Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Dear Customer,
In here you can find all of Containerships' port tariffs,
click on the port of your choice to skip right ahead.
Table of Content
Aarhus
Gdynia
Helsinki
Irish ports
Italy
Klaipeda
Luebeck
PortugalRiga
Rotterdam
SpainTeesport
Thamesport
Ukraine
Zeebrugge
Oslo
April 2018
Version 8.2
Both import and export freight quotations 1.4 CONTAINER CLEANING
for door and quay shipments for all container types
already include THC and ISPS costs. The container must be returned empty at the designated Container Depot.
Unit must be returned without lashing material, any debris inside or labels.
1.1 EXPORT LOCAL CHARGES Partial removal of hazardous cargo label is considered as label not removed
Unit must be brushed and cleaned.
THC EUR 206.00 / dry container charges will be invoiced to the freight payer for cleaning costs.
THC EUR 206.00 / reefer container Containerships Plc reserves the right to apply higher charges in case of extreme dirtiness.
Port dues EUR 27.00 / container Any damages to container will be invoiced according to interchange report or official repair
Bill of lading EUR 31.00 / set of document estimate with additional terminal/depot handling costs.
Customs document EUR 62.00 / set of document All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair
Reefer connection EUR 77.00 / 3 days electricity station.
and monitoring Sweeping/washing/removal
thereafter EUR 18.00 / day / container of debris/labels/lashing material EUR 185.00
Verified Gross Mass EUR 20.00 /container Steam cleaning EUR 255.00
Chemical cleaning EUR 410.00
Freight quotations for door and quay shipments for IMDG label attaching EUR 185.00
reefer containers include electricity and monitoring For 45 ‘HCRF units:
for three days, counted from day of arrival. Cargo lashing bar replacement EUR 180.00
1.2 IMPORT LOCAL CHARGES 1.5 CONTAINER RENT / CONTAINER DETENTION
(amounts per container)
THC EUR 206.00 / dry container
THC EUR 206.00 / reefer container 7 days from vessel arrival until empty redelivery / 7 days from empty
Port dues EUR 27.00 / container release until vessel departure.
Advising charge EUR 31.00 / set of document
Customs document EUR 62.00 / set of document 8 -14 days as from 15th day
Reefer connection EUR 77.00 / 3 days electricity 20' EUR 20.00 / day 38.00 / day
and monitoring 40' EUR 30.00 / day 59.00 / day
thereafter EUR 18.00 / day / container 45' EUR 37.00 / day 74.00 / day
Reefers EUR 55.00 / day 110.00 / day
Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
Freight quotations for door and quay shipments for EUR 55.00 / day 110.00 / day
reefer containers include electricity and monitoring
for three days, counted from day of arrival. 1.6 FIELD RENT / QUAY RENT
1.3 FREE LOADING / DISCHARGING TIME OF 1.6.1 Containers
CONTAINER ONLY FOR DOOR-DELIVERIES (full and empy)
First 7 days free
Free time for loading 1 hour free Day 8 till day 10 EUR 1.25 / 20' - 30' / day
Free time for unloading 1 hour free EUR 2.45 / 40' - 45' / day
thereafter EUR 75.00 / started hour
EUR 105.00 / started hour / Day 11 till day 20 EUR 1.75 / 20' - 30' / day
sideloader EUR 3.50 / 40' - 45' / day
1.4 MERCHANT HAULAGE FOR Day 21 and onwards EUR 3.30 / 20' - 30' / day
QUAY, FREE -IN AND FREE-OUT TERMS EUR 6.55 / 40' - 45' / day
1.4.1. Port lifts 1.6.2 IMDG containers
(full and empy)
On truck EUR 26.00 / container No free dayOff truck EUR 26.00 / container Day 1 and onwards EUR 6.85 / 20' - 30' / day
EUR 13.70 / 40' - 45' / day
1.8 Administration fee
Applies to invoice raised for extra reefer connection
at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
quay/field rent and any extra costs
EUR 21.00 / invoice
AARHUS - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight)
cannot be collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage,
detention, port dues, container cleaning and truck demurrage.
July 2018
Version 8.2
Both import and export freight quotations for door and quay shipments for 1.5 CONTAINER RENT / CONTAINER DETENTION
all container types already include THC and ISPS costs. (amounts per container)
1.1 LOCAL CHARGES Free days 8 -14 days as from 15th day
20' 7 € 20 / day € 40 / day
Bill of lading EUR 36.00 / set of document 40' 7 € 30 / day € 60 / day
Advising fee (arrival notice) EUR 36.00 / set of document 45' 7 € 37 / day € 74 / day
Reefer connection EUR 100.00 /3 days electricity and monitoring Free days 3 -12 days as from 13 th day
thereafter EUR 20.00 / day / container Reefers 2 € 90 / day € 180 / day
Weighing (Verified Gross Mass) EUR 15.00 / container if pre-advised Curtain siders 2 € 90 / day € 180 / day
EUR 50.00 /container if not pre-advised
Manifest correction EUR 35.00 / set of document
1.6 FIELD RENT / QUAY RENT
full and empty,dry units, reefer and IMO containers
1.2 FREE CARGO LOADING / DISCHARGING TIME OF First 7 days free
CONTAINER at Shipper / Consignee premises Day 8 till day 30 EUR 4.00 / 20' - 30' / day
EUR 8.00 / 40' - 45' / day
Free time for cargo loading 6 hours free
Free time for cargo unloading 6 hours free Day 30 till day 60 EUR 8.00 / 20' - 30' / day
EUR 12.00 per started hour counted from EUR 16.00 / 40' - 45' / day
1st hour of loading/unloading
Over 24 hours EUR 120.00 per day Day 61 and onwards EUR 15.00 / 20' - 30' / day
EUR 30.00 / 40' - 45' / day
1.3 MERCHANT HAULAGE FEE Open Tops, Flat Racks out of gauge On Request
Merchant haulage fee EUR 50.00 / container
Seal charge EUR 4.00 /per seal
1.7 Administration fee
Applies to invoice raised for extra reefer connection
1.4 CONTAINER CLEANING at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
The container must be returned empty at the designated Container Depot. quay/field rent and any extra costs
Unit must be returned without lashing material, any debris inside or labels. EUR 21.00 / invoice
Partial removal of hazardous cargo label is considered as label not removed
Unit must be brushed and cleaned. Concern changes need to be done for export container, in terminal
In case the container is not returned cleaned and in sound condition the following operation system (MSOL) if container is already delivered.
charges will be invoiced to the freight payer for cleaning costs. Applies to missing seal or missing number on seal, change of a container
Containerships Plc reserves the right to apply higher charges in case of extreme dirtiness. number, change of status of a container (full/empty), change of commodity,
Any damages to container will be invoiced according to interchange report or official repair change of net weight (in case of container has been weighted outside of
estimate with additional terminal/depot handling costs. the terminal), change of an owner of a container.
All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair EUR 25.00
station.
Sweeping/washing/removal
of debris/labels/lashing material EUR 185.00
Steam cleaning EUR 255.00
Chemical cleaning EUR 410.00
IMDG label attaching EUR 185.00
For 45 ‘HCRF units:
Cargo lashing bar replacement EUR 180.00
GDYNIA - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the
freight) cannot be collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to:
demurrage, detention, port dues, container cleaning and truck demurrage.
September 2018
Version 8.3
Both import and export freight quotations for door and quay
shipments for all container types already include THC and ISPS costs.
already include THC and ISPS costs. 1.5.4. Cancellation fee
if booked unit is not delivered to the Port before VGM-closing or if booking has
1.1 EXPORT LOCAL CHARGES not been cancelled before VGM-closing. EUR 151.00 /container
THC EUR 151.00 / dry container 1.6 CONTAINER CLEANING
THC EUR 151.00 / reefer container
ISPS EUR 10.00 / container The container must be returned empty at the designated Container Depot.
Port dues EUR 3.14 / ton Unit must be returned without lashing material, any debris inside or labels.
Bill of Lading fee EUR 31.00 / set of document Partial removal of hazardous cargo label is considered as label not removed
Reefer connection EUR 144.00 / 3 days electricity Unit must be brushed and cleaned.
and monitoring In case the container is not returned cleaned and in sound condition the following
thereafter EUR 33.00 / day / container charges will be invoiced to the freight payer for cleaning costs.
Verified Gross Mass EUR 17.00 /container if pre-advised Containerships plc reserves the right to apply higher charges in case of extreme dirtiness.
75.00 /container if not pre-advised Any damages to container will be invoiced according to interchange report or official repair
(CTR already on site) estimate with additional terminal/depot handling costs.
Weighing of OOG EUR 53.00 / container All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair
station.
Freight quotations for door and quay shipments for Sweeping/washing/removal
reefer containers include electricity and monitoring of debris/labels/lashing material EUR 185.00
for three days, counted from day of arrival. Steam cleaning EUR 255.00
Chemical cleaning EUR 410.00
1.2 IMPORT LOCAL CHARGES IMDG label attaching EUR 185.00
For 45 ‘HCRF units: Cargo lashing bar replacement
THC EUR 151.00 / dry container EUR 180.00
THC EUR 151.00 / reefer container
ISPS EUR 10.00 / container
Port dues / Helsinki EUR 3.14 / ton 1.7CONTAINER RENT / CONTAINER DETENTION
Advising charge EUR 31.00 / set of documents (amounts per container)
Reefer connection EUR 144.00 / 3 days electricity
and monitoring 7 days from vessel arrival until empty redelivery / 7 days from empty release until vessel departure
thereafter EUR 33.00 / day / container 8 -14 days as from 15th day
20' EUR 20.00 / day 38.00 / day
Freight quotations for door and quay shipments for 40' EUR 30.00 / day 59.00 / day
reefer containers include electricity and monitoring 45' EUR 37.00 / day 74.00 / day
for three days, counted from day of arrival. Reefers EUR 55.00 / day 110.00 / day
Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
EUR 55.00 / day 110.00 / day
1.3 CUSTOMS DOCUMENTS
1.8 FIELD RENT / QUAY RENT
T1/ EX1 EUR 80.00 / per document
1.8.1 Full containers
T2L EUR 60.00 / per document First 4 days free
Day 5 till day 8 EUR 0.53 / TEU / day
1.4 FREE LOADING / DISCHARGING TIME OF Day 9 till day 16 EUR 5.07 / TEU / day
CONTAINER ONLY FOR DOOR-DELIVERIES Day 17 till day 31 EUR 6.03 / TEU / day
Day 31 and onwards EUR 7.25 / TEU / day
Free time for loading 1 hour free
Free time for unloading 1 hour free 1.8.2 IMO containers
thereafter EUR 51.00 / started hour First day free
Extra stop for loading/ unloading address EUR 80.00 stop/ container Day 2 till day 3 EUR 13.05 / TEU / day
(include max.20km extra and 1hour free unloading/loading time) Day 4 till day 7 EUR 43.52 / TEU / day
Extra milage above 20km will be charged on top of the Day 8 till day 14 EUR 54.40 / TEU / day
mentioned additional stop cost on rate EUR 1.10 /km Day 14 and onwards EUR 67.45 / TEU / day
1.3.1. Driver assist EUR 62.00 / container1.8.3 Empty containers
1.5 MERCHANT HAULAGE ADDITIONAL First 4 days free
Day 1 till day 14 EUR 3.32 / TEU / day
1.5.1. Port lifts Day 1 till day 30 EUR 4.79 / TEU / day
Day 1 till day 45 EUR 5.81 / TEU / day
Terminal lift from / to stock EUR 59.00 / full container Day 46 and onwards EUR 7.17 / TEU / day
Terminal lift from / to stock EUR 42.00 / empty container
Equivalents in charging over 20' = 1,5 TEU
1.5.2. Terminal moves over 40' = 2,5 TEU
Move to logictics area EUR 59.00 / container
Transport within terminal 1.8.4 IMO container moves and monitoring
on / of VR wagon EUR 32.00 / container
Move to exchange area EUR 32.00 / container EUR 46.00 / container
1.5.3 free loading / unloading time 1.9 Administration fee
Applies to invoice raised for extra reefer connection
Units are allowed 48 hours from pick up time to at terminal, container cleaning, extra time for
redelivery back, thereafter container rent as per clause 1.7. loading/unloading of container, container rent,
quay/field rent and any extra costs
Charges 1.1 and 1.2 apply also. EUR 21.00 / invoice
HELSINKI - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected,
Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck
demurrage.
(max 2 items per dovcument)
January 2018
Version 8.1
Both Import and Export freight quotations 1.8 CONTAINER RENT / CONTAINER DETENTION DUBLIN & CORKfor door and quay shipments for all container types (amounts per container)already include THC and ISPS costs.
7 days free including day of arrival / departure, thereafter1.1 EXPORT LOCAL CHARGES 7-14 days as from 15th day
20' EUR 20.00 / day 38.00 / dayBill of lading EUR 56.00 / Set of document 40' EUR 30.00 / day 59.00 / dayCustoms Document EUR 75.00 / Set of document 45' EUR 37.00 / day 74.00 / dayReefer Connection EUR 128.00 3 Days Electricity & Monitoring Reefers EUR 55.00 / day 110.00 / day
Thereafter EUR 45.00 / Day / Container Curtain-siders EUR 55.00 / day 110.00 / dayVerified Gross Weight Open-tops EUR 55.00 / day 110.00 / dayBelfast GBP 25.00 / container if pre-advised
GBP 85.00 / container if not pre-advised 1.9 FIELD RENT / QUAY RENT DUBLIN & CORKCork EUR 110.00 / container if pre-advised
EUR 220.00 / container if not pre-advised 1.9.1 Full and empty containersDublin EUR 120.00 / container if pre-advised
EUR 230.00 / container if not pre-advised 7 days free including day of arrival / departure, thereafter
Freight quotations for door and quay shipments for 20' EUR 16.00 / dayreefer containers include electricity and monitoring 40' EUR 26.00 / dayfor three days, counted from day of arrival. 45' EUR 26.00 / day
Reefers EUR 46.00 / day1.2 IMPORT LOCAL CHARGES Curtain-siders EUR 46.00 / day
Open-tops EUR 46.00 / dayAdvising Charge EUR 56.00 / Set of documentCustoms Document EUR 95.00 / Set of document 2.0 CONTAINER RENT / CONTAINER RENT DETENTIONReefer Connection EUR 128.00 3 Days Electricity & Monitoring FIELD RENT / QUAY RENT BELFAST
Thereafter EUR 45.00 / Day / Container2.0.1 Full and empty containers / Belfast
Freight quotations for door and quay shipments for reefer containers include electricity and monitoring 7 days free including day of arrival / departure, thereafterfor three days, counted from day of arrival. Day 8 till day 14
1.3 FREE LOADING / DISCHARGING TIME OF 20' GBP 26.00 / day40' GBP 46.00 / day
Free time for loading 2 hours free 45' GBP 46.00 / dayFree time for unloading 2 hours free Reefers GBP 46.00 / dayDublin & Cork EUR 65.00 / started hour Curtain-siders GBP 46.00 / dayBelfast GBP 65.00 / started hour Open-tops GBP 46.00 / day
Day 15 and onwards1.4 IMO HAULAGE SURCHARGE
20' GBP 36.00 / day25% Additional to be added to ITS Haulage Tariffs 40' GBP 57.00 / day
45' GBP 57.00 / dayReefers GBP 57.00 / day
1.5 CONTAINER CLEANING Curtain-siders GBP 57.00 / dayOpen-tops GBP 57.00 / day
The container must be returned empty at the designated Container Depot. Unit must be returned without labels, lashing material or any debris inside 3.0 IMO FIELD RENT / QUAY RENT DUBLIN, CORK & BELFASTUnit must be brushed and cleaned.In case the container is not returned cleaned and in sound condition First 3 Days freethe following charges will be invoiced to the freight payer for cleaning costs. Thereafter EUR 95 per Day per ContainerContainerships Plc reserves the right to apply higher cherges in case of extreme dirtiness. 4.0 Administration feeAny damages to container will be invoiced according to interchange report Applies to invoice raised for extra reefer connectionor official repair estimate with additional terminal/depot handling costs. at terminal, container cleaning, extra time for All following costs includes terminal / depot shunts and lifts in/out for loading/unloading of container, container rent,cleanings or repair station. quay/field rent and any extra costs
EUR 21.00 / invoiceSweeping/washing/removal of debris/labels/lashing material EUR 185.00Steam cleaning EUR 255.00Chemical cleaning EUR 410.00IMDG label removal EUR 185.00For 45' HCRF units;Cargo lashing bar replacement EUR 180.00
IRISH PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight)
cannot be collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention,
port dues, container cleaning and truck demurrage.
January 2018
Version 8.1
Both import and export freight quotations 1.6 CONTAINER CLEANING
for door and quay shipments for all container typesalready include THC and ISPS costs. The container must be returned empty at the designated Container Depot.
Unit must be returned without lashing material, any debris inside or labels.
1.1 EXPORT LOCAL CHARGES Partial removal of hazardous cargo label is considered as label not removed
Unit must be brushed and cleaned.
Extra handlings(THC) full units EUR 77.00 / container In case the container is not returned cleaned and in sound condition the following
Extra handlings(THC) empty units EUR 41.00 / container charges will be invoiced to the freight payer for cleaning costs.
Bill of lading EUR 36.00 / set of document Containerships plc reserves the right to apply higher charges in case of extreme dirtiness.
Any damages to container will be invoiced according to interchange report or official repair
1.2 IMPORT LOCAL CHARGES estimate with additional terminal/depot handling costs.
All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair
Extra handlings(THC) full units EUR 77.00 / container station.
Extra handlings(THC) empty units EUR 41.00 / container Sweeping/washing/removal
Advising charge EUR 36.00 / set of document of debris/labels/lashing material EUR 175.00
Steam cleaning EUR 200.00
1.3 FREE LOADING / DISCHARGING TIME OF Chemical cleaning EUR 410.00
CONTAINER ONLY FOR DOOR-DELIVERIES IMDG label attaching EUR 185.00
For 45 ‘HCRF units:
Free time for loading/unloading 2 Hrs Cargo lashing bar replacement EUR 180.00
> 2 hrs EUR 62.00 / container
Extra stop for second loading address EUR 77.00 / stop / container 1.7 CONTAINER RENT / CONTAINER DETENTION
Extra stop for second unloading address EUR 77.00 / stop / container (amounts per container)
Extra stop for customs/doc/check/house EUR 77.00 / stop / container
above plus kilometers variances 7 days from train arrival until empty redelivery / 7 days from empty release until train departure.
Charges 1.1 apply also. 8-14 days as from 15th day
IMO Possible on request 20' EUR 20.00 / day 38.00 / day
Tipping chassis EUR 133.00 / container 40' EUR 30.00 / day 59.00 / day
45' EUR 37.00 / day 74.00 / day
Reefers EUR 55.00 / day 110.00 / day
1.4 CUSTOMS OR OTHER AUTHORITIES INSPECTION Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
In Rotterdam Customs or other authorities (Veterinary, Phito or others) EUR 55.00 / day 110.00 / day
may carry out inspection of containers contents in which case
the following charges will be applicable: 1.8.1 FIELD RENT / QUAY RENT ROTTERDAMT1/T2L/ATR documents EUR 77.00 / container (full and empty)
Above price is valid for standard (low value goods). All required information 6 days free starting as from the next day after vessel arrival
should be advised to the carrier. For more detailed information contact your Day 7 until day 17 EUR 9.00 / p.d.p.c.
local CSL customer service office. Day 18 until day 28 EUR 16.00 / p.d.p.c.
EX 1 Document EUR 77.00 / container Day 29 and onwards EUR 51.00 / p.d.p.c.
Door opening EUR 133.00 / container
Full check tba case by case 1.8.2 FIELD RENT / QUAY RENT MELZO
Customs Clearance document (excl. import
duties/vat)EUR 155.00 / container
(full and empty)
Delivery Order EUR 31.00 / set of document 3 days free including day of arrival / departure, thereafter
Manifest correctors EUR 36.00 / container Day 3 until day 10 EUR 13.00 / p.d.p.c.
Supplying seal including physical placing EUR 133.00 / container Day 11 until day 20 EUR 14.00 / p.d.p.c.
Customs Scan Rotterdam (Incl. THC & Shunt) EUR 205.00 /container Day 21 and onwards EUR 51.00 / p.d.p.c.
1.5 MERCHANT HAULAGE FOR QUAY, 1.8.3 IMO FIELD RENT / QUAY RENT both POD/POL & Inland terminals
FREE-IN AND FREE -OUT TERMS(excl tanks) IMO containers
EUR 51.00 / container (full and empty)
First 3 days free
1.5.1 Free loading / unloading time Day 4 and onwards EUR 72.00 / p.d.p.c.
Units are allowed 48 hours from pick up time to Non admitted hazardous goods class: 1, 2.1, 2.3, 5.2, 6.2, 7
redelivery back, thereafter container rent as per clause 1.7
1.9 ADMINISTRATION FEE
Charges 1.1 and 1.2 apply also. Applies to invoice raised for extra reefer connectionat terminal, container cleaning, extra time for
1.5.2 ADDITIONAL SHUNT BETWEEN RST SOUTH and RST NORTH loading/unloading of container, container rent,
For additional shunt between above mentioned terminals quay/field rent and any extra costs
following surcharge will apply: EUR 21.00 / invoice
Charges 1.1 applies x 2 EUR 82.00 / container
1.5.3 ADDITIONAL SHUNT BETWEEN RST and RSC v.v.
For additional shunt RST and Rail terminal
following surcharge will apply:
Charges 1.1 applies x 2
EUR 82.00 / container
ITALY INLAND PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be
collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container
cleaning and truck demurrage.
April 2018
Version 8.2
Both import and export freight quotations 1.4.2 free loading / unloading time
for door and quay shipments for all container types
already include THC and ISPS costs. Units are allowed 48 hours from pick up time to
redelivery back, thereafter container rent as per clause 1.6.
1.1 EXPORT LOCAL CHARGES
Charges 1.1 and 1.2 apply also.
THC EUR 102.00 / 20' dry container
THC EUR 133.00 / 40'/45' container 1.5 CONTAINER CLEANING
THC EUR 204.00 / reefer container
ISPS: EUR 15.00 / container The container must be returned empty at the designated Container Depot.
Bill of lading EUR 36.00 / set of document Unit must be returned without lashing material, any debris inside or labels.
Reefer connection EUR 92.00 / 3 days electricity Partial removal of hazardous cargo label is considered as label not removed
and monitoring Unit must be brushed and cleaned.
thereafter EUR 31.00 / day / container In case the container is not returned cleaned and in sound condition the following
Verified Gross Mass EUR 15.00 / container charges will be invoiced to the freight payer for cleaning costs.
Export Clearance EUR 50.00 / the first code Containerships plc reserves the right to apply higher charges in case of extreme dirtiness.
thereafter EUR 2.00 supplementary Any damages to container will be invoiced according to interchange report or official repair
estimate with additional terminal/depot handling costs.
Freight quotations for door and quay shipments for All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair
reefer containers include electricity and monitoring station.
for three days, counted from day of arrival.
Sweeping/washing/removal
1.2 IMPORT LOCAL CHARGES of debris/labels/lashing material EUR 185.00
Steam cleaning EUR 255.00
THC EUR 102.00 / 20' dry container Chemical cleaning EUR 410.00
THC EUR 133.00 / 40'/45' container IMDG label attaching EUR 185.00
THC EUR 204.00 / reefer container For 45 ‘HCRF units:
ISPS EUR 15.00 / container Cargo lashing bar replacement EUR 180.00
Advising fee EUR 36.00 / set of document
Documentation fee for Transit Cargo 1.6 CONTAINER RENT / CONTAINER DETENTION
with "N" status EUR 41.00 / set of document (amounts per container)
Guaranty letter charges to be confirmed by Klaipeda office
on case by case bases. 7 days from vessel arrival until empty redelivery / 7 days from empty release until vessel departure.
Reefer connection EUR 92.00 / 3 days electricity 8 -14 days as from 15th day
and monitoring 20' EUR 20.00 / day 38.00 / day
thereafter EUR 31.00 / day / container 40' EUR 30.00 / day 59.00 / day
45' EUR 37.00 / day 74.00 / day
Freight quotations for door and quay shipments for Reefers EUR 55.00 / day 110.00 / day
reefer containers include electricity and monitoring Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
for three days, counted from day of arrival. EUR 55.00 / day 110.00 / day
Cut- off time for all bookings is 14:00 for loading next day, in case 1.7 FIELD RENT / QUAY RENT
booking is placed after this timeadditional charges might apply. Liner full, shippers own full and empty container
First 7 days free
Day 8 till day 30 EUR 3.00 / 20' - 30' / day
1.3 FREE LOADING / DISCHARGING TIME OF EUR 5.00 / 40' - 45' / day
CONTAINER ONLY FOR DOOR-DELIVERIES
Day 31 till day 60 EUR 5.00 / 20' - 30' / day
1.3.1 For Lithuania / Estonia / Latvia EUR 9.00 / 40' - 45' / day
Free time for loading 3 hours free Day 61 and onwards EUR 9.00 / 20' - 30' / day
Free time for unloading 3 hours free EUR 17.00 / 40' - 45' / dayEUR 30.00 started hour
Overnight in Lithuania/ Latvia EUR 150.00 1.8 Administration fee
Applies to invoice raised for extra reefer connection
1.3.2 For Russia / Belarus / Ukraina at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
Free time for loading 2 working days quay/field rent and any extra costs
Free time for unloading 2 working days EUR 21.00 / invoice
thereafter EUR 204.00 / day
1.4 MERCHANT HAULAGE FOR
QUAY, FREE -IN AND FREE-OUT TERMS
Merchant Haulage fee EUR 52.00 / container
KLAIPEDA- PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected, Containerships will
invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck demurrage.
September 2018
Version 8.6
Page 1
Both for import and export freight quotations for door and quay shipments for all container types already include THC and ISPS costs.
1.1 LOCAL CHARGES
Following charges apply in case of extra container moves on terminal required: 1.3 CUSTOMS DOCUMENTS
T1/T2L /ATR document EUR 77.00 /per document
Gate in/out "laden" units per handling EUR 53.50 / container ( max 3 items per document )
Gate in/out " empty" units per handling EUR 43.00 / container Above price is valid for standard (low value goods). All required information
Extra handling on terminal per "laden" unit. EUR 53.50 / per handling should be advised to the carrier. For more detailed information contact your
( inspections/repairs/ etc.) local CSL customer service office.
Extra handling on terminal for "empty unit". EUR 43.00 / per handling EX 1 document EUR 77.00 /per document
( inspections/repairs/ reservation of MT cont.by cont.number / etc.) ( max 3 items per document )
Restow costs vessel-quay-vessel EUR 107.00 / container Customs clearance document.(excl.import duties&VAT) On Request
Restow costs vessel - vessel EUR 107.00 / container Manifest correctors before arrival at POD EUR 33.00 / set of document
T/S costs "laden"unit excl. Term.shunt (vessel to vessel)EUR 137.00 / container Manifest correctors after arrival at POD EUR 255.00 / set of document
T/S costs "Empty"unit excl. Term.shunt (vessel to vessel)EUR 120.00 / container Courier costs ( enveloppes / packages max 1 kg) EUR 77.00 / shipment
Lashing Straps(5 tons/9 mtr.long/50mm Wide) EUR 15.00 / set incl. Rattle. 1.3.1 Customs or other authorities inspections
Reefer connection "Liner Equipment" * Customs scans ( incl. THC & shunt) Price on case per case bases
First 3 days Electricity & Monitoring EUR 102.00 / for 3 days Phyco/Customs check ( incl. THC & shunt) Price on case per case bases
(or any part thereof) / container Whenever a pre-advice of containernumber is requested by the shipper or the
thereafter EUR 46.00 / p.day collection address the terminal needs 48 hours notice to prepare this reservation.
(or any part thereof) / container If this period is not respected extra handling costs can be applicable ( see 1.1)
Electrical S/O Tanks & Reefers * EUR 46.00 / p.day
(or any part thereof) / container
* Freight quotations for door and quay shipments for reefer containers only include 1.4 Weighing Costs (VGM)
electricity and monitoring for three days, counted from day of arrival. 1.4.1 Weighing on Sea-Terminal:
For S/O reefers or tanks which only need to be plugged on vessel ONLY additional Weighing on CTL terminal (cont. pre-announced) ** EUR 3.00 per container
charges may apply in case the equipment does not work properly. Weighing on CTL terminal (ex terminal stack) ** EUR 105.00 incl. 2 x Handling
* ALL electrical equipment which need to be plugged on quay and/or vessel needs 1.4.2 Weighing in combination with Haulage:
to have 4 pin plugs ( 380 V/32 AH / 3hrs plugs ) Weighing near Loadingpoint EUR 40.00 / container (excl. Weighing costs)
Vessel closing time for IMDG cargo * Actual weighing costs for account of shipper
- For vessels arriving in weekend:(Sat.&Sundays) Weighbridge on a maximum distance of 5 KM from Loadingpoint.
Before Friday 17:00 hrs all IMO details should be known by sending a DGN Free loadingtime starts at weighbridge
- For Vessels arriving during workdays:(Monday till Friday) Actual weighing costs when provided by CS **: EUR 60.00 / container (Outside terminal)
Before Vessel Arrival all IMO details should be known by sending a DGN ** "Power of Attorney" needed from shipper.
1.1.2 Handling costs for Free-in / Free-out shipments 1.5 CARRIERS HAULAGE FOR DOOR-DELIVERIES
THC EUR 174.00 / container
ISPS EUR 15.00 / container 1.5.1.Free loading / discharging time
Bill of lading (Export cargo) EUR 36.00 / set of document (including stuffing/ export-import documentation, inspections, etc.)
Advising Fee ( Import cargo) EUR 36.00 / set of document Free time for loading 2 hours free
Free time for unloading 2 hours free
thereafter EUR 67.00 / started hour
1.2 Terminal Additional Costs & Container Cleaning/M&R Costs. overnight stay EUR 360.00 / container
The container must be returned empty at the designated Container Depot.
Unit must be returned without labels, lashing material or any debris inside 1.5.2 Extra stop surcharge
Unit must be brushed and cleaned. Extra milage above 20 km. will be charged on top of the below mentioned additional costs
In case the container is not returned cleaned and in sound condition the following
charges will be invoiced to the freight payer for cleaning costs. For second loading / unloading address EUR 77.00 / stop / container
Containerships PLC reserves the right to apply higher charges in case of extreme dirtiness. ( incl. max. 20 km extra milage)
Any damages to container will be invoiced according to interchange report or official repair Extra stop for customs/doc/check/house EUR 77.00 / stop / container
estimate with additional terminal/depot handling costs. ( incl. max. 20 km extra milage)
All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair 1.5.3 Genset hire per day EUR 120.00 / containerstation. ( Unless otherwise stated ) 1.5.4 Tipping chassis surcharge upon requestSweeping/washing/removal 1.5.5 IMO Label & attaching by driver EUR 10.00 / per label
of debris/labels/lashing material EUR 175.00 per container ( excl. handling costs if applicable)
Steam cleaning EUR 200.00 per container ( only applicable when container has not yet been delivered to the terminal
Chemical cleaning EUR 410.00 per container otherwise par.1.2 is applicable )
IMDG label and/or seal attaching on terminal or vessel EUR 185.00 max. 4 labels per cont. 1.5.6 Surcharge for collections and deliveries with curtainside- and flat containers
Purchase IMO Label / without attaching on cont. ( Only applicable if not already added in the quotation) EUR 40.00 /container
(without THC) EUR 10.00 p.label / if available
For 45'HCRF units: Cargo lashing bar replacement EUR 180.00 per bar
Surcharge for OOG handling On Request
Change of Data: EUR 51.00 / container.
LUBECK - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected,
Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck
demurrage.
* In case "The shipper" does NOT provide the VGM or IMDG details before the official communicated deadline "The Line" has the right to postpone the booking to the next available vessel to
avoid delays during the vessel operation; extra cost due to this ( quayrent/containerrent/electricity costs/etc.) will be charged to the shipper as per Port Tariffs. The Shipper has no right to claim
any extra costs caused by the delayed departure/arrival.
This relates to import & export containers where a change of data took place such as change of beyond transportation modality, change of container status ( import, export or Transshipment )or any other change which results to an
extra yard move.
September 2018
Version 8.6
Page 2
1.6.1 ADDITIONAL COSTS IN CASE OF MERCHANT HAULAGE
FOR QUAY, FREE-IN AND FREE -OUT TERMS (excl tanks)
1.6.1.1 Free loading / unloading time
Units are allowed 48 hours from pick up time to redelivery back,
thereafter container rent as per clause 1.7 is applicable
Charges 1.1 apply also
1.6.2 X-Docking of pallets & Timber.
1.6.2.1 Additional shunt between CTL and Lehmann term.2
For additional shunt between above mentioned terminals
following surcharge will apply: EUR 85.00 / container
( excl. terminal handlings as mentioned in 1.1 )
1.6.2.3 Crossdocking on CTL ( NOT outside terminal )
following surcharge will apply: EUR 155.00 / container
Only direct FTL - FCL and v.v. ( transport by Railwagon excluded / rates on request )
Only palletized cargo / excl. Lashing material
Charges 1.1 apply also
1.6.2.4 Timber Crossdocking on Lehmann Terminal 2 ( near CTL terminal ).
Crossdocking by Rollerplate "standard" rate EUR 255.00 / per container incl. shunt to terminal 2
FYTO check / customs formalities / Port & Wharfage Fees / use of railwagon / etc.
These extra costs need to be paid by Freightpayer if receiver is not willing to pay these costs.
Charges 1.1 apply also
1.6.2.5 Timber Crossdocking on Lehmann Terminal 2 ( near CTL terminal ).
Crossdocking by Rollerplate "ALL-IN" rate EUR 325.00 / per container incl. shunt to terminal 2
timber max. 1 week.
FYTO checks / customs formalities / Port & Wharfage Fees/use of railwagon.
These extra costs need to be paid by Freightpayer if receiver is not willing to pay these extra costs.
Charges 1.1 apply also
1.7 CONTAINER RENT / CONTAINER DETENTION
(amounts per container)
7 days free including day of arrival / departure, thereafter
8-14 days as from 15th day/ day
20' EUR 20.00 / day 38.00 / day
40' EUR 30.00 / day 59.00 / day
45' EUR 37.00 / day 74.00 / day
Reefers EUR 55.00 / day 110.00 / day
Curtain-siders EUR 55.00 / day 110.00 / day
Open-tops EUR 55.00 / day 110.00 / day
Flat Racks EUR 55.00 / day 110.00 / day
1.8 FIELD RENT / QUAY RENT
1.8.1 Import & Export Containers (amount per container)
(full and empty)
6 days free starting as from the next day after vessel arrival (import) or 6 days free upto and included the day before vessel departure (export)Day 7 until day 17 EUR 9.00 / p.d.p.c.Day 18 until day 28 EUR 16.00 / p.d.p.c.
Day 29 and onwards EUR 51.00 / p.d.p.c.
1.8.2 IMO containers
(full and empty)
6 days free starting as from the next day after vessel arrival (import) or 6 days free upto and included the day before vessel departure (export)
Day 7 until day 17 EUR 72.00 / p.d.p.c.
Day 18 until day 28 EUR 102.00 / p.d.p.c.
Day 29 and onwards EUR 153.00 / p.d.p.c.
1.9 ADMINISTRATION FEE
Following fee applies to additional invoice raised for extra reefer connection at terminal, container cleaning, extra time for
loading/unloading of container, container rent, quay/field rent and any other extra costs EUR 21.00 / invoice
NO-Show Fee EUR 110.00 / container. In case booked unit will not be on the terminal before the official cut-off time.
2.0 CLAIMSIn cases of illegitimate claims, the following service items will be invoiced:
pictures/video/interchange requests EUR 77.00 / container
Individual request for gate images EUR 35.00 / container (only after confirmation of Ops. Managers)Use of salvage unit ( leaking units )/excl.THC On Request
In deviation from CSL Standard Conditions
Rate include: Extra dunnage needed / steel straps / re-bundling damaged bundles / labour costs / storage of
Rate include: Only pure X-docking by rollerplate / pictures of cargo if extra costs do apply / max.7 days storage of timber.
Rate exclude: plastic cover ( price on request) / pictures of cargo / incorrect timber packages bundling /
LUBECK - PORT TARIFF
Rate exclude: Any applicable extra costs like: extra dunnage / steel straps / plastic cover / re-bundling / labour costs
April 2018
Version 8.1
Both import and export freight quotations
for door and quay shipments for all container types
already include THC and ISPS costs.
1.1 EXPORT LOCAL CHARGES 1.5 CONTAINER CLEANING
Port Cargo Dues* NOK 167.00 / set of document The container must be returned empty at the designated Container Depot.
ISPS EUR 3.00 / container Unit must be returned without lashing material, any debris inside or labels.
Manifest corrections EUR 35.00 / set of document Partial removal of hazardous cargo label is considered as label not removed
Reefer connection EUR 40.00 / 1 day electricity Unit must be brushed and cleaned.
and monitoring In case the container is not returned cleaned and in sound condition the following
thereafter EUR 22.00 / day / container charges will be invoiced to the freight payer for cleaning costs.
Verified Gross Mass EUR 20.00 / container if pre-advised Containerships plc reserves the right to apply higher cherges in case of extreme dirtiness.
EUR 105.00 / container if not pre-advised Any damages to container will be invoiced according to interchange report or official repair
(CNT already on site ) estimate with additional terminal/depot handling costs.
Seal Charge EUR 6.00 / container All following costs includes terminal / depot shunts and liftings in/out for cleanings or repair
Vessel Mail EUR 50.00 / set of document station.
Export Clearance EUR 40.00 / up to 3 articles
thereafter EUR 5.00 / per article Sweeping/washing/removal
of debris/labels/lashing material EUR 20.00
*Port Cargo Dues are included in quotation for door shipments. IMO Label Removal/ Applying EUR 46.00
For quay shipments they are charged additionally.
1.6 CONTAINER RENT / CONTAINER DETENTION
Freight quotations for door and quay shipments for (amounts per container)
reefer containers include electricity and monitoring
for one day, counted from day of arrival. 7 days from vessel arrival until empty redelivery / 7 days from empty release until vessel departure
8 -14 days as from 15th day
1.2 IMPORT LOCAL CHARGES 20' EUR 20.00 / day 38.00 / day
40' EUR 30.00 / day 59.00 / day
Port Cargo Dues* NOK 167.00 / set of document 45' EUR 37.00 / day 74.00 / day
Import Process Fee* NOK 184.00 / set of document Reefers EUR 55.00 / day 110.00 / day
ISPS EUR 3.00 / container Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
Manifest corrections EUR 35.00 / set of document EUR 55.00 / day 110.00 / day
Reefer connection EUR 40.00 / 1 day electricity
and monitoring 1.7 FIELD RENT / QUAY RENT
thereafter EUR 22.00 / day / container
Seal Charge EUR 6.00 / container 1.7.1 Import Containers
Vessel Mail EUR 50.00 / set of document
Import Clearance EUR 40.00 / up to 3 articles First 2 days free
thereafter EUR 5.00 / per article Day 3 - 6 EUR 14.00 / 20' / day
EUR 28.00 / 40' / day
*Port Cargo Dues and Import Process Fee are included in quotation EUR 28.00 / 45' / day
for door shipments. For quay shipments they are charged additionally.
Day 7 onwards EUR 28.00 / 20' / day
Freight quotations for door and quay shipments for EUR 56.00 / 40' / day
reefer containers include electricity and monitoring EUR 56.00 / 45' / day
for one day, counted from day of arrival.
1.7.1 Export Containers
1.3 FREE LOADING / DISCHARGING TIME OF
CONTAINER ONLY FOR DOOR-DELIVERIES First 7 days free
Day 8-14 EUR 10.00 / 20' / day
1.3.1 For Norway EUR 20.00 / 40' / day
EUR 20.00 / 45' / day
Free time for loading 1 hour, afterwards 74 EUR/h
ADR/IMO EUR 45.00 Day 15 onwards EUR 20.00 / 20' / day
Free time for unloading 1 hour, afterwards 74 EUR/h EUR 40.00 / 40' / day
Extra Drop en route EUR 60.00 EUR 40.00 / 45' / day
1.3.2 Cancellation of transportation fee * OOG + 100% at storage charges
In case of overnight stay, double haulage tariff applies.
* TEU count:
1.4 MERCHANT HAULAGE FOR 20', 23' , 25', 26' = 1 TEU
QUAY, FREE -IN AND FREE-OUT TERMS 30', 40', 45' = 2 TEU
1.4.1. Port lifts
On truck / Off truck empty unit EUR 30.00 / container
On truck / Off truck full unit EUR 30.00 / container
1.4.2 free loading / unloading time
Same charges apply as per clause 1.6.
Charges 1.1 and 1.2 apply also.
OSLO - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected, Containerships will invoice those costs to the party responsible for the payment of the
freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck demurrage.
May 2018
Version 8.2
Both import and export freight quotations
for door and quay shipments for all container types
already include THC and ISPS costs.
1.1 EXPORT LOCAL CHARGES 1.7 CONTAINER RENT / CONTAINER DETENTION
full and empty, dry units no special equipment
FOB shipments are not accepted. 7 days free including day of arrival / departure, thereafter
Bill of lading EUR 36.00 / set of document 20' 40'/45
Verified gross weight : 8-11 days EUR 31.00 / p.d.p.c. 62.00 / p.d.p.c.
Leixoes EUR 15.00 /container if pre-advised 12-17 days EUR 48.00 / p.d.p.c. 96.00 / p.d.p.c.
Setubal EUR 16.00 /container if pre-advised as from 18th day EUR 73.00 / p.d.p.c. 146.00 / p.d.p.c.
full and empty, all reefer units special equipment 1.2 IMPORT LOCAL CHARGES 3 days free including day of arrival / departure, thereafter
4-11 days EUR 91.00 / p.d.p.c.
FOB shipments are not accepted. 12-17 days EUR 182.00 / p.d.p.c.
Documentation fee EUR 36.00 / set of document as from 18th day EUR 364.00 / p.d.p.c.
1.3 FREE LOADING / DISCHARGING TIME OF
CONTAINER ONLY FOR DOOR-DELIVERIES 1.8 FIELD RENT / QUAY RENT
full and empty, dry units no special equipment
Free time for loading/unloading 2 hours fee 5 days free including day of arrival / departure, thereafter
therefter EUR 70.00 / standart hour 20' 40'/45
6-11 days EUR 30.00 / p.d.p.c. 60.00 / p.d.p.c.
1.4 CUSTOMS OR OTHER AUTHORITIES INSPECTION 12-17 days EUR 50.00 / p.d.p.c. 100.00 / p.d.p.c.
as from 18th day EUR 75.00 / p.d.p.c. 150.00 / p.d.p.c.
T1/ T2L EUR 25.00 / set of document
EUR1 EUR 45.00 / set of document full and empty, all reefer units special equipment
EX1 document EUR 70.00 2 days free including day of arrival / departure, thereafter
Customs clearance document EUR 70.00 3-11 days EUR 70.00 / p.d.p.c.
12-17 days EUR 140.00 / p.d.p.c.
as from 18th day EUR 210.00 / p.d.p.c.
1.5 MERCHANT HAULAGE FOR QUAY,
FREE-IN AND FREE -OUT TERMS
EUR 51.00 / container
1.9 ADMINISTRATION FEE
Applies to invoice raised for extra reefer connection
1.6 CONTAINER CLEANING at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
The container must be returned empty at the designated Container Depot. quay/field rent and any extra costs
Unit must be returned without lashing material, any debris inside or labels.
Partial removal of hazardous cargo label is considered as label not removed EUR 21.00 / invoice
Unit must be brushed and cleaned.
In case the container is not returned cleaned and in sound condition the
following charges will be invoiced to the freight payer for cleaning costs.
Containerships Plc reserves the right to apply higher charges in case
of extreme dirtiness.
Any damages to container will be invoiced according to interchange report
or official repair estimate with additional terminal/depot handling costs.
All following costs includes terminal / depot shunts and lifts in/out for cleanings
or repair station.
Sweeping/washing/removal
of debris/labels/lashing material EUR 185.00
Steam cleaning EUR 255.00Chemical cleaning EUR 410.00
IMDG label attaching EUR 185.00
For 45 ‘HCRF units:
Cargo lashing bar replacement EUR 181.00
PORTUGAL - PORT TARIFF
/ set of document
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not
paying the freight) cannot be collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include
but are not limited to: demurrage, detention, port dues, container cleaning and truck demurrage.
/ set of document
April 2018
Version 8.2
Both import and export freight quotations 1.4.2 free loading / unloading time
for door and quay shipments for all container types
already include THC and ISPS costs. Units are allowed 48 hours from pick up time to
redelivery back, thereafter container rent as per clause 1.6.
1.1 EXPORT LOCAL CHARGES
Charges 1.1 and 1.2 apply also.
THC EUR 102.00 / 20' dry container
THC EUR 133.00 / 40'/45' container 1.4.3 Overweight surcharge for land transport in Latvia
THC EUR 194.00 / reefer container
ISPS EUR 6.00 / container First 1 ton up to 1,5 ton over allowed weight limit: EUR 30.00
Bill of lading EUR 31.00 / set of document from 1,5 ton up to 2 ton EUR 60.00
Manifest correctors EUR 35.00 / set of document over 2 ton EUR 100.00
Reefer connection EUR 62.00 / 3 days electricity
and monitoring
thereafter EUR 31.00 / day / container
Verified Gross Mass EUR 15.00 / container if pre-advised
EUR 50.00 / container if not pre-advised 1.5 CONTAINER CLEANING
(CNT already on site )
The container must be returned empty at the designated Container Depot.
Freight quotations for door and quay shipments for Unit must be returned without lashing material, any debris inside or labels.
reefer containers include electricity and monitoring Partial removal of hazardous cargo label is considered as label not removed
for three days, counted from day of arrival. Unit must be brushed and cleaned.
In case the container is not returned cleaned and in sound condition the following
1.2 IMPORT LOCAL CHARGES charges will be invoiced to the freight payer for cleaning costs.
Containerships plc reserves the right to apply higher cherges in case of extreme dirtiness.
THC EUR 102.00 / 20' dry container Any damages to container will be invoiced according to interchange report or official repair
THC EUR 133.00 / 40'/45' container estimate with additional terminal/depot handling costs.
THC EUR 194.00 / reefer container All following costs includes terminal / depot shunts and liftings in/out for cleanings or repair
ISPS EUR 6.00 / container station.
Advising charge EUR 31.00 / set of document
Manifest correctors EUR 35.00 / set of document Sweeping/washing/removal
Reefer connection EUR 62.00 / 3 days electricity of debris/labels/lashing material EUR 185.00
and monitoring Steem cleaning EUR 255.00
thereafter EUR 31.00 / day / container Chemical cleaning EUR 410.00
IMDG label attaching EUR 185.00
Freight quotations for door and quay shipments for For 45 ‘HCRF units:
reefer containers include electricity and monitoring Cargo lashing bar replacement EUR 180.00
for three days, counted from day of arrival.
1.6 CONTAINER RENT / CONTAINER DETENTION
1.3 FREE LOADING / DISCHARGING TIME OF (amounts per container)
CONTAINER ONLY FOR DOOR-DELIVERIES
7 days from vessel arrival until empty redelivery / 7 days from empty release until vessel departure
1.3.1 For Lithuania / Estonia / Latvia 8 -14 days as from 15th day
20' EUR 20.00 / day 38.00 / day
Free time for loading 3 hours, afterwards 31 EUR/H 40' EUR 30.00 / day 59.00 / day
Free time for unloading 3 hours, afterwards 31 EUR/H 45' EUR 37.00 / day 74.00 / day
EUR 153.00 / started day Reefers EUR 55.00 / day 110.00 / day
Weekend collection/delivery EUR 50.00 / container Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
IMO/ADR collection/delivery EUR 50.00 / container EUR 55.00 / day 110.00 / day
Bonded collection/delivery EUR 50.00 / container
1.7 FIELD RENT / QUAY RENT1.3.2 For Russia / Belarus / Ukraina
1.7.1 Full containers
48 hours free for customs clearance and unloading,
thereafter detention of EUR 200 per day First 7 days freeDay 8 and onwards EUR 4.00 / 20' - 30' / day
1.3.3 Cancelation of transportation fee EUR 7.50 / 40' - 45' / day
In case booked transportation is cancelled after 15:00 day before
planned pick-up or delivery cancellation cost of 100 EUR applies 1.7.2 Empty containers
1.4 MERCHANT HAULAGE FOR First 7 days free
QUAY, FREE -IN AND FREE-OUT TERMS Day 8 and onwards EUR 4.00 / 20' - 30' / dayEUR 7.50 / 40' - 45' / day
1.4.1. Port lifts
On truck / Off truck empty unit EUR 26.00 / container 1.9 Administration fee
On truck / Off truck full unit EUR 36.00 / container Applies to invoice raised for extra reefer connection
at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
quay/field rent and any extra costs
EUR 21.00 / invoice
RIGA- PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be
collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues,
container cleaning and truck demurrage.
April 2018
Version 8.4
Page 1
Both for import and export freight quotations for door and quay shipments for all container types already include THC and ISPS costs.
1.1 LOCAL CHARGES
Following charges apply in case of extra container moves on terminal required: 1.3 CUSTOMS DOCUMENTS
T1/T2L /ATR document EUR 77.00 /per document
Gate in/out "laden" units per handling EUR 51.00 / container ( max 3 items per document )
Gate in/out " empty" units per handling EUR 41.00 / container Above price is valid for standard (low value goods). All required information
Extra handling on terminal per "laden" unit. EUR 51.00 / per handling should be advised to the carrier. For more detailed information contact your
( inspections/repairs/ etc.) local CSL customer service office.
Extra handling on terminal for "empty unit". EUR 41.00 / per handling EX 1 document EUR 77.00 /per document
( inspections/repairs/ etc.) ( max 3 items per document )
Restow costs vessel-quay-vessel EUR 102.00 / container Customs clearance document.(excl.import duties&VAT) EUR 155.00 / container
Restow costs vessel - vessel EUR 102.00 / container Manifest correctors before arrival at POD EUR 33.00 / set of document
T/S costs "laden"unit excl. Term.shunt (vessel to vessel)EUR 160.00 / container Manifest correctors after arrival at POD EUR 255.00 / set of document
T/S costs "Empty"unit excl. Term.shunt (vessel to vessel)EUR 120.00 / container Courier costs ( enveloppes / packages max 1 kg) EUR 77.00 / shipment
Lashing Straps(5 tons/9 mtr.long/50mm Wide) EUR 15.00 / set incl. Rattle. 1.3.1 Customs or other authorities inspections
Reefer connection "Liner Equipment" * Customs scans ( incl. THC & shunt) EUR 205.00 / container
First 3 days Electricity & Monitoring EUR 113.00 / for 3 days Phyco/Customs check Price on case per case bases
(or any part thereof) / container Whenever a pre-advice of containernumber is requested by the shipper or the
thereafter EUR 46.00 / p.day collection address the terminal needs 48 hours notice to prepare this reservation.
(or any part thereof) / container If this period is not respected extra handling costs can be applicable ( see 1.1)
Electrical S/O Tanks & Reefers * EUR 46.00 / p.day
(or any part thereof) / container
* Freight quotations for door and quay shipments for reefer containers only include 1.4 Weighing Costs (VGM)
electricity and monitoring for three days, counted from day of arrival. 1.4.1 Weighing on Sea-Terminal:
For S/O reefers or tanks which only need to be plugged on vessel ONLY additional Weighing on RST terminal (cont. pre-announced) ** EUR 60.00 per container
charges may apply in case the equipment does not work properly. Weighing on RST terminal (ex terminal stack) ** EUR 111.00 incl. 1 x Handling
* ALL electrical equipment which need to be plugged on quay and/or vessel needs 1.4.2 Weighing in combination with Haulage:
to have 4 pin plugs ( 380 V/32 AH / 3hrs plugs ) Weighing near Loadingpoint EUR 40.00 / container (excl. Weighing costs)
Vessel closing time for IMDG cargo * Actual weighing costs for account of shipper
- For vessels arriving in weekend:(Sat.&Sundays) Weighbridge on a maximum distance of 5 KM from Loadingpoint.
Before Friday 17:00 hrs all IMO details should be known by sending a DGN Free loadingtime starts at weighbridge
- For Vessels arriving during workdays:(Monday till Friday) Actual weighing costs when provided by CS **: EUR 60.00 / container
Before Vessel Arrival all IMO details should be known by sending a DGN ** "Power of Attorney" needed from shipper.
1.1.2 Handling costs for Free-in / Free-out shipments 1.5 CARRIERS HAULAGE FOR DOOR-DELIVERIES
THC EUR 168.00 / container
ISPS EUR 15.00 / container 1.5.1.Free loading / discharging time
Bill of lading (Export cargo) EUR 36.00 / set of document (including stuffing/ export-import documentation, inspections, etc.)
Advising Fee ( Import cargo) EUR 36.00 / set of document Free time for loading 2 hours free
Free time for unloading 2 hours free
thereafter EUR 67.00 / started hour
1.2 Terminal Additional Costs & Container Cleaning/M&R Costs. overnight stay EUR 360.00 / container
The container must be returned empty at the designated Container Depot.
Unit must be returned without labels, lashing material or any debris inside 1.5.2 Extra stop surcharge
Unit must be brushed and cleaned. Extra milage above 20 km. will be charged on top of the below mentioned additional costs
In case the container is not returned cleaned and in sound condition the following
charges will be invoiced to the freight payer for cleaning costs. For second loading / unloading address EUR 77.00 / stop / container
Containerships PLC reserves the right to apply higher charges in case of extreme dirtiness. ( incl. max. 20 km extra milage)
Any damages to container will be invoiced according to interchange report or official repair Extra stop for customs/doc/check/house EUR 77.00 / stop / container
estimate with additional terminal/depot handling costs. ( incl. max. 20 km extra milage)
All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair 1.5.3 Genset hire per day EUR 120.00 / containerstation. ( Unless otherwise stated ) 1.5.4 Tipping chassis surcharge upon requestSweeping/washing/removal 1.5.5 IMO Label & attaching by driver EUR 10.00 / per label
of debris/labels/lashing material EUR 175.00 per container ( excl. handling costs if applicable)
Steam cleaning EUR 200.00 per container ( only applicable when container has not yet been delivered to the terminal
Chemical cleaning EUR 410.00 per container otherwise par.1.2 is applicable )
IMDG label and/or seal attaching on terminal or vessel EUR 185.00 max. 4 labels per cont. 1.5.6 Surcharge for collections and deliveries with curtainside- and flat containers
Purchase IMO Label / without attaching on cont. ( Only applicable if not already added in the quotation) EUR 40.00 /container
(without THC) EUR 10.00 p.label / if available
For 45'HCRF units: Cargo lashing bar replacement EUR 180.00 per bar
Surcharge for OOG handling On Request
Change of Data: EUR 51.00 / container.
ROTTERDAM - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected,
Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck
demurrage.
This relates to import & export containers where a change of data took place such as change of beyond
transportation modality, change of container status ( import, export or Transshipment )or any other
change which results to an extra yard move.
* In case "The shipper" does NOT provide the VGM or IMDG details before the official communicated deadline "The Line" has the right to postpone the booking to the next available vessel to
avoid delays during the vessel operation; extra cost due to this ( quayrent/containerrent/electricity costs/etc.) will be charged to the shipper as per Port Tariffs. The Shipper has no right to claim
any extra costs caused by the delayed departure/arrival.
April 2018
Version 8.4
Page 2
1.6 ADDITIONAL COSTS IN CASE OF MERCHANT HAULAGE
FOR QUAY, FREE-IN AND FREE -OUT TERMS (excl tanks)
1.6.1 Free loading / unloading time
Units are allowed 48 hours from pick up time to redelivery back,
thereafter container rent as per clause 1.7 is applicable
Charges 1.1 apply also
1.6.2 Additional internal shunt between RST SOUTH and RST NORTH
For additional shunt between above mentioned terminals
following surcharge will apply: EUR 85.00 / container
( Incl. terminal handlings )
1.6.3 Additional internal shunt between RST and RSC / Mainport or Kramer and v.v.
For additional shunt RST and Rail terminal
following surcharge will apply: EUR 85.00 / container
( incl. terminal handlings )
1.6.4 Cross-docking
Only direct FTL - FCL and v.v. EUR 230.00 / container
Only palletized cargo / excl. Lashing material
1.6.5 Cross-docking Timber by Rollerplate: upon request
1.7 CONTAINER RENT / CONTAINER DETENTION
(amounts per container)
7 days free including day of arrival / departure, thereafter
8-14 days as from 15th day/ day
20' EUR 20.00 / day 38.00 / day
40' EUR 30.00 / day 59.00 / day
45' EUR 37.00 / day 74.00 / day
Reefers EUR 55.00 / day 110.00 / day
Curtain-siders EUR 55.00 / day 110.00 / day
Open-tops EUR 55.00 / day 110.00 / day
Flat Racks EUR 55.00 / day 110.00 / day
1.8 FIELD RENT / QUAY RENT
1.8.1 Import & Export Containers (amount per container)
(full and empty)
6 days free starting as from the next day after vessel arrival (import) or 6 days free upto and included the day before vessel departure (export)
Day 7 until day 17 EUR 9.00 / p.d.p.c.
Day 18 until day 28 EUR 16.00 / p.d.p.c.
Day 29 and onwards EUR 51.00 / p.d.p.c.
1.8.2 IMO containers
(full and empty)
6 days free starting as from the next day after vessel arrival (import) or 6 days free upto and included the day before vessel departure (export)
Day 7 until day 17 EUR 72.00 / p.d.p.c.
Day 18 until day 28 EUR 102.00 / p.d.p.c.
Day 29 and onwards EUR 153.00 / p.d.p.c.
1.9 ADMINISTRATION FEEFollowing fee applies to additional invoice raised for extra reefer connection at terminal, container cleaning, extra time for
loading/unloading of container, container rent, quay/field rent and any extra costs EUR 21.00 / invoice
NO-Show Fee EUR 110.00 / container. In case booked unit will not be on the terminal before the official cut-off time.
2.0 CLAIMS
In cases of illegitimate claims, the following service items will be invoiced:
pictures/video/interchange requests EUR 77.00 / container
Individual request for gate images EUR 35.00 / container (only after confirmation of Ops. Managers)
Use of salvage unit ( leaking units )/excl.THC EUR 225.00 / p.day p.container ( if not in use by other carriers)
ROTTERDAM - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected,
Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck
demurrage.
January 2018
Version 8.1
page 1
Both import and export freight quotations
for door and quay shipments for all container types
already include THC and ISPS costs.
1.1 EXPORT LOCAL CHARGES 1.4 CUSTOMS OR OTHER AUTHORITIES INSPECTION
FOB shipments are not accepted. Bilbao
Bill of lading EUR 36.00 / set of document T1 EUR 70 / set of document
Verified gross weight : T2L EUR 60 / set of document
Bilbao EUR 15.00 /container if pre-advised EUR1 EUR 20 / set of document
Cartargena EUR 15.00 /container if pre-advised EX 1 EUR 60.00 / one container
Sevilla EUR 35.00 /container if pre-advised Each additional container EUR 6.00 /container
Huelva EUR 15.00 /container if pre-advised
Algeciras EUR 35.00 /container if pre-advised Vigo
Vigo EUR 10.00 /container if pre-advised T1/T2L EUR 35.00 / set of document
EUR1 EUR 15.00 / set of document
1.2 IMPORT LOCAL CHARGES EX 1 EUR 65.00 / set of document
Customs clearance document EUR 120.00 / set of document
FOB shipments are not accepted.
Documentation fee EUR 36.00 / set of document Cartargena, Sevilla, Huelva, Algeciras
T1/ T2L/ EUR1 / EX 1 EUR 60.00 / set of document
Customs clearance document EUR 120.00 / set of document
1.3 FREE LOADING / DISCHARGING TIME OF
CONTAINER ONLY FOR DOOR-DELIVERIES 1.5 MERCHANT HAULAGE FOR QUAY,
FREE-IN AND FREE -OUT TERMS
Free time for loading/unloading EUR 51.00 / container
Bilbao 3 hour fee
thereafter EUR 60.00 /standed hour
Barcelona/ Valencia/ Madrid 2 hour fee 1.6 CONTAINER CLEANING
thereafter EUR 45.00 /standed hour
The container must be returned empty at the designated Container Depot.
Algeciras/Sevilla 2 hour fee Unit must be returned without lashing material, any debris inside or labels.
thereafter EUR 70.00 /standed hour Partial removal of hazardous cargo label is considered as label not removed
Unit must be brushed and cleaned.
Cartargena/Huelva 2 hour fee In case the container is not returned cleaned and in sound condition the
thereafter EUR 80.00 /standed hour following charges will be invoiced to the freight payer for cleaning costs.
Containerships Plc reserves the right to apply higher charges in case
Extra stop for second loading/unloading of extreme dirtiness.
place on request Any damages to container will be invoiced according to interchange report
or official repair estimate with additional terminal/depot handling costs.
All following costs includes terminal / depot shunts and lifts in/out for cleanings
or repair station.
Sweeping/washing/removal
of debris/labels/lashing material EUR 185.00
Steam cleaning EUR 255.00
Chemical cleaning EUR 410.00
IMDG label attaching EUR 185.00
For 45 ‘HCRF units:
Cargo lashing bar replacement EUR 180.00
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected,
Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and
truck demurrage.
SPAIN - PORT TARIFF
January 2018
Version 8.1
page 2
1.7 CONTAINER RENT / CONTAINER DETENTION 1.8.2 Barcelona/ Valencia/ Madrid via railheads
full and empty, dry units no special equipment
5 days free including day of arrival / departure, thereafter full and empty, dry units and special equipment
20' 40'/45 2 days free including day of arrival/ deparure, thereafter
6-18 days EUR 15.00 / p.d.p.c. 25.00 / p.d.p.c. 20' 40'/45
as from 19th day EUR 30.00 / p.d.p.c. 50.00 / p.d.p.c. 3- 7 days EUR 31.00 / p.d.p.c. 62.00 / p.d.p.c.
as from 8th day EUR 48.00 / p.d.p.c. 96.00 / p.d.p.c.
full and empty, all reefer units special equipment
3 days free including day of arrival / departure, thereafter
20' 40'/45 1.8.3 Cartargena/ Sevilla/ Algeciras
4-17 days EUR 30.00 / p.d.p.c. 50.00 / p.d.p.c.
as from 18th day EUR 60.00 / p.d.p.c. 100.00 / p.d.p.c. Export
full and empty, dry units and special equipment
7 days free including day of deparure, thereafter
1.8 FIELD RENT / QUAY RENT as from 8th day EUR 15.00 / p.d.p.c.
1.8.1 Bilbao
Export Import
full and empty, dry units no special equipment full and empty, dry units and special equipment
8 days free including day of deparure, thereafter 5 days free including day of arrival, thereafter
20' 40'/45
9-30 days EUR 1.60 / p.d.p.c. 3.20 / p.d.p.c. 6-7 days EUR 10.00 / p.d.p.c.
as from 30th day EUR 3.50 / p.d.p.c. 7.00 / p.d.p.c. as from 8th day EUR 15.00 / p.d.p.c.
full and empty, all reefer units special equipment 1.8.4 Huelva
5 days free including day of departure, thereafter full and empty, dry units and special equipment
20' 40'/45 7 days free including day of arrival/ deparure, thereafter
6-15 days EUR 3.00 / p.d.p.c. 6.00 / p.d.p.c.
as from 15th day EUR 6.00 / p.d.p.c. 12.00 / p.d.p.c. 8-14 days EUR 10.00 / p.d.p.c.
as from 15th day EUR 15.00 / p.d.p.c.
Import
full and empty, dry units no special equipment
8 days free including day of arrival, thereafter 1.8.4 Vigo
20' 40'/45
9-20 days EUR 10.00 / p.d.p.c. 20.00 / p.d.p.c. full and empty, dry units
as from 20th day EUR 15.00 / p.d.p.c. 40.00 / p.d.p.c. 7 days free including day of arrival/ deparure, thereafter
full and empty, all reefer units special equipment as from 7th day EUR 1.60 / p.d.p.c.
5 days free including day of arrival , thereafter
20' 40'/45
6-15 days EUR 10.00 / p.d.p.c. 20.00 / p.d.p.c. 1.9 ADMINISTRATION FEE
as from 15th day EUR 15.00 / p.d.p.c. 40.00 / p.d.p.c.
Applies to invoice raised for extra reefer connection
at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
quay/field rent and any extra costs
EUR 21.00 / invoice
SPAIN - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected, Containerships will invoice those costs to the party
responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck demurrage.
September 2018
Version 8.2
Both import and export freight quotations 1.6 CONTAINER CLEANING
for door and quay shipments for all container types
already include THC and ISPS costs. The container must be returned empty at the designated Container Depot.
Unit must be returned without lashing material, any debris inside or labels.
1.1 EXPORT LOCAL CHARGES Partial removal of hazardous cargo label is considered as label not removed
Unit must be brushed and cleaned.
THC GBP 115.00 / dry container In case the container is not returned cleaned and in sound condition the following
THC GBP 115.00 / reefer container charges will be invoiced to the freight payer for cleaning costs.
Bill of lading GBP 25.00 / set of document Containerships plc reserves the right to apply higher cherges in case of extreme dirtiness.
Customs entry GBP 41.00 / for first code Any damages to container will be invoiced according to interchange report or official repair
thereafter GBP 3.00 / supplemantary estimate with additional terminal/depot handling costs.
Reefer connection GBP 135.00 / 3 days electricity All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair
and monitoring station.
thereafter GBP 37.00 / day / container Sweeping/washing/removal EUR 185.00
Verified Gross Mass GBP 25.00 / container if pre-advised of debris/labels/lashing material
GBP 65.00 /container if not pre-advised Steam cleaning EUR 255.00
(CTR already on site) Chemical cleaning EUR 410.00
IMDG label attaching EUR 185.00
Freight quotations for door and quay shipments for For 45 ‘HCRF units:
reefer containers include electricity and monitoring Cargo lashing bar replacement EUR 180.00
for three days, counted from day of arrival.
1.7 CONTAINER RENT / CONTAINER DETENTION
1.2 IMPORT LOCAL CHARGES (amounts per container)
THC GBP 115.00 / dry container 7 days from vessel arrival until empty redelivery / 7 days from empty release until vessel departure
THC GBP 115.00 / reefer container 8 - 14 days as from 15th day
Advising charge GBP 22.00 / set of document 20' EUR 20.00 / day 38.00 / day
Customs entry GBP 41.00 / for first code 40' EUR 30.00 / day 59.00 / day
thereafter GBP 3.00 / supplemantary 45' EUR 37.00 / day 74.00 / day
Reefer connection GBP 135.00 / 3 days electricity Reefers EUR 55.00 / day 110.00 / day
and monitoring Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
thereafter GBP 37.00 / day / container EUR 55.00 / day 110.00 / day
Freight quotations for door and quay shipments for 1.8 FIELD RENT / QUAY RENT
reefer containers include electricity and monitoring
for three days, counted from day of arrival. 1.8.1 Full and empty containers
1.3 CUSTOMS OR OTHER AUTORITIES INSPECTION First 7 days free
Day 8 till day 14 GBP 8.00 / 20' - 30' / day
Customs X-ray GBP 100.00 / container GBP 14.50 / 40' - 45' / day
Door-opening examination GBP 150.00 / container
Partial Out-turn examination GBP 128.00 / container Day 15 and onwardsGBP 14.50 / 20' - 30' / day
Full Out-turn examination GBP 167.00 / 20' container GBP 26.00 / 40' - 45' / day
500.00 / all other sizes
1.9 Administration fee
1.4 FREE LOADING / DISCHARGING TIME OF Applies to invoice raised for extra reefer connection
CONTAINER ONLY FOR DOOR-DELIVERIES at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
Free time for loading 2 hours free / 20' - 30' quay/field rent and any extra costs
3 hours free / 40' - 45' GBP 19.00 / invoice
Free time for unloading 2 hours free / 20' - 30'3 hours free / 40' - 45'
Genset
GBP 40.00 / started hour
EUR 120.00 /40’- 45’ Reefer genset
1.5 MERCHANT HAULAGE FOR
QUAY, FREE -IN AND FREE-OUT TERMS
1.5.1. Port lifts
On truck GBP 46.00 / container
Off truck GBP 46.00 / container
1.5.2 free loading / unloading time
Units are allowed 48 hours from pick up time to
redelivery back, thereafter container rent as per clause 1.6.
Charges 1.1 and 1.2 apply also.
TEESPORT - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be
collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues,
container cleaning and truck demurrage.
January 2018
Version 8.1
Both import and export freight quotations 1.5.2 free loading / unloading time
for door and quay shipments for all container types
already include THC and ISPS costs. Units are allowed 48 hours from pick up time to
redelivery back, thereafter:
1.1 EXPORT LOCAL CHARGES Day 1 till day 7: GBP 9.00 / TEU or part thereof
THC GBP 115.00 / dry container Day 8 and onwards: GBP 17.00 / TEU or part thereof
THC GBP 115.00 / reefer container
ISPS GBP 9.00 / container Charges 1.1 and 1.2 apply also.
Bill of lading GBP 25.00 / set of document
Customs entry GBP 41.00 / for first code
thereafter GBP 3.00 / supplemantary 1.6 CONTAINER CLEANING
Reefer connection GBP 135.00 / 3 days electricity
and monitoring The container must be returned empty at the designated Container Depot.
thereafter GBP 37.00 / day / container Unit must be returned without lashing material, any debris inside or labels.
Verified Gross Mass GBP 30.00 /container Partial removal of hazardous cargo label is considered as label not removed
GBP 50.00 /container if not pre-advised Unit must be brushed and cleaned.
(CNT already on site) In case the container is not returned cleaned and in sound condition the following
Freight quotations for door and quay shipments for charges will be invoiced to the freight payer for cleaning costs.
reefer containers include electricity and monitoring Containerships plc reserves the right to apply higher charges in case of extreme dirtiness.
for three days, counted from day of arrival Any damages to container will be invoiced according to interchange report or official repair
estimate with additional terminal/depot handling costs.
1.2 IMPORT LOCAL CHARGES All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair
THC GBP 115.00 / dry container station.
THC GBP 115.00 / reefer container Sweeping/washing/removal
ISPS GBP 9.00 / container of debris/labels/lashing material EUR 185.00
Avdising charge GBP 22.00 / set of document Steam cleaning EUR 255.00
Customs entry GBP 41.00 / for first code Chemical cleaning EUR 410.00
thereafter GBP 3.00 / supplemantary IMDG label attaching EUR 185.00
Reefer connection GBP 135.00 / 3 days electricity For 45 ‘HCRF units:
and monitoring Cargo lashing bar replacement EUR 180.00
thereafter GBP 37.00 / day / container
Freight quotations for door and quay shipments for 1.7 CONTAINER RENT / CONTAINER DETENTION
reefer containers include electricity and monitoring (amounts per container)
for three days, counted from day of arrival
7 days from vessel arrival until empty redelivery / 7 days from empty release until vessel departure
1.3 CUSTOMS OR OTHER AUTORITIES INSPECTION 8 -14 days as from 15th day
20' EUR 20.00 / day 38.00 / day
Customs X-ray GBP 100 / container 40' EUR 30.00 / day 59.00 / day
Door-opening examinationGBP 113 / container 45' EUR 37.00 / day 74.00 / day
Partial Out-turn examinationGBP 150 / container Reefers EUR 55.00 / day 110.00 / day
Full Out-turn examination GBP 300 / container Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
EUR 55.00 / day 110.00 / day
1.4 FREE LOADING / DISCHARGING TIME OF
CONTAINER ONLY FOR DOOR-DELIVERIES 1.8 FIELD RENT / QUAY RENT
(Full and empty)
Free time for loading 2 hours free / 20' - 30' First 7 days free
3 hours free / 40' - 45'
Day 8 till day 14 GBP 17.00 / 20' / day
Free time for unloading 2 hours free / 20' - 30' GBP 23.00 / 30' / day3 hours free / 40' - 45' GBP 31.00 / 40' - 45' / dayGBP 40.00 / started hour
Day 15 and onwards GBP 31.00 / 20' / day
GBP 45.00 / 30' / day
1.5 MERCHANT HAULAGE FOR GBP 61.00 / 40' - 45' / day
QUAY, FREE -IN AND FREE-OUT TERMS
1.9 Administration fee
1.5.1 liftings Applies to invoice raised for extra reefer connection
at terminal, container cleaning, extra time for
On truck GBP 46.00 / container / 20' - 30' loading/unloading of container, container rent
On truck GBP 62.00 / container / 40' - 45' quay/field rent and any extra costs
GBP 19.00 / invoice
Off truck GBP 46.00 / container / 20' - 30'Off truck GBP 62.00 / container / 40' - 45'
THAMESPORT - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not
paying the freight) cannot be collected, Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include
but are not limited to: demurrage, detention, port dues, container cleaning and truck demurrage.
April 2018
Version 8.2
1.1 FREE LOADING / DISCHARGING TIME OF 1.5 CONTAINER RENT / CONTAINER DETENTION
CONTAINER ONLY FOR DOOR-DELIVERIES (amounts per container)
1.1 Rail 7 days from vessel arrival until empty redelivery / 7 days from empty release until vessel departure
Free time for loading/unloading 3 days 8 -14 days as from 15th day
4-7 days EUR 30.00 / day 20' EUR 20.00 / day 38.00 / day
as from 8 day EUR 50.00 / day 40' EUR 30.00 / day 59.00 / day
45' EUR 37.00 / day 74.00 / day
1.2 Rail + truck waiting time depends on distance from terminal: Reefers EUR 55.00 / day 110.00 / dayLess than 200 km 8 hours free Special equipment incl. curtain-siders, open-tops & flat-racks of all sizes
200-400 km 24 hours free EUR 55.00 / day 110.00 / day
More than 400 km 48 hours free
Thereafter EUR 75.00 / day 1.6 FIELD RENT
(Full and empty containers)
First day free
1.2 PAYLOADS Day 2 till day onwards EUR 20.00 / 20' - 30' / day
EUR 30.00 / 40' - 45'/ day
Rail MAX payload 30t
Rail+truck MAX payload 26t 1.7 IMO surcharge /restrictions
Truck MAX payload 20t
General Containerships restrictions for IMO cargo applies
1.3 CUSTOMS CLEARANCE IMO surcharge on haulage depends on HS-code
Import EUR 100.00 (1-5 codes) 1.8 Administration fee
Export EUR 80.00 (1-5 codes)
Applies to invoice raised for extra reefer connection
1.4 CONTAINER CLEANING at terminal, container cleaning, extra time for
loading/unloading of container, container rent,
The container must be returned empty at the designated Container Depot. EUR 21.00 / invoice
Unit must be returned without lashing material, any debris inside or labels.
Partial removal of hazardous cargo label is considered as label not removed
Unit must be brushed and cleaned.
In case the container is not returned cleaned, the following charges
will be invoiced to the consignee for deport handling and
cleaning costs.
In case of extreme dirtiness, Containerships Plc
reserves the right to apply higher charges.
Any damages will be invoiced according to interchange
report.
Basic sweeping/removal of lashing material and/or debrisEUR 185.00 / container
Steam cleaning EUR 255.00 / container
Chemical cleaning EUR 410.00 / container
IMO label attaching EUR 185.00 / container
For 45 ‘HCRF units:
Cargo lashing bar replacement EUR 185.00 / container
UKRAINE - INLAND PORT TARIFF
(higher payload available upon request)
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected,
Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck
demurrage.
January 2018
Version 8.4
Page 1
Both for import and export freight quotations for door and quay shipments for all container types already include THC and ISPS costs.
1.1 LOCAL CHARGES
Following charges apply in case of extra container moves on terminal required: 1.3 CUSTOMS DOCUMENTS
T1/T2L /ATR document EUR 77.00 /per document
Gate in/out "laden" units per handling EUR 51.00 / container ( max 3 items per document )
Gate in/out " empty" units per handling EUR 41.00 / container Above price is valid for standard (low value goods). All required information
Extra handling on terminal per "laden" unit. EUR 51.00 / per handling should be advised to the carrier. For more detailed information contact your
( inspections/repairs/ etc.) local CSL customer service office.
Extra handling on terminal for "empty unit". EUR 41.00 / per handling EX 1 document EUR 77.00 /per document
( inspections/repairs/ etc.) ( max 3 items per document )
Restow costs vessel-quay-vessel EUR 102.00 / container Customs clearance document.(excl.import duties&VAT) On Request
Restow costs vessel - vessel EUR 102.00 / container Manifest correctors before arrival at POD EUR 33.00 / set of document
T/S costs "laden"unit excl. Term.shunt (vessel to vessel)EUR 110.00 / container Manifest correctors after arrival at POD EUR 255.00 / set of document
T/S costs "Empty"unit excl. Term.shunt (vessel to vessel)EUR 110.00 / container Courier costs ( enveloppes / packages max 1 kg) EUR 77.00 / shipment
Lashing Straps(5 tons/9 mtr.long/50mm Wide) EUR 15.00 / set incl. Rattle. 1.3.1 Customs or other authorities inspections
Reefer connection "Liner Equipment" * Customs scans ( incl. THC & shunt) Price on case per case basis.
First 3 days Electricity & Monitoring EUR 113.00 / for 3 days Phyco/Customs check Price on case per case basis.
(or any part thereof) / container Whenever a pre-advice of containernumber is requested by the shipper or the
thereafter EUR 46.00 / p.day collection address the terminal needs 48 hours notice to prepare this reservation.
(or any part thereof) / container If this period is not respected extra handling costs can be applicable ( see 1.1)
Electrical S/O Tanks & Reefers * EUR 46.00 / p.day
(or any part thereof) / container
* Freight quotations for door and quay shipments for reefer containers only include 1.4 Weighing Costs (VGM)
electricity and monitoring for three days, counted from day of arrival. 1.4.1 Weighing on Sea-Terminal:
For S/O reefers or tanks which only need to be plugged on vessel ONLY additional Weighing on CSP terminal (cont. pre-announced) ** EUR 60.00 per container
charges may apply in case the equipment does not work properly. Weighing on CSP terminal (ex terminal stack) ** EUR 111.00 incl. 1 x Handling
* ALL electrical equipment which need to be plugged on quay and/or vessel needs 1.4.2 Weighing in combination with Haulage:
to have 4 pin plugs ( 380 V/32 AH / 3hrs plugs ) Weighing near Loadingpoint EUR 40.00 / container (excl. Weighing costs)
Vessel closing time for IMDG cargo * Actual weighing costs for account of shipper
- For vessels arriving in weekend:(Sat.&Sundays) Weighbridge on a maximum distance of 5 KM from Loadingpoint.
Before Friday 17:00 hrs all IMO details should be known by sending a DGN Free loadingtime starts at weighbridge
- For Vessels arriving during workdays:(Monday till Friday) Actual weighing costs when provided by CS **: EUR 60.00 / container
Before Vessel Arrival all IMO details should be known by sending a DGN ** "Power of Attorney" needed from shipper.
1.1.2 Handling costs for Free-in / Free-out shipments 1.5 CARRIERS HAULAGE FOR DOOR-DELIVERIES
THC EUR 168.00 / container
ISPS EUR 15.00 / container 1.5.1.Free loading / discharging time
Bill of lading (Export cargo) EUR 36.00 / set of document (including stuffing/ export-import documentation, inspections, etc.)
Advising Fee ( Import cargo) EUR 36.00 / set of document Free time for loading 2 hours free
Customs data fee for cargo to non-eu countries EUR 5.00 / container Free time for unloading 2 hours free
thereafter EUR 67.00 / started hour
1.2 Terminal Additional Costs & Container Cleaning/M&R Costs. overnight stay EUR 360.00 / container
The container must be returned empty at the designated Container Depot.
Unit must be returned without labels, lashing material or any debris inside 1.5.2 Extra stop surcharge
Unit must be brushed and cleaned. Extra milage above 20 km. will be charged on top of the below mentioned additional costs
In case the container is not returned cleaned and in sound condition the following
charges will be invoiced to the freight payer for cleaning costs. For second loading / unloading address EUR 77.00 / stop / container
Containerships PLC reserves the right to apply higher charges in case of extreme dirtiness. ( incl. max. 20 km extra milage)
Any damages to container will be invoiced according to interchange report or official repair Extra stop for customs/doc/check/house EUR 77.00 / stop / container
estimate with additional terminal/depot handling costs. ( incl. max. 20 km extra milage)
All following costs includes terminal / depot shunts and lifts in/out for cleanings or repair 1.5.3 Genset hire per day EUR 120.00 / containerstation. ( Unless otherwise stated ) 1.5.4 Tipping chassis surcharge upon requestSweeping/washing/removal 1.5.5 IMO Label & attaching by driver EUR 18.00 / per label
of debris/labels/lashing material EUR 175.00 per container ( excl. handling costs if applicable)
Steam cleaning EUR 200.00 per container ( only applicable when container has not yet been delivered to the terminal
Chemical cleaning EUR 410.00 per container otherwise par.1.2 is applicable )
IMDG label and/or seal attaching on terminal or vessel EUR 185.00 max. 4 labels per cont. 1.5.6 Surcharge for collections and deliveries with curtainside- and flat containers
Purchase IMO Label / without attaching on cont. ( Only applicable if not already added in the quotation) EUR 40.00 /container
(without THC) EUR 18.00 p.label / if available
For 45'HCRF units: Cargo lashing bar replacement EUR 180.00 per bar
Surcharge for OOG handling On Request
Change of Data: EUR 51.00 / container.
ZEEBRUGGE - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected,
Containerships will invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck
demurrage.
This relates to import & export containers where a change of data took place such as change of beyond
transportation modality, change of container status ( import, export or Transshipment )or any other
change which results to an extra yard move.
* In case "The shipper" does NOT provide the VGM or IMDG details before the official communicated deadline "The Line" has the right to postpone the booking to the next available vessel to
avoid delays during the vessel operation; extra cost due to this ( quayrent/containerrent/electricity costs/etc.) will be charged to the shipper as per Port Tariffs. The Shipper has no right to claim
any extra costs caused by the delayed departure/arrival.
January 2018
Version 8.4
Page 2
1.6 ADDITIONAL COSTS IN CASE OF MERCHANT HAULAGE
FOR QUAY, FREE-IN AND FREE -OUT TERMS (excl tanks)
1.6.1 Free loading / unloading time
Units are allowed 48 hours from pick up time to redelivery back,
thereafter container rent as per clause 1.7 is applicable
Charges 1.1 apply also
1.6.2 Additional shunt between CSP terminal/Zeebrugge and Verbrugge term./Zeebrugge
For additional internal shunt between above mentioned terminals
following surcharge will apply: On Request. Currently not possible.
( excl. terminal handlings )
For external shunt between Zeebrugge Sea-terminals EUR 77.00 / single trip per container
( excl. terminal handlings )
Charges 1.1 apply also
1.6.3 Cross-docking pallitized cargo
Only direct FTL - FCL and v.v. EUR 195.00 / container
1.6.4 Timber Crossdocking:
Crossdocking by Rollerplate Price on case per case bases
1.7 CONTAINER RENT / CONTAINER DETENTION
(amounts per container)
7 days free including day of arrival / departure, thereafter
8-14 days as from 15th day/ day
20' EUR 20.00 / day 38.00 / day
40' EUR 30.00 / day 59.00 / day
45' EUR 37.00 / day 74.00 / day
Reefers EUR 55.00 / day 110.00 / day
Curtain-siders EUR 55.00 / day 110.00 / day
Open-tops EUR 55.00 / day 110.00 / day
Flat Racks EUR 55.00 / day 110.00 / day
1.8 FIELD RENT / QUAY RENT
1.8.1 Import & Export Containers (amount per container)
(full and empty)
6 days free starting as from the next day after vessel arrival (import) or 6 days free upto and included the day before vessel departure (export)
Day 7 until day 17 EUR 9.00 / p.d.p.c.
Day 18 until day 28 EUR 16.00 / p.d.p.c.
Day 29 and onwards EUR 51.00 / p.d.p.c.
1.8.2 IMO containers
(full and empty)
6 days free starting as from the next day after vessel arrival (import) or 6 days free upto and included the day before vessel departure (export)
Day 7 until day 17 EUR 72.00 / p.d.p.c.
Day 18 until day 28 EUR 102.00 / p.d.p.c.
Day 29 and onwards EUR 153.00 / p.d.p.c.
1.9 ADMINISTRATION FEEFollowing fee applies to additional invoice raised for extra reefer connection at terminal, container cleaning, extra time for
loading/unloading of container, container rent, quay/field rent and any extra costs EUR 21.00 / invoice
NO-Show Fee EUR 110.00 / container. In case booked unit will not be on the terminal before the official cut-off time.
2.0 CLAIMS
In cases of illegitimate claims, the following service items will be invoiced:
pictures/video/interchange requests EUR 77.00 / container
Individual request for gate images EUR 35.00 / container (only after confirmation of Ops. Managers)
Use of salvage unit ( leaking units )/excl.THC Price on case per case basis.
ZEEBRUGGE - PORT TARIFF
In deviation from CSL Standard Conditions of Carriage 1.1.2001 and in case local costs that are invoiced to the non-contracted party (shipper or consignee not paying the freight) cannot be collected, Containerships will
invoice those costs to the party responsible for the payment of the freight. Additional costs include but are not limited to: demurrage, detention, port dues, container cleaning and truck demurrage.