Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
EXIST
ING
RET
AININ
G W
ALL
Existing pedestrian crossing
Existing unmanaged beechhedge to be retained T64 and T62 requiring remedial
work as outlined in the Tree Survey
Existing unmanaged beech
hedge to be retained andmanaged
4
1
3
2
116.4m
2
9
5
WEST PARK
Pavilion
D
rain
TCB
2
9
3
4
3
5
A
R
N
C
L
I
F
F
E
R
O
A
D
4
5
3
2
C
R
3
0
7
Sports
Path (um
)
2
9
1
D
r
a
in
Ordnance Survey, (c) Crown Copyright 2016. All rights reserved. Licence number 100022432
*
G4
G3
G1
POS1
POS5
P
P
P
5500
5500
5500
G
G
G
P
P
EXISTING PUBLIC RIGHT OF WAY TO BE DIVERTED ALONG NEW FOOTPATH
EXISTING PUBLIC RIGHT OF WAY TO BE DIVERTED ALONG NEW FOOTPATH
PROPOSED ROUTE FOR DIVERTED PUBLIC RIGHT OF WAY
POS2
G
*
*
G
P
G4
*
EP
EP
EP
EP
EP
EP
P
EP
EXISTING STONE PILLARSTO SITE ENTRANCE
TO BE RETAINED AND
MADE GOOD NEWFOOTPATH TO RUN
BETWEEN TO CONNECTWITH PROPOSED PUBLIC
RIGHT OF WAY
EXISTING SITE ENTRANCE
TO BE STOPPED UP
NEW SITE ENTRANCE TOBE FORMED INTO
DEVELOPMENT REFER TO
HIGHWAYS DETAILEDDRAWINGS FOR FURTHER
INFORMATION
EP
EP
P
PROPOSED
SUBSTATION
P
DRAINAGE ATTENUATION TANK
LINE O
F EASEMEN
T TO W
ATER MAIN
LINE O
F EASEMEN
T TO W
ATER MAIN
WATER M
AINW
ATER MAIN
NORTHERN POWER
NORTHERN POWER
LINE O
F EASEMEN
T TO W
ATER MAIN
LINE O
F EASEMEN
T TO W
ATER MAIN
A
5500
PRIVATE
DRIVE
SHARED
SURFACE
SHARED
SURFACE
PRIVATE
DRIVE
PROPOSED ROUTE FOR DIVERTED PUBLIC RIGHT OF WAY
GRAS
SCRE
TE
FOR
ACCE
SS T
O
ATTE
NUATI
ON T
ANK
G2
POS3
P
P
P
ROAD
PRIVATE
DRIVE
P
P
SHARED
SURFACE
P
G
P
P
EP
EP
EP
EP
SHARED
SURFACE
P
EP
EP
EP
EP
A
A
A
A
A
A
G
BUS
STOP
EXISTING STONEWALL TO
BE REMOVED
POS4
PROP
OSED
KNEE
RAI
L TO
MAT
CH E
XIST
ING
TO S
ITE
BOUN
DARY
PROPOSED KNEE RAIL TO MATCH EXISTING TO SITE BOUNDARY
EXISTING KNEE RAIL TO SITE BOUNDARY
EXISTING KNEE RAIL TO SITE BOUNDARY
EXISTIN
G KN
EE RAIL TO SITE BO
UN
DARY
*
*
*
*
EXISTING GATE POSTS TOBE RETAINED/REINSTATEDAS PART OF PROPOSALS
PROPOSED PARKLAND
FENCE TO BE INSTALLEDFOR DURATION OFKNOTWEED TREATMENT
EXISTING FENCE TO BEREMOVED BY LEEDS CITYCOUNCIL PARKSDEPARTMENT
A
DROP KERB TO BEINSTALLED TO FRONT OF
SUBSTATION
FOO
TPAT
H
FOO
TPAT
H
FOOTPATH
FOOTPATH
EXISTING FOOTPATH
PROPOSED GATE TO BEINSTALLED WITHINPARKLAND FENCE TO
REMAIN LOCKED FORDURATION OF KNOTWEEDTREATMENT
VISIBILITY SPLAYS TO BEMAINTAINED. PLANTING TO
BE CUT BACK TO ENSUREVISIBILITY SPLAY CAN BE
ACCOMMODATED
EXISTING PUBLIC RIGHT OF WAY
EXISTIN
G PU
BLIC RIGH
T OF W
AY
EXISTING PUBLIC RIGHT OF WAY
EXISTING PUBLIC RIGHT OF WAY
PROP
OSED
GAR
DEN FE
NCE T
O M
ATCH
EXI
STIN
G TO
SIT
E BO
UNDA
RY
G5TREES
LISTED IN
TPO
OFFSITE PLANTING REFER TOLANDSCAPEPROPOSALS FOR FURTHERINFORMATION
SPORTS PITCH
ES
PARKLAND
2107
6
12010
6306
EP
EP
EP
G
G
EP
G
EP
P
P
9993
P
NEW PLANTING TOBOUNDARY
BIN C
OLLE
CTIO
N POI
NT
EXTENT SALE BOUNDARY
INDICATED BY DASHED /DOTTED LINE
EXTENT SALE BOUNDARYINDICATED BY DASHED /
DOTTED LINE
FOOTPATH
BIN STORAGE POINT PLOTS 14 & 15
G
G
G
G
G
G
G
G
G
4 BED
DET
/SEMI
106.3 M2
8b SILVER
DA
LE
AS
3 BED DET/SEMI
89.8 M2
6GARSDALEAS
3 BED DET/SEMI
89.8 M2
6
GARSDALEOPP
3 BED MEW
S
73.2 M2
3CO
TTERDALEO
PP
4 BED
DET
/SEMI
115.4 M2
9b
WEN
SLEYD
ALE
AS
4 BED DET121.8 M2
10
WHARFDALE
AS
4 BED DET/SE
MI
106.3 M2
8SIL
VERDALE
AS
4 BED DET/SE
MI
106.3 M2
8SIL
VERDALEOPP
4 BED
DET
121.8 M2
10b WH
ARFD
ALE
OPP
4 BED DET121.8 M2
10
WHARFDALE
OPP
5 B
ED
DET
134.4
M2
11
*
KIN
GSD
ALE
AS
5 BED DET134.4 M2
11
*
KINGSDALE
OPP 3 BED DET/SE
MI
89.8 M2
6GARSD
ALE
AS
5 BED D
ET
134.4 M2
11b
*
KIN
GSD
ALE
AS
4 BED
DET
121.8 M2
15 BISH
OPD
ALE
AS
3 BED DET/SEMI
89.8 M2
6GARSDALE
AS
5 BED
DET
134.
4 M
2
11*
KIN
GSD
ALE
AS
4 BED DET/SEMI115.4 M2
9WENSLEYDALE
AS
3 BED DET/SEMI
89.8 M2
6GARSDALE
AS
4 BED DET
121.8 M2
10
WHARFDALEAS
4 BED DET/SEMI
115.4 M2
9WENSLEYDALE
AS
4 BED DET
121.8 M2
10WHARFDALE
OPP
3 BED MEW
S
99.8 M2
13
PATTERDALE
AS
3 BED MEW
S
99.8 M2
13
PATTERDALEOPP
2 BED71 M2
12
LITTONDALE
AS
2 BED71 M2
2BIRKDALE
AS
3 BED MEWS
84.0 M2
3a
BEDALE
2 BED MEWS
73.2 M2
14
NIDDERDALEOPP
3 BED MEWS
84.0 M2
3a
BEDALE
OPP
2 BED71 M2
2BIRKDALE
OPP
4 BED DET/SEMI
106.3 M2
8SILVERDALE
AS
4 BED DET/SEMI
106.3 M2
8SILVERDALE
OPP
2 BED71 M
2
2BIRK
DALE
AS
2 BED71 M
2
2BIRK
DALE
AS
2 BED71 M
2
2BIRK
DALE
OPP
2 BED M
EWS
73.2 M2
14
NID
DER
DALE
AS
3 BE
D S
EMI
82.6
M2
4ST
ON
ESD
ALE
AS
2 BED M
EWS
73.2 M2
14
NID
DER
DALE
OPP
3 BED M
EWS
73.2 M2
3CO
TTERDALEAS
3 BE
D S
EMI
82.6 M
2
4ST
ON
ESD
ALE
OPP
2 B
ED
MEW
S73.2
M2
14NID
DER
DA
LE
AS
2 B
ED
MEW
S73.2
M2
14NID
DER
DA
LE
OPP
3 BED SEMI
82.6 M2
4ST
ONESDALE
AS
3 BED
DET
/SEMI
89.8 M2
6b GA
RSD
ALE
AS
2 BED
MEW
S
73.2 M2
14b NID
DER
DA
LE
AS
2 BED
MEW
S
73.2 M2
14b NID
DER
DA
LEO
PP
3 BED
DET
/SEMI
89.8 M2
6b GA
RSD
ALE
OPP
3 BED MEW
S
99.8 M2
13
PATTERDALE
AS
3 BED MEW
S
99.8 M2
13
PATTERDALEOPP
3 BED SEMI
82.6 M2
4ST
ONESDALE
OPP
OPP
2
.
4
x
2
5
m
V
i
s
i
b
i
l
i
t
y
S
p
l
a
y
2
.
4
x
2
5
m
V
i
s
i
b
i
l
i
t
y
S
p
l
a
y
2
.
4
x
2
5
m
V
is
ib
ilit
y
S
p
la
y
R
9
.0
m
R
9
.0
m
2
5
m
F
o
r
w
a
r
d
V
is
ib
ility
S
p
la
y
R
6
m
R
6
m
R
6
.
0
m
R
6
.
0
m
R
6
.
0
m
R
6
.
0
m
2
.
4
x
5
5
m
V
i
s
i
b
i
l
i
t
y
S
p
l
a
y
2
.
4
x
9
0
m
V
i
s
i
b
i
l
i
t
y
S
p
l
a
y
*
When printing feed this edge first
© Copyright Spawforths
Client Name
Drawn By
Drawing No.
File Path
Important notice:
Do not scale off this drawing. Critical dimensions should be checked on site prior to works commencing. Dimensionalconflicts should be brought to the company's attention as soon as they become apparent. Failure to do so could renderthe contractor liable for subsequent losses. Copyright in this drawing and any work executed from this drawingremains the property of Spawforths.
planners | urbanists | architects
Junction 41 Business Court, Thorpe Road, East Ardsley, Leeds, West Yorkshire WF3 2AB
T: 01924 873873 F: 01924 870777 www.spawforths.co.uk [email protected]
spawforths
Project Title
Reviewed By Scale Discipline Date
RevisionDrawing Title
Project No
Revisions
SPACE HOMES
P4104-3DG- SPEN LANE, WEST PARK
JLB 1:500@A1 ARCH JUNE17
0200-0027 PROPOSED SITE LAYOUT
Revision | Drawn | Reviewed | Date |A JLB 4 SEPT 17
MIX AMENDED FOLLOWING DESIGN TEAM MEETING 4 SEPT 17
0 10 M 20 M 30 M 40 M 50 M
DO NOT SCALE THIS DRAWING.VERIFY ALL DIMENSIONS / SETTING OUT ON SITE.NOTIFY ANY DISCREPANCIES TO THE ARCHITECT.FOR STRUCTURAL INFORMATION REFER TO STRUCTURAL ENGINEER'S DRAWINGS.FOR M&E INFORMATION REFER TO M&E ENGINEER'S AND SUB-CONTRACTOR'SDRAWINGS.FOR HEALTH AND SAFETY INFORMATION REFER TO ARCHITECTURAL HEALTH ANDSAFETY RISK ASSESSMENTS.
N
PRODUCED FROM PROMAP SURVEY INFORMATION CROWN COPYRIGHT Licence number 1000224432
Revision | Drawn | Reviewed | Date |B JLB 6 SEPT 17
PLOT NUMBERS ADDED - MINOR AMENDMENTS TO UNITS
Revision | Drawn | Reviewed | Date |C JLB 15 SEPT 17
LAYOUT ADJUSTED TO ACCOMMODATE CONFIRMED HOUSETYPE 3A AND 13.ADJUSTMENTS TO LAYOUT TO ACCOMMODATE BIN STORAGE TO PLOTS.
Revision | Drawn | Reviewed | Date |D JLB 20 SEPT 17
UPDATED TO INDICATED UPDATED TREE SURVEY.
Revision | Drawn | Reviewed | Date |E JLB 22 SEPT 17
UPDATED FOLLOWING DISCUSSIONS WITH LOCAL AUTHORITY.
Revision | Drawn | Reviewed | Date |F JLB 26 SEPT 17
UPDATED FOLLOWING DISCUSSIONS WITH CLIENT
Revision | Drawn | Reviewed | Date |D1 JLB 28 SEPT 17
UPDATED TO INDICATED UPDATED TREE SURVEY.
Revision | Drawn | Reviewed | Date |G JLB 11 OCT 17
UPDATED FOLLOWING DISCUSSIONS WITH LOCAL AUTHORITY ANDHIGHWAYS FEEDBACK
Revision | Drawn | Reviewed | Date |H JLB 12 OCT 17
SHARED SURFACE ADJACENT POS 2 AMENDED SUIT TRACKING PROVIDED BYHAIGH HUDDLESTON
Revision | Drawn | Reviewed | Date |I JLB 16 OCT 17
REDLINE AMENDED TO INCLUDE OFF SITE DRAINAGE, OFFSITE PLANTING ANDPROPOSED SUBSTATION.
Revision | Drawn | Reviewed | Date |J JLB 20 OCT 17
PLANTING UPDATED TO SUIT CHANGES TO LAYOUT
Revision | Drawn | Reviewed | Date |K JLB 6 DEC 17
LAYOUT UPDATED TO OMIT LOOP ROAD FOLLOWING DISCUSSIONS WITHPLANNING OFFICER.
GAP IN KNEE RAIL TO BE PROVIDED AS INDICATED BY * TO SITE BOUNDARYTO PROVIDE ACCESS TO ADJACENT GREENSPACE
Revision | Drawn | Reviewed | Date |L JLB 7 DEC 17
REDLINE UPDATED FOLLOWING DISCUSSIONS WITH PLANNING OFFICER
Revision | Drawn | Reviewed | Date |M JLB 7 DEC 17
UPDATED IN LINE WITH COMMENTS RECEIVED FROM HIGHWAYS ANDPLANNING OFFICER 14 DEC 17
Revision | Drawn | Reviewed | Date |N JLB 3 JAN 17
UPDATED FOLLOWING COMMENTS RECEIVED FROM HIGHWAYS ANDPLANNING OFFICER
Revision | Drawn | Reviewed | Date |O JLB 12 JAN 17
UPDATED FOLLOWING COMMENTS RECEIVED FROM HIGHWAYS ANDPLANNING OFFICER 12 JANUARY 2018
Revision | Drawn | Reviewed | Date |P JLB 23 JAN 17
ISSUE JANUARY 2018
Revision | Drawn | Reviewed | Date |Q JLB 29 JAN 17
AMENDMENTS TO PLOT NUMBERS FOLLOWING DISCUSSIONS WITH LA
ACCOMMODATION SCHEDULE
Site Name -SPEN LANE WEST PARK
HOUSE TYPE BedsSTOREY
BIRKDALE
STONESDALE
GARSDALE
SILVERDALE
WENSLEYDALE
WHARFDALE
KINGSDALE
PATTERDALE
BISHOPDALE
HT02
HT04
HT06/06B
HT08/08B
HT09/09B
HT10/10B
HT11/11B
HT13
HT15
2
3
3
4
4
4
5
3
4
2
2
2
2
2
2
2
2.5
2
1
2
7
5
3
5
4
4
1
764
889
967
1144
1242
1315
1447
1076
1315
1778
6769
5721
3726
6577
5787
4306
1315
82.60
89.80
106.30
115.40
122.20
134.40
100.00
122.20
165.20
628.60
531.50
346.20
611.00
537.60
400.00
122.20
3,11,12,23,24,49,50
31,32
8,9,26,27,36,37,40
4,5,10,41,46
21,25,48
20,22,35,38,47
1,33,34,39
42,43,44,45
30
SHARED OWNERSHIP
NIDDERDALE
BEDALE
STONESDALE
HT14
HT03 A
HT04
2
3
3
2
2
2
788
904
889
5516
1808
1778
73.20
84.00
82.60
512.40
168.00
165.20
NUMBERSQ.FEET TOTAL SQ FEET SQ. METRES
plot nos
SOCIAL RENTED
HT03COTTERDALE
LITTONDALE
2
HT12 2
2
2
4
2
1
764
788
764
3056
764
71.00
71.00
284.00
71.00
13,14,15,28
29
TOTAL TRADITIONAL 50
TOTALS:
Area Gross:
Area Gross:
POS area 1
POS area 2
POS area 3
POS area 4
POS area 5
Mitigation area
Non Developable
Developable area
Developable area
Density:
Coverage Sq.ft/acre
1.98
4.9
0.1328
0.031
0.04
0.117
0.025
0
0
4.098224
1.6592
25.25
12502.92
50
Hectares
Acres
Hectares (NOT ADOPTABLE LESS THAN 1000 SQM)
Hectares (NOT ADOPTABLE LESS THAN 1000 SQM)
Hectares (NOT ADOPTABLE LESS THAN 1000 SQM)
Hectares (NOT ADOPTABLE LESS THAN 1000 SQM)
Hectares (NOT ADOPTABLE LESS THAN 1000 SQM)
Hectares
Hectares
Acres
Hectares
Units / Hectare
Sq.ft/acre
51240 4760
FOR SALE
2, 62
216, 17
7
7
18, 19
HT02 2 2BIRKDALE
TOTAL SQ METRES
71.00
1576
764
73.20 146.40
71.00
Revision | Drawn | Reviewed | Date |P0 JLB 10 AUG 18
HANDING SHOWN AS CONTRACTOR REQUESTSHED LOCATIONS INDICATED AS REQUESTBUILDING REGULATIONS APPLICATION SUBMISSIONSCHEDULE UPDATED AS CONTRACTOR REQUEST
SPL_SPA_ZZ_XX_DR_A_0200-0027
P2
Revision | Drawn | Reviewed | Date |P1 JLB 30 AUG 18
GARDEN AREA PLOT 8 AMENDED TO OMIT BT AREA FENCING REMOVED ASPER CLIENT INSTRUCTION, ACCESS TO PLOTS 8,9 AND 47-50 AMENDED IN LINEWITH SECTION 38 COMMENTS. PLOT BLOCK DRAWINGS INCORPORATED.
Revision | Drawn | Reviewed | Date |P2 JLB 31 AUG 18
BAY WINDOWS TO PLOTS 18,19,35,47 AMENDED FOLLOWING LIAISON WITHWSP