TDP calibration and processing group (CPG): activities and status

Athol Kemball (for CPG)University of Illinois at Urbana-Champaign

[email protected]

Page 2: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

Current CPG membership

• Athol Kemball (Illinois) (Chair)• Geoff Bower (UCB)• Jim Cordes (Cornell; TDP PI)• Joe Lazio (NRL)• Colin Lonsdale (Haystack/MIT)• Steve Myers (NRAO)• Jeroen Stil (Calgary)• Greg Taylor (UNM)

Calgary.... .

. .Cornell

NRL

UIUC MIT

NRAO

UCB UNM

Page 3: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

Calibration and processing challenges for the SKA

(LSST)

SKA-era telescopes & science require:• Surveys over large cosmic volumes (Ω,z),

fine synoptic time-sampling Δt, and/or high completeness

• High receptor count and data acquisition rates

• Software/hardware boundary far closer to receptors than at present

• Efficient, high-throughput survey operations modes

Processing implications• High sensitivity, Ae/Tsys~104 m2K-1, wide-

field imaging;• Demanding (t,ω,P) non-imaging analysis• Large O(109) survey catalogs

High associated data rates (TBps), compute processing rates (PF), and PB/EB archives (HI galaxy surveys, e.g. ALFALFA HI

(Giovanelli et al. 2007); SKA requires a billion galaxy survey.)

Page 4: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

SKA design & development phase (2007-2011)

SKA science requirements

SKA technical specifications, e.g. sensitivity, survey speed, time, spectral, and angular

resolution, etc.

SKA reference design, e.g.

receptor, array configuration, receptor and

receivers, signal transport and

correlation, cal & processing, data

management

Antenna design elements e.g.

receptor, receivers,

antenna etc..

Calibration and processing

design elements e.g. calibration and imaging algorithms,

scalability, etc..

Design drivers

• Hardware design choices will define calibration and processing performance (e.g. dynamic range), cost, and feasibility.

• In turn, need to identify calibration and processing constraints on hardware designs.

Page 5: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

Calibration and processing design elements

CPG goals• Determine feasibility of calibration and

processing required to meet SKA science goals;

• Determine quantitative cost equation contributions and design drivers as a function of key design parameters (e.g. antenna diameter, field-of-view, etc)

• Measure algorithm cost and feasibility using prototype implementations

• Demonstrate calibration and processing design elements using pathfinder data.

US technology development emphases• Large-N small-diameter (LNSD) parabolic

antenna design, wide-band single-pixel feeds, mid to high frequency range.

• Close liaison with current international and national efforts.

PrepSKACDIT

TDP project

CPG – calibration and processing

groupPrepSKA WBS 2

(ATA)

Page 6: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

• 08/07: Initiate workplan development for CPG. Work ramps up.

• 09/07: PrepSKA collaboration discussions.• 11/29/07: Face-to-face CPG meeting for in-depth workplan

refinement. • 12/15/07: Finalize CPG project execution plan as part of

general TDP project execution plan.• 01/08: URSI LNSD session.• 04/08: SKA CALIM conference Perth.• Q1-Q3/08: Hire CPG postdocs at UCB, MIT, & UIUC.

• …

CPG immediate future steps

November 2007

CompletedCompletedCompleted

Completed 01/08CompletedCompleted Completed In process

Page 7: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

CPG activity timeline Oct 07 to present

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL OCT NOV

CPG formation

Project execution plan

Execution plan implementation

F2F planning meeting (Urbana)

URSI 2008 LNSD session

CPG meeting

CPG F2F meeting (Perth)

SKA CALIM 08

CPG F2F meeting (Washington DC)

Page 8: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

CPG organization and coordination

• Targeted design and development research working group, not production software development for SKA.

• Prototype development will be software-package neutral, i.e any package allowing the research task can be used.

• Close liaison with current international and national efforts.

• Regular schedule of face-to-face meetings and telecons

• All results aggregrated upwards into CPG Project Book; template defined. Intermediate results in memo series.

• Internal mailing list, collaborative workspace, progress tracking wiki, and document repository.

(Internal collaborative workspace: progress tracking and communication)

Page 9: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

CPG engagement and partnerships

• Community web-site launched to publicize intermediate results and activities

• Engagement with:– National pathfinders (e.g.

ATA, LWA, MWA, EVLA)– National center (NRAO)– Canadian efforts (Russ

Taylor/Jeroen Sil [Calgary])

– International pathfinders:• MeerKAT• ASKAP

– PrepSKA– Computer science &

computer engineering groups

(http://rai.ncsa.uiuc.edu/SKA/RAI_Projects_SKA_CPG.html)

Page 10: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

CPG project execution plan

CPG work breakdown structure • WBS 2.0: General• WBS 2.1: Signal transport• WBS 2.2: Calibration algorithms• WBS 2.3: Imaging, spectroscopy, &

time-domain imaging• WBS 2.4: Scalability, & high-

performance computing• WBS 2.5: RFI• WBS 2.6: Surveys• WBS 2.7: Data management

Cross-cutting goals• LNSD feasibility:

– e.g. dynamic range error budget• LNSD cost equation contributions (per

calibration and processing technology)

OVERALL TDP GOALS

WBS 2 CAL & PROCESSING GOALS

1. Feasibility

2. Cost equation contribution

3. Design driver identification

4. Pathfinder demonstration

Calibration & processing issue #1

Calibration & processing issue #2

Calibration & processing issue #3

Calibration & processing issue #4

… XDesign parameters (e.g. diameter, mid-range upper cutoff frequency, amongst others)

Calibration and processing issues Design parameters

PrepSKA/CDIT SKA pathfinders

Page 11: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

Primary CPG deliverables

• CPG work breakdown structure made up

of prioritized calibration and processing technologies that are central to SKA LNSD design.

• Key cross-cutting milestones are feasibility and cost assessments as envelope of design parameters (e.g. antenna diameter) and key science goals.

• Feasibility and cost model release planned annually; successively refined based on research results.

Calibration and processing

design elements e.g. calibration and imaging algorithms, scalability.

Feasibility relative to science goals

Cost equation contributions and design drivers

Prototyping and demonstration with pathfinder data

Page 12: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

Feasibility: imaging dynamic range

Richards 2000 HDF VLA 1.4 GHz 7.5 μJy

Norris et al 2005 HDF-S ATCA 1.4 GHz 10 μJy

Middelberg et al

2008

ELAIS I ATCA 1.4 GHz < 30 μJy

Miller et al 2008 E-CDF-S {E}VLA 1.4 GHz 6.4 μJy

Reference specifications (Schillizzi et al 2007)• Targeted λ20cm continuum field: 107:1.• Routine λ20cm continuum: 106:1.• Driven by need to achieve thermal noise limit

(nJy) over plausible field integrations.• Spectral dynamic range: 105:1.• Current typical state of practice near λ ~ 20

cm given below.

(de Bruyn and Brentjens, 2005)

High-sensitivity deep fieldsNoordarm et al

1982

3C84 WSRT 1.4 GHz 10,000:1

Geller et al 2000 1935-692 ATCA 1.4 GHz 77,000:1

de Bruyn &

Brentjens 2005

Perseus WSRT 92 cm 400,000:1

de Bruyn et al,

2007

3C147 WSRT 1.4 GHz 1,000,000:1

Dynamic range

Page 13: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

Feasibility: imaging dynamic range budget

Visibility on baseline m-n

Visibility-plane calibration effect

Image-plane calibration effect Source

brightness (I,Q,U,V)Direction

on sky: ρ

Basic imaging and equation for radio interferometry (e.g. Hamaker, Bregman, & Sault et al. 1996):

Key contributions• Robust, high-fidelity image-plane (ρ) calibration:

– Non-isoplanatism.– Antenna pointing errors.– Polarized beam response in (t,ω), …

• Non-linearities, non-closing errors• Deconvolution and sky model representation limits• Dynamic range budget will be set by system design

elements.

(Bhatnagar et al. 2004; antenna pointing self-cal: 12µJy => 1µJy rms)

Page 14: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

(Cornwell et al. 2006: example of 1.4 GHz edge effect at 2% PB level)

Page 15: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

SKA dynamic range assessment – beyond the central pixel• Current achieved dynamic ranges degrade significantly with radial projected distance from field center, for reasons

understood qualitatively (e.g. direction-dependent gains, sidelobe confusion etc.)• An SKA design with routine uniform, ultra-high dynamic range requires a quantitative dynamic range budget.• Strategies:

– Real data from similar pathfinders (e.g. ATA, EVLA) are key.– Simulations are useful if relative dynamic range contributions or absolute fidelity are being assessed with simple

models.– New statistical methods:

• Assume convergent, regularized imaging estimator for brightness distribution within imaging equation; need to know sampling distribution of imaging estimator per pixel, but unknown PDF a priori:

• Statistical resampling (Kemball & Martinsek 2005ff) and Bayesian methods (Sutton & Wandeldt 2005) offer new approaches.

Feasibility: dynamic range assessment

( )S ( )S

Page 16: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

Monte Carlo reference

variance image

MODEL-BASED BOOTSTRAP RESAMPLING EXAMPLE

Np=1; Δt = 60 s Np=1; Δt = 150 s

Np=1; Δt = 300 s Np=2; Δt = 900 s

Page 17: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

WBS 2.3.1: Cost equation: wide-field image formation

Algorithm technologies• 3-D transform (Perley 1999), facet-based tesselation / polyhedral

imaging (Cornwell & Perley 1992), and w-projection (Cornwell et al. 2003).

(Cornwell et al. 2003; facet-based vs w-projection algorithms)

Page 18: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

• LNSD data rates (Perley & Clark 2003):

where D = dish diameter, B = max. baseline, Δν = bandwidth, and ν = frequency• Wide-field imaging cost ~ O(D-4 to -8) (Perley & Clark 2003; Cornwell 2004; Lonsdale et al

2004).• Full-field continuum imaging cost (derived from Cornwell 2004):

• Strong dependence on 1/D and B. Data rates of Tbps and computational costs in PF are readily obtained from underlying geometric terms.

• Spectral line imaging costs exceed continuum imaging costs (further multiplier )• Possible mitigation through FOV tailoring (Lonsdale et al 2004), beam-forming, and

antenna aggregation approaches (Wright et al.)

– 550 GBps/na2 (Lonsdale et al 2004)

• Runaway petascale costs for SKA tightly coupled to design choices

WBS 2.3.1: Imaging cost equation contributions

t

NNN

TBps

V antantchanvis

1210

)1(20

2

1410~D

NB

TBps

Vvis

1500273.02

2 2103.22

D

B

ant D

BN

PF

C

0

500

1000

1500

2000

D=12.5m, B=5km

D=12.5m,B=35km

D=6m, B=5km

TB per hour

0

2

4

6

8

10

D=12.5m,B=5km

D=12.5m,B=35km

D=6m,B=5km

Peak PF

chanN

Page 19: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

WBS 2.4: Scalability

Inconvenient truths

• Moore’s Law holds, but high-performance architectures are evolving rapidly:– Breakpoint in clock speed evolution

(2004)– Lateral expansion to multi-core

processors and processor augmentation with accelerators

• Theoretical performance ≠ actual performance

• Sustained petascale calibration and imaging performance for SKA requires:– Demonstrated mapping of SKA

calibration and imaging algorithms to modern HPC architectures, and proof of feasible scalability to petascale: [O(105) processor cores].

– Remains a considerable design unknown in both feasibility and cost.

0

20000

40000

60000

80000

100000

10 TF 100 TF 1 PF

No processors

(Golap, Kemball et al. 2001, Coma cluster, VLA 74 MHz, parallelized facet-based wide-field imaging)

Page 20: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

NSF support for open petascale computing

Page 21: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

WBS 2.4: Scalability

Fastest current

NCSA system

(abe.ncsa.uiuc.

edu*)

Generic

petascale

system

Peak

performance0.090 PF 10-20 PF

Number of

processors9,600 300,000-

750,000

Amount of

memory0.0096 PB 0.5-1.0 PB

Disk storage 0.10 PB 25-50 PB

Archival

storage0.005 EB 0.5-1 EB

(Dunning 2007)

*Abe: Dell 1955 blade cluster– 2.33 GHz Intel Cloverton Quad-Core• 1,200 blades/9,600 cores• 89.5 TF; 9.6 TB RAM; 170 TB disk– Power/Cooling• 500 KW / 140 tons

Page 22: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

WBS 2.4.5: Computing hardware cost models

• Computing hardware system costs

vary over key primary axes:– Time evolution (Moore’s Law)– Level of commoditization

0

50

100

150

200

250

300

GPU 500GF CPU 100-1000GF CPU 100-1000TF

$1000 per TF

Commoditization effects in computing hardware costs models for general- purpose CPU and GPU accelerators at a fixed epoch (2007). Estimated from public data.

Moore’s Law for general-purpose Intel CPUs.

Trend-line for Top 500 leading-edge performance.

Page 23: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

• Predicted leading-edge LINPACK Rmax performance from Top 500 trend-line (from data tyr = [1993, 2007]):

• Cost per unit teraflop cTF(t), for a commiditzation factor η, Moore’s Law doubling time Δt, and construction lead time Δc:

[with cTF(t0) = $300k/TF, t0 = 2007, η = [0.3-1.0], Δt ~ 1.5 yr, Δc ~ 1-4 yr]

WBS 2.4.5: Computing hardware cost models

0

20

40

60

80

100

2011 2012 2013 2014 2015 2016

Predicted Rmax (PF)

)1993(6217.0max 05555.0

yrteTF

R

0( )ln(2)

0( ) ( )t t

tTF TFc t c c t e

0

50

100

150

200

250

300

350

400

1 PF(2012)

10 PF(2012)

7.5 PF(2016)

90.1 PF(2016)

Approximate projected costs ($M)

Page 24: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

• Facility parameters:– One PF sustained requires tens MW; O(104) sq. ft.– Green innovations essential, will likely be mandated in

US by law:• Current US data centers 61bkWh• Will double by 2011; peak 12 GW, $7.4b per year

electricity cost• Software development costs (Boehm et al. 1981):

where β ~ ratio of academic to commerical software construction costs (~ 0.3-0.5); can mitigate through re-use (see adjacent)

• LSST computing costs ~25% of project; order of magnitude smaller data rates than SKA (~ tens of TB per night).

WBS 2.4.5: Related computing cost components

NCSA Petascale Computing Facility (20,000 ft2 machine room; chilled water with free cooling 6/12 months)

1.05

2.41000

COST Lines of code

FTE month

(Kemball et al., 2007, “A component-based framework for radio-astronomical imaging software systems”, Software: Practice & Experience, 38 (5), 493-507)

Page 25: TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@uiuc.edu

US SKA May 2008

• CPG work plan continues per project execution plan.• Q2-Q3/08: Hire CPG postdocs at MIT, & UIUC.• 08/08: URSI GA 2008 (presentations and associated CPG

meeting)• 10/08: First release of cost-feasibility LNSD model• …

CPG upcoming activities