32
(IN ASSOCIATION WITH ABZAN CONSTRUCTION PRIVATE LIMITED) New Delhi (INDIA) An ISO 9001:2008 Certified Company CONSTRUCTION PROFESSIONALS >>> MECHANICAL ELECTRICAL CIVIL The Company Profile

T Company Profile - zagson.comzagson.com/pdf/profile.pdf · He has thorough expertise of power sector from concept to ... construction projects of various industries largely Power,

  • Upload
    hamien

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

(IN ASSOCIATION WITH ABZAN CONSTRUCTION PRIVATE LIMITED)

New Delhi (INDIA)

An ISO 9001:2008 Certified Company

CONSTRUCTION PROFESSIONALS >>> MECHANICAL ELECTRICAL CIVIL

TheCompany Profile

The History

Established as Abzan Construction Private Limited in the year 1992, under

The Companies Act 1956. Zagson Engineering Limited is constituted as a sister

concern of Abzan Construction Private Limited in the year 2010.

This company is currently being developed by Mr. M. T. Kaifi, Mr. M. T. Saifi &

Mr. D. N. Prasad, who have rich experience in their relevant industries through

different organizations at senior positions.

THE COMPANY

The Vision

t Zagson Engineering Limited is determined to win customer satisfaction

through prompt and professional services by maintaining quality and

cost effective operations.

t To continue striving hard to provide excellent services to the customers

of Engineering & Construction sector.

t To provide job opportunities for attainment of better lifestyle and to

become respectable & responsible citizens of society.

t Zagson Engineering is also determined to grow along with the pace of the

Nation's growth & become a renowned Construction Engineering

company in India.

KEY MANAGEMENT

D N PrasadChairman

M T SaifiVice Chairman

M T Kaifi Managing Director

Mr. Prasad is a professionally qualified engineer of 1974. He has served the MP State Electricity Board till his retirement as Chairman in 2007.He has thorough expertise of power sector from concept to commissioning including operations. He has earned various distinctions including National Award for his tenure of services. He has many contacts with various national/ multinational power companies & OEMs.

Mr. Saifi is a professionally qualified engineer of 1979. He has hands on specialization & loads of accomplishments to his credit in Project Management of Mega - construction projects of various industries largely Power, Petrochemical & Infrastructure sectors.In over 30 years of service, he has served companies like L&T, UB Engineering & ETA (UAE). During his tenure of service, he enjoyed a rich rapport and received several appreciations from employers/ clients & principals he was associated with.

Mr. Kaifi is a professionally qualified engineer of 1984. He is one of the founder member of Zagson Engineering Limited which was initially established by him as Abzan Construction Private Limited in 1992, (after his initial employment) with his natural instinct to support livelihood for common people.He holds various key posts with many social organizations to satisfy his passion & basic instinct. A silent character with great courage & conviction.

MANAGING DIRECTOR

DIRECTOR - OPERATIONS

BUSINESS SUPPORT

FUNCTIONS

SECRETARIAL

ORGANIZATION STRUCTURE AT H.O.

HR / ADMIN

IR & RESOURCEMGMT.

FINANCE &

STATUTORY

CONTRACT &

PLANNING

MECHANICAL

PROJECTS

REFURBISHMENT &

MAINT. PROJECTS

ELECTRICAL &

INFRA PROJECTS

HSE

QA/QC

SECTOR

SEGMENT

BUSINESSRANGE

Ÿ Power (Thermal & Gas)

Ÿ Petrochemical/Refinery

Ÿ Infrastructure & Utility Sector

ŸMechanical & Structural Construction

ŸElectrical Installation

ŸCivil & Infrastructure Projects

ŸMaintenance & Refurbishment Services

ŸFacility Management Services

MECHANICAL PROJECTS

v Piping : On Site / Shop Fabrication & Erection

v Tanks : Site Fabrication & Installation

v Structure : On Site/Shop Fabrication & Erection

v Equipment Installation

v Thermal Insulation & Painting

PROJECTS EXECUTED IN LAST 5 YEARS

Sl.No. Brief Description of Work Client

1. Site Fabrication & Erection of OSBL area AG piping at

IOCL, Paradeep (Odisha).

2. Site Fabrication & Erection of CS (Non IBR & NACE) AG

piping at Paradeep (Odisha).

3. Site Fabrication & Erection of 2X500 MW TPS, coal

Handling Structure at Rihand (UP).

4. Erection of CHP component of 2X500 MW, TPS, at

Rihand (UP).

5. Structural steel erection work at solar Poly-Silicon plant

for LANCO at Rajnandgaon (MP).

9. Installation of technological structure and mechanical

equipments related to CHP at Cuddalore for IL&FS.

6. Structure, piping & tank installation works for chemical

plant at Bharuch (Gujarat).

10. Installation of make up water U/G piping for Kudgi STPP,

stage-I (3x800MW) for NTPC.

7. Erection of non - pressure part component for 1X300 MW

Boiler for JSW - Energy Ltd, Bellary (Karnataka).

KAZSTROY

ESSAR

IVRCL

FL SMIDTH

FEDDERSLLYOD

EEPL

JUBILANT

GRAPHITEINDIA/

AAAKAR

SPIC JEL

8. Fabrication & Erection of CW Piping at Panipat,

(Haryana)

NFL

*

* Projects currently under execution.

*

v Earthing / Grounding / Raceways

v Transformer /Reactor, Switchgear / Panel

v Cabling (HV / LV/Control)

v Substations(GIS/AIS)

ELECTRICAL INSTALLATIONS

PROJECTS EXECUTED IN LAST 5 YEARS

Sl.No. Brief Description of Work Client

1. Installation of 400 KV, GIS for Reliance CCPP at

Samalkot (AP).

2. Equipment installation works for 765/400 KV substation

at Seoni & Satna(MP).

3. Installation of raceways & cabling of VDU unit at IOCL,

Paradeep (Odisha).

4. Raceways & cabling installation at 2X660MW TPS at

Rajpura (Punjab).

5. Supply and installation of street light poles along with

other associated civil works at Abu Dhabi (UAE).

6. Electrical works for Sewage & water treatment system at

RAK (UAE).

7. Installation of raceways, panels & cabling for EMAL at

Taweela (UAE).

8. OFC cable Laying & Associated works of Urban Area

in Delhi.

Xian

L&T

Essar

MHI /L&T

FaberMalaysia

Veolia WaterSystem

ETA

BhartiTelecom

9. 400/220 KV substation of Powergrid at Maithon and Samba.

220/132 KV substation of Powergrid at Ara (Bihar).

10. Installation and commissioning of electrical equipments

related to CHP at Cuddalore for IL&FS.

ToshibaT&D

EEPL

* Projects currently under execution.

*

*

v Excavation & Earth Works

v Building/Warehouse/Camp Construction

v Road & Infrastructure

v Facility Management Services

CIVIL & INFRASTRUCTURE

PROJECTS EXECUTED IN LAST 5 YEARS

Sl.No. Brief Description of Work Client

3. Execution of civil foundation works of STG, GTG and

Stack for 225 MW combined cycle power plant at

Kashipur (UK).

4. Earth work, reinforcement & PCC works for equipment

foundations including access road making & metal

spreading for PGCIL substation at Ballia & Unnao (UP).

Soma

L&T

2. Flooring, Brick works, grading, concreting, (RCC/PCC)

and shuttering of FC plant and utility building at

Bharuch (Gujarat).

JUBILANTGROUP

5. Earth works for CHP package stage – III , 2X500MW at

NTPC, Rihand (UP).

IVRCL

1. Earth work and Construction of reclamation bund for

Essar Power Project at Vadinar (Gujarat).

L&T

6. Construction of warehouses & leveling/earthwork of the

Material Storage Area for NTPC at Meja (UP) & Kudgi

(Karnataka) Projects.

TPSC(INDIA)

7. Construction of staff & labour accommodation with all

facilities for NTPC at Meja (UP) & Kudgi (Karnataka)

Projects.

TPSC(INDIA)

All kinds of Repair, Refurbishment & Maintenance works of Electro

Mechanical nature for:

v Power

v Petrochemical / Refinery / Fertilizer

v Steel / Cement & other utility Sector

MAINTENANCE & REFURBISHMENT SERVICES

PROJECTS EXECUTED IN LAST 5 YEARS

Sl.No. Brief Description of Work Client

1. Major overhauling of non – pressure parts of 1X500MW

Boiler for SGTPS at Birsinghpur (MP).

2. Overhauling of various pumps & equipments of TG island

of 4X210 MW-TPS at Birsinghpur (MP) from last 10 years.

3. Overhauling & Maintenance of 2X210 MW Boilers at

SGTP Birsinghpur (MP) from last 12 years.

4. Dismantling, Repair & Re-erection of Kiln & Steel Stack at

Bhiwadi (Rajasthan).

5. Refurbishment of Compressed Air, Tech Water & Fuel Oil

System of 4X50 MW Boiler at Korba East (Chhattisgarh).

6. Overhauling of 2X110MW Boiler pressure parts for

HPGCL at Panipat (Haryana).

7. Annual Maintenance of 2X300 MW Boiler & its Auxiliaries

for HPGCL at Yamuna Nagar (Haryana).

8. Routine maintenance of 2X210 MW Boiler pressure parts

at ATPS, Anpara (UP).

9. Overhauling of coal handling plant equipment of SGTPS,

at Birsinghpur (MP).

MPPGCL

MPPGCL

MPPGCL

SRF

ALSTOM

HPGCL

UHPL

UPPGCL

MPPGCL

* Projects currently under execution.

*

*

*

1. Directors 03

2. Senior Management Personnel 04

3. Contract & Procurement Group 02

4. Project Management Group 03

5. Business Support Functions Group 04

6. QC Personnel 01

7. HSE Personnel 01

PERSONNEL STRENGTH

Nos.Sl.No. Category / Discipline

Civil/Infra.Sl.No. Category Mech/Refurb. Electrical

11

16

08

03

05

14

06

09

06

08

11

1. Engineer

2. Supervisor/Foreman

3. Admin/Stores/Accounts

4. QC Personnel

5. HSE Personnel

6. Welders (Argon/Arc)

7. Welders (IBR)

8. Pipe Fabricator/Fitter

9. MWF

10. Structure Fabricator/Fitter

11. Sarang/Rigger/Scaf Folder

12. Cable Jointer/Electrician

13. Electrical Fitter

14. Crane Operator/HVD

15. Mason

16. Carpenter/ Barbender

05

10

05

02

02

08

06

02

03

02

01

01

04

08

10

At Project Sites

At Head Office

1.00 LIFTING & RIGGING TOOLS

2.00 MECHANICAL TOOLS

3.00 WELDING TOOLS

1.1 Chain Pulley Block 01/05 T 115

1.2 Chain Pulley Block 10/20 T 20

1.3 Lifting and Pulling Machine 01/05 T 120

1.4 Mechanical Jack 05/100 T 16

1.5 Electric Winch 05/10 T 08

1.6 Hand Winch 03/05 T 09

1.7 Hydra Crane 12/14 T 04

1.8 Crane 30/25 T 02

2.1 Hydraulic Test Pump (Elect.Opera) Upto 175 Kg. 02

2.2 Abrasive cut off Machine Upto 25 mm 16

2.3 Plate Bending Machine Upto 25mm 02

2.4 Grinding Machine Assorted 185

2.5 Cutting Set Lots

2.6 Precision Tools ----- 10 lot

2.7 Pug Cutting Machine 14

2.8 Micro 'D' Meter 12

3.1 Welding Generator Upto 600 Amp 35

3.2 Welding Rectifier Upto 600 Amp 180

3.3 Welding Transformer Upto 600 Amp 15

CONSTRUCTION AIDS

1 LIFTING & RIGGING TOOLS

2 MECHANICAL TOOLS

3 WELDING TOOLS

Qty.Sl.No. Description Capacity

Qty.Sl.No. Description Capacity

3.4 Plasma Cutting M/C 04

3.5 MIG Machine 02

3.6 Argon Set ----- 65

3.7 Cutting Set Lots

4.1 Crimping Tools Above 150 Sq. mm 02

4.2 Crimping Tools Upto 150 Sq. mm 04

4.3 HV Testing Kit ----- 01

4.4 Meggar (s) 500 - 2500 06

4.5 Earth Tester ----- 04

4.6 Tongue Tester 32 A to 250 A 10

4.7 Power Genset 65KVA - 125 KVA 02

4.8 Cable Roller Lots

5.1 HYVA 10 Wheel 01

5.2 Excavator 01

5.3 Truck 10 Wheel 01

5.4 Soil Compactor 01

5.5 Tractor With Trolly 04

5.6 Concrete Mixture M / C (Diesel) 02

5.7 Theodolite 03

5.8 Water Tanker 04

5.9 Steel Shuttering Material Lot

-----

4.00 ELECTRICAL TOOLS

5.00 CIVIL TOOLS

CONSTRUCTION AIDS

4 ELECTRICAL TOOLS

5 CIVIL TOOLS

QUALITY POLICY

Zagson Engineering Limited is determined to :

S Win customer satisfaction through prompt & professional services by maintaining quality in accordance with ISO 9001: 2008.

S Achieve Growth Rate of 20% and ensure Minimum Profit of 15% of Turnover prior to tax deductions.

S Zagson Engineering is committed to :

S Prioritize customer needs through prompt & appropriate services with the support of dedicated & experienced professionals.

S Maintain Quality which means that all work must be done in the right manner.

S Achieve cost reduction through proper, planned & systematic way of working with continuous efforts for improvement.

S Provide High degree of safety awareness at all their work places.

M. T.KaifiManaging DirectorDated : 21st Oct. 2015

HEALTH, SAFETY & ENVIROMENT POLICY

Zagson Engineering Limited is committed to :

S Take initiative and create awareness for safe working environment.

S Address and educate about the root cause to avoid injuries of even minor nature.

S Carry out all work in safe manner by protecting the environment and following safety principles in day to day work.

S Ensure that all the personnel working under Supervisor shall have thorough working knowledge of safety rules & regulations.

S Inculcate the principle of safe working culture in every individual associated with the project work.

M. T.KaifiManaging DirectorDated : 21st Oct. 2015

AN ISO 9001:2008 CERTIFIED COMPANY

BU

SIN

ES

S G

RO

WT

H A

T A

GL

AN

CE

0

50

10

0

15

0

20

0

25

0

30

0

35

0

20

10

20

11

20

12

20

13

20

14

Millions

Ord

er B

oo

kin

g

Sale

s

OUR ESTEEMED CLIENTELE

HARYANA POWER GENERATION CORPORATION LIMITED

STATUTORY DOCUMENTS

Zagson is also involved in various social support activities especially through the basic education for the children in need, focusing especially on girl's education. Zagson management firmly believes in “If you teach a boy, you educate an individual; but if you teach a girl, you educate a community”.In addition, company also supports people suffering due to natural calamities, medical and health and providing basic necessities for living to the people in need.

CORPORATE SOCIAL RESPONSIBILITY

In today's world where Human Resources are considered more important than Financial Resources. Zagson took this philosophy long time back resultantly as extremely high employee retention rate and committed team of specialists are its actual strength. Zagson goes all out to retain and nurture talent along with deeply respecting hard work put in by its employees. Zagson management always stand with its employees and considers them as an extended family with traditional values.

CONTACT DETAILS

Registered Office E-33/FF, Street No. - 06, A.F. Enclave - IIJamia Nagar, New Delhi - 110025 (India)

Tel. : +91-11-29943284E-mail : [email protected]

Website : www.zagson.com

Corporate OfficeG-60, IInd Floor, Shaheen Bagh, (Jasola - Kalindi Kunj Main Road)

New Delhi - 110025 (India)Tel. : +91-11-26942600, 65833287