1 Sustainability & Environmental Management System (SEMS) Contract Specialist Focus Wednesday, July 18, 2012 Colorado Room Call-In #: ______________ Passcode _______________

Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

  • Upload
    ulric

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

Sustainability & Environmental Management System (SEMS) Contract Specialist Focus. Wednesday, July 18, 2012 Colorado Room. Call-In #: ______________ Passcode _______________. AGENDA. GSA Mission: How SEMS Fits in with Contracting Environmental Policy SEMS Overview - PowerPoint PPT Presentation

Citation preview

Page 1: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

1

Sustainability & Environmental Management System (SEMS)

Contract Specialist FocusWednesday, July 18, 2012

Colorado Room

Call-In #: ______________Passcode _______________

Page 2: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

2

AGENDA• GSA Mission: How SEMS Fits in with Contracting• Environmental Policy• SEMS Overview• Responsibilities of Contract Specialists

Page 3: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

3

“…use expertise to provide innovative solutions for our customers in support of their missions and by so doing foster an effective, sustainable and transparent Government for the American People.”

GSA Mission

Page 4: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

4

The GSA commits to:• Compliance with

regulations• Pollution prevention• Promoting awareness• Continual improvement

GSA Environmental Policy

Page 5: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

5

What is an SEMS?

It’s a system to maintain environmental compliance and IMPROVE environmental performance

Page 6: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

6

Economic (lower utility bills and O & M costs, smart use of space)

Social (improve work space, enhance

communities, environmental justice)

Environmental (conserve natural resources,

emit less GHG)

Sustainable Real Estate

Page 7: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

Environmental Footprint

7

Page 8: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

8

Introductions

THE TEAM!• SEMS Core Team• SC Representatives• Program Managers• Project Managers• Property Managers• Contracting Officers

Page 9: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

9

SEMS Objectives• Improve regional engagement • Improve SEMS planning for environmental program

areas• Improve tracking of performance metrics and reporting

to R8 leadership• Improve internal awareness of environmental programs

and procedures • Support DFC pursuit of Gold Rating from CDPHE• KISS

Page 10: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

10

What's in it for me & Region 8?Program Managers:• Help me track my requirements• Align my program with the Region and Central Office• Provide tools for managing my program• Support my metrics trackingProject Managers and COs:• Integrate sustainability into my projects Property Managers: • Improve the economic and environmental performance

of my building

Page 11: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

11

• Incorporate text of procedures directly into contract document

– Environmental Procedures are stored on the ARC• Ensure that SEMS requirements in contracts are met• Enforcement under contract requirements• Report project metrics

Mechanism: Environmental Procedure Clauses

Page 12: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

12

Procedure / Parameter

(Repair and Alteration

(R&A) -Construction)

90-DAY STORAGE AREA: EMERGENCY HAZARDOUS WASTE SPILL RESPONSE

ASBESTOS

MANAGEMENT

BOILER

EMISSIONS

BUILDING

DESIGN

and

SPECS.-ENERGY

USE

CHEMICAL

STORAGE and

DISPOSAL

CHILLER

EMISSIONS

PROGRAM

CONSTRUCTION and

DEMOLITION

WASTE

MANAGEMENT

CROSS-CONNECTION

CONTROL

AND

BACKFLOW

PREVENTION

DRINKING

WATER-

LEAD

TESTING

EXCAVATION

PERMIT

FACILITY

SOLID

WASTE

MANAGEMENT

FUGITIVE

DUST

MANAGEMENT

MAINTENANCE-

GREEN

PURCHASING

GROUNDS

MAINTENANCE-

CHEMICAL

USAGE

GROUNDS

MAINTENANCE-

WATER

USE

HAZARDOUS

WASTE

MANAGEMENT

PCB

MANAGEMENT

PRE-DEMOLITION INSPECTION

RECYCLING

and

UNIVERSAL

WASTE

SANITARY

SEWER

DISCHARGE

SPILL

RESPONSE

STORMWATER

MANAGEMENT

SUSTAINABLE

NEW

CONSTRUCTION

and

MAJOR

RENOVATIONS -

HPGB

UTILITY

METERING-

ENERGY

USE

WATER INCLUSION / INTRUSION

WATER

METER

MEASUREMENTS

Asbestos Removal ☼ ☼ ☼ ☼ ☼ ☼ ☼

Boiler ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Carpeting / Flooring ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼

Chiller ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Concrete ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Drains ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Drywall ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Electric ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Elevators ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼HVAC / Refrigeration ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼

Infrastructure ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Painting ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Paving (Roads / Parking Lots) ☼ ☼ ☼ ☼ ☼ ☼ ☼

Plumbing ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Roofing ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼

NOTES: (☼ Insert the entire procedure into the Statement or Scope of Work)90-Day Storage Area: Old construction material being demoed may contain hazardous materials (e.g. dry wall: asbestos, paint: lead, electrical: PCB ballasts)Asbestos Management may only require Asbestos Awareness training. Infrastructure, non-surface features.Electrical projects outdoors may require excavations and therefore a dig permit. Pre-Demolition is conducted by the GSA PM, report of findings given to contractor.Facility Solid Waste Management pertains to the removal of trash from office areas. Roofing: Old roofing may contain asbestos and the flange or trim heavy metals.

Environmental Procedures

Region 8 Sustainability & Environmental Management System Revised: Feb. 28, 2011

Page 13: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

13

Procedure / Parameter (Services)

90-DAY

STORAGE

AREA:

EMERGENCY

HAZARDOUS

WASTE

SPILL

RESPONSE

ASBESTOS

MANAGEMENT

BOILER

EMISSIONS

BUILDING

DESIGN and

SPECS.-ENERGY

USE

CHEMICAL

STORAGE

and

DISPOSAL

CHILLER

EMISSIONS

PROGRAM

CONSTRUCTION

and

DEMOLITION

WASTE

MANAGEMENT

CROSS-CONNECTION

CONTROL

AND

BACKFLOW

PREVENTION

DRINKING

WATER-

LEAD

TESTING

EXCAVATION

PERMIT

FACILITY

SOLID

WASTE

MANAGEMENT

FUGITIVE

DUST

MANAGEMENT

MAINTENANCE-

GREEN

PURCHASING

GROUNDS

MAINTENANCE-

CHEMICAL

USAGE

GROUNDS

MAINTENANCE-

WATER

USE

HAZARDOUS

WASTE

MANAGEMENT

PCB

MANAGEMENT

PRE-DEMOLITION INSPECTION

RECYCLING

and

UNIVERSAL

WASTE

SANITARY

SEWER

DISCHARGE

SPILL

RESPONSE

STORMWATER

MANAGEMENT

SUSTAINABLE

NEW

CONSTRUCTION and

MAJOR

RENOVATIONS -

HPGB

UTILITY

METERING-

ENERGY

USE

WATER INCLUSION / INTRUSION

WATER

METER

MEASUREMENTS

Custodial / Janitorial ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼

Elevator Maintenance ☼ ☼ ☼ ☼ ☼ ☼

Environmental ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Fire Protection ☼ ☼ ☼ ☼Grounds Maintenance ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼

High Voltage ☼ ☼ ☼ ☼ ☼ ☼ ☼Locksmith ☼ ☼ ☼ ☼Operation and Maintenance ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼

Pest Control ☼ ☼ ☼ ☼ ☼ ☼ ☼Pipeline Repair ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Snow Removal ☼ ☼ ☼ ☼Trash Removal ☼ ☼ ☼ ☼

NOTES: (☼ Insert the entire procedure into the Statement or Scope of Work)Environmental pertains to investigative and cleanup (remediation) workGrounds Maintenance: Landscaping, sprinkler repair

Environmental Procedures

Region 8 Sustainability & Environmental Management System Revised: Feb. 28, 2011

Page 14: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

14

Sample pages of Environmental Procedures

Page 15: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

• Make sure you are using the most current version of the Environmental Procedures Clauses

• Choose the clauses that apply to your project, remove extraneous clauses, check formatting and save

• Insert to body of Contract document or save as PDF and attach as an Appendix (with SOW, wage determination document etc.)

15

Practical Considerations

Page 16: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

• Be thoroughly familiar with the Environmental Procedures• When problems come up:

– Review the Contract– Contact the appropriate person to report problems

(Environmental Program Group) per the Environmental Procedure clause

– Report to the Contracting Officer (if you are not the C.O.)– Interface with the Project Manager and COR

• Report project metrics as required

16

Practical Considerations

Page 17: Sustainability & Environmental Management System (SEMS) Contract Specialist Focus

17

• SEMS Introductory Training Slide Show• R8SEMS.com• Sustainable Federal Laws, Policies, and Executive Orders• GSA Strategic Sustainability Performance Plan• SEMS Core Teams

Resources