTS, AND STRUCTURE

ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

A.F.F.GWB

8'-0" A.F.F.GWB

8'-0"

113'-4"

113'-8"

AT-1HT. VARIES

AT-1HT. VARIES

AT-1HT. VARIES

AT-1HT. VARIES

AT-1HT. VARIES

AT-1HT. VARIES

AT-1HT. VARIES

AT-1HT. VARIES

113'-0"113'-6 1/2"113'-8"114'-2 1/2"

A.F.F.AT-2

10'-0"

A.F.F.AT-2

10'-0"

A.F.F.AT-2

9'-0"

A.F.F.AT-2

9'-0"

PAINT

EXPO

SED D

ECK A

NDST

RUCT

URE A

BOVE

A.F.F.AT-1

10'-0"

PAINT EXPOSED DECK,DUCTS, AND STRUCTURE

ABOVE

3

A5.1

3

A5.1

7

A5.1

2

A5.1

2

A5.1

2

A5.1

6

A5.1

PAINT EXPOSED DECK ANDSTRUCTURE ABOVE

A.F.F.AT-1

8'-0"

PAINT EXPOSED DECK,DUCTS,CONDUIT, ANDSTRUCTURE ABOVE

6

A6.3

6

A6.3

13

A6.3

13

A6.3

13

A6.3

6

A5.1

1'-8 1/4

"

7

A6.3

7

A6.3

7

A6.3

7

A6.3

A.F.F.AT-1

10'-2"

7

A6.3

7

A6.3 6

A5.1

110'-0"110'-0"110'-0" 110'-0"110'-0"

PAINT EXPOSED DECK, ANDSTRUCTURE ABOVE

PAINT EXPOSED DECK, ANDSTRUCTURE ABOVE

PAINT

EXPO

SED D

ECK,

AND

STRU

CTUR

E ABO

VE

PAINT EXPOSED DECK, ANDSTRUCTURE ABOVE

8

A5.1

113'-8"

113'-4"

108'-8" 108'-8"

A.F.F.AT-1

9'-0" A.F.F.AT-1

9'-0"A.F.F.

AT-19'-6"

5

A5.15

A5.1

5

A5.1

5

A5.1

11A6.2

WOOD

SLAT

CLOU

D

12A7.0

6A4.2

A.F.

F.G

WB

10'-0

"

A.F.

F.G

WB

10'-0

"

GRAY FILL REPRESENTS LOCATION OFHEAT PUMP ABOVE.CEILING GRID TO BE DISCONTINUOUSAND REMOVABLE. ALL TRADES TO AVOIDRUNNING PIPING AND WIRING ABOVETHIS AREA.

LAY-IN 2x4 FLUORESCENT LIGHT FIXTURE

RECESSED CAN LIGHT FIXTURE

REFLECTED CEILING PLAN LEGEND

SURFACE MOUNTED LIGHT FIXTURE

HANGING LINEAR PENDANT LIGHT FIXTURE

HANGING PENDANT HVAC SUPPLY VENT HVAC RETURN VENT

REFLECTED CEILING PLAN GENERAL NOTES

AT ALL CEILING CLOUD LOCATIONS, PAINT STRUCTURE, DUCTS & ALL PIPING PT-5.

COORDINATE WITH MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICALTHE EXACT LOCATIONS OF CEILING FIXTURES, DIFFUSERS, SPRINKLER HEADS,ETC.

SPRINKLER HEADS, RECESSED LIGHT FIXTURES, SPEAKERS, EXIT LIGHTS,SMOKE DETECTORS, ETC. TO BE LOCATED IN THE EXACT CENTER OF 2X2, 4X4CEILING TILE.

WHEN GRID LAYOUT RESULTS IN A CEILING TILE OF LESS THAN 2 INCHES FORTHE LENGTH OR WIDTH OF A ROOM, OMIT RUNNER NEAREST WALL AND CUT FULLTILE TO WIDTH AS NEEDED

AT LOCATIONS INDICATING PAINTED EXPOSED DECK OR CEILING. PAINTEXPOSED DECK, DUCTS,CONDUIT, AND STRUCTURE ABOVE.

1.

2.

3.

4.

5.Sheet Number:

© 2014 Bray Associates Architects, Inc.

Issued For:

Issue Dates:

Proje

ct Tit

le:

Project Number:

Sheet Title:

CONSTRUCTIONDOCUMENTS

Office Locations:

www.brayarch.com

Milwaukee173 North Broadway

Milwaukee, Wisconsin 53202

T: 414.226.0200

Sheboygan1202A North 8th Street

PO Box 955Sheboygan, Wisconsin 53082

T: 920.459.4200

C:\B

ray

Rev

it\31

51 -

MM

SD\3

151

- nst

ark

- M

MSD

Rev

6.rv

t20

14-1

2-16

4:5

9:11

PM

A5.0

CD SET 2014.12.12

1610

Moo

rland

Roa

d

Madis

on M

etro S

ewera

ge D

istric

tMa

inten

ance

Facil

ity

Madis

on, W

i 537

13

3151

First Floor RCP

1/8" = 1'-0"1 Level 1

Page 7: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

QUARRY/ CERAMIC TILE

VINYL/ RUBBER TRANSITIONSTRIP

SEALED CONC.CONC. FLOOR

CARPET

VINYL/ RUBBER TRANSITIONSTRIP

SEALED CONC.CONC. FLOOR

VINYL/ RUBBER TRANSITIONSTRIP

SEALED CONC.CONC. FLOOR

VINYL COMPOSITION TILE

VINYL COMPOSITION TILE

VINYL/ RUBBER TRANSITIONSTRIP

CARPET

CONC. FLOOR

VINYL COMPOSITION TILE

ELASTOMERIC SEALANTJOINT

TERRAZZO

CONC.FLOOR

VINYL COMPOSITION TILE

ELASTOMERIC SEALANT JOINT

CONC.FLOOR

CERAMIC TILE

VINYL COMPOSITION TILE

BUTT JOINT

RUBBER JOINT

CONC.FLOOR

QUARRY/ CERAMIC TILE

VINYL/ RUBBER TRANSITIONSTRIP

CARPETCONC.FLOOR

CARPET

VINYL/ RUBBER TRANSITION STRIP

TERRAZZO

CONC. FLOOR

QUARRY/ CERAMIC TILE

ELASTOMERIC SEALANTJOINT

TERRAZZOCONC. FLOOR

HARD TILE/ SEALED CONC. CARPET/ SEALED CONC. VCT/ SEALED CONC.

VCT/ CARPET VCT/ TERRAZZO VCT/ HARD TILE

VCT/ RUBBER HARD TILE/ CARPET CARPET/ TERRAZZO

HARD TILE/ TERRAZZO

COVED RUBBER BASE

RUBBER FLOOR

CONC. FLOOR

STRAIGHTVINYL BASE

CARPET

CONC. FLOOR

COVEDVINYL BASE

VINYLCOMPOSITION TILE

CONC. FLOOR

COVED CERAMICTILE BASE

SEALED CONC.

CONC. FLOOR

COVEDVINYL BASE

SEALED CONC. FLOOR

CONC. FLOOR

COVEDVINYL BASE

TERRAZZO

CONC. FLOOR

COVEDTERRAZZO BASE

TERRAZZO

CONC. FLOOR

COVED QUARRYTILE BASE

QUARRY TILE

CONC. FLOOR

COVED CERAMIC TILEBASE

CERAMIC TILE

CONC. FLOOR

VENT COVE BASEBY WOOD FLOORING CONTR.CONT. AIR SPACEWOOD FLOOR SYSTEM SEESPEC.POLY VAPOR BARRIERBY WOOD FLOORING CONTR.

CONC. FLOORSEE STRUCT.

2 3/

4"VE

RIFY

PER MFR. SPEC.1 1/2"

RUBBER W/ VINYL BASE CARPET W/ VINYL BASE VCT W/ VINYL BASE

SEALED CONC. W/ CERAMICTILE BASE

SEALED CONC. W/VINYL BASE

TERRAZZO W/VINYL BASE

TERRAZZO W/TERRAZZO BASE

QUARRY TILE W/QUARRY TILE BASE

CERAMIC TILE W/CERAMIC TILE BASE

WOOD FLOOR SYSTEMW/ VENT BASE

EPOXY BASEEPOXY FLOOR

CONC. FLOOR

EPOXY FLOOR W/ EPOXYBASE @ SHOWER

SOLID SURFACE PANEL

SILICON SEALANT

STAINLESS STEEL TRANSITIONSTRIP; ROUNDED PROFILE

1/2"1/2"

1/2"

1/2"

WALL SEEPLAN

COMPRESSIBLE FILLER SEESTRUCT. DWGS. FOR COLD

JOINT LOCATIONS

QUARRY/ CERAMIC/ TERRAZZO TILE BASE SEEROOM FINISH SCHEDULE

ELASTOMERIC SEALANT JOINT @PERIMETER BY TILE CONTR.

QUARRY/ CERAMIC/ TERRAZZO TILE SEEROOM FINISH SCHEDULE

CONC. FLOORSEE STRUCT. DWGS.

PERIMETER JOINT @ BASE

EXPANSION JOINT W/BACKER ROD BY GEN. CONTR.3/4" DEEP SAW CUT JOINT SEESTRUCT. DWGS. FOR SIZE OF

AREAS

ELASTOMERIC SEALANTBY TILE CONTR.

QUARRY/ CERAMIC/ TERRAZZO TILESEE ROOM FINISH SCHEDULE

CONC. FLOORSEE STRUCT. DWGS.

SAW CUT EXPANSION JOINTEXPANSION JOINT W/

BACKER ROD BY GEN. CONTR.COMPRESSIBLE FILLER SEESTRUCT. DWGS. FOR COLD

JOINT LOCATIONS

ELASTOMERIC SEALANTBY TILE CONTR.

QUARRY/ CERAMIC/ TERRAZZO TILESEE ROOM FINISH SCHEDULE

CONC. FLOORSEE STRUCT. DWGS.

COLD JOINT @ FIELD

7'-7"

PCT-2

PCT-3

Sheet Number:

© 2015 Bray Associates Architects, Inc.

Issued For:

Issue Dates:

Proje

ct Tit

le:

Project Number:

Sheet Title:

CONSTRUCTIONDOCUMENTS

Office Locations:

www.brayarch.com

Milwaukee173 North Broadway

Milwaukee, Wisconsin53202

T: 414.226.0200

Sheboygan1202A North 8th Street

PO Box 955Sheboygan, Wisconsin 53082

T: 920.459.4200

Addendum #1 2015.01.07CD Set 2014.12.12

Addendum #2 2015.01.15

C:\B

ray

Rev

it\31

51 -

MM

SD\3

151

- nst

ark

- M

MSD

201

5 C

A.rv

t20

15-0

8-13

2:5

5:54

PM

A9.0

Change Request #012015.03.10

1610

Moo

rland

Roa

d

Madis

on M

etro S

ewera

ge D

istric

tMa

inten

ance

Facil

ity

Madis

on, W

i 537

13

3151

Room FinishSchedule

Room Finish Schedule

RoomNumber Room Name

Wall FinishNorth

Wall FinishEast

Wall FinishSouth

Wall FinishWest Floor Finish Base Finish Comments

100 Vestibule PT-1 PT-1 PT-1 PT-1 PCT-1 PCT-1101 Corridor PT-1 PT-1 PT-1 PT-1 POL. CONC. VB102 Meeting / Training PT-4 PT-1 PT-1 PT-1 CPT-1 / PCT-1 CT-2, VB103 Water Serv. PT-1 PT-1 PT-1 PT-1 S. CONC. VB104 Collection Sys. Office PT-1 PT-1 PT-1 PT-3 CPT-2 VB105 Stor PT-1 PT-1 PT-1 PT-1 S. CONC. VB106 Data PT-1 PT-1 PT-1 PT-1 S. CONC. VB107 Elec. PT-1 PT-1 PT-1 PT-1 S. CONC. VB108 Womens PCT-2 /

PCT-3PCT-2 /PCT-3

PCT-2 /PCT-3

PCT-2 /PCT-3

PCT-4 PCT-5

109 Mens PCT-2 /PCT-3

PCT-2 /PCT-3

PCT-2 /PCT-3

PCT-2 /PCT-3

PCT-4 PCT-5

110 Boiler PT-1 PT-1 PT-1 PT-1 S. CONC. VB111 Stor. PT-1 PT-1 PT-1 PT-1 CPT-2 VB112 Conf. PT-1 PT-1 PT-1 PT-3 CPT-2 VB113 Reception PT-1 PT-1 PT-1 PT-1 CPT-1 VB114 Shop Office PT-3 PT-1 PT-1 PT-1 CPT-2 VB115 Shop Office PT-1 PT-1 PT-3 PT-1 CPT-2 VB116 Corridor PT-1 PT-1 PT-1 PT-1 POL. CONC. VB117 Mech. Offices PT-1 PT-1 PT-3 PT-1 CPT-2 VB118 Library / Records PT-3 PT-1 PT-1 PT-1 CPT-2 VB119 Office PT-1 PT-1 PT-3 PT-1 CPT-2 VB120 Office PT-1 PT-1 PT-3 PT-1 CPT-2 VB121 Elec. Offices PT-1 PT-1 PT-3 PT-1 CPT-2 VB122 Lunch / Multipurpose PT-1 PT-1 PT-1 PT-1 POL. CONC. VB124 Vestibule PT-1 PT-4 PT-1 PT-1 POL. CONC. VB125 Men's Lockers EP2-1 EP2-1 EP2-1 EP2-1 RES-1, CPT-2 RES-1, VB126 Women's Lockers EP2-1 EP2-1 EP2-1 EP2-1 RES-1, CPT-2 RES-1, VB127 Ice EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB128 Staging EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB131 Vestibule EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB132 Office EP1-1 EP1-1 EP1-3 EP1-1 S. CONC. VB133 Collection Sys. Shop EP2-1 EP2-1 EP2-1 EP2-1 S. CONC. VB134 Collection Sys. Stor. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB135 Mechanical Shop EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB136 Sandblasting EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB137 Staging EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB138 Paint EP2-1 EP2-1 EP2-1 EP2-1 RES-1 RES-1139 Office EP1-3 EP1-1 EP1-1 EP1-1 S. CONC. VB140 Office EP1-1 EP1-1 EP1-3 EP1-1 S. CONC. VB141 Part Staging EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB142 Part Stor. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB143 Stairs EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB144 Elev. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB145 Office EP1-1 EP1-1 EP1-1 EP1-3 CPT-2 VB146 Office EP1-3 EP1-1 EP1-1 EP1-1 CPT-2 VB147 Office EP1-1 EP1-1 EP1-1 EP1-3 CPT-2 VB148 Elec. Shop EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB149 JC EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB150 Inst. Stor. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB151 Aid EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB152 Office EP1-1 EP1-1 EP1-1 EP1-3 CPT-2 VB153 B&G Office EP1-1 EP1-1 EP1-1 EP1-1 CPT-2 VB154 B&G Stor. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. VB155 Garage EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. -156 Turnout Gear EP2-1 EP2-1 EP2-1 EP2-1 RES-1 RES-1159 Loading Dock EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. -201 Mez. Stor. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. -202 HVAC EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. -203 Mez. Stor. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. -204 Mez. Stor. EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. -205 Elev. Mech EP1-1 EP1-1 EP1-1 EP1-1 S. CONC. -273 Tank Stor. PT - - PT - -

1 1/2" = 1'-0"1 Typ. Floor Transitions

1 1/2" = 1'-0"2 Typical Floor to Base Conditions

3" = 1'-0"3 Typ. Hard Tile Floor Joints

MATERIAL IDPAINT-SHERWIN WILLIAMSPT-1 – SW7022 ALPACA (FIELD)PT-2 – SW7076 CYBERSPACE (DOOR FRAME)PT-3 – SW6250 GRANITE PEAKPT-4 – SW7019 GAUNTLET GRAYPT-5- SW7020 BLACK FOX (EXPOSED CLOUD CEILING DECK)PT-6- SW7004 SNOW BOUND (EXPOSED CEILING DECK)

EPOXY PAINTEP1-1 WATERD BASED, SW7022 ALPACAEP2-1 TWO PART RESIN, SW7022 ALPACAEP1-3 WATER BASED, SW6250 GRANITE PEAK

CARPETCPT-1- INTERFACE: STYLE: EXPOSED 1383202500,

COLOR: WATER MILL 8690CPT-2- J&J INVISION KINETEX: STYLE: VELOCITY 1814,

COLOR: POSITION 1603CPT-3- INTERFACE: STYLE: EXPOSED 1383202500,

COLOR: WATER MILL 8690 (ACCENT BORDER)

VINYL BASE-JOHNSONITEVB- COLOR: 63 BURNT UMBER

RESINOUS FLOORINGRES-1 STONHARD – FLAGSTONE, MEDIUM TEXTURE

PORCELAIN CERAMIC TILEPCT-1 ALFALUX, STYLE: STONEPRINTS, COLOR: NERO, NATURALE

FINISH, SIZE: 18”x18”PCT-2- DALTILE, STYLE: VERANDA TONES, COLOR: IRON

JUNGLEP534, SIZE: 6 ½”x 20”PCT-3- DALTILE, STYLE: VERANDA SOLIDS, COLOR: STEEL P500,

SIZE: 6 ½”x 6 ½”PCT-4- DALTILE, STYLE: VERANDA SOLIDS, COLOR: GUNMETAL P504,

SIZE: 20”x20”PCT-5- DALTILE, STYLE: VERANDA SOLIDS, COLOR: GUNMETAL P504,

COVE BASE S-36E9T, 6 ½”X 13”

PLASTIC LAMINATE-FORMICAPLAM-1- ELEMENTAL STONE 8831-58 (COUNTER)PLAM-2- GINGER ROOT MAPLE 7288-58 (CABINETS)

INTERIOR MELAMINE: GRAYTRIM & EDGE: TO MATCH FACEHINGES AND PULLS: BRUSHED CHROME

SOLID SURFACESSF-1- CORIAN: LAVA ROCK (RECEPTION LOW COUNTER)SSF-2- CORIAN: JUNIPER (BATHROOM 108/109 COUNTER)SSF-3- WILSONART: INDIGO MELANGE 9027ML

(LOCKERROOM 126/125 COUNTER)SSF-4 AVONITE: FOUNDATIONS WET WALL SYSTEM,

COLOR: MALT F1-7810

GROUT – BOSTIKGRT-1- SILVER BULLET #H168 (USED WITH PCT-2-PCT-5 IN

BATHROOM 108/109)GRT-2- DELOREAN GRAY #H160 (USED WITH PCT-1 IN

VESTIBULE 100 AND MULTIPURPOSE ROOM 102)

WOOD STAINWD-1- VT INDUSTRIES: WHITE MAPLE APLINE AL07

(DOORS AND SILLS)WD-2- VT INDUSTRIES: WHITE MAPLE RAVINE RA07

(RECEPTION AREA)

LOCKER COLORS – PENCOL-1- TBD

BATHROOM PARTITIONS – SCRANTON PRODUCTSBATHROOM 108/109 – COLOR: TITANIUM, TEXTURE: ORANGE PEALLOCKERROOM 125/126 – COLOR: SANDCASTLE, TEXTURE: ORANGE PEAL

3/8" = 1'-0"5 Typ. Tile Wall Pattern #1

tims
Highlight
tims
Highlight
tims
Highlight
tims
Highlight
tims
Cross-Out
Page 8: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

U U

UU

U

U

U

U

U

U

U

U

U

U

U

GENERAL NOTES:

1. ALL LIGHTING FIXTURES IN MECHANICAL ROOMS SHALL BE LAID OUT ON SITE AND DETERMINED BY THEMECHANICAL EQUIPMENT IN ROOM.

2. ALL EXIT LIGHTS THIS SHEET SHALL BE CIRCUITED TO LIGHTING IN ROOM PER NEC.

3. SHADED FIXTURE ( ) INDICATES FIXTURE CONNECTED TO EMERGENCY BATTERY MODULE ORLIGHTING INVERTER.

4. IN ROOMS WITH OCCUPANCY SENSOR, GENERAL ILLUMINATION IN ROOM SHALL BE CONTROLLED BY SENSOR.CONTRACTOR TO DETERMINE BEST LOCATION FOR SENSOR IN FIELD WITH MANUFACTURER. SEE DETAIL

5. LIGHTING CONTROLS TO BE WATTSTOPPER DIGITAL LIGHTING MANAGEMENT.

6. ALL FIXTURE HEIGHTS INDICATED ARE MEASURED FROM FINISHED FLOOR TO BOTTOM OF FIXTURE.

5

E3.0

PLAN NOTES:

1. CONTROL THIS CIRCUIT THROUGH CONTACTOR C1 IN EXTERIOR LIGHTING CONTROL PANEL. SEE DETAIL

2. SEE DETAIL FOR ELEVATOR LIGHTING REQUIREMENTS.

3. WIRE FIXTURE THROUGH LIGHTING INVERTER INVC.

4. CONTROL THIS CIRCUIT THROUGH EMERGENCY SWITCH BYPASS RELAY PER DETAIL

5. WIRE FIXTURES THROUGH LIGHTING INVERTER INVD.

6. MOUNT SENSOR TO BOTTOM OF JOIST.

7. BOTTOM OF ALL P4 FIXTURES THIS AREA TO BE MOUNTED EVEN WITH SUSPENDED CEILING CLOUD PLANE.MOUNTING HEIGHTS VARY. SEE ARCHITECTURAL ELEVATIONS.

8. ALL P3 FIXTURES THIS AREA TO BE MOUNTED 19''-0"AFF TO BOTTOM.

9. ALL J3 AND J3E FIXTURES THIS AREA TO BE MOUNTED 21'-0"AFF TO BOTTOM.

10. ALL P2 FIXTURES THIS AREA TO BE SURFACE MOUNTED TO CEILING STRUCTURE.

11. ALL P4 FIXTURES THIS AREA TO BE MOUNTED 18'-0"AFF TO BOTTOM.

12. ALL P5 FIXTURES THIS AREA TO BE MOUNTED10'-0"AFF TO BOTTOM.

13. FIXTURE TO HAVE 24" PENDANT.

14. ALL P1 FIXTURES THIS AREA TO BE MOUNTED 10'-0"AFF TO BOTTOM.

15. SURFACE MOUNT FIXTURES TO CEILING STRUCTURE THIS ROOM.

16. ALL WIRING AND LIGHT FIXTURES THIS ROOM TO BE RATED CLASS 1, DIVISION 2 AND SHALL COMPLY WITHNEC 516. PROVIDE LISTED CONDUIT SEALS.

X4

E3.06

E3.0

9

E3.0

1

J3J3E

J3EJ3

J3EJ3

SD

A1

A1 A1

LS

K3

K3

Women's Lockers

126

Lunch /Multipurpose

122 Elec. Offices

121

Office

120

Office

119

Library / Records

118

Mech. Offices

117

Corridor

101 Vestibule

100

Reception

113

Shop Office

114

Shop Office

115Conf.

112

Boiler

110

Elec.

107

Data

106

Collection Sys.Office

104

Water Serv.

103

Stor

105

Womens

108

Mens

109

Meeting / Training

102

Staging

128

Office

152

B&G Office

153

B&G Stor.

154

Inst. Stor.

150

Aid

151

JC

149

Elec. Shop

148

Tank Stor.

273

Office

147

Office

146

Elev.

144

Office

145

Part Staging

141

Office

140

Office

139

Mechanical Shop

135

Paint

138

Staging

137

Sandblasting

136

Collection Sys.Stor.

134

Collection Sys.Shop

133

Office

132

SD

A1

A1

K3E

K3

K3E

P4

P4

P4

P4

P1P1P1P1P1

P5

S3

P1 P1 P1

P1

S S S SDSDSDSD

SM

SM

A1 A1 A1LS

A2 A2 A2

S4S4

S4

S4S4E

P4

A1E

A1 A1 A1 A1

A1

A1E

A1

A1E

A1 A1 A1 A1

A1

A1E

P4

P4

P4P4

P4

P4

P4

P4 P4

P4 P4

P4

P4P4

P4

P4

K2 K2K2E

K2

K2E

K2E

K2

K2EB2 B2

B2 B2

K1

A1

A1

K1

K1

K1

K1

K1

K1

K1

S3D

S3D

S3DS3D

A1

A1 A1

A1 A1

A1 A1 A1

A2A2

A2E

A2

A2

A2E

A2

A2A2

A2

A2EA1

S3D

S3D

S3DS3D

A1 A1 A1

A1 A1 A1

S4D

S3D

S3D

SD

SD

S3D

S3D

S

SD

S3D

S3D

S

S3

S3

S

S3

S3

SS

DS

DS

DS

D

K4 K4 K4

B2

B2

B2E

B2

B2 B2E

B2

B2E

B2 B2

A2 A2

S4

B2 B2E

K4

A2A2E

A2

A2

P3 P3 P3 P3 P3 P3P3P3P3P3P3P3

S3 S3

S4 S4

S

S5S5 S5

A1

A1SD

S3

S3

S4 S4

S4 S4

S4S4

S4 S4

S4 S4

S4

S4

S

S4

J3EJ3

J3J3E

J3EJ3

J3J3E

A1

A1

A1

A1

SD

SD

S4 S4

S4 S4

S4 S4

S3

S3

A1 A1

A1 A1

A1

A1

SD

SD

S4

S4

S4

S3

S3

SM SM

M2S4

SD

A1

A1

S3D

S3

S3

S3D

S4

S4

S4

S4E

S4

S4E

S4

S4

S4

S4

S4

S4

S4

S4 S4

S4 S4 S4

J3J3E

Part Stor.

142

S4 S4 S4

S4S4 S4 S4

S4S4 S4 S4

S4S4 S4 S4

S3

UP TOFIXT

S3D

S4

S3S

3

S3S

3

S3D

S4D

S3D

S

S4D

S3D

S4D

SD

S4D

H2 H2 H2

X2

X2

S

S4E

P3 P3P3P3

H5 H5 H5 H5

H2

H3

H4

F1 F1

SD

"LC"

K4

K4 K4

S3

A2E

S4

S

V4

A1

A1A1

A1A1

A1A1

A1A1

A1

A1 A1

A1 A1

A1 A1

A1 A1

LS

P2

P2

S

S3S

3S

3

SWP

SDc

SDS3DSDSDSDSDSDDSa b c d e f g

S3

SDd

SDg

SDa

LS

b

SDe

SDf

SDb

LS P

U

U

LS

S4

S4

S4

S4

O

LS

LS PLS P

U

S3S3S3 S4

LS U

LS

U LS

S3

S3

S

LSU

S4

S

B2

O

A2

A2 A2

Men's Lockers

125

A2 A2

A2 A2

LS

LS

LS

H1 H1

H1 H1

2

P1

P5P5

HA-6

H3

9'-0"

9'-0"

3

3

3 3

9'-0"

12'-0"

HB-4

1

12'-0"9'-0"12'-0"9'-0"12'-0"

4

3

3

HA-4

33

5

5

HA-9

3

3

4

HA-3

9'-0"12'-0"INVB

1 3

HA-2

3P5

S

53

SM

B2

S3

B2

B2

S

4

4 4

4

43

4

4

3

43

S

D88' AFF

5

55

3

5

3

535

P

P

1

1

HB

61

U1

P

1

h

P HB

1

K3

11

P

6

SD

3

6

HA-7

P HB

6

1 1

1

1 1

1

1

PP

P P1 1

11

P HB

6

1

6

1

P HB

61

P

S

11

11

1

1

P

1

P

HB

6

1

6

HB

1

HA-5

1

1

1 1

1

1

1

1

7

SDh1

1

101

15

1

115

15

9

1

15

1

11

9

1

15

1

15

1

11

13

13

14

1

1

S5 S5 S5

X2

X2 X2 X2

161

1

1

8 1

12

1

U4

S11

1

1

1

Sheet Number:

© 2014 Bray Associates Architects, Inc.

Issued For:

Issue Dates:

Pro

ject

Titl

e:

Project Number:

Sheet Title:

CONSTRUCTIONDOCUMENTS

Office Locations:

www.brayarch.com

Milwaukee173 North Broadway

Milwaukee, Wisconsin 53202

T: 414.226.0200

Sheboygan1202A North 8th Street

PO Box 955Sheboygan, Wisconsin 53082

T: 920.459.4200

\\fs

-kie

l\A

cti

ve P

roje

cts

\2014 P

roje

cts

\Mad

iso

n m

etr

op

olita

n S

ew

era

ge D

istr

ict

2014054\M

uerm

an

n D

raw

ing

s\E

lectr

ical\14-2

014054-E

LE

C-A

DD

2.r

vt

1/1

5/2

015 1

:31:2

9 P

M

E1.1L

Addendum #2 2015.01.14

1610

Moo

rland

Roa

d

Mad

ison

Met

ro S

ewer

age

Dis

tric

t

Mai

nten

ance

Fac

ility

Mad

ison

, Wi 5

3713

3151

AREA A -LIGHTING

1/8" = 1'-0"1

AREA A - LIGHTING

OCCUPANCY SENSOR SCHEDULE

SYMBOL DESCRIPTION

DIGITAL ULTRASONIC OCCUPANCY SENSOR

DIGITAL DUAL TECHNOLOGY VACANCY SENSOR

PASSIVE INFRARED WALL SWITCH OCCUPANCY SENSOR

U

SM

DIGITAL DAYLIGHT SENSORLS

DUAL TECHNOLOGY OCCUPANCY SENSORO

DIGITAL PIR OCCUPANCY SENSOR - HIGH BAYP HB

DIGITAL PIR OCCUPANCY SENSORP

1

CD Set 2014.12.12

Page 9: Subject: Request for Quotation Maintenance Facility ......A3.0 Building Sections A3.1 Building Sections A4.0 Wall Sections A4.1 Wall Sections A4.2 Wall Sections A5.0 First Floor RCP

CR CR

H

H

H

H

C

C

C

C C

H

H

H

H

2"LC"

GFIGFI

W/D

W/D

GFI

ICE ICE

2

2 2

2

2

2

2

REF

VEND

VEND

REFGFI

GFI

2

2

GFIGFI

GFI

2

2

2

2

WP/GFI

WP/GFI

WP/GFI

3/4

OHD

3/4

OHD

3/4

OHD

3/4

OHD

3/4

OHD

3/4

OHD

GFI

GFI

GFI

2

2

2

Office

152

B&G Stor.

154

B&G Office

153Aid

151

JC

149

Inst. Stor.

150

Tank Stor.

273

Elec. Shop

148

Part Stor.

142

Office

147

Office

145

Office

146

Elev.

144

Part Staging

141

Staging

128

Office

140

Office

139

Mechanical Shop

135

Paint

138

Staging

137

Sandblasting

136

Collection Sys.Stor.

134 Collection Sys.Shop

133

Office

132

Women's Lockers

126

Lunch /Multipurpose

122

Men's Lockers

125

Elec. Offices

121

Library / Records

118

Office

120

Office

119

Mech. Offices

117

Shop Office

115

Shop Office

114

Reception

113

Mens

109

Womens

108

Conf.

112

Boiler

110

Elec.

107

Data

106

Collection Sys.Office

104

Stor

105

Water Serv.

103

Meeting / Training

102

Corridor

101

Vestibule

100

Ice

127

WP/GFI

2

WP/GFI

2 2

2 2

2 2

EWC

EWC

LA-41(GFI)

2

2 2 2 2

2

2

2

COPIER2

2

2

2

2

22

2

2

22

2

2

2

2

2

2

2

2

2

2

4

EWC

EWC

LA-39(GFI)

EWC

EWC

LC-21(GFI)

GFI

GFI GFI

"LC"30A/2P

"LC"30A/2P

REF GFI

GFI

1

WP/GFI

1

GFI

GFI

GFI

GFI

WP/GFI

GFI

GFI

1GFI

GFI

1

GFI

GFI

GFI

GFI

GFI

GFI

WP/GFI

GFI

GFI

WP/GFI

1

1

GFI

GFI

GFI

GFI

3/4

HP-12

1HP-10

M

HP-11

M

HP-9M

HP-7

1

HP-5

M

HP-4

M

HP-6

M

HP-3

3/4

HP-20

3/4

HP-1

M

HP-2

M

CH-4

M

CH-3

M

CH-2

M

DS-4

M

DS-2

M

DS-1

M

DS-3

ECH-1

M

DS-15

M

DS-16

M

HP-13

3/4

HP-14

M

UH-8

M

UH-2

M

CH-1

M

UH-1

M

UH-9

M

UH-10

M

HP-16

1

HP-18

M

HP-17

M

HP-15

M

HP-19

M

UH-3

M

UH-11

DS-18

DS-17

DS-14

DS-13

2 2

2 2

2 2

P MPROJECTIONSCREEN

SEE ENLARGEDPLAN THIS SHEET

2

2

2

2

2

2

2

2

GFI

GFI

GFI

GFI

2

GFI

2

2

GFI2

GFI

GFI

P

"LA"20A/3P

"LA"20A/3P

M M

2

2

GFI

"LA"20A/3P

2

2

GFI

2

MCC-A60A/3P

PRESSUREWASHER

2

SP

D

TLC

H H4

9

M

M

M

MOTORIZEDDOOR

"LA"20A/3P

"LA"20A/3P

2

8

6

AUDIO AMPLIFIER

LC-74

LC-86LC-88

LC-82LC-84LC-72

LC-73

LC-69

LC-78 LC-80

LC-70

LC-66

LC-68

LC-64

LC-44

LC-71

LC-65

LC-61

LC-63

LC-79

LC-85

LC-77

LC-59

LC-67

LC-75

LC-51

LC-53

LC-49

LC-55

LC-57

LC-47

LC-45LC-43

LC-40 LC-42

LC-36

LC-38

LC-34

LC-32

LC-30

LC-28

LC-26

LC-24

LC-25(GFI)

LC-23(GFI)

LC-20LC-18

LC-2 LC-4

LC-6

LC-12

LC-14

LC-16

LC-22

LC-29

LC-41LC-39

LC-33

LC-31

LC-2

LC-87

LC-81

LC-83

2

LC-17(GFI)

LC-19(GFI)

LOCKERS

LOCKERS

GFI

GFI

LC-1(GFI)

LOCKERS

LC-3(GFI)

LOCKERSLC-13(GFI)

LOCKERS

LC-15(GFI)

LOCKERSLC-9(GFI)

LOCKERS

LC-11(GFI)

LOCKERSLC-5(GFI)

LOCKERS

LC-7(GFI)

LA-58

LA-56

LA-52

LA-50

LA-51

LA-48LA-49

LA-47

LA-45

LA-53

LA-57

LA-43

LA-57

LA-36

LA-38LA-34

LA-60

LA-40

LA-42LA-20

LA-22

LA-24

LA-26

LA-8LA-10

LA-14

LA-16

LA-4

LA-6

LA-18

"LA"20A/3P

LA-17

LA-23

LA-21LA-15

LA-44

GFIGFI

LA-28

2

LA-30

LA-32

LA-62

GFI

LA-33

GFI GFI

LA-31

LA-19

LA-2

43

LA-29

43

LA-27

43

LA-25

WAP

WAP

10

GFI

WP/GFI

LA-54

WAP

GFI

GFI

LC-90

J

LC-76

GFI

GFI

LC-37

12

3#10, #10 GND 3/4"C

GFI

GFI

LC-35

WAP

GFI

LC-10

1313

GD

S

11

LC-8

WAPWAP

WAP

10

10

WP/GFI

LA-12

WAP

GFI

LA-35(GFI)

LA-37(GFI)

WAP

"LA"20A/2P

SF

"HA"20A/3P

18

"HA"15A/3P

18

SF

"HA"15A/3P

18

18

"HA"15A/3P

"LA"15A/2P

"LA"15A/2P

"LC"15A/2P

"HA"15A/3P

18

SF

M CE-3

M UH-13

"HA"15A/3P

18

"LC"15A/2P

5

IP-1"HA"

20A/3P

5

IP-2"HA"

20A/3P

SF

SF

LC-89

"HA"20A/3P

3#10, #10 GND 3/4"C

"HA"20A/3P

18

"LC"15A/2P "LC"

15A/2P

M

HP-8

1

HP-21

"HA"20A/3P

18

"LC"15A/2P

M

CE-2

"LC"15A/2P

"LC"15A/2P

"HA"20A/3P

18

"LC"15A/2P

"HA"15A/3P

18

24

5

M

M

M

DS22

DC

DC

7

DC

DC

SPRINKLERTS FS

TS FS

TS FS

19LC-91

DCDC

B19

M

DC

DC

WP

DC

WP

DC

BRIDGECRANE

"HA"50A/3P

25

SEE ONE LINEDIAGRAM FORWIRE SIZE

FAX

FAAP

M

CP-1M

CP-2

LC-95

WS

WS

LC-93

1/3

1/3

SUMP PUMP3#12, #12GND 1/2"C

"LC"20A/2P

DS22H

LC-99

H

LC-97

M

M

DS22

M

DC

DC

WP

M

SPRINKLER AIRCOMPRESSION

"LA"15A/3P

DS22

BRIDGECRANE

25

"HA"50A/3P

LA-26

2

"HA"50A/3P

25

"TB"

"LD"50A/3P

25

480V ,3Ø

240V ,3Ø120V, 1ØNEMA 5-20R

LA-64

GFI

208V ,3Ø

"LA"50A/3P

25

240V, 1Ø NEMA 6-20R

"LD"20A/2P

1

1

1

11

1 1

1

1

WAP

1

K

1

60"AFF

1

1

"LD"20A/2P

BLASTCABINET

LA-66

BLASTCABINET

3

PAINT BOOTHEXHAUST FAN

"HA"15A/3P

LA-46

PAINTBOOTHLIGHTS

27

28

1

1

1

26

MIC 62"

LC-94

MIC 62"LC-96

26

1

1

1

1

2

2

2

25"AFF

1

1

1

29

GENERAL NOTES:

1. PROVIDE EXTERIOR RECEPTACLES PER DETAIL

2. ALL CONDUITS STUBBED OUT OF BUILDING SHALL BE DONE PER DETAIL

3. CONFIRM EXACT LOCATION OF ALL OUTLETS AND TELECOMMUNICATION OUTLETS WITH OWNER ANDFURNITURE SHELVING SUPPLIER PRIOR TO ROUGH-IN.

4. ALL RECEPTACLES FOR ELECTRIC WATER COOLERS (EWC) TO BE ROUGHED-IN BEHIND UNIT. CONFIRMEXACT LOCATION PRIOR TO ROUGH-IN. CONFIRM RECEPTACLE OR DIRECT CONNECTION.

5. ALL RECEPTACLES MOUNTED WITHIN 6 FEET OF SINKS SHALL BE GFI TYPE.

6. ALL LOW VOLTAGE CABLING IN AREAS WITH EXPOSED STRUCTURE CEILING SHALL BE IN CONDUIT.

7. SEE DETAIL FOR TELECOMMUNICATIONS OUTLETS INSTALLATION.

8. PROVIDE TELECOMMUNICATIONS CABLE RACEWAY INSTALLATION PER DETAIL

9. SEE DETAIL FOR TELECOMMUNICATIONS RISER DIAGRAM.

10. COORDINATE ALL HVAC AND PLUMBING ELECTRICAL CONNECTIONS WITH HVAC CONTRACTOR ANDPLUMBING CONTRACTOR.

11. VERIFY ALL EQUIPMENT CIRCUIT REQUIREMENTS AND CONNECTIONS WITH OWNERS EQUIPMENT.

12. E.C. TO PROVIDE BRANCH CIRCUIT TO ALL HVAC EQUIPMENT. SEE MOTOR STARTER SCHEDULE ONHVAC DRAWINGS.

13. VERIFY ELECTRICAL TEST BENCH POWER INSTALLATION WITH OWNER.

14. ALL DEVICES TO BE FLUSH MOUNTED WITH CONCEALED CONDUIT IN WALLS.

8

E3.0 1

E3.0

PLAN NOTES:

1. PROVIDE CONNECTION TO OVERHEAD DOOR MOTOR PER DETAIL . ALSO, PROVIDE FLUSH MOUNTED ROUGH-INCONNECTIONS FOR STOP EYE, UPPER STO SWITCH, OPEN/CLOSE/STOP PUSH BUTTON CONTROL STATION(S) AND ANYADDITIONAL VEHICLE SENSORS PROVIDED BY DOOR SUPPLIER. VERIFY LOCATIONS OF PUSH BUTTON CONTROLSTATIONS WITH OWNER.

2. PROVIDE TYPE 4 FLOOR BOX. SEE SPECIFICATIONS.

3. PROVIDE TYPE 6 FLOOR BOX. SEE SPECIFICATIONS.

4. SEE DETAIL FOR ELEVATOR POWER REQUIREMENTS.

5. E.C. TO WIRE SCREEN CONTROL SWITCH.

6. PROVIDE CEILING PROJECTOR MOUNT PEERLESS PPC.

7. PROVIDE HDMI PROJECTOR CABLING PER DETAIL

8. MOUNT RECEPTACLE TO BOTTOM OF JOIST FOR PROJECTOR.

9. SURFACE MOUNT DEVICES INSIDE CASEWORK.

10. PROVIDE 120V CONNECTION TO MOTORIZED DOOR OPERATORS. PROVIDE ALL WIRING FROM DOOR OPERATOR TOPUSH BUTTONS. MOUNT PUSH BUTTONS 40" AFF.

11. PROVIDE RECEPTACLE BELOW COUNTER AND SWITCH ABOVE COUNTER FOR GARBAGE DISPOSAL. LABEL SWITCHPLATE "DISPOSAL".

12. NEMA 14-30R RECEPTACLE.

13. FLUSH MOUNT RECEPTACLE INTO CASEWORK.

14. PROVIDE 4'X8'X3/4" FIRE RETARDANT PAINTED (WHITE) PLYWOOD ALL WALLS THIS ROOM.

15. PROVIDE DATA GROUND BUS PER DETAIL

16. OPEN FLOOR MOUNTED DATA RACK SEE DETAIL

17. PROVIDE CABLE TRAY PER DETAIL

18. WIRE USING 4#12, #12 GND IN 1/2"C.

19. PROVIDE FIRE ALARM CONNECTION TO SPRINKLER SYSTEM PER DETAIL

20. ANALOG PHONE PUNCHDOWN BLOCKS.

21. COORDINATE EXACT UPS CIRCUIT AND RECEPTACLE WITH MMSD.

22. PROVIDE DUCT SMOKE DETECTOR PER DETAIL

23. CONNECT FIRE ALARM TO I/O PANEL.

24. PROVIDE 6"X6"X4" JUNCTION BOX INSIDE CASEWORK WITH 1" CONDUIT STUB TO ROOF DECK WITH 6"X6"X4" JUNCTIONBOX FOR SOUND SYSTEM CABLING. AUDIO SYSTEM COMPNENTS BY OTHERS.

25. WIRE USING 3#8, #10 GND IN 3/4"C.

26. RECEPTACLE TO BE MOUNTED HORIZONTALLY BELOW WINDOWS.

27. COORDINATE EXACT ELECTRICAL COMMECTIONS WITH PAINT BOOTH VENDOR.

28. ALL WIRING THIS ROOM TO BE CLASS 1 DIVISION 2 AND SHALL COMPLY WITH NEC 516. PROVIDE LISTED CONDUIT SEALS.

29. COORDINATE EXACT SECURITY ALARM KEYPAD LOCATION WITH OWNER.

X 2

E3.1

1

E3.1

3

E3.1

5

E3.1

6

E3.0

3

E3.0

6

E3.14

E3.17

E3.1

9

E3.1

10

E3.0

1

1

S

FACP

I/OPANEL

LC-62

17

LC-54,56

LC-50,52

16

LC-46,48

LC-60

1415

LC-58

23

SECURITYALARMCONTROLPANEL

2LC-92

SERVERRACK

NEWPAGINGAMPLIFIERIN DATARACK

UPS

"LC"30A/2P

21

NEMAL6-30R

NEMAL6-20R

"LC"20A/2P

"LC"20A/2P

20

2 M

RAC-1

TO OU-1

1

1

Sheet Number:

© 2014 Bray Associates Architects, Inc.

Issued For:

Issue Dates:

Pro

ject

Titl

e:

Project Number:

Sheet Title:

CONSTRUCTIONDOCUMENTS

Office Locations:

www.brayarch.com

Milwaukee173 North Broadway

Milwaukee, Wisconsin 53202

T: 414.226.0200

Sheboygan1202A North 8th Street

PO Box 955Sheboygan, Wisconsin 53082

T: 920.459.4200

\\fs

-kie

l\A

cti

ve P

roje

cts

\2014 P

roje

cts

\Mad

iso

n m

etr

op

olita

n S

ew

era

ge D

istr

ict

2014054\M

uerm

an

n D

raw

ing

s\E

lectr

ical\14-2

014054-E

LE

C-A

DD

2.r

vt

1/1

5/2

015 1

:31:3

5 P

M

E1.1P

Addendum #2 2015.01.14

1610

Moo

rland

Roa

d

Mad

ison

Met

ro S

ewer

age

Dis

tric

t

Mai

nten

ance

Fac

ility

Mad

ison

, Wi 5

3713

3151

AREA A - POWER

1/8" = 1'-0"1

AREA A - POWER

1/4" = 1'-0"2

ENLARGED DATA 106

CD Set 2014.12.12

1