Sustainability & Environmental Management System (SEMS)
Contract Specialist FocusWednesday, July 18, 2012
Colorado Room
Call-In #: ______________Passcode _______________
2
AGENDA• GSA Mission: How SEMS Fits in with Contracting• Environmental Policy• SEMS Overview• Responsibilities of Contract Specialists
3
“…use expertise to provide innovative solutions for our customers in support of their missions and by so doing foster an effective, sustainable and transparent Government for the American People.”
GSA Mission
4
The GSA commits to:• Compliance with
regulations• Pollution prevention• Promoting awareness• Continual improvement
GSA Environmental Policy
5
What is an SEMS?
It’s a system to maintain environmental compliance and IMPROVE environmental performance
6
Economic (lower utility bills and O & M costs, smart use of space)
Social (improve work space, enhance
communities, environmental justice)
Environmental (conserve natural resources,
emit less GHG)
Sustainable Real Estate
Environmental Footprint
7
8
Introductions
THE TEAM!• SEMS Core Team• SC Representatives• Program Managers• Project Managers• Property Managers• Contracting Officers
9
SEMS Objectives• Improve regional engagement • Improve SEMS planning for environmental program
areas• Improve tracking of performance metrics and reporting
to R8 leadership• Improve internal awareness of environmental programs
and procedures • Support DFC pursuit of Gold Rating from CDPHE• KISS
10
What's in it for me & Region 8?Program Managers:• Help me track my requirements• Align my program with the Region and Central Office• Provide tools for managing my program• Support my metrics trackingProject Managers and COs:• Integrate sustainability into my projects Property Managers: • Improve the economic and environmental performance
of my building
11
• Incorporate text of procedures directly into contract document
– Environmental Procedures are stored on the ARC• Ensure that SEMS requirements in contracts are met• Enforcement under contract requirements• Report project metrics
Mechanism: Environmental Procedure Clauses
12
Procedure / Parameter
(Repair and Alteration
(R&A) -Construction)
90-DAY STORAGE AREA: EMERGENCY HAZARDOUS WASTE SPILL RESPONSE
ASBESTOS
MANAGEMENT
BOILER
EMISSIONS
BUILDING
DESIGN
and
SPECS.-ENERGY
USE
CHEMICAL
STORAGE and
DISPOSAL
CHILLER
EMISSIONS
PROGRAM
CONSTRUCTION and
DEMOLITION
WASTE
MANAGEMENT
CROSS-CONNECTION
CONTROL
AND
BACKFLOW
PREVENTION
DRINKING
WATER-
LEAD
TESTING
EXCAVATION
PERMIT
FACILITY
SOLID
WASTE
MANAGEMENT
FUGITIVE
DUST
MANAGEMENT
MAINTENANCE-
GREEN
PURCHASING
GROUNDS
MAINTENANCE-
CHEMICAL
USAGE
GROUNDS
MAINTENANCE-
WATER
USE
HAZARDOUS
WASTE
MANAGEMENT
PCB
MANAGEMENT
PRE-DEMOLITION INSPECTION
RECYCLING
and
UNIVERSAL
WASTE
SANITARY
SEWER
DISCHARGE
SPILL
RESPONSE
STORMWATER
MANAGEMENT
SUSTAINABLE
NEW
CONSTRUCTION
and
MAJOR
RENOVATIONS -
HPGB
UTILITY
METERING-
ENERGY
USE
WATER INCLUSION / INTRUSION
WATER
METER
MEASUREMENTS
Asbestos Removal ☼ ☼ ☼ ☼ ☼ ☼ ☼
Boiler ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Carpeting / Flooring ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼
Chiller ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Concrete ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Drains ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Drywall ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Electric ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Elevators ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼HVAC / Refrigeration ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼
Infrastructure ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Painting ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Paving (Roads / Parking Lots) ☼ ☼ ☼ ☼ ☼ ☼ ☼
Plumbing ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Roofing ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼
NOTES: (☼ Insert the entire procedure into the Statement or Scope of Work)90-Day Storage Area: Old construction material being demoed may contain hazardous materials (e.g. dry wall: asbestos, paint: lead, electrical: PCB ballasts)Asbestos Management may only require Asbestos Awareness training. Infrastructure, non-surface features.Electrical projects outdoors may require excavations and therefore a dig permit. Pre-Demolition is conducted by the GSA PM, report of findings given to contractor.Facility Solid Waste Management pertains to the removal of trash from office areas. Roofing: Old roofing may contain asbestos and the flange or trim heavy metals.
Environmental Procedures
Region 8 Sustainability & Environmental Management System Revised: Feb. 28, 2011
13
Procedure / Parameter (Services)
90-DAY
STORAGE
AREA:
EMERGENCY
HAZARDOUS
WASTE
SPILL
RESPONSE
ASBESTOS
MANAGEMENT
BOILER
EMISSIONS
BUILDING
DESIGN and
SPECS.-ENERGY
USE
CHEMICAL
STORAGE
and
DISPOSAL
CHILLER
EMISSIONS
PROGRAM
CONSTRUCTION
and
DEMOLITION
WASTE
MANAGEMENT
CROSS-CONNECTION
CONTROL
AND
BACKFLOW
PREVENTION
DRINKING
WATER-
LEAD
TESTING
EXCAVATION
PERMIT
FACILITY
SOLID
WASTE
MANAGEMENT
FUGITIVE
DUST
MANAGEMENT
MAINTENANCE-
GREEN
PURCHASING
GROUNDS
MAINTENANCE-
CHEMICAL
USAGE
GROUNDS
MAINTENANCE-
WATER
USE
HAZARDOUS
WASTE
MANAGEMENT
PCB
MANAGEMENT
PRE-DEMOLITION INSPECTION
RECYCLING
and
UNIVERSAL
WASTE
SANITARY
SEWER
DISCHARGE
SPILL
RESPONSE
STORMWATER
MANAGEMENT
SUSTAINABLE
NEW
CONSTRUCTION and
MAJOR
RENOVATIONS -
HPGB
UTILITY
METERING-
ENERGY
USE
WATER INCLUSION / INTRUSION
WATER
METER
MEASUREMENTS
Custodial / Janitorial ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼
Elevator Maintenance ☼ ☼ ☼ ☼ ☼ ☼
Environmental ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Fire Protection ☼ ☼ ☼ ☼Grounds Maintenance ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼
High Voltage ☼ ☼ ☼ ☼ ☼ ☼ ☼Locksmith ☼ ☼ ☼ ☼Operation and Maintenance ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼
Pest Control ☼ ☼ ☼ ☼ ☼ ☼ ☼Pipeline Repair ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Snow Removal ☼ ☼ ☼ ☼Trash Removal ☼ ☼ ☼ ☼
NOTES: (☼ Insert the entire procedure into the Statement or Scope of Work)Environmental pertains to investigative and cleanup (remediation) workGrounds Maintenance: Landscaping, sprinkler repair
Environmental Procedures
Region 8 Sustainability & Environmental Management System Revised: Feb. 28, 2011
14
Sample pages of Environmental Procedures
• Make sure you are using the most current version of the Environmental Procedures Clauses
• Choose the clauses that apply to your project, remove extraneous clauses, check formatting and save
• Insert to body of Contract document or save as PDF and attach as an Appendix (with SOW, wage determination document etc.)
15
Practical Considerations
• Be thoroughly familiar with the Environmental Procedures• When problems come up:
– Review the Contract– Contact the appropriate person to report problems
(Environmental Program Group) per the Environmental Procedure clause
– Report to the Contracting Officer (if you are not the C.O.)– Interface with the Project Manager and COR
• Report project metrics as required
16
Practical Considerations
17
• SEMS Introductory Training Slide Show• R8SEMS.com• Sustainable Federal Laws, Policies, and Executive Orders• GSA Strategic Sustainability Performance Plan• SEMS Core Teams
Resources