TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
14-17 March 2005 Bilbao, Spain
TANGGUH LNG TANGGUH LNG –– ENERGY EFFICIENCY ENERGY EFFICIENCY MEASURES THROUGH LIFE CYCLE MEASURES THROUGH LIFE CYCLE
COST ANALYSISCOST ANALYSIS
Co Authors: Richard Phillips III – BP
Tim Solis – BP Hitoshi Konishi - JGC
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
AGENDA
1. Introduction 2. Project Objectives3. Life Cycle Cost Approach4. Energy Efficiency Measures5. Project Status6. Summary
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
Arun Arun Bontang Bontang
TangguhTangguh
INTRODUCTION
Tangguh LNGTangguh LNG
Tangguh will become Indonesia’s third liquefaction center, joining Arun in Sumatra and Bontang in Kalimantan
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
INTRODUCTION
LNG Sales Drives Two Train Launch • Fujian Sales – China new LNG market (2.6 mmtpa) • Sempra Sales – first long term Asia Pacific sales to North America (3.7 mmtpa)• SK / K-Power – new Korean LNG Buyers (1.15 mmtpa)
Fujian, 2.6mmtpa
SK / K-Power 1.15mmtpa
Sempra 3.7mmtpa
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
OBJECTIVES
• Safety• Reliability• Energy Efficiency• Liquefaction Technology Competition• Low Cost Producer• Greenfield Development• Social and Community Interfaces
The Project Philosophy established the key Tangguh Objectives :
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
LIFE CYCLE COST APPROACH
Life Cycle Cost (LCC) used as Objective Measure to Evaluate• Competing Liquefaction Technologies • Energy Efficiency Measures • Green House Gas Reduction Features • Design Optimizations
LCC Approach considered• CAPEX (lump sum EPC price) • OPEX (operating expenses)
– Fuel consumptions – Plant maintenance – Chemical / catalyst make up – Refrigerant consumption – HC losses
Lowest Net Present Value based on LCC selected as winning bidder
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
LIFE CYCLE COST APPROACH
Key metrics of LCC approach • Fuel Gas Value • Incremental LNG credit
(to allow competing bidders to match most efficient refrigeration driver configuration with selected liquefaction technology)
• Interest/Discount Rate• Life Cycle Period
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
ENERGY EFFICIENCY MEASURES
LCC approach allowed incorporation of innovative, energy efficient, reduced greenhouses gas emission, environmental and design optimization features in the winning design from the consortium of Kellogg Brown & Root/JGC/Pertafiniki
Major Features:• Extensive use of heat recovery
in a combined cycle application to produce 27% (320MW) of plant’s total energy demand
• Selection of Propane Pre-Cool Mixed Refrigerant liquefaction process
• Application of Split Mixed Refrigerant Compressor Configuration
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
ENERGY EFFICIENCY MEASURES
Major Features (cont’d): • Recovery of LNG Ship Vapors during loading to
achieve no operational flaring. • Selection of proprietary tertiary activated amine solvent
for the gas conditioning system. • Dual flash separation step for the rich amine circuit of
the gas conditioning system• Selection of tandem seals for rotating equipment in
hydrocarbon service to minimize fugitive emissions.
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
Major features (cont’d): • Innovative relief analysis technique to reducing flaring loads
and relief system equipment designs through the use of dynamic simulation.
• Plot plan improvements substantiated by extensive use of computational fluid dynamic simulation to model hot air recirculation to minimize plant footprint.
• Siting of marine facilities (LNG jetty and off loading dock) such that operational dredging is not required.
• Establishment of single status employee basis for operating company thereby reducing infrastructure needs and minimizing environmental impact.
ENERGY EFFICIENCY MEASURES
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
ENERGY EFFICIENCY MEASURES
26.9 320.4Total
0.911.0 Power Generation
4.350.3Frame 7EA Steam Helper Turbines
21.7259.1AGRU
Total Plant (%) Recovered Energy (MW)
Tangguh LNG Project Deep Combined Cycle Application
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
LNG Loading Dock
LNG Loading Dock
Control Room
Control Room
AirportAirport
Community
Community
LNG Trains
LNG Trains
LNG Storage
LNG Storage
Cargo DockCargo Dock
Gas Production Facilities
Maintenance Area
Gas Production Facilities
Maintenance Area
• US$ 3 billion initial development cost for onshore & offshore
• Two train 3.8 mmtpa capacity each, gas drive, air cooled, C3 precool/mixed refrigerant process
• KJP (Kellogg Brown & Root, JGC and Pertafiniki) as appointed contractor
Tangguh LNG Plant Design
• $ 200m worth of long lead equipment orders placed - Gas Turbines, Refrigerant compressors, Main Cryogenic Heat Exchangers, LNG Storage Tanks plates.
• $ 50m Early Work Program w/ KJP: Pioneer camp, construction dock, tree clearing
• Formal EPC award 1Q 2005
PROJECT STATUS
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
PROJECT STATUS
• 4 Stages of Safety Review – HAZID,HAZAN, HAZOP(2)• Independent Reliability, Availability, Maintainability (RAM) studies –
94% availability Projected• Risk Based Assurance
- Proved Design- Meets BP Group Risk Criteria- QRA, Blast Over Pressure, Fire Risk Assessment, Vapor Cloud Dispersion, Flare Radiation, Tsunami Study
• Incorporation of Lesson Learned• Social/Community
- Babo Airport Up grade- Tanah Merah Village Relocation
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
Babo Runway – June 2003
Babo/Saengga UXO found near runways
PROJECT STATUS - Babo Airstrip Before
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
PROJECT STATUS - Babo Airstrip After
Babo Hangar Babo April 2004
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
PROJECT STATUS - Tanah Merah Before
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
PROJECT STATUS - Tanah Merah (Baru) After
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
PROJECT STATUS - Pioneer Camp
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
PROJECT STATUS - Site Activities
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
PROJECT STATUS - Wooden Jetty
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
SUMMARY
These major Energy Efficiency Measures have allowed the Tangguh design to achieve benchmark results which compare very favorably and possibly best in class with other recent LNG projects.
Key Benchmarks
Tangguh 3.8 mmtpaTrain size
Typical Design
Tangguh 3.5 mmtpaTrain size3Q 2003
Specific Combustion CO2tons CO2/ton LNG
4.4
0.24
200
4.8
0.26
TBASpecific Cost$/ton LNG
Specific Fuel MMBTU/ton LNG 5+
0.3+
200 - 250
TANGGUH LNG-- TANGGUH LNGTANGGUH LNG
Muchas Gracias y Adios Muchas Gracias y Adios