View
213
Download
0
Tags:
Embed Size (px)
Citation preview
Submarine Systems Design, Installation and Operations
ESACC/Internet2 Techs WorkshopFlorida International University
Miami, FL
By Anthony Liguori
February 3, 2003
History• Global Marine Systems - Formerly Cable &
Wireless Global Marine
• Origins of Global Marine trace back over 150 years
• 1999 - Cable & Wireless Global Marine bought by Global Crossing Limited
• World’s largest subsea cable installation and maintenance contractor
History• 1850 : First submarine telegraph cable laid (Dover
- Calais)• 1866 : First successful Trans-Atlantic telegraph
submarine cable laid• 1956 : First Trans-Atlantic analogue telephone
cable laid• 1962 : First Trans-Pacific analogue telephone
cable laid• 1988 : First Trans-Atlantic fibre optic cable laid
Desk Study
• Land site selection
• Fishing activity
• Oil exploration & production
• Sea bed conditions
• Environmental factors
• Permits & permissions
• Existing cables & pipelines
Faults by Water Depth
62%
20%
4%
5%
3%6% 0-100 Metres
100-200 Metres
200-500 Metres
500-1000 Metres
1000-2000 Metres
>2000 Metres
Summary Slide
• “Submarine Systems Design, Installation and Operations” are interdependent and the long term profitability of the system is the direct result of the initial planning and the quality of installation.