Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS
Agenda
I. Introduction and Context
• Tim Ramirez, Natural Resources Division Manager, SF Public Utilities Commission
II. Sunol Yard Improvements Project (Yard and Watershed Center)
• Bryan Dessaure, Project Manager, SF Public Utilities Commission
III. Sunol Yard Phase 1 Design
• Paul De Freitas, Stanley So, Martha Ketterer & Nick Ancel
Architecture & Landscape Architecture, BDC, SF Department of Public Works
BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Agenda 2
A robust community process informed the project design:
I. 2010-2012
• 7 separate public meetings with the Sunol Water Temple
Preservation Association (SWTPA), SAGE, and others
• Interviews with school districts, museums, educational
organizations, and residents
• Community input during the Sunol Water Temple Centennial
Celebration (September 2010)
• Mission and vision brainstorming session (May 2011)
• 2 detailed input documents received from SWTPA (October 2011)
• Open house to discuss the project prior to presenting before Civic
Design Review committee (September 2012)
• Proposed design received positive feedback from community in
02/25/13 Public Meeting
BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Community Outreach A R C H I T E C T U R E
3
Sunol Yard Improvements
I. Temple Road Improvements
• Rehabilitation of Entrance Gate and surrounding area
• Improved landscaping and planting between Entrance Gate and Water Temple
II. SFPUC Corporation Yard Improvements
• Site reconfigured to improve operational effi ciency
• New structures to replace obsolete facilities
• Improved circulation and aesthetics
III. Watershed Center
• Under development
BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Project Key Elements 4
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS A R C H I T E C T U R E
Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Project Location 5
BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Vicinity Map 6
Delete
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS L A N D S C A P E A R C H I T E C T U R E
Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Overall Site Plan 7
North Entry to Yard from Temple Road Detail of Main Gate to Temple Road
Sunol Water Temple Main Gate to Temple Road looking South to Temple Temple Road Typical Roadside Landscape
BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Existing Conditions - Temple Road A R C H I T E C T U R E
8
BUILDING DESIGN & CONSTRUCTION Site Plan & Proposed Landscaping Plan S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 for Temple Road L A N D S C A P E A R C H I T E C T U R E
9
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 L A N D S C A P E A R C H I T E C T U R E
10
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 L A N D S C A P E A R C H I T E C T U R E
11
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 L A N D S C A P E A R C H I T E C T U R E
12
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 L A N D S C A P E A R C H I T E C T U R E
13
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 L A N D S C A P E A R C H I T E C T U R E
14
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 L A N D S C A P E A R C H I T E C T U R E
15
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 L A N D S C A P E A R C H I T E C T U R E
16
~ 73
5’
~ 679’
Area within (E) Fenceline ~ 7.6 Acres
Sunol Yard
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS A R C H I T E C T U R E
Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Existing Site Plan Sunol Corporation Yard 17
1
2
34
5
6
8
9 12
10 1113
14 15 16 17
18
19
20
21
7
BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS A R C H I T E C T U R E
Sunol Yard
SITE FEATURES
1. ADMINISTRATION BUILDING (10,140 SF) 2. SHOP #6 (EMT AND RADIO) (3,600 SF) 3. SHOP #5 (PLUMBING AND ELECTRICAL) (3,600 SF) 4. COVERED MATERIAL STORAGE (8,000 SF) 5. LARGE EQUIPMENT COVERED STORAGE #1 (8,000 SF) 6. LARGE EQUIPMENT COVERED STORAGE #2 (8,000 SF) 7. LARGE EQUIPMENT COVERED STORAGE #3 (8,000 SF) 8. ELECTRICAL SWITCHGEAR 9. TRANSFORMER PAD 10. VEHICLE FUEL TANKS (BIO DIESEL, 2 UNLEADED
GASOLINE) 11. SHADE CANOPY / ENCLOSURE FOR FUEL TANKS 12. DIESEL STANDBY POWER GENERATOR AND ABOVE GROUND FUEL TANK 13. FUEL STATION 14. EXISTING SHOP #1 ( WELDING AND ROLLING) (3,600 SF) 15. EXISTING SHOP #2 (PAINT AND BLAST ) (3,600 SF) 16. EXISTING SHOP #3 (AUTO) (3,600 SF) 17. EXISTING SHOP #4
(BUILDING AND GROUNDS/CARPENTER) (3,600 SF) 18. EXISTING PUMP BUILDING 19. NATURAL GAS STORAGE SYSTEM 20. NATURAL GAS REFUELING APPLIANCE 21. WASHRACK AREA
18Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Proposed Site Plan Sunol Corporation Yard
BUILDING DESIGN & CONSTRUCTION Administration Building and Temple Road S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
19
Massing Diagram
Solid vs Transparent Diagram
Public \ Common \ Private Diagram
TEM
PLE
ROA
D
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS A R C H I T E C T U R E
Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Administration Building - Floor Plan Sunol Corporation Yard 20
East Elevation
OPERABLE STOREFRONT WINDOWS, (TYPICAL)
North Elevation
CHANNEL GLASS CLEARSTORY STANDING SEAM METAL ROOF
OPERABLE STOREFRONT WINDOWS, (TYPICAL)
South Elevation West Elevation GABION WALL
TRELLIS
BOARD FORM CONCRETE
MECHANICAL LOUVERS
BUILDING DESIGN & CONSTRUCTION Administration Building - Perspective Elevations S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
21
BUILDING DESIGN & CONSTRUCTION Administration Building from Temple Road S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
22
BUILDING DESIGN & CONSTRUCTION View of the Yard S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
23
BUILDING DESIGN & CONSTRUCTION Administration Building - Perspective S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
24
UNISEXUNISEX SHARED SHARED RESTROOM ROOFRESTROOM OFFICE OFFICESOFFIT AND VENTILATION SOFFIT AND VENTILATION OVERHANGCLERESTORY ABOVE CLERESTORY ABOVE ABOVE
ENTRY ENTRY ENTRY ENTRY
STOREFRONT STOREFRONTROLLUP DOOR SHOP AREA SHOP AREA ROLLUP DOORGLAZING GLAZING
CONCRETE DRIVEWAY
CONC
RETE
WAL
KWAY
CONC
RETE
PAT
IO
LINEAR LANDSCAPE CORRIDOR
CONC
RETE
PAT
IO
CONC
RETE
WAL
KWAY
CONCRETE DRIVEWAY
AA ROLLUP DOOR SHOP AREA STOREFRONT
GLAZING STOREFRONT
GLAZING SHOP AREA ROLLUP DOOR A
ENTRY ENTRY ENTRY ENTRY
SOFFIT AND VENTILATION SOFFIT AND VENTILATION CLERESTORY ABOVE UNISEX
RESTROOM SHARED OFFICE
SHARED OFFICE
UNISEX RESTROOM
CLERESTORY ABOVE
RAINWATER HARVESTING & INFILTRATION
POTENTIAL PV PANELS @ ROOF
POWER VENTILATED CLERESTORY FAN WALL OPERABLE GLAZING
CLERESTORY GLAZING
ROLLUP DOOR
CONCRETE DRIVEWAY
SHOP AREA LINEAR
LANDSCAPE CORRIDOR
SHOP AREA CONCRETE DRIVEWAY
0 4’
8’
16’
32’
BUILDING DESIGN & CONSTRUCTION Shops #5 and #6 - Floor Plans and Building SectionsS.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation YardA R C H I T E C T U R E
25
STOREFRONT WINDOWS
ROLL UP DOORS
Front Elevation Rear Elevation
STANDING SEAM METAL ROOF
BOARD FORM CONCRETE
MECHANICAL LOUVERS
Side Elevation
BUILDING DESIGN & CONSTRUCTION Shops - Perspective Elevations S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
26
BUILDING DESIGN & CONSTRUCTION Shops
S.F. DEPAR TMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
27
BUILDING DESIGN & CONSTRUCTION Covered Storage Structures S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Sunol Corporation Yard A R C H I T E C T U R E
28
BUILDING DESIGN & CONSTRUCTION
S.F. DEPAR TMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Conclusion A R C H I T E C T U R E
29
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 ****Placeholder**** L A N D S C A P E A R C H I T E C T U R E
30
Stucco Assemblies: Armour wall 300 Water Master
Window Mullion: Medium Bronze Louvers
Panelite ClearShade Concrete Concrete Insulating Glass Unit: Solarban 60
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKS Sunol Yard Improvements | Civic Design Review Phase 2 | July 21, 2014 Materials Board A R C H I T E C T U R E