7/28/2019 TankHeatingCoil&BoilerCapacityRequirement.rev.2
1/1
12LV01-BE-Eq-S-001
Heating Coil & Boiler Capacity Requirement Calculation Sheet
U:OWNER'S INPUT
Calculating (Heating Time Required)BT063 AT101 AT041/
AT042
AT043/
AT044
MT151 MT101 MT051 MT01 MT02
CORE 2500 DI-P(SJ) I-455 DI-P(SJ)SJ10W30
MASJ10W30MB SS7KAI SL20W40MA SL20W40MB
nos/Unit 1 1 2 2 1 1 1 1 1
nos for estimation 1 1 1 1 1 1 1 1 1
Heating Time Required hr 2.9 3.9 2.8 2.8 4.4 3.9 2.9 1.9 1.9
V Tank Volume m3 60.0 100.0 40.0 40.0 150.0 100.0 50.0 25.0 25.0
Sg Specific Gravity --- 0.9000 0.9895 0.8660 0.9760 0.8652 0.8658 0.8601 0.8830 0.8824
W Tank Volume kg 54,000 98,950 34,640 39,040 129,780 86,580 43,005 22,075 22,060
Cp Specific Heat kcal/(kg deg.) 0.433 0.413 0.441 0.416 0.441 0.441 0.443 0.437 0.437
A Coil Surface Area m2 27 36 18 19 44 33 23 17 17 U Overall Coefficient kcal/(m2 hr deg.) 130 130 130 130 130 130 130 130 130
t1 Steam Temp. deg. 150 150 150 150 150 150 150 150 150
T1 Oil Initial Temp. deg. 10 10 10 10 10 10 10 10 10
T2 Oil Target Temp. deg. 60 60 60 60 60 60 60 60 60
Calculating A(Heating Coil Surface Area)A Coil Surface Area m2 26.5 34.7 17.3 18.4 43.3 32.5 21.6 16.4 16.4
Heating Time Required hrs 3 4 3 3 4.5 4 3 2 2
Heating Coil Length L(m)1-1/2B 180 234 120 127 290 219 148 114 114
2B 145 188 96 102 233 176 119 91 91
3B 98 128 65 69 158 120 81 62 62
Steam Consumption(kg/Hr)Specific Heat/ Oil kcal/(kg deg.) 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
Heat Requirement kcal 1,215,000 2,226,375 779,400 878,400 2,920,050 1,948,050 967,613 496,688 496,350
Steam Consumption/Vessel kg/Hr 802 1102 514 580 1285 964 639 492 491
Steam Consumption/Vessel m3/Hr 219 301 141 158 351 263 174 134 134
Steam Consumption/Unit kg/Hr 802 1102 514 580 1285 964 639 492 491
7,894 kg/Hr
789 kg/Hr Vessel Consumption0.1(Dicision by arrangement)
200 kg/Hr
8,883 kg/Hr
75 % OWNER'S INPUT
6,662 kg/Hr
d Coil Size
Vessel Consumption: 1st Stage
Total Consumption: 1st Stage
Boiler Capacity Requirement: 1st Stage
ISO Tank Warm-up :ISO Tank x 2 Units
Consumption Ratio (% )
n Vessel Q'ty
Steam Trace Consumption: 1st Stage
( )
( )
-
-
=
21
11
Tt
Tt
AU
CWP
lnq