TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

  • Upload
    005944

  • View
    229

  • Download
    0

Embed Size (px)

Citation preview

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    1/18

    HUAWEI TECHNOLOGIES CO., LTD.

    www.huawei.com

    Huawei Confidential

    Security Level:

    2010-11-27

    ISSUE 1.0

    TATA UMTS Project

    Cluster Optimization

    Guideline

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    2/18

    Content

    Work Flow

    Cluster Readiness

    Cluster DT Preparation (Tools, Map, Route)

    Cluster DT Plan

    Log File Naming

    Recommend test plan configure

    Report Template

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    3/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3

    Work Flow

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    4/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 4

    Cluster Readiness

    Cluster Definition

    Sites in a cluster should make contiguous coverage footprint over an

    area with a fairly homogenous clutter type

    Pre-defined sites shown in cluster sites list

    Cluster is given with clear boundary in MapInfo Layer file

    80% or more sites in the cluster should be ready for test in both

    hardware and software

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    5/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5

    Cluster Readiness

    Hardware and Software Checkup

    No major hardware alarms within this cluster

    Alarms such as VSWR can be checked from OMC in advance

    Finish detailed planning and configure it into network to ensure

    cluster sites function normally

    Ensure RNC and Node B configuration is the same as the detailed

    planning

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    6/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 6

    Cluster DT-Preparation

    Tools. 2 Test Mobiles, 2 Data card, GPS, 4 SIM Cards (including 2for Data Card

    without throughput limitation), Test Cables

    . FTP user/password/FTP Server in CN for data test, Destination Mobile

    numberpredefined in CN for voice call test

    . Digital Map, Engineering parameter table forProbe &Assistant, Probe &

    Assistant V2.3 Software, and P&A Dongle and software license

    . UPS, Compass, Ruler, Pen and Recording paper; Car with enough fuel,DC/AC power convertor, Key and Entry approval into NodeB room from the

    each owner

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    7/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7

    Cluster DT-Preparation

    Drive Test Route

    All cells in the testing cluster should be driven through

    Drive routes agreed by Huawei and TATA

    Minimize duplication of routes

    Output the Drive Test routes in MapInfo Layer files

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    8/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Cluster DT Plan

    Two conditions: Unloaded & Loaded conditions

    Two round DT test for each conditions

    Round 1 ( Scanner + Video Call )

    Round 2 ( Voice Call + HSDPA/HAUPA )

    Page 8

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    9/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Test Setup

    Device Type of Call Comments

    Scanner - Test RSCP & Ec/Io forPCPICH

    MS1 Video Call1. 90s duration, 15s test intervals, 20s exceptional intervals2. Call MS2

    MS2 Video Call Receiver video call from MS1

    Page 9

    Round 1:

    Round 2:

    Device Type of Call Comments

    MS1 Voice Call 1. 90s duration, 15s test intervals, 20s exceptional intervals2. Call defined number in CN

    MS2 HSDPA1. FTP user/password/FTPServer in CN for data test2. Download test are performed with 50MB file simultaneously

    MS3 HSUPA1. FTP user/password/FTPServer in CN for data test2. Upload test are performed with 50MB file simultaneously

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    10/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10

    TEST SETUP

    Round 1 Configuration:

    scanner

    Circle Frequency UARFCN

    Gujarat

    UL: 1959-1964 9807

    DL: 2149-2154 10757

    KeralaUL: 1969-1974 9857DL: 2159-2164 10807

    Rajasthan

    UL: 1974-1979 9882

    DL: 2164-2169 10832

    Madhya Pradesh

    UL: 1974-1979 9882

    DL: 2164-2169 10832

    Maharashtra

    UL: 1959-1964 9807

    DL: 2149-2154 10757

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    11/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11

    TEST SETUP

    Round 1 Configuration:

    Video Call (MS1)

    Video Call (MS2) : configure Auto Answer in Mobile

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    12/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12

    TEST SETUP

    Round 2 Configuration:

    Voice Call (MS1)

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    13/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13

    TEST SETUP

    Round 2 Configuration:

    Data Call (MS2 HSDPA)

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    14/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14

    TEST SETUP

    Round 2 Configuration:

    Data Call (MS3 HSUPA)

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    15/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15

    Cluster DT-Log File Naming

    Drive Test Log file

    Circle Name_ClusterID_Round1_Loaded_Date.gen

    Circle Name_ClusterID_Round2_Loaded_Date.gen

    Circle Name_ClusterID_Round1_Unloaded_Date.gen

    Circle Name_ClusterID_Round2_Unloaded_Date.gen

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    16/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 16

    Cluster DT-recommend test plan configure

    TestPlan for

    Round1.rar

    TestPlan for

    Round2.rar

    After import the test plan, please modify as per the real situation.

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    17/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 17

    Report Template

    Micro o

    O

    iceord 97 - 2003

    Coverage Measurement Get the KPI from

    In 95% of the area driven, should have coverage better than or equal

    to mutually agreed design based on the planning tools.

    Round 1(Scanner)

    Call Quality Get the KPI from

    In 95% of the bins the Voice BLER

  • 8/8/2019 TATA UMTS Project Cluster Optimization Guideline_20101007_V1.0

    18/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 18

    Thank You!Thank You!Thank You!Thank You!