Technical Guide For the Design and Construction of Tall Wood Buildings in Canada
Tall Wood Building Guide Project
Context and Purpose of the Tall Wood Building Guide (Guide)
Overview of Guide Contents
Project Timeline and Deliverables
2
Presentation Outline
25.09.2013
Confidential. For employees only. 2
Tall Wood Building Guide Project
3
Context and Purpose of the Guide
Tall Wood Building Guide Project
Support the design of tall demonstration wood buildings
Consensus document reflecting state-of-the-art
90% Draft* delivered by August 30, 2013
* “90% Draft” defined as follows: technical content substantially complete and judged technically correct by Working Group, authors, and peer reviewers; all referenced tables and figures included in the document but not yet located in the body of the text; and some figures and tables to be redone to improve appearance and consistency. Feedback from users of the “90% Draft” may be considered for implementation in the First Edition of the Guide.
4
Context for the Project
25.09.2013
Confidential. For employees only. 3
Tall Wood Building Guide Project
Tall Wood Buildings fall outside the scope of the acceptable solutions in North American building codes and design manuals for wood structures.
• The purpose of the Technical Guide is to facilitate acceptance by Authority Having Jurisdiction (AHJ) of tall wood buildings using the alternative solutions path in building codes.
• The Guide is intended to be a consensus document applicable to any tall wood building system.
• The Guide also contains recommendations pertaining to construction costing, pre-fabrication, performance monitoring, and sustainability.
5
Purpose of the Guide
Tall Wood Building Guide Project
Be consistent with the underlying code objectives for tall steel and concrete buildings for tall wood buildings in the NBCC 2010 and NECB 2011
Follow performance-based philosophy and suggest performance criteria (e.g. those developed for steel or concrete systems) where applicable and preferred methodology (e.g. whole building energy efficiency, systems approach)
Follow a generic approach that can be applied to different innovative systems (brief examples for specific systems may be given)
6
Guiding Principles
25.09.2013
Confidential. For employees only. 4
Tall Wood Building Guide Project
Develop recommendations for designing for redundancy and resiliency (e.g. to rare and extreme events such as hurricanes, earthquakes, floods, tornados; against or tolerant of moisture ingress)
Make recommendations for attributes or for addressing issues that are not explicitly covered in the Canadian codes (e.g. disproportionate collapse, provisions for maintenance / inspections / monitoring)
Develop recommendations on how to: assess and specify proprietary connections, products, assemblies, systems (materials selection, substitution and equivalency); carry out assessment of whole building energy efficiency; design for durability
7
Guiding Principles
Tall Wood Building Guide Project
Strive to address pressing issues with a multi-disciplinary approach, and make reference to the existing technical information
Focus on essential items (e.g. identify appropriate assumptions for wood construction) that may form the basis of a good practices guide or code change proposal for broader acceptance
Enable the monitoring and collection of feedback on the performance of demonstration projects to help update Guide
8
Guiding Principles
25.09.2013
Confidential. For employees only. 5
Tall Wood Building Guide Project
9
Project Organization
Tall Wood Building Guide Project
Organization
FPInnovations• Select Working Group and provide administrative support
• Sign PSA’s with Working Group Members and Peer Reviewers
• Staff participate as Authors, Peer Reviewers and/or Editors
Working Group (WG)• Develop the Extended Outline
• Agree on Lead and Co-Authors, and select Peer Reviewers
• Review progress and recommend adjustments to the schedule
Lead Authors and Co-Authors• Finalize content in consultation with the Working Group
• Draft and revise sections in response to Reviewer, WG and Editor comments
Peer Reviewers
10
Role and Responsibilities
25.09.2013
Confidential. For employees only. 6
Tall Wood Building Guide Project
Organization
Erol Karacabeyli, P.Eng. FPInnovations
Eric Karsh, P.Eng. Equilibrium
Michael Green, MAIBC MGA
Andrew Harmsworth, P.Eng. GHL
Dave Ricketts, P.Eng. RDH
Joe Rekab, PQS(F) BTY Group
Kevin D. Below, ing., Ph.D. Douglas Consultants
Cameron McCartney, NRC
Helen Griffin, P.Eng. CWC
11
Working Group Members
Tall Wood Building Guide Project
12
Project Timeline and Deliverables
25.09.2013
Confidential. For employees only. 7
Tall Wood Building Guide Project
Timeline and Deliverables
Working Group formed February 2013
Extended Outline approved April 25, 2013
Peer Reviewers selected April 25, 2013
Extended Outline sent to NRCan April 30, 2013
1st draft for WG review (and as reference for Lead Authors) May 30, 2013
2nd draft for peer review (peer review may start earlier) June 24, 2013
Peer reviewed draft for WG review July 24, 2013
Draft for final editing and formatting August 12, 2013
Final draft for WG review August 2013
90% Draft of the Guide delivered August 30, 2013
Release of the 1st edition of the Guide February 28, 2014
13
Key Milestones
Tall Wood Building Guide Project
Timeline and Deliverables
Activity Date
1. Project overview March 4
2. Approve draft Extended Outline April 25
3. Review 1st drafts with Lead Authors May 30
4. Approve 2nd drafts for peer review (face-to-face, Vancouver) June 26
5. Approve responses to peer comments July 25
6. Approve 90% Draft End of August*
7. Approve 1st edition of the Guide End of November 2014*
* Meeting dates to be determined.
14
Working Group Meetings
25.09.2013
Confidential. For employees only. 8
Tall Wood Building Guide Project
15
Proposed Guide Content
Tall Wood Building Guide Project
16
Proposed Content
Introduction
TheBuildingasaSystem
ConsiderationsforConceptualDesign
DesignConsiderationsandInputParametersforConnectionsandAssemblies
AdvancedAnalysisandTestingofSystemsforDesign
BuildingSoundInsulationandFloorVibrationControl
FireSafetyandProtection
BuildingEnclosure
Sustainability
PrefabricationandInspectionofAssemblies
ProjectandConstructionCosting
MonitoringandMaintenance
StructuralandServiceability
25.09.2013
Confidential. For employees only. 9
Tall Wood Building Guide Project
Proposed Content
Introduction / The Building as a System / Performance (15%)
Structural and Serviceability (43%)
Fire Safety and Protection (13%)
Building Enclosure (11%)
Prefabrication and Inspection of Assemblies (6%)
Project and Construction Costing (5%)
Monitoring and Maintenance (7%)
17
Sections – % Effort
** Based on March 4th proposed budget
Tall Wood Building Guide Project
18
Typical Section
25.09.2013
Confidential. For employees only. 10
Tall Wood Building Guide Project
Typical Section
• Review of code objectives and functional requirements (if applicable) for tall buildings
• Identify potential risks associated with using wood in tall buildings
• List the risk the mitigation measures
• Recommend approaches (models) for identifying optimum combinations of risk mitigation measures to reduce risks to “acceptable levels”
• List of References
• Appendices
19
Overview of Content
Tall Wood Building Guide Project
20
Drafting and Review Teams
25.09.2013
Confidential. For employees only. 11
Tall Wood Building Guide Project
21
Proposed Content
Introduction
TheBuildingasaSystem
Sustainability
Tall Wood Building Guide Project
Defining “Tall Wood Building”
Why wood in tall buildings?
Tall wood buildings to date
High rise wood demonstration projects
Purpose of the technical guide
Guiding principles
Organisation of the guide
22
Introduction
Lead and Co-AuthorsPeer Reviewers
Lead Author• Michael Green, MGA
Co-Authors• Erol Karacabeyli, FPInnovations
• Eric Karsh, Equilibrium
25.09.2013
Confidential. For employees only. 12
Tall Wood Building Guide Project
Architecture and structure
Integrating systems
Important considerations
Structural capacity for alterations
Building code compliance
Tall wood building system solutions - examples
23
The Building as a System
Lead and Co-AuthorsPeer Reviewers
Lead Author• Michael Green, MGA
Co-Authors• Eric Karsh, Equilibrium
• Andrew Harmsworth, GHL
• Dave Ricketts, RDH
• Joe Rekab, BTY
Peer Reviewers• Jim Taggart• Mark Lucuik, Morrison Hershfield
• Jana Foit, Perkins+Will
• Conroy Lum, FPInnovations
Tall Wood Building Guide Project
Material sourcing and forest impact
Transportation of materials
Construction waste and by-product use
Durability and longevity
Re-use and end-of-life
Impact on human health, well-being, and comfort
Tools to measure, evaluate, and certify sustainability
24
Sustainability
Lead and Co-AuthorsPeer Reviewers
Lead Author• Michael Green, MGA
Co-Authors• Helen Goodland, Brantwood
• Dave Ricketts, RDH
• Angela Lai, BTY
Peer Reviewers• Kathy Wardle, Perkins+Will
• Peter Moonen, CWC
• Jennifer O’Connor, FPInnovations
• Adam Robertson, CWC
25.09.2013
Confidential. For employees only. 13
Tall Wood Building Guide Project
25
Proposed Content
ConsiderationsforConceptualDesign
DesignConsiderationsandInputParametersforConnectionsandAssemblies
AdvancedAnalysisandTestingofSystemsforDesign
BuildingSoundInsulationandFloorVibrationControl
StructuralandServiceability
Tall Wood Building Guide Project
Considerations for conceptual design
Design considerations and input parameters for connections and assemblies
Advanced analysis and testing of systems for design
Building sound insulation and floor vibration control
26
Structural and Serviceability
Lead and Co-AuthorsPeer Reviewers
Lead Author• Eric Karsh, Equilibrium
Co-Authors• Marjan Popovski, FPInnovations
• Mohammad Mohammad, FPInnovations
Reviewers• Sylvain Gagnon, FPInnovations
25.09.2013
Confidential. For employees only. 14
Tall Wood Building Guide Project
Considerations for conceptual design
• Tall wood case studies
• Conceptual structural systems
• Practical guidelines for given heights
• Foundations for tall wood buildings
27
Structural and Serviceability
Lead and Co-AuthorsPeer Reviewers
Lead Author• Eric Karsh, Equilibrium
• Ilana Danzig, Equilibrium
Co-Authors• Kevin Below, Douglas Consultants
• Sylvain Gagnon, FPInnovations
• Michael Green, MGA
Peer Reviewers• Leung Chow, MMA
• Michael McNaught, CEI
• Grant Newfield, RJC
Tall Wood Building Guide Project
Design considerations and input parameters for connections and assemblies
• Wood-related analysis and design considerations
• Input data for connections and assemblies
28
Structural and Serviceability
Lead and Co-AuthorsPeer Reviewers
Lead Author• Kevin Below, Douglas Consultants
Co-Authors• Robert Malczyk, Equilibrium
• Mohammad Mohammad, FPInnovations
• Chun Ni, FPInnovations
• Marjan Popovski, FPInnovations
Peer Reviewers• Steve Boyd, Quaile
• Ilana Danzig, Equilibrium
• Bernhard Gafner, Fast+Epp
• Andrew Harmsworth, GHL
• Grant Newfield, RJC• Thomas Tannert, UBC
• Jasmine Wang, CWC
25.09.2013
Confidential. For employees only. 15
Tall Wood Building Guide Project
Advanced analysis and testing of systems for design
• National Building Code of Canada
• Analysis and design for gravity loads
• Analysis and design for earthquake loads
• Analysis and design for wind loads
• Design methodology for low seismic damage
• Quality assurance
29
Structural and Serviceability
Lead and Co-AuthorsPeer Reviewers
Lead Author• Mahmoud Rezai, Equilibrium
• Marjan Popovski, FPInnovations
Co-Authors• Lin Hu, FPInnovations
• John Sherstobitoff, Ausenco Sandwell
Peer Reviewers• Ron DeVall, RJC
• Erol Karacabeyli, FPInnovations
• John van de Lindt, Colorado State U.
• Jasmine Wang, CWC
Tall Wood Building Guide Project
Building sound insulation and floor vibration control
• Building sound insulation
Wall sound insulation
Floors sound insulation
Best practices
• Floor vibration control
Control of vibration induced by footsteps for occupant’s comfort
Control of vibration induced by footsteps for occupant’s comfort
Best practices
30
Structural and Serviceability
Lead and Co-AuthorsPeer Reviewers
Lead Author• Lin Hu, FPInnovations
• Stefan Schoenwal, Empa
Co-Authors• Y.H. Chui, U. New Brunswick
• Dan Dolan, Washington State U.
• Eric Karsh, Equilibrium
Peer Reviewers• Brad Gover, NRC (to be confirmed)
• Michael Green, MGA
• Jean-Luc Kouyoumji, FCBA
• Peggy Lepper, CWC
• Ciprian Pirvu, FPInnovations
25.09.2013
Confidential. For employees only. 16
Tall Wood Building Guide Project
31
Proposed Content
FireSafetyandProtection
BuildingEnclosure
PrefabricationandInspectionofAssemblies
ProjectandConstructionCosting
MonitoringandMaintenance
Tall Wood Building Guide Project
Development of a fire safe alternative solution
Provisions for high buildings
Fire resistance of assemblies and components
Flame spread rating of exposed timber
Fire separation
Fire protection of service penetrations and construction joints
Concealed spaces
Spatial separation and exposure protection
….
32
Fire Safety and Protection
Lead and Co-AuthorsPeer Reviewers
Lead Author• Andrew Harmsworth, GHL
• Christian Dagenais, FPInnovations
Co-Authors• Gary Chen, GHL
• Robert Heikkila, CFT
• Gary Lougheed, NRC• Jim Mehaffey, CHM
Peer Reviewers• George Hadjisophocleous, Carleton U.
• Angela Lai, BTY
• Tim Ryce, Deputy Chief Building Official
• Peter Senez, Sereca Larden Muniak
• Joseph Su, NRC
• Geoff Triggs, LDMG
25.09.2013
Confidential. For employees only. 17
Tall Wood Building Guide Project
Building enclosure loads
Building and energy code considerations
Building enclosure design fundamentals
Building enclosure assemblies and details
Protection and wood durability
33
Building Enclosure Design
Lead and Co-AuthorsPeer Reviewers
Lead Author• Dave Ricketts, RDH
• Graham Finch, RDH
Co-Authors• M. Lacasse, NRC
• John Straube, U. Waterloo
• Jieying Wang, FPInnovations
Peer Reviewers• Robert Jonkman, CWC
• Angela Lai, BTY
• Mark Lawton, Morrison Hershfield
• Paul Morris, FPInnovations
• Leslie Peer, RJC
• Constance Thivierge, FPInnovations
Tall Wood Building Guide Project
General
Fabrication
Execution
Inspection and records
34
Prefabrication and Inspections of Assemblies
Lead and Co-AuthorsPeer Reviewers
Lead Author• Gerry Epp, Fast+Epp
Co-Authors• Richard Aarestad, Ledcor
• John Boys, Nicola LogWorks
• Bernhard Gafner, Fast+Epp• Ciprian Pirvu, FPInnovations
Peer Reviewers• John Bowswer, Tango Management
• Robert Drew, Perkins+Will
• Sylvain Gagnon, FPInnovations
• Jens Hackethal, Styxworks
• Ken Koo, FPInnovations
• Angela Lai, BTY
• Thomas Leung, TLSE
• Robert Malczyk, Equilibrium
• Ghassan Marjaba, NRC
25.09.2013
Confidential. For employees only. 18
Tall Wood Building Guide Project
Knowledge aps in costing tall wood buildings
Procurement
Quantifying schedule benefits of prefabrication
Disposal costs and opportunity for re-use/recycling
Planning/design process/soft costs
How to develop the cost estimate
Insurance costs
35
Project and Construction Costing
Lead and Co-AuthorsPeer Reviewers
Lead Author• Joe Rekab, BTY
Co-Authors• Richard Aarestad, Ledcor
• Olivier Barjole, BTY
• Gerry Epp, Fast+Epp
• Sylvain Gagnon, FPInnovations
• Angela Lai, BTY
• Ashley Perry, BTY
Peer Reviewers• Kevin Below, Douglas Consulting
• John Davidson, Bird Construction
• Vince Tersigni, PCL
Tall Wood Building Guide Project
Short-term performance tests
Long-term performance monitoring studies
Building maintenance
36
Monitoring and Maintenance
Lead and Co-AuthorsPeer Reviewers
Lead Author• Jieying Wang, FPInnovations
• Lin Hu, FPInnovations
Co-Authors• Bruno Di Lenardo, NRC
• Eric Karsh, Equilibrium
• Dave Ricketts, RDH
Peer Reviewers• Richard Aarestad, Ledcor
• Bob Bryant, Polygon
• David Khudaverdian, Édifice Experts
• Angela Lai, BTY
25.09.2013
Confidential. For employees only. 19
Tall Wood Building Guide Project
Introduction
Structural and Serviceability• Conceptual Design Recommendations• Input Data Connections/Assemblies• Advanced Analysis & Testing• Sound Insulation & Floor Vibration Control
Fire Safety and Protection
Durability and Building Enclosure
Sustainability
Prefabrication and Inspections
Project and Construction Costs
Monitoring and Maintenance
37
SUMMARY – First Authors
Lead and Co-AuthorsPeer Reviewers
Michael Green, MGA
Eric Karsh, Equilibrium• Eric Karsh, Equilibrium• Kevin Below, Douglas Consultants• Mahmoud Rezai, Equilibrium• Lin Hu, FPInnovations
Andrew Harmsworth, GHL
Dave Ricketts, RDH
Michael Green, MGA
Gerry Epp, Fast+Epp
Joe Rekab, BTY
Jieying Wang, FPInnovations
© 2013 FPInnovations. All rights reserved. Copying and redistribution prohibited.
® FPInnovations, its marks and logos are registered trademarks of FPInnovations.
Erol Karacabeyli, P.Eng.Research Manager, Advanced Building SystemsE-mail: [email protected]. 604.222.5645
2665 East MallVancouver BCCanada V6T 1W5
38