57
ISO IMPLEMENTATION A CASE STUDY VP GUPTA CERTIFIED ENERGY AUDITOR Principal Chief Engineer (Electrical)BSNL

tamil_iso

Embed Size (px)

Citation preview

Page 1: tamil_iso

ISO IMPLEMENTATION A CASE STUDY

VP GUPTACERTIFIED ENERGY AUDITOR

Principal Chief Engineer (Electrical)BSNL

Page 2: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 2

INTRODUCTION

ISO 9001 : 2000 Certificate was awarded by STQC Directorate on 21.06.2004 and valid up to 20.06.2007 for the Electrical Wing, Tamilnadu.

For re-certification, External Audit completed in June, 2007.

Page 3: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 3

SCOOPE OF CERTIFICATION

Planning, Designing, Procuring, Installation, Monitoring, Energy Auditing, Operation and Maintenance of Electrical, Airconditioning and other Electro-mechanical Services for BSNL, Telecom, Admn Building and Staff Quarters.

Page 4: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 4

ISO 9001-2000: SCOPE

Applicable to all organizations for– demonstration of its ability to consistently provide product that meet customer and applicable regulatory requirements– aims to enhance customer satisfaction through the effective application of the system, including processes for continual improvement and the assurance of conformity to customer and applicable regulatory requirements

Page 5: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 5

ISO 9001-2000: APPLICATION

Apply all requirementsExclude only those requirements that

neither affect ability to comply with customer/regulatory requirementsnor absolve the organization of its responsibility to comply with customer/regulatory requirements

Exclusions are limited to Clause 7 onlyExclusions due to

nature of organisationnature of product

Page 6: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 6

ISO 9001-2000: TERMS & DEFINITIONS

As given in ISO 9000:2000Product -Result of a processContinual Improvement

part of the quality management system focussed on increasing the effectiveness of organization to fulfil quality policy and quality objectives, on an ongoing basis

Supply Chain

Supplier Organization Customer

Page 7: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 7

1. Scope2. Normative Reference3. Terms & Definitions4. Quality Management System5. Management Responsibility6. Resource Management7. Product Realization Processes8. Measurement, Analysis & Improvement

General RequirementsDocumentation Requirements

GeneralQuality ManualControl of DocumentsControl of Records

ISO 9001-2000: STRUCTURE

Page 8: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 8

Management CommitmentCustomer FocusQuality PolicyPlanningResponsibility,authority& communicationManagement Review

ISO 9001-2000: STRUCTURE

1. Scope2. Normative Reference3. Terms & Definitions4. Quality Management System5. Management Responsibility6. Resource Management7. Product Realization Processes8. Measurement, Analysis & Improvement

Page 9: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 9

Provision of ResourcesHuman ResourcesInfrastructureWork Environment

ISO 9001-2000: STRUCTURE

1. Scope2. Normative Reference3. Terms & Definitions4. Quality Management System5. Management Responsibility6. Resource Management7. Product Realization Processes8. Measurement, Analysis & Improvement

Page 10: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 10

Planning of Product realisationCustomer Related ProcessesDesign and DevelopmentPurchasingProduction & Service provisionControl of Measurement and

Monitoring Devices

ISO 9001-2000: STRUCTURE

1. Scope2. Normative Reference3. Terms & Definitions4. Quality Management System5. Management Responsibility6. Resource Management7. Product Realization Processes8. Measurement, Analysis & Improvement

Page 11: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 11

GeneralMeasurement & Monitoring

Customer SatisfactionInternal AuditsProcessesProducts

Control of Nonconforming productAnalysis of DataImprovement

Continual ImprovementCorrective ActionsPreventive Actions

ISO 9001-2000: STRUCTURE

1. Scope2. Normative Reference3. Terms & Definitions4. Quality Management System5. Management Responsibility6. Resource Management7. Product Realization Processes8. Measurement, Analysis & Improvement

Page 12: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 12

PDCA (PLAN – DO – CHECK - ACT)

PLANEstablish the objectives and processes to deliver results in accordance with the customer requirements and the organisationDOImplement the processCHECKMonitor and measure process and product against policies, objectives and requirements for the product and report the results.ACTTake action to continually improve process performance.

Page 13: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 13

TERMS AND DEFINITIONS

ORGANISATION

PRODUCT OR SERVICE

SUPPLIER

(OUTSOURCING)

REGULATORY AUTHORITY

CUSTOMERS

(END USERS)

Page 14: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 14

Management Meetings.

Training at ALTTC

Quality Policy and Quality Objectives

Quality Manual and Procedure Manual

Review of QMS

ISO AWARENESS

Page 15: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 15

THE PROCESS MODEL

Product

Continual Improvement of theQuality Management System

Customer

SatIsfacttIon

Customer

RequIrement

ManagementResponsibility

ResourceManagement

ProductRealization

MeasurementAnalysis andImprovement

Page 16: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 16

TYPE OF DOCUMENTS

QUALITY MANUAL PROCEDURES PROCESS DOCUMENTS QUALITY PLANS WORK INSTRUCTIONS TECHNICAL DATA SPECIFIATIONS/ NORMS FORMS TECHNICAL PRODUCT DOCUMENTS DOCUMENTS OF EXTERNAL ORIGIN

Page 17: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 17

PURPOSE OF DOCUMENTS

TO SPELL OUT REQUIREMENTS(QUALITY MANUAL, PROCEDURES, WORK INSTRUCTIONS, QUALITY PLANS ETC.)

PURPOSE OF RECORDS

(RECORDS, DATA, REPORTS, MINUTES, AUDITS ETC.)

Page 18: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 18

NEED OF DOCUMENTS

REFERENCE FOR IMPLEMENTATION, EVALUATION OF QMS I/C IMPROVEMENTS

ENSURES FORMALITY BRINGS TRANSPARENCY WITHIN ORGANISATION, WITH CUSTOMERS AND CERTIFICATION BODIES

ENSURES COMMON UNDERSTANDING

USEFUL TOOL FOR TRAINING

Page 19: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 19

ISO DOCUMENTATION

Quality Manual and Procedures Manual are mandatory documents. They have been revised before re- Certification.

Present Issue No.4 dated 28.4.2007 for both.

MIS reports, Customer (SSA/ Admn. Unit office) feedback reports, Internal Quality Audit System, Meetings with Suppliers and their assessment reports for continual improvement.

Page 20: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 20

ISO DOCUMENTATION contd.

Regulatory Requirements Master List of Documents

Structure Changes:

- New structure of the standards should not oblige

organisations to change their system

documentation to match the structure of the

standards.

- System documentation is unique to each

organisation.

Page 21: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 21

ISO DOCUMENTATION contd.

Master List of Documents

1. Quality Manual (Issue 4 dt. 28.04.2007)2. Procedures Manual (Issue 4, 28.04.2007))3. Indian Standard for QMS (Revision 2)4. Electromechanical Works Handbook (Issue dt. 30 Aug)5. Fire Protection Manual (Issue dt. 22.11.97)6. Guidelines for NIT preparation and Tender evaluation (Issue dt. 21.12.98)7. Guidelines for designing EI&Fans schemes for Telecom bldg (Dt. 7.12.98)8. Works Instructions, Forms and Checklist (Issue dt. 1.7.02)9. Duties and resp. of Officers and staff of Electrical Wing (Issue dt. 1.7.02)10. CPWD Work Manual 11. DSR Electrical (Int)12. DSR Electrical (Ext)13. CPWD/BSNL Forms 6 and 8 14. Indian Electricity Rules 15. Energy Conservation Act (2001)16. Pollution Control Act (2000)

Page 22: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 22

ISO REVIEW AND FEEDBACK

Three levels of Management meetings

- in o/o 1. PCE(E) 2. SE(E) 3. EE(E)

- Recorded and Documented.

MIS reports/Execution Process Report

1. For original works

2. For mtce. Works

3. For Energy Conservation - Ensure works are carried out as per Quality Objectives and Quality Policy.

Page 23: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 23

ISO REVIEW AND FEEDBACK contd.

Customer feedback and meeting with customers

Suppliers feedback and meeting with suppliers.

Internal Quality Audit/External Quality Audit

Circulars and Guidelines

Feedback on items such as days to day points and Work Instructions and Check lists.

Page 24: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 24

QUALITY MANUAL

IMPORTANT ITEMS

Page 25: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 25

QUALITY MANUAL

-The Quality Manual is the 1st most important document for the Q.M.S. - It is a controlled document and all the members of the Top management committee are provided with the original copy of this document.

Page 26: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 26

VISION

The Tamilnadu Electrical Wing is committed to provide world class Electro-Mechanical Services to its Customers with devotion and dedication to ensure exceptional degree of dependability in the services rendered.

Page 27: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 27

MISSION

Customer Satisfaction, Quality of Service, Cost Consciousness and Conservation of Energy.

Page 28: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 28

QUALITY POLICY

Original Works: BSNL, Electrical Wing, Tamilnadu avows to provide World Class Electrical and Electromechanical Services to our Customers by Effectively deploying the infrastructure.

Page 29: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 29

Quality Policy - Contd

Maintenance Works:

By way of Quality Maintenance, BSNL, Electrical Wing, Tamilnadu is committed to provide uninterrupted power supply and Air-conditioning Services to Telcom Exchanges.

Page 30: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 30

Quality Policy - Contd

Energy Conservation: BSNL, Electrical Wing, Tamilnadu is committed to conserve energy in all its operations. We shall transform energy conservation into a strategic business goal and make it as a way of life.

Page 31: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 31

QUALITY OBJECTIVES

Original works :

To complete minimum 92% of the projects before the target date for start of installation work or along with Civil Works.

To clear 85% of projects by Acceptance Testing in their first test itself.

Page 32: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 32

Maintenance Works

To attend at least 80% of faults within 24 hours for minor faults, within 7 days for major faults and within 15 days for obsolete items.

QUALITY OBJECTIVES contd.

Page 33: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 33

Energy Conservation:Energy Auditing of i) All buildings once in a year with

connected load of >=500 KW.ii) One building per quarter per

Sub-division with Substation or AC Plant of 30 Ton and above.

iii)6 Buildings per quarter per Sub-Division not covered in above.

QUALITY OBJECTIVES contd.

Page 34: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 34

3 Core Energy Management Group Meetings / Programmes for each SSA in a year

Maintain the Power Factor above 0.95.

QUALITY OBJECTIVES contd.

Page 35: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 35

EXECUTION PROCESS REPORT

REPORT FOR THE QUARTER OF …………….

Following reports to be submitted by the SDEs as per Procedure Manual.

i) Completion of Original Works – Annx 9

ii) Maintenance Works – Annx 10

iii)Energy Conservation – Annx 11

 

Page 36: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 36

Customer feedback

Customer Feedback from the SSAs to be submitted every year for the period ending December in the proforma as per Annx – 7 covering Original Electro-mechanical worksMaintenace of Electro-mechanical installationsPerformance of Electrical Installations during its life time.

Page 37: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 37

PROCEDURES MANUAL

IMPORTANT ITEMS

Page 38: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 38

-The Procedure Manual is the 2nd. most important document for the Q.M.S.

- It is also a controlled document. All the members of the Top management committee are provided with the original copy of this document.

-Our procedure manual contains 11 procedures. Out of 8 procedures nos. 1 to 6 are mandatory as per the ISO 9001-2000 Standard.

- The procedure nos. 7&11 are additional procedures as per the requirements of the Organization.

PROCEDURES MANUAL

Page 39: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 39

1. Procedure for Control of Documents (PR1)2 Procedure for Quality Records (PR2)

3. Procedure for Internal Audit (PR3)

4 Procedure for Control of non conforming product (PR4)

5 Procedure for Corrective Action (PR5)

6. Procedure for Preventive Action (PR6)

7. Procedure for Maintaining Stores (PR7)8. Procedure for Customer Feedback (PR8)9. Procedure for Execution Process Report10. Procedure for MRC Meeting11. Procedure for Planning and Control of Works.

PROCEDURES MANUAL contd.

It contains following procedures

Page 40: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 40

PROCESS APPROACH FOR QMS

Based on the presented Process Approach we have

made specific flow diagrams for original and Maintenance

works.

Annx – 15 of PM

Page 41: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 41

In today’s competitive environment, it is not quality at any cost. Instead, it is quality at competitive cost. In this context, QMS provides the right frame-work for organisations to harness their capabilities & direct the efforts to achieve the intended business results & serve as a basis for long term growth & survival. Establishment of QMS is commensurate with the benefit, cost & risk considerations of an organisation

Why do we need QMS ?

Page 42: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 42

Customer - focused organizationLeadershipInvolvement of peopleProcess approachSystem approach to managementContinual improvementFactual approach to decision makingMutually beneficial supplier relationship

Quality Management Principles

Page 43: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 43

Quality management principles

Customer - Focused Organization

Organizations depend on their customers and therefore should understand current and future

customer needs, meet customer requirements and strive to exceed

customer expectations.

Page 44: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 44

Leadership

Leaders establish unity of purpose and direction of the organization. They should

create and maintain the internal environment in which people can become

fully involved in achieving the organization´s objectives.

Quality management principles

Page 45: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 45

Involvement of People

People at all levels are the essence of an organization and their full involvement

enables their abilities to be used for the organization´s benefit.

Quality management principles

Page 46: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 46

Process Approach

A desired result is achieved more efficiently when related resources and activities are

managed as a process.

Quality management principles

Page 47: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 47

System Approach to Management

Identifying, understanding and managing a system of interrelated processes for a given

objective improves the organization´s effectiveness and efficiency.

Quality management principles

Page 48: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 48

Continual Improvement

Continual improvement should be a permanent objective of the organization.

Quality management principles

Page 49: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 49

Factual approach to decision making.

Effective decisions are based on the analysis of data and information.

Quality management principles

Page 50: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 50

Mutually beneficial supplier relationships

An organization and its suppliers are interdependent, and a mutually beneficial

relationship enhances the ability of both to create value.

Quality management principles

Page 51: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 51

New structure of the standards should not oblige organizations to change their system documentation to match the structure of the standards.

System documentation is unique to each organization e.g. Master List of Documents.

REGULATORY REQUIREMENTS

Structure changes

Page 52: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 52

Purchase with specifications and verification of purchased items. Supplier’s relationship, meeting with

contractors. Production and service provision, work instructions, suitable equipment, measuring devices, delivery and post delivery activities. Control of monitoring and measuring devices Permitted exclusions Customer Property

THINGS REQUIRED TO BE DONE FOR IMPROVEMENT

Page 53: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 53

Customer’s satisfaction Internal audit Non conformant products Non conformities Corrective Action Preventive Action

THINGS REQUIRED TO BE DONE FOR IMPROVEMENT

Page 54: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 54

Documentation- Quality Manual- Six Mandatory procedures- Work Instructions, Forms and Check lists- Records to be maintained

Apply for certification Adequacy audit External audit Non conformities raised - Action Plan Get ISO Certificate

THINGS REQUIRED TO BE DONE FOR IMPROVEMENT

Page 55: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 55

Enables to systematically provide Electro-Mechanical Services with Quality, Speed, Energy Conservation and ensures their continuous and reliable operation.

Provides a Management System which Facilitates: Regular Management Meetings at Three

Levels (PCE, SE’s & EE’s Level)

Feedback From SSAs & Suppliers for Continual Improvement.

BENEFITS OF ISO 9001:2000 CERTIFICATION

Page 56: tamil_iso

Electrical Wing, BSNL, Tamil Nadu 56

Quality Audit: - Internal Quality Audit

- Assessment done by independent out side Auditors as per International Standards.

- Helps in identification, Traceability of records.- Evaluation of over all working of different Offices/ Maintenance Centers.

MIS Reports: - Enables to monitor the rectification of Faults and

Completion of Works as per the Quality Objectives.

- Cases not complying with the Quality Objectives are Identified, discussed for the Corrective Action.

BENEFITS OF ISO 9001:2000 CERTIFICATION

Page 57: tamil_iso

Thank You