TECHNICAL SPECIFICATIONS
FOR 4 LADEN CONTAINER REACH STACKERS
Capacity 45 ton under twist lock
قطاع االعال انعاووزارة وانبرى انبحرانشركت انقابضت نهقم
نخداول انحاواث وانبضائع اإلسكدرتشركت ALEXANDRIA CONTAINER & CARGO
HANDLING CO. شرك حابع يسات يصر ) ش.ث.و.و(
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 2 of 22
COMMITMENT
We hereby commit if our offer is accepted, to undertake the following: -
1- To provide all the basic specifications needed to Alexandria Container & Cargo Handling Co.
(ACCHCO.) to purchase the spare parts from its original manufacturers as follows:-
A- Main components (Engine,Transmission, Drive axle,Spreader,Pumps, Hyd. Controls & valves)
installed in the REACH STACKER (R.S.) must be provided with its original manufacturer
name plate (in English language) .
B- Submit the required copies of complete spare parts and workshop manuals (in English
language) of the main components for each equipment from its original manufacturer,
including the requisition form of spare parts, quantity of parts and codes in equipment ( see
the form of attached spare parts list ) as well as CD (compact disc ) registering these
information .
C- Submit the basic specification for all standard parts installed in the R.S. or in its components
so as to be purchased by (ACCHCO. ) from any local or foreign supplier.
2- To ensure and guarantee that no constraints for (ACCHCO.) to get the spare parts from any of the
sub - suppliers (Even during the warranty period) and that would not make any deals with the sub -
suppliers to refuse supplying any required parts for (ACCHCO.),or to raise its prices than the usual
market prices.
3- The supplier under takes that the prices of the attached & recommended lists spare parts will be
fixed during guarantee period (two years).
4 - Tenderer must assure and provide a guarantee for the continuous production of the R.S. main
components ( engine, transmission , axles;….etc) and their spare parts at least for the coming ten
years and that their local agents can supply at any time the required spare parts and programs to
repair and maintain the equipment’s in good working conditions from the date of final acceptance .
Name of the company :
Name of representative :
Signature :
Date :
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 3 of 22
Table of contents
Chapter I : General 1-1 Object of the Tender 4
1-2 Lift capacity 4
1-3 Climatic conditions 4
1-4 Standards and codes 4
1-5 Technical service 5
1-6 Spare Parts 5
1.7 Documents 6
1.8 Software &hardware 6
1.9 Training and inspection 6
1.10 Factory and site tests 7
Chapter II : R.S. requirements and performance 2.1 Chassis& boom 8
2.2 Engine 8
2.3 Transmission 9
2.4 Front axle 9
2.5 Rear axle 9
2.6 Hydraulic system 9
2.7 Brake system 10
2.8 Steering system 10
2.9 Greasing system 10
2.10 Tyres and Wheels 10
2.11 Spreader 11
2.12 Cabin 11
2.13 Stability 13
2.14 Performance 13
2.15 Safeties 13
2.16 Guarantee 14
Technical data List 15
Attached spare parts List ( 1 ) 20
Recommended Spare Parts List ( 2 ) 21
Evaluating Point System List 22
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 4 of 22
CHAPTER I
1 – General
1.1 Object of the tender
Tenderers are invited by Alexandria Container and Cargo Handling Company (ACCHCo.)
branch (private free zone) for delivery and commissioning of the following:-
- Four in number (two for Alexandria terminal + two for Dekhila terminal) brand-new REACH
STACKERS (R.S. ) capacity not less than 45 ton under twist lock .
- The required RS will be able to handle 20` to 40` ISO containers on terminal tractor’s trailer and
stacking the container by the spreader to a height of five ( 5 ) stacking high cube containers of 9`6"
height in stacking areas.
- The maximum height under twist lock must be not less than 14.8 mt.
- The Reach stacker must be made in USA, Japan ,Great Britain, European Union not under license
(under license will be rejected).
- R.S. painting colour & ACCHCO logo will be determined during commissioning stage.
1.2 Lift capacity
- S.W.L. under twist locks not less than 45 ton for five ( 5 ) stacking high cube containers of 9`6"
at the first row& 35 ton for four ( 4 ) stacking at the second row ¬ less than 18 ton for (3)
stacking at third row.
1.3 Climatic conditions
The R.S. must be designed and guaranteed by the manufacturer to operate under the following
climatic conditions:
1. Sea water spray and in general a marine atmosphere.
2. Temperature up to 50º C.
3. Relative humidity of 100 %.
4. Area full of smooth dust(Presence of fine sands, and coal dust) .
1.4 Standards and codes
The R.S. must be designed for the heavy – duty operation conditions. New and of the latest
model, robust construction and high reliability to meet the international design standards for this
particular duty (design standards and classes should be mentioned).
The original manufacturer must prove in his experience list that his company has already manufactured in
a wide range the same type of R.S. not be less than 50 trucks of the same R.S. offered,
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 5 of 22
working in mutli international terminals and of standard series and not of special design to meet
the required specifications the experience list must be registered and stamped from the chamber of
commerce in the manufacturer country.
1.5 Technical service
Tenderers must assure and provide guarantees for the continues production of spare parts for the R.S. at
least for the next ten years and that their local agents can at anytime supply the spare parts required to
maintain the equipment in a good working condition. Further assurance is required that the local agents
can provide technical staff to give technical assistance as may be requested by A.C.C.H.CO for
maintaining and repairing this equipment.
1.6 Spare parts
Tenderers must submit the attached spare parts list (1) and the recommended spare parts list(2)
Prices will be evaluated with the R.S. prices .
Tenderers must submit itemized recommended spare part list(2) for two years. List must
include the determined spare parts in the list in addition to any other spare parts the
manufacturer recommends for safe operating performance .
The supplier under takes that the prices of the attached &recommended spare parts will be
fixed during guarantee period(two years).
The financial evaluation include the attached spare parts and recommended spare parts prices.
Tenderers must indicate their own sub suppliers / manufacturers for main components in R.S.
Tenderers must submit a commitment and guarantee direct supply of spare parts by the
specified sub-suppliers to ACCHCO. without any constraint or overhead additional cost;
Tenderers must state the basic specifications, manufacturers, and codes for main components
installed in the R.S. in order to be purchased by ACCHCO. from any local or foreign suppliers;
All mechanical and electrical components to be installed in the R.S. must be of the standard
production models / types of their original manufacturer (unique, modified and special products
must be avoided).
Tenderers must provide all components with their original manufacturer name plates, specially
for the following:
- Engine,
- Transmission,
- Drive, Steer axles,
- Spreader,
- Hydraulic pumps/motors
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 6 of 22
1.7 Documents :
The manufacturer must furnish each equipment with 1 copy of the following documents (must be in
English language-all the provided documents and technical charts must be for the offered model and not
generic ):-
Full specification, manual including the name plate data for the R.S. and its different components.
Operating& maintenance manual.
OEM descriptive workshop manual (assembly& disassembly) for engine, transmission, drive axle and
spreader from their original manufacturers .
Hydraulic and electric charts &outlay of connecting plugs for the whole equipment( copy must be
submit in the technical offer)
OEM Spare parts manual for each main component ( engine, transmission, drive axle, spreader )
from their original manufacturers including quantities of parts installed
Spare parts manual from the R.S’s manufacturer with part no. and remarks.
Original fault codes lists must be provided for engine, transmission .
Lubrication and greasing charts for all moving and rotating parts including the recommended and
alternative types of oils and grease covered by our local market ( Shell, Esso, and Mobil products ) .
1.8 Software and hardware
The successful tenderer must submit the following items:-
For each R.S an electric screen sheet (Tab) well-known brand device with display not less than 9.6
inch, octa core processor with software package of engine, transmission.
Eight flash memories include software database for spare parts, maintenance instruction, manual
instruction for all R.S. components (engine, transmission, hydraulic system, control system
,…etc).
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 7 of 22
1.9 Training and inspection
The manufacturer have to submit training program for two weeks for each of:
Maintenance engineers, technicians and drivers, on site during receiving stage ( primary test).
ACCHCO has the right to send Four Engineers and four technicians at
manufacturer firm for two weeks, air tickets and accommodation and internal
transportation will be on behalf of contractor The manufacturer must submit in the
offer an intensive training course proposal in english language within two weeks at
manufacturer firm, training will be for engine &transmission ,hydraulic , electric
wiring,…etc maintenance, repair, analyzing, faults diagnostic, loading software
program practically on the R.S., ACCHCO will review and evaluate the training
course proposal .
ACCHCO has the right to send four (4) engineers for two weeks for inspection and
testing R.S. performance in the manufacturer factory , air tickets and
accommodation and internal transportation will be on behalf of contractor.
1.10 Factory and site tests:
- Test load under twist locks (handling and maneuvering) must be 45 ton for five ( 5 ) stacking at the
first row& 35 ton for four ( 4 ) stacking at the second row ¬ less than 18 ton for (3) stacking at
third row .
- Tenderers must submit the factory test certificates for all main components installed in the
R.S.(Engine, axles, transmission, spreader, …etc) .
- Inspection and final tests in tenderer’s factory should be carried out under the supervision of one of
the international societies (LR,GL,ABS,BV) and in the presence of ACCHCO inspectors .
- The stamped certificates by one of the above mentioned international societies should be submitted
at the receiving stage
– All performance tests on site, is bidder’s responsibility and on his account to prepare all facilities
for performance test in primary acceptance .
– Charges due to supervision of the international society in tenderer’s firm will be on the tenderer’s
account .
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 8 of 22
CHAPTER II
2- R.S. requirements and performance :
2.1 Chassis & boom:
- Main frame must be heavy duty steel construction and of torsion resistant in accordance to the
acceptable international design standards to give maximum durability, rigidity and long service
life.
- The manufacturer must state the material and the chassis construction type.
- The boom must be telescopic box shape section the tenderer must submit full dimentions of the
boom(length, width& thickness) for both inner and outer boom .
- The boom must have a suitable construction to withstand high lateral and torsional stresses in
accordance to relevant international design standards.
- Design standards and classes should be mentioned.
2.2 Engine:
1. The diesel engine must be Volvo or Cummins( Volvo is preferable); new and latest model
;environment adapted of industrial type (Tier III emission compliant) without UREA.
2. The diesel engine must be heavy duty, four stroke in line cylinders arrangement with direct
injection, water cooled and equipped with direct mounted cooling fan and tropical heavy duty
radiator, the engine maximum power without fan must be not less than 350Hp at rated rpm.
3. Fresh air intake to engine must be through a suitable air cleaner with renewable air filter element.
4. Fuel /water-trap separator assembly and must be equipped with water drain system (done from
the cabin is preferable) .
5. The exhaust system must be of heavy duty type mounted in an up-swept position, completely
shielded with suitable expanded metal grill and must incorporate a rain cap or trap.
6. The engine must be protected with a shut-off device in case of mal-function,limphome (low oil
pressure and high water cooling temperature) . it will be checked at factory firm during inspection.
7. R.S shall be equipped with an automatic and adjustable delay shutdown time for engine after
ignition switch off.
8. R.S must be equipped with an automatic shutdown device to stop the engine after adjustable
certain time when the engine working in idle speed without any movement.
9. The engine production year must be the recent year of the offer.
10. The engine must be made by the original manufacturer (USA /G.B./ Western Europe /Japan) not
under license (under license will be rejected).
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 9 of 22
2.3 Transmission:
- The transmission system must be of a well known standard type, robust, and rated to transmit the
maximum engine torque, the transmission must be heavy-duty power shift with torque converter
suitable for the engine power,
- Number of speeds by gear selector with automatic shift not less than 3 forward and 3 reverse.
- The transmission must be equipped with protection device against sudden direction change.
- Tenderer must prove with a certificate from the transmission manufacturer for the compatibility of
the offered transmission with the offered engine accomplish with the related calculations & curves
to be evaluated.
- The fixation between torque converter and engine must be flexible steel plates (Ring gear will be
rejected).
2.4 Front (drive) axle:
Front drive axle must be Kessler Germany :wider type(not less than 4000 mm) -high strength, heavy-
duty rigid type with dual reductions through drives head and planetary gears in wheel hub.
All front wheel should be mounted on the drive axle .
2.5 Rear (Steer) axle:
Steering axle with extra-wide operational range. Full hydro static power steering single cylinder/ double
acting type, steering shafts must have an ability for greasing. The bidder must submit all detailed
information about the axle (manufacturer, capacity , ……. etc. ).
2.6 Hydraulic system:
- Hydraulic system must consist of pumps,hyd.motors, filters, valves. safety valves must be
incorporated in the speed limiting system for both telescoping , lifting and lowering. Relief valves
must be provided and fitted to the hydraulic system and also safety valves that prevent boom in and
boom lowering in case of hydraulic system failure . Hydraulic oil cooling system must be fitted.
Filters must be fitted in the hydraulic return line.
- Separated hydraulic tanks for brake oil and working hydraulics.
- Adequate number of pressure checking points must be provided at suitable positions as
recommended by the manufacturer.
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 10 of 22
- The hydraulic system design must have the proper protocol and components that ensure
that no uneven lifting of the RH and LH cylinders that can lead to boom torsion.
2.7 Brake system
- The brake system must be suitable and durable to perform its function. Bidder has to indicate the
manufacturer and specify the system.
- Service brake and parking brake must be separate as follows:-
a. Service brake ( wet disc brake) on drive axle fully enclosed and maintenance free ; actuated from
the cabin by pedal.
b. Parking brake must be actuated from cabin;consists of disc brake on the universal drive shaft.
Preferable to be between universal drive shaft and differential, actuated by a powerful spring and
released hydraulically.
2.8 Steering system:
- Full hydro static power steering single cylinder type . Bidders are requested to specify and submit full
information about the system and manufacturer of its components.
-Steering valve (orbitrol)should be outside the cabin.
2.9 Greasing System
- The R.S. should be equipped with 2 separate automatic greasing units with tank capacity not less
than 6 kgs /unit , to grease and cover all movable & rotating parts (steering, boom ,spreader lifting
cylinders, ..etc).
- Greasing unit must have the ability to setup its pause and operating time.
2.10 Tyres and wheels
- Heavy-duty type interchangeable front and rear wheels pneumatic tyres BAIS type.
- Tyre size must be not less than 1800x33 .
- Bidder must indicates the manufacturer and specifications of tyres and rims .
- Preferable : Bridgestone––Yokohama.
- Drive axel wheels should be four ( 4 ).
- Steer axel wheels should be two ( 2 ).
2.11 Spreader
- Must be telescopic provided with 2 hydraulic extension cylinders (chain type not acceptable) and
high mounted , adjustable for 20 and 40-feet (ISO standard) containers and flats (ELME
INNOVATION is preferable) . Spreader must be equipped with 4 floating/pendular twist locks
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 11 of 22
and relevant indicators, electric cable and hoses for cylinder of twist lock must be inside spreader
beam.
- Spreader signal lights indicating spreader function status, must be provided on the spreader and
in driver’s cab and must be easily visible by driver for all spreader positions.
- Rotation not less than +190/-95 degree.
- Side shift of spreader must be not less ± 800 mm in both directions.
- The spreader must be able to mechanically pile slope.
- The spreader must be equipped with 2 rotation motors.
The Spreader must be provided with the following safeties:-
a- Safety device preventing container locking, when all twist locks are not correctly seated,
b- Safety device preventing container lifting when all twistlocks are not correctly locked. (no lock no
lift ),
c- Safety device preventing, container unlocking, when all twistlocks are not correctly seated,
d- Safety device preventing, spreader down when twist locks are seated,
e- Safety device preventing spreader extension when spreader is locked,
f- Safety device preventing spreader extension when spreader is seated.
g- Safety device preventing boom extension when spreader is seated.
h- Each twistlock is protected individually against unwanted rotation (mechanical interlocking against
faulty locking and unlocking) .
2.12 Cabin.
1. Must be safe, comfort.
2. Provide wide visibility range for the driver to do his job easily; and has interior mirror.
3. The front shield glass must be safe type(Semi flat is preferable) and equipped with wipers.
4. Cabin must be able to be slide electrically or hydraulically.
5. Two sides’ movable safety glass windows( up to down is preferable).
6. Noise proof, heat insulated and has efficient ventilation.
7. Provided with suitable fire fighting extinguishers (2 x 6 kg powder) From Egyptian local
market to meet the traffic regulations.
# The cabin must be equipped with:-
1- Indicators for the following functions:
a. Spreader correctly seated on the container.
b. Spreader twist locks closed.
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 12 of 22
c. Spreader twist locks opened.
2- A multifunctional display must has and indicates :
a- Parker IQAN control or equivelant ( Parker IQAN is preferable ).
b- Written and readable faults (engine, transmission, hydraulic system).
c- Transmission calibration needed must be done from the display.
d- Maintenance intervals must be shown in display (preferable pop up/splash screen) .
e- Lift height ,boom angle & boom length .
f- Engine Cooling temperature
g- Engine RPM.
h- Engine Oil Pressure gauge.
i- Fuel level.
j- Transmission oil temperature and pressure.
k- Hour meter.
l- Container actual weight and total number of the handled containers.
m- Safety override by pass key switch for spreader (preferable done from the display) .
n- Safety over load by pass key switch .
o- Access steps/ladder to the cabin with hand rail must to be from both sides.
3- Multifunction joystick to control hydraulic functions and spreader
4- Control gear shift selector is preferable to be separate .
5- Warning indicators for:-
a. Battery Charging.
b. Low oil pressure for engine.
c. Parking brake.
d. Low oil pressure for brake system.
e. low engine coolant level.
f. Direction indicator.
2.13 Stability
R.S. must be stable at full operating parameters, and protected against tipping .
Stability factor must comply with international standards (standards must be mentioned).
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 13 of 22
2.14 Performance
Tenderer must submit in his offer:
1 - Boom full out/in time (laden, empty) .
2 - Boom full lifting/lowering time (laden, empty).
3 - Combination time for boom telescopic and derricking.
4 - Spreader telescopic time.
5 -Maximum traveling speed for R.S. with / without load
6 Acceleration rate with / without load.
2.15 Safeties
In addition to the previously stated safeties for hydraulic system stated in item (2 – 6), safeties for
spreader stated in item (2 – 12), and for cabin in item (2-13)
The R.S. must be equipped with:-
1- Anti - tipping device to prevent boom out and lowering the load when the design limits of the
machine have been reached .
2- An audible and visible warning must be fitted to warn the driver when approach 90% of the
max. load.
3- Automatic twist locks locking activation for spreader when are seated.
4- Camera at rear/back up and camera at boom nose with LCD coloured monitor inside the cabin.
5- Transmission protection against sudden change of direction.
6- Rotating beacon on boom.
7- Acoustic back up warning alarm with back up LED light, direction and rear stops indicators
8- Extra working LED (not less than 3000 lumin) under front of outer boom .
9- LED spot lights on spreader (not less than two).
10- LED spot lights(position,reverse,brake and the mudguards.
11- Rear view mirrors in both mudguard sides
12- Maintenance free batteries in a suitable place.
13- Extra external analogue operating hour meter.
The R.S. Is preferable to be equipped with:-
1- Automatic thermal fuses (circuit breaker) .
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 14 of 22
2- Automatic parking brake activation & gearshift inching in case of driver leave his
seat.
3- An external oil dipstick for both engine & transmission.
4- Spot light in electric control box.
2.16 Guarantee:
- The manufacturer must guarantee the R.S with all components manufactured
for a period of two years with unlimited operating hours against 10% of the total value
of the contract.
- After these two years, an additional two years for both boom and chassis guarantee
against 5% from the total value of the contract
The guarantee will be started from primary acceptance /start up date at
ACCHCO site.
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 15 of 22
Technical Data List
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 16 of 22
Technical data list
1. THE OFFERED MACHINE:
A. Manufacturer – origin :
B. Model:
2. CAPACITY :
A. 1 row / load center : ton/mm
B. 2 row / load center : ton/mm
C. 3 row / load center : ton/mm
3. OVERALL DIMENSIONS :
A. Length including spreader
B. Width
C. Wheel base
D. Ground clearance
E. Turning radius
F. 90° stacking aisle(40 feet container)
4. PRE-QUALIFICATION :
No. of machines of the same type :
5. ENGINE :
A. Manufacturer/origin :
B. Type :
C. Power: Hp/r.p.m
D. Torque: Nm/r.p.m
E. No. of cylinders:
F. Malfunction shut off device Yes/No
6. TRANSMISSION : A. Manufacturer/origin –:
B. Model /Type :
C. No. of gears F/R :
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 17 of 22
D. Power: Hp
E. Torque : Nm
F. Protection device againest sudden change
Yes/No
7. DRIVE AXLE : A. Manufacturer and model :
B. Drive axle static capacity ton
C. Drive axle dynamic capacity ton
8. REAR AXLE: A. Manufacturer and model :
B. Rear axle capacity with /without load Ton
9. CHASSIS & BOOM:
A.
B.
C.
Description of chassis design, type, manufacture
technique, steel code & properties and welding
electrodes must be mentioned.
Design standards and classes should be specified
Boom Section dimensions (length,width&thickness)
for the two stages are required
10. BRAKE SYSTEM :
A. Main brake :
Manufacturer, type , braking force , cooling fluid,
braking fluid and location
B. Parking brake :
Manufacturer, type, braking force, and location
11. HYDRAULIC SYSTEM : A. Type of pumps :
B. Type of control valves :
C. Type of accumulators
D. Safety control valve to avoid abrupt lowering of
load in case of hydraulic failure. Yes/No
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 18 of 22
12. SPREADER :
A. Manufacturer and origin
B. Model:
C. Spreader weight : ton
D. Side shift (R/L) : mm
E. Rotation at both direction : degrees
F. MPS: degrees
G. No. of rotation motors :
H. No. of damping cylinders :
I. -Safety device preventing container locking when all
twist-locks are not correctly seated.
-Safety device preventing container lifting, when all
twist-locks are not correctly locked. ( No lock No lift )
-Safety device preventing container unlocking when
all twist locks are not correctly seated.
-Safety device preventing spreader down when
twistlocks are seated.
-Safety device preventing extension when spreader is
locked
- Safety device preventing extension when spreader is
seated
- Mechanical interlocking against faulty locking and
unlocking
13. TYRES & RIMS : A. Manufacture of Tyres:
B. Manufacture of Rims:
C. Size
D. ply rating
E. Tread depth :
14. WEIGHTS : A. Weight of reach stacker unladen :
B. Front axle load at load center L1 :
(unladen / at rated load) :
C. Front axle load at load center L2 :
(unladen / at rated load) :
D. Front axle load at load center L3 :
(unladen / at rated load) :
E. Front axle load at driving position at rated load
F. Rear axle at load center L1
(unladen / at rated load) :
G. Rear axle at load center L2
(unladen / at rated load) :
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 19 of 22
H. Rear axle at load center L3
(unladen / at rated load) :
I. Rear axle load at driving position at rated load:
L1: Load center at 1 row
L2: Load center at 2 row
L3: Load center at 3 row
15. PERFORMANCE : A. Boom full telescopic time (load/empty) :
B. Boom full derricking time (load/empty) :
C. Combination time for boom telescopic and
derricking
D. Spreader telescopic time
E. Gradeability laden/unladen
16. SAFETIES :
LIST(1)
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 20 of 22
Attached Sprae Parts List
Descriptions Qty
Unit
Price
Total
Price
Tenderer
Part No
Sub-
supplier
Part No
1- For filters
All filters needed to maintain each RS
for 8000 operating hours :
1- Engine oil filter
(Bidder must take in his consideration
that the engine oil filter change interval is
250 working hours)
2- Fuel filter
3- Engine air filter
4- Hydraulic filter
5- Breathing filters
6- Transmission filter
7- Water separator
8- Return hyd. Filter
And other filters exist in RS
2- For wheels :
1- Spare wheel complete with rim
2- Spare tyre without rim
8
8
List (2)
Recommended Spare Parts
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 21 of 22
Descriptions Qty
Unit
Price
Total
Price
Tenderer
Part No
Sub-
supplier
Part No
1- For Engine
1- Turbocharger
2- Water pump
3- Starter motor
4- Alternator
5- Fuel injectors
6- Fuel Pump
All engine hoses (fuel – water – air)
2
2
2
2
12
2
2 set
2- For Hydraulic system:
1- Hydraulic pump of each type exist in RS.
2- Repair kit for each type of hydraulic cylinders exist in RS
3- Control lever(joystick)
4- Electric Solenoid valve for each type exist in RS
5- Hydraulic motor for each type exist in RS
2
2
2
2
2
3- Set of all belts 2 sets
4- Electronic components
1- Set of all electronic cards exist in the RS programmed and
ready to use as: EMS for Engine, TCU for transmission,
cabin main display,spreader and any control unit exist in
the RS.
2- Engine sensors set includes (camshaft, crank shaft, flywheel,
fuel, boost pressure, temperature, oil pressure & any other
sensors exist).
3- Transmission sensors set includes ( turbine, speed
,pressure, temperature any other sensors exist)
4- All Hydraulic sensors & tranceducers exist
5- Set of working lights LED
2 sets
5 - For spreader
1- Complete Set of twist locks for spreader includes (sleeve, washers, nuts
….etc.)
2- Hydraulic cylinder for Twist lock
3- Complete Set of proximity switches
2 set
6-Set of all Anti wear Pads in the RS (Including
Spreader)
2 sets
7- Tyre 24
TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS
Page 22 of 22
Tender Technical Evaluation will be by pointing system
No ITEM %
1 Main frame(chassis, boom, and overall dim. ) 10
2 Drive train(engine-transmission-drive axle) 25
3 Hydraulic, Steering and Brake system 10
4 Performance and Stability 10
5 Spreader 15
6 Cabin and Safeties 15
7 After sale service ,Experience 15
Total 100
ال حقم سبت و % نكم بد عهي حد 08 ال حقم ع حصم عهي سبتأانقبول فا جب طاء انعأاحفقج انهجت
. انفدرجاث انخقى أجان % ي 08 ع
/ / انراسيخ :
خطاب ضمان الدفعة المقدمة رقم
انسادج/ ششكح االسكذسيح نرذاول انذاوياخ و انثضائع
يياء االسكذسيح –يذطح انذاوياخ 49-94سصيف
ض تقرضي هزا
في دذود يثهغ
) فقط
تخصىص
و رعهذ تذفع هزا انثهغ نذي اول طهة يكى و تذو انظش اني ايح يعاسضح و يسشي يفعىل خطاب انضا هزا
دري / /
و عهي رنك فا ايح يطانثح تانقيح في هزا انشأ يجة ا ذقذو نا دري هزا انراسيخ يصذىتح تاالذي
ال شئ
ح دري رنك انراسيخ يقضي يكى ايح يطانثح تانقيفارا نى ذصها انرزايا ي ذهقاء فسه و يصثخ هزا انضا الغيا و ضارا يرهيح.
انشجاء اعادج خطاب انضا هزا انيا عذ ارهاء انذج نالنغاء
و ىد االفادج ا انصىس انفىذىغشافيح و انكشتىيح نهزا انخطاب ال يعرذ تها.
نا ته الصذاس خطاتاخ انضا.و قش تاا نى رعذ انذذ انصشح
و ذفضهىا تقثىل فائق االدرشاو ,
: يشاعي ا يصذس خطاب انضا ي تك يذهي دسجح ملحوظة ثك انشكزي.اوني يعرذ ي ان
Date: / /
ADVANCE PAYMENT L/G NO.
Messrs , Alexandria container & cargo handling CO.
Quay 49-50 containers terminal – port of Alexandria
We hereby guarantee
To the extent of
(Say
In respect of
And we undertake to pay his sum on your first demand, Notwithstanding any contestation. This letter of guarantee holds good until the / /
Consequently, any claims for payment in respect thereof should be made to us by that date accompanied by:
Should we receive no claim for payment from you by that date, our liability will cease "ipso facto" and the present letter of guarantee will definitely become null and cancelled and our guarantee expired.
Please return to us this letter of guarantee on expiry date for cancellation.
Please be informed that the photocopies and copies of this letter are considered non negotiable copies. We certify that we have not exceeded the limit permitted to us for issuing letters of guarantee.
Yours faithfully,
ذ انعرانرىقيع
Authorized signature
يعرثش خطاب انضا الغيا و ال يعرذ ته في دانح وجىد
اي ذعذيم او كشط او اضافح اني انثيااخ انىاسدج ته دري
ا كاد يعرذج
Date: / /
BID BOND GUARANTEE NO.
Messrs.' of Alexandria Container& Cargo Handling
Co.
Quay 49-54 Containers Terminal – Port of Alexandria
With reference to the tender of
In connection with the adjudication no
Date
For the supply of
We hereby undertake to hold at your disposal as
provisional deposit, free of return and payable in
cash on your first demand and notwithstanding any
contestation by the tenders the sum of:
This undertaking remains in force until a decision is
taken on the offer and ( in the event of the whole or
part of the offer being accepted) until the tenders
has provided such final guarantee deposit as may be
required but it will in any case automatically expire
on the / /
Consequently any claim for payment in respect
thereof should be made to us by the
accompanied by :
At the least should we receive no claim for payment
from you by that date , our liability will cease “ ipso
facto “ and the present letter of guarantee will
definitely become null and void.
This guarantee is not to be used as final guarantee ,
please be informed that the photocopies and copies
of this letter are considered non-negotiable copies.
Please return to us this letter of guarantee on expiry
date for cancellation.
We certify that we should have not exceeded the
limit permitted to us for issuing letters of guarantee.
Yours faithfully,
التوقيع المعتمد
Authorized signature
/ / التاريخ:
خطاب الضمان االبتدائى رقم
انسادج / ششكح االسكذسح نرذال انذااخ انثعائغ
ياء االسكذسح –يذطح انذااخ 49-94سصف
تاالشاسج ان انؼطاء انقذو نكى ي
تخصص انقاصح سقى
تراسخ
نرسذ
تذ رؼذ تقرع زا تأ عغ ذذد ذصشفكى كرأي اترذائ,
ػائذ, قاتال نهذفغ قذا ػذ أل طهة يكى تغط انظش ػ أ
اػرشاض ي يقذي انؼطاء يثهغ :
سش يفؼل يفؼل زا انرؼذ ان أ رخز قشاس تشأ انؼطاء
) ف دانح قثل انؼطاء كه أ جضء ي ( ان أ قو يقذو انؼطاء
نك سر ػه أ دال تاذاع انعا انائ انز قذ ذطهث
ذهقائا ف / /
ػه فا أ يطانثح تانقح ف زا انشأ جة أ ذقذو انا ف
يؼاد غار
يصذتح تاالذ :
فارا نى ذصها يكى اح يطانثح تانقح ف زا انشأ در رنك انراسخ,
ئا يرح.قع انرضايا ي ذهقاء فس ذصثخ ز انعاح ا
كا ا ال جص اسرخذاي كعا ائ , د االداطح ا انصس
انفرغشافح انكشتح نزا انخطاب ال ؼرذ تا.
انشجاء أ ذؼذا انا خطاب انعا زا ػذ اراء انذج نالنغاء.
قش تاأا نى رؼذ انذذ انصشح نا ت ألصذاس خطاتاخ انعا
ذفعها تقثل فائق االدرشاو ,
ؼرثش خطاب انعا الغا ال ؼرذ ت ف دانح جد أ ذؼذم أ
كشط أ اظافح ان انثااخ اناسدج ت در ا كاد يؼرذج
شاػ أ صذس خطاب انعا ي تك يذه دسجح أن يؼرذ ي انثك انشكض. : ملحوظة
Date : / /
PERFORMANCE BOND NO.
Messrs Alexandria Container & Cargo Handling Co.
Quay 49- 54 Containers Terminal – Port of
Alexandria
We hereby guarantee
To the extent of
(Say
In respect of
And we undertake to pay this sum on your first
demand, notwithstanding any contestation .This
Letter of guarantee holds good until the / /
Consequently , any claims for payment in respect
thereof should be made to us by that date
accompanied by :
Should we receive no claim for payment from you by
that date , our liability will cease “ ipso facto “ and
the present letter of guarantee will definitely
become null and cancelled and our guarantee
expired.
Please return to us this letter of guarantee on expiry
date for cancellation.
Please be informed that the photocopies and copies
of this letter are considered non-negotiable copies.
We certify that we should have not exceeded the
limit permitted to us for issuing letters of guarantee.
Yours faithfully,
انرقغ انؼرذ
Authorized signature
التاريخ: / /
رقم خطاب الضمان النهائى
انسادج / ششكح االسكذسح نرذال انذااخ انثعائغ
ياء االسكذسح –يذطح انذااخ 49-94سصف
ذع تقرع زا
ف دذد يثهغ
)فقط
تخصص
رؼذ تذفغ زا انثهغ نذ أل طهة يكى تذ انظش ان اح
يؼاسظح سش يفؼل خطاب انعا زا
در / /
ػه رنك فا أح يطانثح تانقح ف زا انشأ جة أ ذقذو نا در
تح تاالذ :زا انراسخ يصذ
فارا نى ذصها يكى أح يطانثح تانقح در رنك انراسخ قع
انرضايا ي ذهقاء فس صثخ زا انعا الغا ظارا يرح.
انشجاء اػادج خطاب انعا زا انا ػذ اراء انذج نالنغاء
د االفادج ا انصس انفرغشافح انكشتح نزا انخطاب ال ؼرذ
تا
قش تأا نى رؼذ انذذ انصشح نا ت ألصذاس خطاتاخ انعا
ذفعها تقثل فائق االدرشاو ,
ؼرثش خطاب انعا الغا ال ؼرذ ت ف دانح جد أ ذؼذم أ
ظافح ان انثااخ اناسدج ت در ا كاد يؼرذجكشط أ ا
: شاػ أ صذس خطاب انعا ي تك يذه دسجح أن يؼرذ ي انثك انشكضملحوظة
TO WHOM IT MAY CONCERN
Hereby I …….. Board director of …………… And duly authorized
to engage the company, give power to attorney to Messrs …………….
Our commercial agent in A.R.E to sign the contract for the supply of
…………… according to our offer No. ………… For Branch of
Alexandria Container And Cargo Handling Co, Private Free Zone, on
behalf of our company.
Name:
Signature:
Date:
PROFORMA INVOICE No. Date / /
ITEM DESCRIPTION QTY UNIT
PRICE
TOTAL
PRICE
1
VALUE OF EQUIPMENT ( C.I.F )
INCLUDING TEST , INSTALATION AND START UP ON
SITE.
2 PERSONNEL TRAINING IN FACTORY
ON SITE
3 COST FOR COMPANY ENGINEERS INSPECTION
4 CHARGES FOR INTERNATIONAL SOCIETY IN FACTORY
5 ATTACHED SPARE PARTS
Total value CIF on site
COUNTRY OF ORIGIN :
PORT OF SHIPMENT :
DELIVERY PERIOD CIF ON SITE:
PAYMENT TERMS :
VALIDITY :
`WE CONFIRM THAT THIS PROFORMA INVOICE IS TRUE AND CORRECT.
MESSRS
BRANCH OF ALEXANDRIA CONTAINER AND CARGO HANDLING CO,
PRIVATE FRE ZONE
QUAY 49-54 PORT OF ALEXANDRIA
ALEXANDRIA, EGYPT
1
ARAB REPUBLIC OF EGYPT
MINISTRY OF BUSINESS SECTOR
HOLDING COMPANY FOR MARITIME & LAND TRANSPORT
ALEXANDRIA CONTAINER AND CARGO HANDLING COMPANY
GENERAL CONDITIONS
FOR GENERAL TENDER TO SUPPLY AND DELIVERY
FOR FOUR (4) LADEN CONTAINER REACH STACKERS
Capacity 45 ton under twist lock
2
GENERAL CONDITIONS
FOR GENERAL TENDER TO SUPPLY AND DELIVERY
FOR FOUR (4) LADEN CONTAINER REACH STACKERS
Capacity 45 ton under twist lock TENDERNESS ARE INVITED BY FOREIGN PURCHASING COMMITTEE OF BRANCH OF ALEXANDRIA
CONTAINER & CARGO HANDLING COMPANY PRIVATE FREE ZONE (ACCHCO) TO SUPPLY AND DELIVERY OF
FOUR (4) LADEN CONTAINER REACH STACKERS CAPACITY 45 TON UNDER TWIST LOCK, AS FOLLOWS:
- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA
CONTAINER TERMINAL - PRIVATE FREE ZONE, QUAY 49-54 , PORT OF
ALEXANDRIA,ALEXANDRIA,EGYPT.
- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA
CONTAINER TERMINAL- PRIVATE FREE ZONE, QUAY 96 , PORT OF EL DEKHEILA,
ALEXANDRIA, EGYPT.
- BEFORE SUBMITTING THE TENDERS, THE TENDERERS SHOULD CAREFULLY REVISE THESE INSTRUCTIONS
AND TECHNICAL SPECIFICATIONS.
- TENDERERS HAVE THE RIGHT TO ASK ANY QUESTIONS THAT CAN CLARIFY ANY MISUNDERSTANDING
BEFORE SUBMITTING THEIR OWN PROPOSAL UP TO 21 DAYS BEFORE OPENING ENVELOPE (A).
- TENDERERS MUST PRESENT THEIR TENDER COMPLYING WITH TECHNICAL SPECIFICATIONS, IN CASE
TENDERS NOT COMPLYING WITH THE TECHNICAL SPECIFICATIONS THE COMPANY HAS THE RIGHT TO
REJECT THESE TENDERS.
- TENDERERS SHOULD CONSIDER ALL THE TENDER ITEMS AND STICK TO THE SPECIFIED TECHNICAL
SPECIFICATIONS IF ANY TENDERER DESIRES TO OFFER SPECIAL CONDITIONS OR INTRODUCE TECHNICAL
CHANGES OR ALTERATION HE MAY SEND THESE MODIFICATIONS BY SEPARATE LETTER PROVIDED THAT
IT REACHES THE PURCHASING COMMITTEE BEFORE THE FIXED DATE AND TIME FOR SUBMITTING THE
ENVELOPE (A) .
- TENDERES SHOULD COMPLY WITH ALL THE TENDER'S BOOK ATTACHED SPECIMENS ESPECIALLY THE
CONTRACT TERMS & CONDITIONS, AND THE COMPANY COULDN'T ACCEPT ANY AMENDMENTS UPON IT.
- THE COMPANY COULDN’T ACCEPT ANY QUESTIONS CONCERNING THE DESIGN , REVIEWING THE
DRAWING OR AMENDMENTS AFTER THE FIXED DATE AND TIME FOR UNSEALING ENVELOPE (A)
- NO ATTENTION WILL BE PAID TO TENDERS NOT INCLUDING THE FINANCIAL C.V REQUIRED IN ENVELOPE
(A) AS IT IS CONSIDERED AN OBLIGATION
- IN CASE OF INSERTING ANY FINANCIAL / COMMERCIAL CONDITIONS IN THE TECHNICAL OFFER , NO
ATTENTION WILL BE PAID TO THIS CONDITION .
- TENDERER IS OBLIGED TO SIGN AN ACCEPTANCE UNDERTAKEN AS PER ATTACHED FORM.
- ALL QUESTIONS & ANSWERBACKS WILL BE SUBMITTED TO ALL TENDERERS.
ART. 1- SUBMISSION OF TENDERS:
THE TENDERS MUST BE DELIVERED IN THREE COPIES (ONE ORIGINAL + 2 PHOTOCOPIES) AND PLACED IN 2
SEPARATE ENVELOPES (A, B) SEALED WITH SEALING WAX.
IN CASE OF ANY DISCREPANCY, THE ORIGINAL SHOULD BE CONSIDERED.
3
THE TENDER DOCUMENTS TO BE PRESENTED AS FOLLOWS:
ENVELOPE (A) : INCLUDES THE FOLLOWING:
1. TECHNICAL OFFER AND TECHNICAL SPECIFICATIONS.
2. PAST EXPERIENCE (REFERENCE LIST) AUTHORIZED BY THE CHAMBER OF COMMERCE.
3. THE PROVISIONAL DEPOSIT.
4. FORM 14C , COPY OF TAXES CARD & COMMERCIAL REGISTRY FOR LOCAL AGENT OR LOCAL TENDERER .
5. FINANCIAL C.V FOR THE SUPPLIER CONFIRMED BY FIRST CLASS BANK.
6. THE COMMITMENT ATTACHED WITH TECHINCAL SPECIFICATIONS SIGNED BY AUTHORIZED PERSON .
7. POWER OF ATTORNEY FROM SUPPLIER TO AUTHORIZED PERSON RESPONSIBLE TO SIGN THE CONTRACT.
ENVELOPE (B) : INCLUDES THE FOLLOWING :
ITEMIZED FINANCIAL OFFER AND CONDITIONS AND ANY ELEMENTS AFFECTS THE FINANCIAL OFFER.
- BOTH ENVELOPES (A) & (B) SHOULD BE PUT TOGETHER INSIDE ANOTHER ENVELOPE TO BE SUBMITTED
ON DATE OF OPENING ENVELOPE (A) & TO BE ADDRESSED AS FOLLOWS:
PRESIDENT OF FOREIGN PURCHASING COMMITTEE OF BRANCH OF ALEXANDRIA
CONTAINER AND CARGO HANDLING CO. BRIVATE FREE ZONE. QUAY 49/54 PORT OF ALEXANDRIA .
FAX: 03-4862124 E-MAIL: [email protected]
TITLE: GENERAL CONDITIONS FOR GENERAL TENDER TO SUPPLY AND DELIVERY
FOUR (4) LADEN CONTAINER REACH STACKERS CAPACITY 45 TON UNDER TWIST LOCK
- TENDER DOCUMENTS SHOULD BE SIGNED BY AUTHORIZED PERSONS.
- THE DATE AND TIME OF ENVELOPES DELIVERY TO THE FOREIGN PURCHASING COMMITTEE SHOULD
BE BEFORE 12.00 O’CLOCK AT NOON.
* OPENING OF THE TECHNICAL ENVELOPE (A) AT 12.00 O’CLOCK ON / /2019
* OPENING OF THE FINANCIAL ENVELOPE (B) AT 12.00 O’CLOCK ON / /2019
FOR SUCCESSFUL AND ACCEPTED TECHNICAL OFFERS.
- ENVELOPES RECEIVED AFTER DATE AND TIME WILL NOT BE CONSIDERED, WHATEVER MAY BE THE
REASON OF DELAY.
- TENDERERS OR THEIR AUTHORIZED REPRESENTATIVES SHOULD ATTEND BOTH UNSEALING ENVELOPES
(A) & (B) AGAINST A STAMPED AUTHORIZATION FORM ISSUED BY CONTRACTOR TO ATTEND.
- NO ATTENTION WILL BE PAID TO ANY FINANCIAL MODIFICATION RECEIVED AFTER OPENING OF THE
ENVELOPE (A).
ART. 2- PRICE LIST:
TENDERERS SHOULD OBSERVE THE FOLLOWING PROCEDURES IN THE PRICE LISTS OR THEIR SUBSTITUTES:
A) PRICE MUST BE GIVEN ON CIF BASIS ON SITE, BRANCH OF ALEXANDRIA CONTAINER &
CARGO HANDLING COMPANY - PRIVATE FREE ZONE, QUAY 49-54 PORT OF ALEXANDRIA, &
QUAY 96 PORT OF EL DEKHEILA, ALEXANDRIA - EGYPT ,
THE PRICE INCLUDES: THE VALUE OF THE REACH STACKERS (COST, INSURANCE AND FREIGHT).
TESTS, COMMISSIONING IN FACTORY AND AT SITE.
COSTS OF INSPECTION OF FOUR ENGINEERS AT FACTORY FOR TWO WEEKS .
COSTS AND EXPENSES OF INTERNATIONAL CLASSIFICATION SOCIETY IN FACTORY.
COSTS FOR THE TRAINING OF FOUR ENGINEERS & FOUR TECHNICAL AT FACTORY FOR TWO WEEKS
COSTS FOR THE TRAINING ON SITE.
ATTACHED SPARE PARTS.
FOUR ELECTRIC SCREEN SHEET (TAB)
EIGHT FIRE EXTINGUISHERS 6 KG FROM THE LOCAL MARKET.
4
VESSEL DISCHARGING EXPENSES, CUSTOMS, CLEARANCE FEES AND STORAGE FEES IN
A.R.E AND INTERNAL TRANSPORT TO FIRST PARTY CONTAINER TERMINALS LOCATION IN
ALEXANDRIA AND DEKHELA PRIVATE FREE ZONE.
B) TOTAL PRICE SHOULD BE WRITTEN IN FIGURES AND IN WORDS. THE UNIT PRICE FOR EACH ITEM
SHOULD BE SPECIFIED IN THE PRICE LIST.
C) NO ERASURES OR CROSSING SHOULD BE MADE IN THE PRICE LISTS.
IN CASE OF ANY DIFFERENCE BETWEEN THE UNIT PRICE AND THE TOTAL PRICE, THE UNIT PRICE
WILL BE CONSIDERED CORRECT.
ART. 3- ORIGIN OF ARTICLES:
IT SHOULD BE MENTIONED CLEARLY IN THE TENDERS THE ORIGIN OF EACH ITEM AND MUST NOT BE UNDER
LICENSE. FALSE INFORMATION GIVEN WILL ENTAIL REFUSAL OF THE ARTICLE. THE TENDERER SHOULD BE
SUBMIT A CERTIFICATE OF ORIGIN LEGALIZED BY A.R.E REPRESENTATION WITH SHIPPING DOCUMENTS.
ART. 4-CUSTOM DUTIES AND TAXES:
PRICES QUOTED BY TENDERERS SHOULD COMPRISE: ALL RIGHT CHARGES, STAMP DUTIES AND ALL OTHER
TAXES ACCORDING TO THE TENDERERS COUNTRY LAW AND FEES TO BE PAID ABROAD ACCORDING TO
THEIR LAWS AND REGULATIONS.
ALL STAMP DUTIES AND TAXES TO BE PAID IN ACCORDANCE WITH LAWS OF THE ARAB REPUBLIC OF EGYPT
(A.R.E.) SHOULD BE BORN BY THE BRANCH OF ( ACCHCO.) - PRIVATE FREE ZONE .
CUSTOMS CLEARANCE WILL BE CARRIED OUT BY THE SUPPLIER ON HIS RESPONSIBILITY AND ACCOUNT
(INCLUDING DOCKAGE & WHARFAGE CHARGES, UNLOADING, LOCAL TRANSPORTATION, AND STORAGE
CHARGES IN A.R.E).
ART. 5-VALIDITY OF TENDERS:
TENDERS MUST BE VALID FOR 90 DAYS FROM THE DESIGNATED DATE OF OPENING ENVELOPE (A).
AT THE EXPIRE DATE OF TENDER VALIDITY, THE TENDERER MAY WITHDRAW HIS PROVISIONAL DEPOSIT,
AND IN THIS CASE THE TENDER BECOMES NULL AND INEFFECTIVE.
IF THE TENDERER WITHDRAWS HIS TENDER BEFORE THE DESIGNATED DATE OF UNSEALING TENDERS, THE
PROVISIONAL DEPOSIT WILL BE FORFEITED TO THE COMPANY WITHOUT NEED FOR ANY NOTICE OR
RECOURES TO COURTS.
IF HE DOES NOT WITHDRAW HIS DEPOSIT, HE WILL BE DEEMED TO REMAIN BOUND BY HIS TENDER UNTIL
COMPANY RECEIVES NOTICE FROM HIM FOR WITHDRAWAL OF HIS DEPOSIT AND CANCELLATION OF HIS
TENDER.
ART. 6- RESIDENCE OF TENDERER:
THE TENDERER MUST GIVE THE NAME AND ADDRESS OF HIS AGENT OR REPRESENTATIVE RESIDING IN
EGYPT.
TENDERS SUBMITTED BY AGENTS REPRESENTING CONTRACTORS MUST BE ACCOMPANIED BY A POWER OF
ATTORNEY DULY AUTHENTICATED BY THE COMPETENT AUTHORITIES.
5
ART. 7- PAYMENT TERMS:
THE CONTRACT VALUE SHALL BE PAID BY AN IRREVOCABLE & DIVISIBLE LETTER OF CREDIT AND PAYMENT
TERMS WILL BE AS FOLLOWS:
20% OF THE VALUE OF THE CONTRACT AS ADVANCE PAYMENT AGAINST AN IRREVOCABLE BANK
LETTER OF GUARANTEE OF THE SAME VALUE AND CURRENCY WITHOUT ANY CONDITIONS OR
RESERVATIONS TO BE SUBMITTED BY THE CONTRACTOR AND ACCEPTED BY THE COMPANY VALID FOR
A PERIOD NOT LESS THAN TWO MONTHS AFTER THE DATE OF ACCEPTANCE OF THE TRUCKS ( AS PER
ATTACHED FORM ) .
THE SAID VALUE SHALL BE TRANSFERRED AGAINST A SIMPLE NOTIFICATION FROM THE COMPANY TO
THE BANK.
70% OF THE VALUE OF THE CONTRACT AFTER RECEIVING, COMMISSIONING AND ACCEPTING THE R.S.
AND ITS ATTACHMENTS BY THE COMPANY.
THE SAID VALUE SHALL BE TRANSFERRED AGAINST A SIMPLE NOTIFICATION FROM THE COMPANY TO
THE BANK.
10 % OF THE VALUE OF THE CONTRACT AGAINST A CERTIFICATE ISSUED BY THE COMPANY
CONFIRMING THE TERMINATION OF THE TRAINING ON SITE. THE TRAINING PROGRAM SHOULD BE
TWO WEEKS FROM THE DATE OF HANDING OVER AND THE PRELIMINARY ACCEPTANCE OF THE
TRUCKS AFTER CONCLUDING PERFORMANCE TESTS ON SITE.
- IF THE TENDERER DESIRE TO PROPOSE AN ALTERNATIVE PAYMENT TERMS SHOULD BE NOTED THAT ANY
ADVANCE PAYMENT (BEFORE RECEIVING ON SITE) WILL BE AGAINST AN IRREVOCABLE BANK LETTER OF
GUARANTEE OF THE SAME VALUE AND CURRENCY WITHOUT ANY CONDITIONS OR RESERVATIONS.
- IF THE SUPPLIER NEEDS TO CONFIRM THE L/C, THE CONFIRMATION FEES WILL BE BORN BY HIMSELF.
ART. 8 THE PROVISIONAL DEPOSIT:
TENDERS MUST BE ACCOMPANIED BY A PROVISIONAL DEPOSIT LE 1000000 OR EQUIVALENT.
ART. 9 - PAYMENT OF PROVISIONAL DEPOSIT:
THE PROVISIONAL DEPOSIT MAY BE PAID BY EITHER ONE OF THE FOLLOWING:
A) DEPOSIT IN CASH MAY BE PAID INTO THE COMPANY TREASURY AGAINST AN OFFICIAL RECEIPT
WITH NO INTEREST CALCULATED ON DEPOSIT , A COPY OF THE RECEIPT TO BE ATTACHED WITH
THE TENDER .
B) LETTER OF GUARANTEE ISSUED BY ONE OF THE AUTHORIZED LOCAL BANKS WITHOUT ANY
CONDITIONS OR RESERVATIONS, THE BANK MUST GIVE DECLARATION TO PAY IT IN FULL
IMMEDIATELY TO THE COMPANY ON FIRST DEMAND WITHOUT ANY OPPOSITION OF THE CONTRACTOR
(AS PER ATTACHED FORM ) , THE LETTER OF GUARANTEE MUST BE VALID UP TO 60 DAYS AFTER THE
END OF VALIDITY DATE OF THE TENDER .
IN CASE OF SUBMITTING CONDITIONAL L/G, THE TENDER WILL BE CANCELLED.
ART.10. REIMBURSEMENT OF THE PROVISIONAL DEPOSIT :
THE PROVISIONAL DEPOSIT IS TO BE REIMBURSED TO NON-SUCCESSFUL TENDER WITHOUT APPLICATION
AFTER EXPIRATION OF THE SPECIFIED DATE OF TENDER VALIDITY OR IF THE FINAL DEPOSIT OF
SUCCESSFUL TENDER HAS BEEN RECEIVED , WHICH EVER COMES FIRST .
6
SUCH REIMBURSEMENT IS TO BE MADE AGAINST WITHDRAWAL OF RECEIPT GIVEN FOR CASH
PAYMENTS. IF THE GUARANTEE IS A LETTER FROM A BANK, THE LETTER OF GUARANTEE WILL BE
RETURNED TO THE BANK ITSELF.
ART 11 - THE FINAL DEPOSIT:
THE TENDERER WHO'S OFFER HAS BEEN ACCEPTED MUST SUBMIT 10% OF THE TOTAL VALUE OF HIS
TENDER AS A FINAL DEPOSIT IN SAME CURRENCY WITH MAXIMUM 20 DAYS CALCULATED FROM THE DAY
OF TENDER ACCEPTANCE NOTIFICATIONS (SUPPLY ORDER) AND NOT ALLOWED TO EXTEND THIS PERIOD.
i.e. : IN CASE OF DELAY IN SUBMITTING THE FINAL DEPOSIT WITHIN THE SAID PERIOD THE COMPANY HAS
THE RIGHT TO CANCEL THE CONTRACT, AND PROJECT TO BE PERFORMED ON HIS ACCOUNT BY THE
FOLLOWING TENDERER.
SUCH DEPOSIT WILL BE A SECURITY FOR THE FULFILLMENT OF THE CONDITIONS OF THE CONTRACT, AND
FINAL ACCEPTANCE.
THE FINAL DEPOSIT WILL BE A LETTER OF GUARANTEE ISSUED BY ONE OF THE AUTHORIZED LOCAL
BANKS WITHOUT ANY CONDITIONS OR RESERVATIONS, THE BANK MUST GIVE DECLARATION TO PAY IT IN
FULL IMMEDIATELY TO THE COMPANY ON FIRST DEMAND WITHOUT ANY OPPOSITION OF THE
CONTRACTOR ( AS PER ATTACHED FORM ) , THE LETTER OF GUARANTEE MUST BE VALID 30 DAYS AFTER
THE GUARANTEE PERIOD .
N.B. ALL LETTERS OF GUARANTEE MUST BE ISSUED AND CONFIRMED BY FIRST CLASS BANK IN EGYPT,
PREFERABLE NATIONAL BANK OF EGYPT.
ART. 12 - NOT LODGING THE FINAL DEPOSIT:
IF THE TENDERER DOES NOT LODGE THE FINAL DEPOSIT WITHIN THE PRE-DESCRIBED PERIOD FIXED FOR
LODGING THAT DEPOSIT, BY NOTIFICATION WITHOUT NEED FOR OTHER MEASURES, OR HAVING RECOURSE
TO COURTS THE COMPANY MAY:
A) CANCEL THE SUPPLY ORDER AND FORFEIT THE PROVISIONAL DEPOSIT.
B) FULFILL THE WHOLE OR PART OF THE CONTRACT AT THE CHARGE OF THE TENDERER OR BY ONE OF
THE TENDERERS WHOSE OFFERS COME NEXT TO HIS OWN ONE, OR BY PRIVATE TREATY, OR BY A
LIMITED OR GENERAL ADJUDICATION.
IN SUCH EVENT, THE COMPANY WILL HAS THE RIGHT TO DEDUCT THE VALUE OF ANY DAMAGE OR LOSS
ARISED FROM THAT EVENT FROM ANY SUMS WHICH ARE OR MAY BECOME DUE TO HIM RELATED TO ANY
TRANSACTION WITH THE COMPANY OR BY ANY OTHER GOVERNMENTAL DEPARTMENT AND WITHOUT
PREJUDICE TO ITS RIGHT TO BRING A LAWSUIT FOR SUCH LOSSES OR DAMAGE IF IT FAILED TO RECOVER.
ART. 13- ACCEPTANCE OF TENDER:
THE TENDER WILL BE HELD ON THE LOWEST CONSIDERED PRICE RELATIVE TO ITS TECHNICAL
EVALUATION . TENDER WILL BE EVALUTED TECHICALLY (BY POINT SYSTEM) , THE WINNER WILL BE THE
LOWEST CONSIDERED PRICE ACCORDING TO THE FOLLWING EQUATION :
THE EVALUATION CONSIDERED PRICE =
THE CONTRACTED PRICE WILL BE THE TENDER PRICE AFTER FINANCIAL EVALUATION PRICE OF THE
LOWEST TENDER CONSIDERED PRICE.
HIGHEST TECHNICAL TENDER DEGREE
------------------------------------------------------------
TECHNICAL TENDER DEGREE
TOTAL PRICE OF THE TENDER x
7
IT MAY PLACE THE CONTRACT FOR THE SUPPLY OF THE REQUIRED ITEMS AS A WHOLE OR CANCEL THE
ENTIRE TENDER ENTIRELY WITHOUT GIVING ANY REASON AND THE SUPPLIER SHALL HAVE NO RIGHT TO
CLAIM FOR DAMAGE OR ANYTHING ELSE .
ART. 14 - CORRESPONDENCE:
SUPPLIERS ABROAD ARE TO BE NOTIFIED BY FAX OR E-MAIL OR CONFIRMED REGISTERED MAIL.
ART. 15 - THE CONTRACT:
THE CONTRACT TO BE SIGNED BY THE SUPPLIERS OR HIS COMMERCIAL AGENT AGAINST POWER OF
ATTORNEY { PRESENTED WITH ENVELOPE (A) } WITHIN 20 DAYS FROM THE DATE OF SUPPLY ORDER .
IN CASE OF DELAY IN SIGNING THE CONTRACT WITHIN THE SAID PERIOD THIS IS CONSIDERED WAIVING
FROM HIS PART TO PERFORM THE PROJECT; THE COMPANY HAS THE RIGHT TO PERFORM THE PROJECT BY
THE FOLLOWING TENDERER AND THE PRICE DIFFERENCE TO BE BORNE BY THE WAIVING PARTY.
IF THE SUPPLIER MAKE ANY CHANGE IN THE TECHNICAL SPECIFICATION SUBMITED IN HIS TECHNICAL
OFFER FOR ANY REASON AFTER SIGNING THE CONTRACT, THIS IS CONSIDERD A FAULT & FAILURE FROM
HIS SIDE TO MEET THE TENDER BOOK REQUIREMENTS, AND IN SUCH CASE THE COMPANY HAS THE RIGHT
TO CANCEL THE CONTRACT, AND PROJECT TO BE PERFORMED ON HIS ACCOUNT BY THE FOLLOWING
TENDERER.
ART. 16 - CESSION OF CONTRACT:
UNDER NO CIRCUMSTANCE IT IS UNALLOWABLE FOR THE TENDERER OR CONTRACTOR TO ASSIGN THE
CONTRACT OR AMOUNTS DUE TO HIM OR TRANSMIT ITS OBLIGATIONS OR RIGHTS PARTIALLY OR TOTALLY
TO A THIRD PARTY .
ART. 17 - CANCELLATION OF CONTRACT:
THE CONTRACT MAY BE CANCELED AND THE DEPOSIT FORFEITED TO THE RIGHT OF THE COMPANY
(WITHOUT PREJUDICE) TO ANY DAMAGES RESULTING FROM SUCH PROCEDURE IN THE FOLLOWING CASES:
A) IF THE CONTRACTOR RESORTS TO FRAUD OR TO DECEIT IN HIS DEALING , IN SUCH CASE HIS NAME WILL
BE DELETED FROM THE LIST OF CONTRACTORS AND HE WILL NOT BE PERMITTED TO PARTICIPATE IN ANY
ADJUDICATION OR BARGAIN IN ADDITION TO TAKE LEGAL ACTION IF NECESSARY .
B) IF IT IS PROVED THAT THE CONTRACTOR HAS ATTEMPTED PERSONALLY OR BY MEANS OF ANOTHER
PERSON, DIRECTLY OR INDIRECTLY, TO OFFER BRIBERY TO ANY EMPLOYER, OR HAS COMMITTED ANY
HARM TO THE COMPANY, HIS NAME WILL BE DELETED FROM THE LIST OF CONTRACTORS, AND COMPANY
WILL TAKE LEGAL ACTION AGAINST HIM.
C) IF HE BECOMES BANKRUPT OR HAS FINANCIAL DIFFICULTY.
ART. 18 - DECEASE OF THE CONTRACTOR:
IF THE SUPPLIER IS DECEASED, THE COMPANY (THROUGH A NOTICE) WITHOUT NEED FOR A JUDICIAL
PROCEEDING OR RESORTING TO THE COURTS MAY EITHER:
A) CANCEL THE CONTRACT AND REFUND THE DEPOSIT, IF NO CLAIMS ARE EXISTED AGAINST HIM.
B) ALLOW HIS HEIRS ON HIS DEMAND TO CONTINUE THE EXECUTION OF THE CONTRACT, PROVIDED THAT
THEY APPOINT SOMEONE TO REPRESENT THEM LEGALLY WITH OFFICIAL POWER OF ATTORNEY AND
PROVIDED THAT SUCH REPRESENTATIVE IS ACCEPTED BY THE COMPANY. IF THE CONTRACT INCLUDES
SEVERAL CONTRACTORS, AND ONE OF THEM IS DECEASED, THE COMPANY MAY CANCEL THE
CONTRACT AND REFUND THE DEPOSIT OR MAY ALLOW HIS ASSOCIATES TO CONTINUE THE CONTRACT.
8
ART. 19- DAMAGE IN TRANSPORT AND INSURANCE:
THE SUPPLIER SHALL BE FULLY RESPONSIBLE FOR ALL R.S. AND ITS ATTACHMENTS UNTIL ACCEPTANCE ON
SITE.
ART. 20 - DELIVERY OF THE ITEMS:
THE FOUR (4) LADEN CONTAINER HANDLERS TOP LIFTTRUCKS SHALL BE DELIVERED AS THE FOLLOWING:
- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA CONTAINER TERMINAL -
PRIVATE FREE ZONE, QUAY 49-54 , PORT OF ALEXANDRIA,ALEXANDRIA,EGYPT.
- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA CONTAINER TERMINAL-
PRIVATE FREE ZONE, QUAY 96 , PORT OF EL DEKHEILA, ALEXANDRIA, EGYPT.
IN A FULLY ASSEMBLED CONDITION LEAVING ONLY MINOR WORK AS USUAL/NORMAL PRACTICE OF REACH
STACKERS START-UP. THE SUPPLIER IS RESPONSIBLE FOR UNLOADING THE REACH STACKERS & ITS
ATTACHMENTS FROM THE SHIP TO THE BRANCH OF ACCHCO. PRIVATE FREE ZONE PREMISES, QUAY 49-54
PORT OF ALEXANDRIA & QUAY 96 PORT OF EL DEKHEILA, ALEXANDRIA – EGYPT.
THE TENDERER MUST STATE IN HIS TENDER THE TOTAL PERIOD NECESSARY TO SUPPLY THE ITEMS WHICH
TO BE COUNTED FROM THE DATE OF THE TWO PARTIES SIGN THE CONTRACT, AND MUST SUBMIT THE
SCHEDULE OF SUPPLY (WITHIN ONE MONTH AFTER CONTRACT COMING IN FORCE).
ON THE ARRIVAL OF THE CONTRACTED ITEMS TO SITE A COMMITTEE APPOINTED BY THE COMPANY WILL
BE ON SITE TO CARRY OUT THE TESTS.
THE COMMITTEE IS ENTITLED TO EXAMINE EACH ITEM AND ALL ITS PARTS TO CHECK THAT ALL ARE
SOUND AND IN GOOD CONDITION. ALL TESTS AND CERTIFICATES SHALL BE ON THE SUPPLIER
RESPONSIBILITY AND ON HIS EXPENSE. THE SUPPLIER MUST DELIVER THE ITEMS CONTRACTED WITHIN THE
PERIODS AND PLACES SPECIFIED IN THE CONTRACT ACCORDING TO THE ORDER OF SUPPLY.
DELIVERY PERIOD WILL BE CONSIDERD IN EVALUATION AND IT MUST INCLUDE ALL
VACATIONS
ART. 21 - REJECTION OF ITEMS AND WORKS:
IN CASE OF ONE OR MORE ITEMS FOUND MISSING, DAMAGED, DETERIORATED OR HAVE ANY DEFICIENCY
OR DEFECT OR NOT IN CONFORMITY WITH THE APPROVED SAMPLE OR WITH THE SPECIFICATIONS WILL BE
REJECTED BY THE COMMITTEE WITH A NOTICE IN WRITING TO THE CONTRACTOR, OR HIS COMMERCIAL
AGENT EXPLAINING THE REASON OF REJECTION, AND DEMAND HIM TO WITHDRAW THE REJECTED ITEMS,
AND SUPPLY REPLACEMENT WITHIN MAX. TEN WORKING DAYS (14 DAYS) EXCLUDES CUSTOMS CLEARANCE
PERIOD FROM THE NEXT DAY OF NOTIFYING HIM OR HIS COMMERCIAL AGENT BY FAX OR E-MAIL, AFTER
THIS PERIOD THE COMPANY HAS THE RIGHT TO TAKE THE NECESSARY PROCEDURES FOR REPLACEMENT
ON THE CONTRACTORS ACCOUNT . THE CONTRACTOR HAS NO RIGHT TO DISCUSS THE EXPENSES INCURRED
THE MANNER ADOPTED BY THE COMPANY IN CARRYING OUT .
THE REJECTED ITEMS SHALL REMAIN AT THE CONTRACTOR'S RISK UNTIL THE DATE OF THEIR REMOVAL .
IN ALL CASES THE REJECTED ITEMS MUST BE WITHDRAWN WITHIN (4) FOUR WEEKs FROM THE NEXT DAY
OF THE NOTIFICATION. ELSE A STORAGE FEE EQUAL (2) PERCENT OF THE VALUE OF THE GOODS PER WEEK,
OR ANY FRACTION OF WEEK UP TO FOUR WEEKS WILL BE CHARGED. AFTER THIS PERIOD THE COMPANY
WILL HAVE THE RIGHT TO SELL THESE GOODS AND DEDUCT FROM THE SALE PRICE ANY AMOUNT WHICH
MAY BE DUE TO IT, THE COMPANY IS NOT RESPONSIBLE FOR ANY DAMAGE WHICH MAY OCCUR TO THE
REJECTED ITEMS THROUGH FIRE OR OTHER CAUSE PENDING THEIR WITHDRAWL BY THE CONTRACTOR OR
DISPOSAL THEREOF BY THE COMPANY.
9
ART. 22- DELAY IN DELIVERY:
IN CASE OF DELAY, ON THE SUPPLIER PART IN THE SUPPLY OF THE WHOLE OR PART OF CONTRACT AFTER
THE DATE FIXED IN THE CONTRACT . THE COMPANY MAY GRANT TO THE SUPPLIER AN EXTENSION PERIOD
FOR THE SUPPLY SUBJECT TO FINE IN RESPECT OF THE DELAY AS (1%) FOR EVERY WEEK OR PART OF IT, IN
ANY CASE THE TOTAL AMOUNT OF THIS FINE SHALL NOT EXCEED (3%) OF THE VALUE OF THE CONTRACT .
FINE WILL BE CALCULATED TO THE FULL VALUE OF THE R.S. , IF THE DELAYED PART WOULD DIRECT OR
INDIRECT LEAD UP TO HINDER THE R.S. USAGE WITH FULL SATISFACTION AS WELL AS WITHIN THE FIXED
DELIVERY PERIOD .
IN CASE OF THE SUPPLIER FAILS TO FULFILL ANY OF THE CONTRACT CONDITIONS OR IN CASE HE
BREACHES OR FAILURE TO PERFORM ANY OF HIS CONTRACTUAL OBLIGATIONS , HE HAS TO PROPERLY
START CURE SUCH A DISCREPANCY WITHIN TEN WORKING DAYS MAX. EXCLUDES CUSTOMS CLEARANCE
PERIOD FROM THE NEXT DAY OF NOTIFYING HIM OR HIS COMMERCIAL AGENT THROUGHT A REGISTER
CERTIFIED LETTER BY MAIL , FAX OR E-MAIL , OTHERWISE THE COMPANY HAS THE RIGHT TO ADOPT
EITHER OF THE TWO FOLLOWING ALTERNATIVES, WITHOUT NEED OF HAVING RECOURSE TO THE COURTS:
A) PROCURE ELSE WHERE EITHER BY PRIVATE TREATY, OR BY LIMITED OR PUBLIC ADJUDICATION OR
BARGAIN FOR THE OBLIGATIONS WHICH THE SUPPLIER FAILED TO SUPPLY, ANY EXCESS IN PRICE DUE
TO SUCH PROCUREMENT PLUS ANY OTHER CHARGES OVER AND ABOVE THE AMOUNT OF FINE
INFLICTED ON ACCOUNT OF DEFAULTS OFFERED IN SUPPLY ARE TO BE DEDUCTED FROM THE DEPOSIT
OFFERED IN SECURITY ON THE CONTRACT OR FROM ANY SUMS THAT MAY BE DUE TO THE
CONTRACTOR BY THE COMPANY OR BY ANY OTHER GOVERNMENTAL DEPARTMENT.
SHOULD HOWEVER THE PROCUREMENT PRICE OF ANY ARTICLES BE LESS THAN THAT OF THIS
CONTRACT, HE WILL NOT BE ENTITLED TO THE DIFFERENCE AS WELL AS WILL NOT BE EXEMPTED
FROM THE FINE RELATING TO THE DELAY IN SUPPLY OR THE OTHER CHARGES .
B) TERMINATE THE CONTRACT ON HIS OWN AND THE FORCE ON LAW AND FORFEIT THE FINAL DEPOSIT
AMOUNTING (10%) OF ITS VALUE AS WELL AS ALL FINES AND COMPENSATIONS DUE TO THE COMPANY
AFTER SERVING A NOTICE TO THE CONTRACTOR AND WITHOUT PREJUDICE TO THE RIGHT OF THE
COMPANY TO TAKE LEGAL ACTIONS AGAINST THE CONTRACTOR FOR RIGHTS WHICH THE COMPANY
FAILED TO RECOVER .
ART. 23 - PROVISIONAL ACCEPTANCE:
IN THE DATE WHEN THE R.S. HAVE BEEN TESTED BY THE COMMITTEE APPOINTED BY THE COMPANY UNDER
THE SUPERVISION OF THE INTERNATIONAL SOCIETY, AND TRANING HAS BEEN COMPLETED, APROVISIONAL
ACCEPTANCE CERTIFICATE WILL BE ISSUED.
ART. 24 - GUARANTEE:
THE TENDERER WILL GUARANTEE THE R.S. WITH ALL COMPONENTS MANUFACTURED FOR A PERIOD OF 24
MONTHS (WITH UNLIMITED OPERATING HOURS) FOLLOWING PROVISIONAL ACCEPTANCE OF THE R.S. BY THE
COMPANY.
AFTER THESE TWO YEARS, AN ADDITIONAL GUARANTEE 24 MONTHS FOR BOTH BOOM AND CHASSIS
THE SUPPLIER GUARANTEES THAT THE R.S. WILL WORK EFFICIENTLY TO PERFORM ALL REQUIRED TARGETS
DURING THE GUARANTEE PERIOD AND AS FOLLOWS:
11
1- THE SUPPLIER IS COMMITTED AS SOON AS NOTIFYING HIM OR HIS COMMERCIAL AGENT BY FAX
OR E-MAIL TO REPAIR, OR REPLACE ON HIS ACCOUNT, ANY DEFECTED EQUIPMENT OR PARTS OF IT
WITHIN TEN WORKING DAYS MAX. NOT INCLUDED CUSTOMS CLEARANCE PERIOD COUNTED FROM THE
NEXT DAY OF NOTIFYING HIM OR HIS COMMERCIAL AGENT BY FAX OR E-MAIL DURING THE GUARANTEE
PERIOD.
IN CASE OF DELAYS IN THE REPAIRING WORKS MORE THAN THE MAX. SPECIFIED DATE ( TEN WORKING
DAYS ) , THE COMPANY HAS THE RIGHT FOR COMPENSATION OF (250 EURO) FOR THE R.S. , AGAINST
TECHNICAL DEFECT, MANUFACTURING DEFECTS OR DEFECTS DUE TO FABRICATING MATERIALS FOR
EVERY DAY TO COMPENSATE THE LOSS OCCURED TO THE COMPANY AS A RESULT OF STOPPING WORK ,
AND IF THE SUPPLIER FAILS TO ACHEIVE SAID REPAIR , THE COMPANY WILL HAVE THE RIGHT TO
EXECUTE THE REQUIRED WORKS ON THE ACCOUNT AND RESPONSIBILITY OF THE SUPPLIER .
THE COMPENSATION WILL BE COUNTED FROM THE NEXT DAY FOLLOWING OF THE ABOVE MENTIONED
SPECIFIED DATE, AND EACH CASE OF DELAY WILL BE CONSIDERED SEPARATELY WITH MAXIMUM
AMOUNT NOT EXCEED 10% (TEN PERCENT) OF THE VALUE OF THE R.S.
2- IN ALL CASES , ON REPLACING ANY PART OF THE R.S. PARTS DURING THE GUARANTEE PERIOD , AS
A RESULT OF ANY DEFECTS , A NEW GUARANTEE PERIOD OF TWENTY FOUR (24) MONTHS FOR THIS PART
OF THE R.S. WILL BE CONSIDERED AND STARTED FROM DATE OF BEING EFFICIENTLY OPERATED AFTER
REPLACEMENT .
3- ALL PERIODS OF STOPPING THE R.S. RESULTING FROM MALFUNCTION DUE TO DEFECTS DURING THE
GUARANTEE PERIOD WILL BE ADDED TO THE ORIGINAL GUARANTEE PERIOD OF THE R.S. .
ART 25 - FINAL ACCEPTANCE:
UPON CONCLUSION OF GUARANTEE PERIOD IF R.S. HAS BEEN PROVED SATISFACTORY, FINAL ACCEPTANCE
WILL BE GIVEN AND SUPPLIER'S LETTER OF GUARANTEE WILL BE RELEASED AS FOLLOW.
10% FOR MAIN GUARANTEE (24 MONTHS) REDUCES TO 5% FOR ADDITIONAL GUARANTEE (24 MONTHS FOR
BOTH BOOM AND CHASSIS
ART. 26 - LEGAL DISPUTES:
LEGAL DISPUTES AND ACTIONS ARISING OUT THE CONTRACT SHOULD BE DEALT ACCORDING TO THE
EGYPTIAN LAW WITH THE EGYPTIAN COURTS IN ALEXANDRIA STIPULATIONS OF THE REGULATION
RELATING TO ADJUDICATION ARE TO BE CONSIDERED COMPLEMENTARY TO THE CONDITIONS OF
CONTRACT WHERE NO STIPULATIONS HAVE BEEN MADE IN IT .
ART. 27 – FORCE MAJEURE :
FORCE MAJEURE IS APPLIED WHEN EVENTS OUTSIDE THE CONTROL OF THE SUPPLIER OCCURE SUCH AS
RIOTS OR CIVIL COMMOTION , WAR OR CIVIL WAR , FLOOD , EARTHQUAKE , LANDSLIDE OR SIMILAR
NATURAL DISASTERS, ALSO FOREIGN GOVERNMENTS WARNINGS FOR TRAVELING RESTRICTIONS FOR
THEIR CITIZENS IN CASE OF INSTABILITIES INSIDE EGYPT. THE SUPPLIER MUST DECLARE AND PROVE
THESE EVENTS AT ONCE AND SATISFACTION OF THE COMPANY THAT THESE EVENTS WERE REASONABLY
OUTSIDE HIS CONTROL.
ART 28 SECRTNESS OF DOCUMENTS
ALL DOCUMENTS CONCERNING THIS CONTRACT ARE CONSIDERED TOP CONFIDENTIAL.
11
ART. 29- LAWS AND REGULATIONS:
THE SUPPLIER UNDERTAKES TO OBEY ALL GOVERNMENTAL AND LOCAL LAWS AND REGULATIONS
CONCERNING EXECUTION OF THIS CONTRACT AND SHOULD BE RESPONSIBLE FOR THE DISCIPLINE IN THE
SITE. THE SUPPLIER HAS TO OBEY THE ORDER OF THE COMPANY TO DISMISS ANY EMPLOYEE WHO
NEGLECT IN HIS WORK OR DOES NOT OBEY THE RULES OR REGULATIONS OF THE COMPANY OR TRIES TO
CHEAT THE SUPPLIER UNDERTAKES ALL THE SAFETY MEASURES (O.H.S.A.S) TO AVOID ALL INJURIES OR
DEATH OF THE WORKERS OR ANY THIRD PARTY IN THE SITE OR DAMAGE TO ANY PERSON OR MATERIAL OR
PHYSICAL DAMAGE TO PROPERTY WHATSOEVER .
THE RESPONSIBILITIES IN SUCH CASE ARE DIRECT WITHOUT THE INTERVENTION OF THE COMPANY. IF THE
SUPPLIER FAILS TO FULFILL THESE MEASURES THE COMPANY SHOULD UNDERTAKES TO FULFILL ALL THE
SAFETY MEASURES ON HIS ACCOUNT, THE SUPPLIER SHOULD INSURE ALL HIS WORKERS AGAINST
ACCIDENTS AND CIIVIL INJURIES AND WILL BE SOLELY RESPONSIBLE FOR THEM FOR INDEMNITY .
ART . 30 - FINANCIAL EVALUATION :
THE FOLLOWING (7) ITEMS WILL BE CONSIDERED IN THE FINAL EVALUATION :
ITEM DESCRIPTION QTY UNIT
PRICE
TOTAL
PRICE
1 VALUE OF EQUIPMENT ( C.I.F )
INCLUDING TEST , INSTALATION AND START UP ON SITE.
2 PERSONNEL TRAINING IN FACTORY
ON SITE
3 COST FOR COMPANY ENGINEERS INSPECTION
4 COST FOR ATTACHED SPARE PARTS
5 COST FOR RECOMMENDED SPARE PARTS
Total value CIF on site
THIS FORM SHOULD BE PRICED & DISPATCHED WITHIN ENVELOPE B "FINANCIAL OFFER"
ART . 31 OTHER CONTRACT RULES:
THE RULES OF CONTRACT, PURCHASING AND STORES REGULATIONS OF ACCHCO. ARE APPLICABLE ON THIS
CONTRACT AND ITS EXECUTIVE STATUS IS CONSIDERED AN INTEGRAL PART IN CASE OF ANY STIPULATION
NOT INCLUDED.
PAGE 1 OF 14
Contract For Supplying and handing over four laden container reach
stackers capacity 45 ton under twist lock to both Alexandria and Dekhela
container terminals for Branch of Alexandria Container & Cargo Handling
company–Private Free Zone -Alexandria Port- Egypt
On ……. / /20….. this contract was issued between the following parties:-
1- First Party:- Branch of Alexandria Container & Cargo Handling Company
"Private Free Zone" an Egyptian shareholding company, One of the
companies belonging to the Maritime & Inland Transport Holding Company
and legally represented by Mr. Admiral /Mamdouh Tawfik Draz
- Chairman of the Board and CEO. Its premises Quay 49/54 Alexandria
Seaport – Alexandria- A. R. of Egypt .
Herein after referred to as first party.
Fax no. 00 20 3 4862124
Email : [email protected]
(First party)
2-: Second Party and its premises Box
Herein after referred to as second party.
Tel no. : Fax no. :
Email : Legally represented by in signing this contract according to the
power of attorney countersigned by and notarized by the Egyptian
embassy in dated / /20 .
Represented in Arab Republic of Egypt by
Tel no. Fax no.
Commercial registry no. Tax Registration no.
(Second Party)
بسم ميحرلا نمحرلا هللا 44حىنت Reach Stacker(RS) ثقموص ( 4عذد ) ىرذ و حسهىعقــــذ ح
انذخهت نفرع ضركت و اإلسكذرت بحطخى حاواث ط ححج اطار اناونت
–ياء اإلسكذرت -يطقت حرة خاصت –اإلسكذرت نخذاول انحاواث وانبضائع
يصر
رذغع ظا اؼوض ث٤ : 02 ..... / / ااكن .....ئ ك٠ ٣
صت"اإلسكذرت نخذاول انحاواث وانبضائع "يطقت حرة خاكغخ كغع -1
ئدض الغبد ازبثؼخ لغخ اوبثخ و ـبخ وغ٣خربثؼخ كغخ
عئ٤ؾ -ثذغ١/ضح رك٤ن صعاػ اجذغ اجغ ٣ثب هبب اـ٤ض ااء
٤بء اإلؿضع٣خ 94/49جؾ اإلصاعح اؼ ازضة وغب عه٤ق
اجذغ.
٣لبع ئ٤ب ب ك٤ب ٠٣ ثبطغف اال.
2202 49120109البؾ عه
[email protected]اجغ٣ض االزغ٠ :
) غف أ (
غؼب اغئ٤ـ٠ كغخ -0
اثب٣٠لبع ئ٤ب ب ك٤ب ٠٣ ثبطغف
عه البؾ عه از٤ل :
اجغ٣ض االزغ٠ :
اؼوض ثجت ازه٤غ ػ٠ ظا ك٢ ٣ة ػب هبب اـ٤ض /
اثن اـلبعح اـغكخ ازجبع٣خ ازل٣ي اوضم ػ٤
. 02 // إعر ك٠ ظا الأ ا اوبصع اوغ٣خ
وغب ٣ثب ك٠ جع٣خ وغ اؼغث٤خ ٤ب ازجبع كغخ
عه البؾ عه از٤ل :
رـج٤ غ٣ج٠ : ؿج رجبع :
) غف ثب٠ (
PAGE 2 OF 14
Preamble
Alexandria Container Handling Company (First Party) has announced the
General tender no. ( ) for year 2019/2020, for the delivery and handing
over of Four RS with capacity 45 ton under spreader for Alexandria and
Dekhela container terminals.
According to the authorization granted from General Authority For
Investment and free zones no. 460 for the year 2005 dated 16/1/2005 ,
according to the tender technical specifications and conditions stipulated
under the published tender documents and to the conclusions reached by
the technical and financial evaluation committees for the said tender and to
the documents and ratifications included within them and the negotiation
session held on / /2019, from which it was concluded to accept the offer
submitted by .
On / / , the first party board of directors according to their decree no.
/2019 approved on purchasing Four RS with capacity 45 ton under
spreader with a total amount of (only ). CIF to location of first
party branches in Alexandria and Dekhela container terminals Private Free
Zone from the second party.
On / / the commercial agent of the second party was notified with the
awarding letter no. /F- / with the acceptance of the second party offer
and that it was decided to award the delivery and handing over of Four RS
with capacity 45 ton under spreader model for both Alexandria and
Dekhela terminals , CIF to location of first party branches in Alexandria and
Dekhela container terminals Private Free Zone with a total amount of
(only ) to based on:
-Two (2) RS for Alexandria Terminal – Private Free Zone – Quay 49/54
Port of Alexandria- Egypt.
- Two (2) RS for Dekhela Terminal – Private Free Zone –
The prices are including the following:
- Tests, commissioning in factory and at site.
حهـــــــــــذ
اطغف اال( اإلؿضع٣خ زضا اذب٣بد اجبئغ ) كغخغدذ
( 9ػضص ) رـ٤ زع٣ض 0214/0202( ـخ ابهوخ اؼبخ عه )
دب٣بد االؿضع٣خ ز٠ذط رذذ ابع ابخ 94دخ RS ق ثو٤
. اضس٤خ
ابن اذغح ثغه ثوز٠ ازغس٤ن اوبصع ا٤ئخ اؼبخ الؿزثبع
اهلبد ال٤خ 12/1/0224ثزبع٣ز 0224ـخ 922 طي جوب
االكزغابد ااعصح ثغاؿخ الغ ااهلبد اشبهخ ثبطغح ب
ازذ ا٤ جز٠ ازو٤٤ ال٠ اب٠ ك٠ ابهوخ اـزضاد اإلهغاعاد
از٠ اؿلغد ز٤جزب ػ / / جـخ البخ ثزبع٣ز اوضخ ث
. هج اؼغى اوض كغخ
اكن جؾ اصاعح الغخ اطغف اال ثجت هغاع / / ثزبع٣ز
94دخ RS ق ثو٤ اعثؼخػضص كغاءهج ( ػ٠ عه )
( الؿ٤غ كو ) عح ثبجب٠ جؾ هض رذذ ابع ابخ
طوخ دغح -ثذطز٠ دب٣بد االؿضع٣خ اضس٤خلغخ كغػ٠ اؿ٤ق هغ
سبهخ اطغف اثب٠.
)اثب٠ ثأغ االؿبص عه الغخ اطغف ر اسطبع ٤ ثزبع٣ز
رع٣ض رـ٤ ػضص اؿبصاثب٠ اخ هض روغع الغخ اطغف ثوج ػغى(
ص٣ رذذ ابع ابخ 94دخ RS ق ثو٤أعثؼخ
ثذطز٠ ؿ٤ق هغ كغػ٠ الغخ ذطز٠ دب٣بد االؿضع٣خ اضس٤خ
ثبجب٠ جؾ هضعطوخ دغح سبهخ -دب٣بد االؿضع٣خ اضس٤خ
اذ ازب٠: ػ٢ لغخ الؿ٤غ( كو )
لغع الغخ ثذطخ دب٣بد ص٣ RS ق ثو٤ 0ػضص -
طوخ دغح سبهخ. –االؿضع٣خ
لغع الغخ ثذطخ دب٣بد ص٣ RS ق ثو٤ 0ػضص -
طوخ دغح سبهخ - اضس٤خ
اـؼغ ٣ل االر٠:
PAGE 3 OF 14
- Costs of Inspection of four engineers in factory for two weeks.
- Costs and expenses of international classification society in factory.
- Costs for the training of (4) engineers and (4) technicians in factory
for two weeks .
- Costs for the training on site.
- Attached spare parts (as detailed stated in the awarding letter
no.(……….)and the performa invoice no. ………….
- Two electric screen sheet (tablet) .
- Eight fire extinguishers 6 KG from the local market.
- Vessel discharging expenses, customs clearance fees and storage
fees in A.R.E and internal transport to first party container terminals
location in Alexandria and Dekhela Private Free Zone according to
article no.4 from the tender documents.
-
On / / 2019 the second party submitted Proforma invoice no. dated and the performance guarantee no dated with total value
(only ) representing 10% from the total contract value as a
performance guarantee to grant the contract performance , issued by
bank without any conditions or restrictions payable at the first party first
demand and the advance payment guarantee no. dated with
total value (only ) representing 20% from the total contract
value, issued by bank without any conditions or restrictions payable at
the first party first demand and valid with the transfer of its amount and a
Power of Attorney dated notarized and legalized for the person who
have the right to sign the contract.
After the two parties fully acknowledged their qualifications for contracting
and legal actions , they agreed on the following:
ثبوغ اهغ.ازلـ٤ األسزجبعاد -
ثبوغ ضح اؿجػ٤. ضؽ ( 9وبع٣ق رلز٤ق ػضص ) -
ارؼبة وبع٣ق ٤ئخ ازلز٤ق اض٤خ ثبوغ. -
. ثبوغ ضح اؿجػ٤ ( ك٤٤ 9ضؿ٤ ػضص ) ( 9ص )ازضع٣ت ؼض -
ازضع٣ت ثبهغ. -
البرعح ...... ب خ رلو٤ال ثأغ االؿبص عه هطغ اـ٤بع -
اجضئ٤خ عه ............
electric screen sheet ( tablet)( 9ػضص ) -
.ذ٠ اـم ا ٤ 2( لب٣خ دغ٣ن ؿؼخ 1ػضص ) -
وبع٣ق ازلغ٣ؾ وبع٣ق ازش٤ن اجغ٠ ازشؼ٣ ثجع٣خ -
اطغف اال كغػ٠ الغخ وغ اؼغث٤خ او دز٠ هغ
ثذطز٠ دب٣بد االؿضع٣خ اضس٤خ طوخ دغح سبهخ جوب ن ابصح
( غاؿخ الغ ااهلبد.9عه )
رلو٤٤خ الغخ )اطغف اثب٠( كبرعح جضئ٤خ هضذ 0214// ثزبع٣ز
هبصع عه سطبة ب ث٠ بئ٠ إعسخ غه ث
الؿ٤غ( ثاهغ )كو ثجؾ ئجب٠ 0214/ / ثزبع٣ز
% ه٤خ اؼوض زب٤ بئ٠ لبخ رل٤ظ هبصع اجي 12
وبخ اطغف اال ػض ا ا٣خ كغ ا رذلظبد وجال ضكغ سب
هبصع ثزبع٣ز سطبة ب ث٠ سبم ثبضكؼخ اوضخ عه ت
% 02الؿ٤غ( ثاهغ )كو هضعح ثجؾ ئجب٠ 0214/ /
سب ا٣خ كغ ا رذلظبد وجال خ اؼوض هبصع اجي ه٤
رل٣ي ضكغ وبخ اطغف اال ػض ا ت ؿبع ثزذ٣ ه٤زخ
. / / إعرؼزض ثن ث خ اذن ك٠ ازه٤غ ػ٠ اؼوض
قذ ها نهخعاقذ و انخصرفاث انقاىت، فهخبعذ ا اقر انطرفا بكايم اهو
-عهى يا هى :اأحفق
PAGE 4 OF 14
Article No. 1 The above preamble, all papers and documents related to tender no. and the
second party offer no. and the awarding letter no. ,the submitted
commitments and ratifications and the mutual correspondences which were
accepted by the two parties, and the negotiation session dated and the
Proforma invoice no. are all considered as an integral part of this contract as
well the tender documents related to this contract completes its provisions and is
part of it.
Article No. 2 :-
The Second Party is committed to deliver and hand over (4) RSs Model
and their relevant spare parts to the location of first party branches in
Alexandria and Dekhela container terminals – Private Free Zone,fully erected
and operational as mentioned in details in the attached performa invoice no
……….dated…../…../……as follows: -Two (2) LADEN CONTAINER REACH STACKER for Alexandria Terminal –
Private Free Zone – Quay 49/54 Port of Alexandria- Egypt.
- Two (2) LADEN CONTAINER REACH STACKER for Dekhela Terminal –
Private Free Zone –
Article No. 3:-
The total and final contract value is (only ) and this value
include delivery and handing over of four RSs with capacity 45 ton under
spreader model CIF to location of first party branches in Alexandria
and Dekhela container terminals -Private Free Zone, And the prices includes:
- The value of the RSs (cost , insurance and Freight) .
- Tests, commissioning in factory and at site.
- Costs of Inspection of four ENGINEERS in factory for two weeks.
- Costs and expenses of international classification society in factory.
- Costs for the training of eight persons in factory for two weeks.
- Costs for the training on site.
- Attached spare parts (as detailed stated in the awarding letter no.
).
انبـــــذ األول :
اؼبخ بك االاعم اـزضاد ازؼوخ ثببهوخ ؿبق اظغ ٣ؼزجغ از٤ض
سطبة االؿبص عه ػغى اطغف اثب٠ ( ـخ عه )
اوجخ د اوضخ اغاؿالد ازجبصخ ازؼضاد االهغاعاعه
عه البرعح اجضئ٤خ البخ ثزبع٣ز ذغ جـخ اطغك٤
ال ٣زجؼأ ظا اؼوض ب رؼزجغ غاؿخ الغ ااهلبد اشبهخ جؼء
ثظا اؼوض خ الدب ربسظ د .
ا:ذ انثبـــــان
RS ززززق ثو٤ززززأعثؼززززخ ( ٣9زززززؼ اطززززغف اثززززب٠ ثزع٣ززززض رـزززز٤ ػززززضص )
كغػززز٠ الزززغخ ثذطزززز٠ دب٣زززبد االؿزززضع٣خ ؿززز٤ق هزززغ هطزززغ ؿ٤بعزززب
بخ ازغ٤ت ازج٤غ ااعصح رلوز٤ال ثبلزبرعح اضس٤خ طوخ دغح سبهخ
جوب الر٠: اإعسخ عه اغكوخاجضئ٤خ
( 0ػضص )ق ثو٤(RS ) كغع الغخ اطغف اال ثذطخ ؿ٤ق هغ
طوخ دغح سبهخ. -دب٣بد االؿضع٣خ
( 0ػضص )ق ثو٤ (RS ) ثذطخ اطغف االكغع الغخ ؿ٤ق هغ
.طوخ دغح سبهخ -دب٣بد اضس٤خ
:ثانثانبــــذ ان
)كو هضعثولخ ئجب٤خ بئ٤خ ثجؾ رذضصد ه٤خ ظا اؼوض
94دخ RS ق ثو٤ اعثؼخظ او٤خ رل رع٣ض رـ٤ ػضص الؿ٤غ(
ثذطز٠ ؿ٤ق هغ كغػ٠ الغخ ص٣ رذذ ابع ابخ
طوخ دغح سبهخ -دب٣بد االؿضع٣خ اضس٤خ
-: االر٠ ل٣ ـؼغا
. او ازأ٤ ه٤خ األبف -
ثبوغ اهغ.ازلـ٤ األسزجبعاد -
. ثبوغ ضح اؿجػ٤ ضؿ٤( 9وبع٣ق رلز٤ق ػضص ) -
ارؼبة وبع٣ق ٤ئخ ازلز٤ق اض٤خ ثبوغ. -
ثبوغ ضح اؿجػ٤ ( ك٤٤ 9ضؿ٤ ػضص ) ( 9)ازضع٣ت ؼضص -
.ازضع٣ت ثبهغ -
PAGE 5 OF 14
- four electric screen sheet (tablet) from the local market.
- Eight fire extinguishers 6 KG from the local market.
- Vessel discharging expenses, customs clearance fees and storage
fees in A.R.E
- and internal transport to first party container terminals location in Alexandria and Dekhela Private Free Zone according to article no.4 from the
tender documents.
This value is final and the second party has no right to ask for any reason to
increase it. The First Party is committed to pay this value through issuing an
irrevocable and divisible letter of credit to be issued within maximum two weeks
from the contract date, the Second Party will bear confirmation fees in case he
request to confirm the L/C. The payment of this value in installments as follows:
20% (Twenty Percent) of the contract value as advance payment, against
advance payment bank letter of guarantee of the same value and currency, issued
by a local bank operating in Arab Republic of Egypt subject to the central bank of
Egypt supervision, irrevocable and without any conditions or reservations, valid for
a period not less than two months after the date of arrival of the contractual items
on site of the first party terminals location in Alexandria and Dekhela -Private Free
Zone-. according to the advance payment letter of guarantee template included in
the tender documents , this installment to be paid within maximum three weeks
from the contract signing date.
70% (Seventy Percent) from the value of each RS and its spare parts after
preliminary acceptance by the First Party on Site. This installment to be paid within
maximum four weeks from the date of vessel arrival at Alexandria port or two
month from the bill of lading date.
10% (Ten Percent) of the contract value against certificate issued by the First
Party after completion of the training on site on the RSs after commissioning and
operation. This installment to be paid within maximum one month from the
preliminary acceptance date. The training has to be executed within two week from
the date of handing over and the preliminary acceptance of the RSs and after
concluding tests.
All the above mentioned installments will be paid against a written notification from
the First Party to the bank issuing the letter of credit.
In case of First Party is delayed in implementing his contractual obligations
including but not limited to transfer of installments and the letter of credit
البرعح عه )ب خ رلو٤ال ثأغ االؿبصهطغ اـ٤بع -
اجضئ٤خ عه .
electric screen sheet ( tablet)( 9)ػضص -
. اـم اذ٠ ٤ 2( لب٣خ دغ٣ن ؿؼخ 1ػضص ) -
وبع٣ق ازلغ٣ؾ وبع٣ق ازش٤ن اجغ٠ ازشؼ٣ ثجع٣خ -
اطغف اال كغػ٠ الغخ ؼغث٤خ او دز٠ هغوغ ا
ثذطز٠ دب٣بد االؿضع٣خ اضس٤خ طوخ دغح سبهخ جوب ن ابصح
( غاؿخ الغ ااهلبد.9عه )
ال ٣جززػ طززغف اثززب٠ ززت ػ٣ززبصح االؿززؼبع ال ؿززجت زز االؿززجبة ٣زززؼ
غ٣ززن كزززخ اػزززبص ـزززض ؿ٤ززغ هبثزز اطززغف اال ثبكززبء ثزززي او٤ززخ ػزز
الـززبء هبثزز زجؼئززخ ٣لزززخ كزز٠ سززال ززضح أهوززبب أؿززجػ٤ ثؼززض ره٤ززغ اؼوززض
٣زذزز اطززغف اثززب٠ وززبع٣ق رؼؼ٣ززؼ كزز٠ دبززخ جزز طززي ػزز٠ ا ٣زز
اكبء ثظ او٤خ ػ٠ صكؼبد ػ٠ اذ ازب٠ :
كؼخ وضخ وبث سطزبة زب % ) ػلغ ك٠ ابئخ ( ه٤خ اؼوض ص02 -
ث٠ ثلؾ او٤زخ طاد اؼزخ هزبصع ز ادزض اجزى صاسز جع٣زخ وزغ
اؼغث٤خ اشبؼخ الكغاف اجي اغؼ ؿ٤غ هبث الـزبء ؿ٤زغ وززغ ثزب
كغ ا رذلظبد ؿبع الؼ ضح كغ٣ ز رزبع٣ز هز االهزبف
ثذطزززز٠ دب٣زززبد خ اطزززغف االبهزززض ػ٤زززب اززز٠ هزززغ كغػززز٠ الزززغازؼ
طوززخ دززغح سبهززخ جوززب ززطم سطززبة اززب –االؿززضع٣خ اضس٤ززخ
.اهلبد اضكؼخ اوضخ اغكن ثغاؿخ الغ ا
٣ززز هجزز ذوبرزز ززق ثو٤زز% )ؿززجؼ كزز٠ ابئززخ( زز ه٤ززخ زز 72 -
.اؿزالب اثزضائ٤ب اؿزال
اجبه٤خ ه٤خ ازؼبهض رضكغ وبث كبصح روزضع ز % )ػلغح ك٠ ابئخ( 12 -
رل٤ززض ارززب رززضع٣ت االكززغاص ازززبثؼ٤ ززب ثززبهغ ػزز٠ اطززغف االالززغخ
. ػزز٠ ا ٣ززز اجززبػ ززظا ازززضع٣ت كزز٠ ززض اؿززجػ٤ زز لززـ٤باؼززضاد ثؼززض ر
٤زب ربع٣ز هج األهبف اؿززالب اؿززالب اثززضائ٤ب ثؼزض اززبء االسزجزبعاد ػ
ثبهغ .
ػزز٠ أ ٣ززز ؿززضاص اززضكؼبد اززاعصح ثززظا اجززض ثجززت سطززبة رجزز الززغخ
PAGE 6 OF 14
issuance, the delayed time to be added to the delivery period.
Article No. 4 :-
All duties, stamp duties, and all other taxes and fees to be paid outside of
Egypt shall be born by the Second Party.
The Second party to conclude all customs clearance procedures for the
contracted items on his responsibility and account (pay costs) starting from
the vessel berthing and discharging and till the contracted items are inside
the location of first party branches in Alexandria and Dekhela container
terminals – Private Free Zone , also the second party is committed to pay
any bank charges (if any) resulting from delivery delay after the agreed
delivery period in the contract. Also any expenses resulting from shortage in
the delivered items or related to the items which are delivered separately
after the RSs delivery.
All duties, stamp duties, and all other taxes and fees to be paid inside of
Egypt shall be born by the First Party except for what is mentioned in the
above paragraph.
Article No. 5 :-
The Second Party is committed to deliver and hand over (4) RSs Model
and their relevant spare parts to the location of first party branches in
Alexandria and Dekhela container terminals – Private Free Zone on due date
maximum months CIF Alexandria seaport starting from the contract
signing date, this delivery period excludes the custom clearance period,
which will be concluded by the second party. In case of second party delivery delay, in supplying of the whole or part of
contractual items after the fixed due date in the contract, including the
rejected items, the First Party may grant the Second Party an extension
period to deliver, subject to delivery delay penalty in respect of the delay
interval, being (1%) for every week or part of a week from the value of the
undelivered quantities or items , in any case the total amount of this delay
penalty shall not exceed (3%) from the value of items in which the second
party delayed to deliver, the delivery delay penalty will be applied upon the
delay occurrence without the need for any warnings or legal disputes.
IF the delayed items would prevent the benefit from the usage or full
ئ٠ اجي كبرخ االػزبص . اطغف األ
ك٠ دبخ رأسغ اطغف اال ك٠ اكبء ثبزؼابرخ ازؼبهض٣خ ثب ك٤ب رذ٣
٣ض.ربف كزغح ازأسغ ا٠ ضح ازع كزخ االػزبص اـزض اضكؼبد
:رابعانبــــذ ان
بكزخ ازغائت اغؿز ؿ٤غزب ز اغؿز ازز٠ ـضاص ٣زؼ اطغف اثب٠ ث
رلغى سبعم اه٤ اطغف اال ، ب ٣زؼ ثببء اجغاءاد ازشز٤ن
اجغ٠ ػ٠ األهبف ع ظا اؼوض ػ٠ لوز رذذ ـئ٤ز ثضء ز
دزز٠ صسزب هزغ كغػز٠ الزغخ اطزغف رغا٠ اـل٤خ رلغ٣زؾ االزبف
ثذطزز٠ دب٣زبد االؿزضع٣خ اضس٤زخ طوزخ دزغح سبهزخ ، زب ٣زززؼ اال
وغكبد ث٤خ رزغرت ػ ازبس٤غ كز٠ ازع٣زض ػز اػزض اذزضص ثـضاص ا٣خ
وغكبد رلزأ ػز االهزبف اؼجزؼ ا االهزبف ازز٠ رزعص ظا اثبؼوض.
ع ازؼبهض.ثؼض رع٣ض االبف
٣زؼ اطغف اال ثبكخ اغائت اغؿ ؿ٤غب اغؿ از٠
.اال ػضا ب طغ ك٠ الوغح اػالرلغى صاس اه٤ اطغف
: خايسانبــــذ ان
ص٣ززز RS زززق ثو٤ززز( ٣9ززززؼ اطزززغف اثزززب٠ ثزع٣زززض رـززز٤ ػزززضص )
ثذطززززز٠ دب٣ززززبد ثلغػزززز٠ الززززغخ اطززززغف اال هطززززغ اـ٤ززززبع
ؿز٤ق ( أكزغ كز٠ ػزض اهوزب ) طوخ دزغح سبهزخ –االؿضع٣خ اضس٤خ
٤بء اإلؿضع٣خ ز رزبع٣ز ره٤زغ اؼوزض ال٣زضس كز٠ دـزبة زظا ا٤ؼزبص زضح
ازشزز٤ن ػزز٠ لزز اغؿززبخ ثبجززبعى اززظ ؿززف ٣ززز ثؼغكززخ الززغخ
اطغف اثب٠.
طا رأسغ اطغف اثب٠ كز٠ رع٣زض االهزبف ازؼبهزض ػ٤زب أ أ جزؼء زب كب
ك٠ ا٤ؼبص اذضص ثبؼوض ٣ضس كز٠ طزي االهزبف اغكزخ ك٤جزػ طزغف
اال اػطبؤ خ ابك٤خ زع٣ض ػز٠ ا ٣هزغ ػ٤ز ؿغازخ رزأس٤غ ػز زضص
غ أ جززؼء زز % ػزز زز اؿززجع رززأس1٤ازززأس٤غ أ ػزز ززظ اززخ وززضاعب
االؿجع ه٤زخ ا٤زخ أ االهزبف ازز٠ ٣ززأسغ اطزغف اثزب٠ كز٠ رع٣زضب
رـزذن اـغاخ ثجغص دضس ازأس٤غ ز % ظ او٤خ ، 4ثذض اهو٠
٣زغرت ػ٤ ا غع ص دبجزخ از٠ رج٤ز ا ئزظاع ا ارشزبط ا٣زخ اجزغاءاد
PAGE 7 OF 14
operation of the RS, the delivery delay penalty will be calculated on the total
value of each RS.
Second Party’s responsibility
The Second Party’s responsibility under this contract shall be limited to the
amount of the actual direct damages incurred by the First Party. The First
Party shall be entitled to no other remedies regardless of the form of claim
or cause of action, whether based in contract, negligence or otherwise. The
Second Party’s overall maximum liability (including e.g. liquidated damages)
to the First Party relating to this contract or the Works shall not exceed forty
percent (45%) of the Total Contract Price.
Without any contradictions with the delivery delay penalty mention in this
contract item.
Article No. 6 :-
In case the First Party will find any shortage in the contractual items or a non
conformity with the conditions or specifications, the first party will notify by
fax the Second Party, followed by a confirmed registered mail on the Second
Party address outside the country, but the date of fax will be considered as a
base, and will also notify by fax in the same date his commercial agent
followed by a registered mail, explaining the reasons of rejection and
requesting them to withdraw the rejected articles and supply a replacement.
In all cases the Second Party or his agent must withdraw the rejected
articles within 15 days maximum calculated from the second day of the
notification date. Otherwise a storage fee will be applied equivalent to 2% of
the value of the rejected items per week or part of a week up to four weeks
maximum.
After four weeks The First Party will have the right to sell these goods on
behalf of the second party and the expenses to be deducted from the sales
sum, without any contradiction with what have been mentioned in article 6
from this contract.
It is agreed upon according to this contract that the responsibility and the
ownership of the First Party shall start from the date of preliminary
acceptance of the RSs and their attachments and spare parts, and before
هبئ٤خ.
أ اؿززـال ػز٠ ق ثو٤ز ص االزلبع ثباطا بذ االهبف ازأسغ رذ
ق اخ ػ٠ او٤خ اإلجب٤زخ زاج األ ك٠ ا٤ؼبص اظع كزذـت اـغ
.ثو٤
ـإ٤خ اطغف اثب٢
ر ـإ٤خ اطغف اثب٢ ثجت ظا اؼوض ذوعح ثبذض األهو٠ و٤خ
األ.الؼ٤خ ألغاع اجبكغح از٢ رجضب اطغف
أسغ ثـي اظغ ػ ك ال ٣ دن اطغف األ أ١ رؼ٣بد
اطبجخ أ ؿجت اذضس ، ؿاء ثبؼوض أ ز٤جخػض اؼغكخ أ ؿ٤غ طي.
ـإ٤خ اطغف اثب٢ البخ اوو )ثب ك٤ب رؼ٣بد وطػخ ثال( ئ٠
األعثؼ٤ ك٢ ائخ جبػاطغف األ ك٤ب ٣زؼن ثظا اؼوض أ األػب ال رز
٪( اـؼغ اإلجب٢ ؼوض.92)
طغف اال اظع ثظاد ثب ال ٣زؼبعى غ ؿغاخ ازأس٤غ اـزذو
اجض.
: دسانبــــذ انسا
اطا رج٤ طغف اال جص ا٣خ شبلخ لغ ااهلبد ك٠ األهبف
غ اطغف اثب٠ ثظي ػ٠ ػا ازؼبهض ػ٤ب أ جض ثب ون كؼ٤ أ ٣شط
٣ؼزض ثزبع٣ز البؾ ب ٣شطغ ك٠ عم ثجت كبؾ رإ٣ض ثزبة الدن .ثبشب
وغ ػ٠ ذ اشزبع ث ٤ ازجبع ثجت كبؾ ك٠ طاد ازبع٣ز
٣إ٣ض ثشطبة ـج وذة ثؼ اه الدن ثأؿجبة عكي االهبف
٣ ) سـخ ػلغ ٣ب ( 14اشبلخ ثجة ؿذجب رع٣ض ثضال ب سال
سطبع ثظي ٤ ازجبع .ػ٠ االثغ ا٤ ازب٠ ال
كززبطا رززأسغ اطززغف اثززب٠ كزز٠ ؿززذجب ك٤زز طززغف اال اذززن كزز٠ رذوزز٤
% ) اثزب كز٠ ابئزخ ( ز ه٤ززب ػز ز اؿزجع 0وغكبد رشزؼ٣ ثاهزغ
رززأس٤غ أ جززؼء زز ززضح اهوززبب اعثؼززخ اؿززبث٤غ ثؼززض ازززبء ززظ اززضح رزشززظ
اثب٠ رشو ري اوغكبد ثز اج٤ز غ اجغاءاد ث٤ؼب ذـبة اطغف
ظا اؼوض . ـبصؽ ص االسال ثبجبء ثبجض ا
ازلن ػ٤خ ثجت ظا اؼوض أ ـئ٤خ ٤خ اطغف األ رجضأ
ربع٣ز اوج االؿزال االثزضائ٢ ألبف برب ذوبرب هطغ اـ٤بع
PAGE 8 OF 14
that all responsibilities for the RSs are the Second Party responsibility.
Article No. 7 :-
The Second Party is committed to supply the mechanical, electrical and
electronic components for the contracted RSs, from the original
manufacturer and not manufactured under license, in accordance to the
sub-suppliers list submitted in the offer.
The second party is committed to submit a certificate of origin for those RSs
certified by the Chamber of commerce.
The second party is also committed that all main components (Engine ,
Transmission , Front axle , Spreader) of the RSs to have a fixed name plate
in English language from the original sub supplier.
The Second Party is committed to ensure the availability of the necessary
and essential spare parts specially the main spare parts when requested
and ordered which will be needed to keep the RSs in operation for at least a
period of ten years after the end of the warranty period,and fixing the prices
of spare parts attached & recommended during the guarantee period (24
months)
The second party is committed to allow the first party to purchase the spare
parts directly from any of the sub-suppliers, according to the part numbers or
code numbers indicated in the spare part list of each RS, submitted from the
original manufacturer incase they are not delivered.
Article No. 8 :-
The Second Party is allowed to modify the agreed delivery schedule if it was
necessary, and in this case the First Party may agree on doing these
changes in the delivery schedule without any effect on the total delivery
period and without any contradiction with conditions of articles 6 and 14
from this contract.
Article No. 9 :-
Both parties have agreed that the international classification society (LR,
GL, ABS ,or BV) is assigned to issue the certificates and supervise the tests
at the factory according to delivery time schedule and to issue an original
certificates authenticated from them upon the completion of Tests and
ـئ٤بد اشبهخ ثبألبف برب هطغ اـ٤بع هج طي ر ج٤غ ا
.ـئ٤خ اطغف اثب٢
: سابعانبــــذ ان
٣زززززؼ اطززززغف اثززززب٠ ثززززأ ٣ززززز رع٣ززززض اززززبد ا٤ب٤٤ززززخ اغثبئ٤ززززخ
االزغ٤خ ألبف ع ازؼبهزض ز اوزبغ االهز٠ ز٤ؾ ثززغس٤ن
.وضخ ثبؼغىطي جوب وبئخ عص اجب ا
. اـغكخ ازجبع٣خ ب ٣زؼ ثزوض٣ كبصح لأ ظ االبف ؼزضح
ب ٣زؼ ثب ر ج٤غ ازبد اغئ٤ـز٤خ )اذزغى ، اج٤غثزؾ ، االزؾ
االززب٠ ، االؿززجغ٣ضع( ثبالززبف ثجززذ ػ٤ززب دززخ ث٤بززبد سبهززخ ثززب )ثبـززخ
ه٠.االج٤ؼ٣خ( اوغ االكااا هخااتو بخااىفر قطااع انزااار انورياات وانضاارورت وخاصاات اعساسااى يهااا ورناا عااذ
ساىاث حانات نسات اعساخوو انهاائى عطرطهبها نخزطت حطزم األواش نذة عحقم ع
خاول فخارة انضاا و انىصا بهااانقخرحات انصااحبت ويع حثبج ساعر قطاع انزاار
( ضهرا44يذحها )
طغف اال كغاء هطغ اـ٤زبع ز زعص اجزب جبكزغح ثبـبح ب ٣زؼ
ازاعصح ثلزف هطزغ ؿ٤زبع زق ثو٤زجوب العهب اص٣خ وطغ اـ٤بع
. ك٠ دب ػض رع٣ضباوبع االه٤٤
: ثايانبــــذ ان
٣جػ طغف اثب٠ ت اجغاء ثؼزي ازؼزض٣الد كز٠ اجغزبز اؼز٠ ازلزن
ػ٤ زع٣ض اطا اهز٠ االغ طي ك٠ ظ اذبخ ٣جػ طغف اال ااكوزخ
ػ٠ ظ ازؼض٣الد ثض ازأث٤غ ػ٠ الزغح ا٤خ زع٣ض ص االسال ثبدب
ػلغ ثص ظا اؼوض . غاثغا ـبصؽاجض٣ ا
:خاسعانبــــذ ان
( LR ,GL,ABS, or BV) ض٤زخ٤ئزخ ازلزز٤ق اارلن اطغكب ػ٠ ا رز
االكغاف ػ٠ ػ٤خ اجغاء االسزجزبعاد هضاع البصاد ٠ اجخ اؼزضح ال
ب جغبز اؼ٠ زع٣ض اهضاع كبصح اهز٤خ ؼززضح زب رل٤زض ثبوغ جو
غاجؼزززخ ااهزززلبد ال٤زززخ ث٤زززب زززض طبثوززززب غاؿزززخ السزجزززبعاارزززب
.ل٤خ ع ازؼبهضالغ ااهلبد ا
٣ذززن ػزز٠ ا رزز ج٤ززغ ارؼززبة ٤ئززخ ازلززز٤ق ػزز٠ لوززخ اطززغف اثززب٠ ززب
PAGE 9 OF 14
revise the technical specification and to insure its compliance with the
tender documents Technical conditions and specifications related to this
contract.
The second party will be responsible for the international classification
society costs and expenses. The First Party has the right to delegate four
engineers for a period of two weeks to inspect the RSs and test the
functionality and inspect the spare parts and tools, They are responsible to
issue an inspection report signed by both parties during inspection at factory
for all the found remarks during the inspection which are not in compliance
with the technical specifications specified in the second party offer and the
second party is obliged to rectify those remarks prior to shipping.
Full accommodation, airfares and internal transportation will be on behalf of
the Second Party, the second party is also committed to handover to the first
party all the issued certificate by the international classification society.
The second party is committed to submit the factory test certificates for the
main components (engine , transmission , front axle and spreader)
Article No. 10 :-
On site training: the Second Party is committed to provide a training course
for the first party employees (engineers - technicians –operators) for two
weeks on site during the preliminary acceptance.
Factory training: The Second Party is committed to provide a training course
for training eight engineers and technicians for duration of two weeks in the
factory premises in, Full accommodation, airfares and internal transportation
to be born by the second party.
Article No. 11 :-
The Second Party guarantee that the RSs and their components will be
brand new and genuine and complying with the latest design and that all the
equipments are genuine and produced by the original manufacturers and
not under licenses, and in accordance with the contractual technical
specifications and the recent international technological levels also that The
RSs will not have any defects or faults due to wrong design or materials or
due to fabrications and should perform efficiently during the guarantee
زلز٤ق طزي و٤زب ثزبزضح اؿزجػ٤ ٤ضؿز( 9 طغف اال ا٣لزبص ػزضص )
ػزز٠ ا ػزز٠ االززبف اسزجززبع ا ززبئق هطززغ اـ٤ززبع اؼززض اوززبدج
طزززغك٤ اثزززبء ازلزززز٤ق ثبوزززغ ززز ثزبثزززخ روغ٣زززغ لززززغى ثززز٤ ا ا٣وززز
االدظبد از٠ رظغ ػزض ازلزز٤ق ازز٠ رشزبق اهزلبد ال٤زخ ازظعح
ثؼززغى اطززغف اثززب٠ ، ٣زززؼ اطززغف اثززب٠ ثزالكزز٠ رززي االدظززبد هجزز
الذ .
ػ٠ ا ر ج٤غ رزب٤ق االهبزخ اززوالد اضاس٤زخ رزظاغ اـزلغ ثبطزبئغح
اطزغف اال ج٤زغ لوخ اطغف اثزب٠ زب ٣ززؼ اطزغف اثزب٠ ثزـز٤ ػ٠
البصاد اوبصعح ٤ئخ ازلز٤ق اض٤خ
٣ززززؼ اطزززغف اثزززب٠ ثزوزززض٣ كزززبصاد اسزجزززبع اوزززغ زززبد اغئ٤ـززز٤خ
)اذغى ، اج٤غثؾ ، االؾ االب٠ االؿجغ٣ضع(
:عاضرانبــــذ ان
اززبثؼ٤ اؼزب٤ ززضع٣ت٣زؼ اطزغف اثزب٢ ثزوزض٣ ثغزبز غ :ازضع٣ت ثبه
االؿزال اثبء اـبئو٤( ضح أؿجػ٤ ثبهغ -ك٤٤ -ضؿ٤ )طغف اال
.االثزضائ٠
(9) ؼززضصزززضع٣ت ٣زززؼ اطززغف اثززب٠ ثزوززض٣ ثغززبز : ازززضع٣ت ثبوززغ
رز ج٤زغ رزب٤ق ثوزغ اوزغزضح اؿزجػ٤ ٤ك٤ز ( 9ػزضص ) ٤ضؿ
االهبخ ازوالد اضاس٤خ رظاغ اـلغ ثبطبئغح ػ٠ لوخ اطغف اثب٠.
عطر: حاديانبــــذ انجض٣زضح طبثوزخ ب ـززؼبر ر االبف ازعص ٣ اطغف اثب٠ ا
٤ـزذ الدضس رو٤ ا ر اه٤خ ا ر ج٤زغ اؼزضاد ززز اهز٠
زجززخ ثزززغس٤ن رزلززن ززغ اـززز ااهززلبد ال٤ززخ ازؼبهززض ػ٤ززب جوززب
الدضس اظ ازج٤خ اؼب٤خ از ز ٣ظزغ ثزب ا ػ٤زت ٣غجزغ از٠ سطزأ
كز٠ ازوز٤ ا ازاص ا اوززبػخ ا رؼز ثلزبءح طززي سزال زضح اززب
:وضاعب
ربع٣ز هجب اؿزالب ٤غ بربجكغا البف أعثؼخ ػلغ -
.اؿزالب اثزضائ٤ب
PAGE 10 OF 14
period:
(24) months for the RSs and its components starting from the date of
preliminary acceptance.
(48) months for the Chassis and BOOM starting from the date of preliminary
acceptance.
without violating the civil law decrees in regards of the warranty for the
hidden defects.
The second party is committed to provide any enhancements, modifications,
or new technologies done by the original manufacturer to the first party in
sufficient time to use them when needed.
Article No. 12 :-
The Second Party guarantees that the RSs will work efficiently to perform all
required targets during the warranty period and as follows :
1- During the warranty period, the Second Party is committed as soon as
notifying him or his commercial agent in written by fax, to repair or replace,
on his account, any defected equipment or parts of it within ten working
days (fourteen days) maximum excluding customs clearance period ,counted
from the next day of notifying him by fax.
In case the Second Party fails to achieve the said repair, the First Party will
have the right to execute the required works on the account and
responsibility of the Second Party.
In case of delay in the repairing works more than the maximum due date
(fourteen days), the First Party has the right for compensation penalty
amounting (250) two hundred and fifty EURO per each RS per day to
compensate the loss occurred to the first party as a result of stopping
operations, and the compensation penalty will be counted from the next day
following the above mentioned grace period for the repair, and each case of
delay will be considered separately, with maximum value of 10% from each
RS value.
2- In all cases, when replacing any part of the RS parts, during the warranty
period, as a result of manufacturing defects mentioned in article no. 12 of
this contract, a new warranty period of twelve months, for this specifically
ربع٣ز هجب اؿزالب اؿزالب اج لبؿ٤بدكغا ثب٤خ أعثؼ -
.اثزضائ٤ب
زؼوخ ثب اؼ٤ة اشل٤خ .ص االسال ثبدب اوب اض٠ ا
٣الد ا رج٤ب جض٣ضحب ٣زؼ اطغف اثب٠ ثزوض٣ ا رذـ٤بد ا رؼض
٣و ثب اوغ االه٠ لغخ اطغف اال ك٠ د٤ الؿزلبص ثب د٤
اذبجخ.
عطر: انبــــذ انثااعصح ؿف رؼ ثوعح كؼبخ بؿجخ ٣ اطغف اثب٠ ا االبف
زذو٤ن االضاف اذضصح ب ا كزغح اب ػ٠ اذ ازب٠ :
زؼ اطغف اثب٠ ثجغص اسطبع ا اسطبع ٤ زبثخ ثلبؾ ثب ٣ -1
ثشالف ضح ثذض اهو٠ ٣( 19) ٣و ػ٠ لوز سال ػلغح ا٣ب ػ
ا ٤ ازجبع ا٤ ازب٠ السطبع ازش٤ن اجغ٠، رذزـت
ا ثبلبؾ ثبه الح ا اؿزجضا اؼضاد ا ا اجؼاء ب هض ٣ظغ ثب س
ػ٤ة سال كزغح اب ك٠ دبخ ػض ه ٤ب اطغف اثب٠ ثظي ٣
طغف اال اذن ك٠ رل٤ظ االػب اطثخ ػ٠ ل وخ ـئ٤خ اطغف
اثب٠ ٣ـزذن طغف اال ك٠ دبخ رأسغ االهالح ػ اضح ا ذضصح
) بئزب ٣ع ٣042 ( رؼ٣ي ثاهغ 19) هضعب ػلغح ا٣ب ػ =
ق ثو٤( ػ ٣عسـ ػ اغع ابرز ػ ازهق ػ ٤٣ب
اؼ ٣ذزـت ازؼ٣ي اػزجبعا ا٤ ازب٠ الزبء اضح اذضصح ػب٤
ق %( ه٤خ 12ثذض اهو٠ ػلغح ك٠ ابئخ ) دبخ ػ٠ دضح
2 ثو٤
اثبء RSق زجضا ا جؼء اجؼاء اك٠ ج٤غ االدا ك٠ دبخ اؿ -0
كزغح اب ز٤جخ ػ٤ت ك٠ اوبػخ جوب جض )اثب٠ ػلغ( ظا اؼوض
كغ 09كغا ) أعثؼخ ػلغرذزـت كزغح ب جض٣ضح ظا اجؼء ضح
( رجضأ ربع٣ز ازلـ٤ اـ٤ ثؼض االؿزجضا .
ػطب ابرجخ ػ ػ٤ة ك٠ اوبػخ ز٤جخ اال ق ربف كزغاد رهق ا - 2
. سال كزغح اب ا٠ كزغح اب االؿبؿ٤خ
PAGE 11 OF 14
replaced part of the RS, will be considered and counted from the date of
being efficiently operated after replacement.
3- All stoppage periods (down times) of the RSs, resulting from malfunctions
due to manufacturing defects during the warranty period, will be added to
the original warranty period of the RSs.
Article No. 13:-
If the Second Party would fail to fulfill his obligations for the supply and
commissioning of the contracted RSs or spare parts , fully or partially, at
the specified delivery date mentioned in the contract or within the extra
grace period, the First Party has the right without warning or any legal
procedures , to adopt one of the following two alternatives after notifying the
Second Party or his commercial agent by fax on his address mentioned in
the contract:
1. To purchase the items which the second party failed to deliver from any
other sources and on his account in a way granting the fast delivery , either
through a general or public or limited tender or limited bargaining or direct
award with the same previously announced and contracted technical
specifications and conditions, any excess in price due to such procurement
shall be deducted from the value of the deposited guarantee or any due
amounts at the first party side or any other governmental authorities, in
addition to any administration expenses that the first party incurred to
implement such procurement, however should such procurement price of
any articles be less than that of the contract price , the second party will not
be entitled to the difference, as well as will not be exempted from the
delivery delay penalty or the compensation penalty.
2. To terminate the contract in relation to the undelivered items and to
liquefy the performance guarantee amounting 10% from the contract value,
without the prejudice to first party deserved delivery delay or compensation
penalties who will also have the right to recourse to the courts against the
second party to what he could not conduct for any rights due to him.
عطر: ثانث انبــــذ ان
اطا اس اطغف اثب٠ ثبزؼا ثزع٣زض رـز٤ االزبف هطزغ اـ٤زبع ازؼبهزض
٣جزػ ػ٤ب ب ا ثؼب ك٠ ا٤ؼبص اذضص ثبؼوض ا سزال ازخ االزبك٤خ
طززغف اال ص رج٤زز ا اززظاع ا ارشززبط ا٣ززخ اجززغاءاد هززبئ٤خ ا ٣زشززظ ادززض
االجززغاء٣ ازززب٤٤ طززي ثؼززض اسطززبع اطززغف اثززب٠ ثبشززبعم ا ػزز٠ ذزز
اشزبع ثوغ ث ٤ ازجبع ثلبؾ ػ٠ ػا اج٤ ك٠ اؼوض :
ؿ٤غ ػ٠ دـبث كغاء االهبف از٠ ٣و اطغف اثب٠ ثزع٣ضب -1
ؿاء ثطغ٣ن ابهوخ اؼبخ ا اذضصح ا ابعؿخ ا ثبالرلبم اجبكغ
ثظاد الغ ااهلبد ال٤خ اؼ ػب ازؼبهض ػ٤ب ٣شو ه٤خ
ازأ٤ اصع ا أ٣خ ـزذوبد ض اطغف اال ا ا٣خ جخ د٤خ
اؼ٣بصح ك٠ اث بكب ا٤ب اوغكبد از٠ اسغ ه٤خ الغم ابرجخ ػ
٣ اطغف اال هض رجضب ك٠ ازل٤ظ ػ٠ دـبة اطغف اثب٠ ب ٣ـزذن
رؼ٣ي، ال٣ذن طغف اثب٠ اطبجخ اطغف اال ؿغابد رأس٤غ
ثلغم االؿؼبع اطا ب ؿؼغ الغاء ػ٠ دـبث اه اث ازلن ػ٤ ك٠
ظا اؼوض.
٣وجخ ازأ٤ ابئ٠ ابء ازؼبهض ك٤ب ٣شزن ثبالهبف از٠ رعص-0
% ) ػلغح ك٠ ابئخ ( 12 دن الغخ ) اطغف األ ( ثب ٣ اػ
ص االسال ثب ٣ـزذو اطغف اال ؿغابد رأس٤غ اؼوضه٤خ
ال ك٠ اغجع ػ٠ رؼ٣ي .. طي غ ػض االسال ثذن اطغف اا
اطغف اثب٠ هبئ٤ب ثب ٣ز اؿز٤لبئ دوم .
عطر:رابع انبــــذ ان
ثأززبء اجززغاءاد اؿزززشغام اهززغاعاد اززاعص زز رزؼززض الززغخ اطززغف اال
روض٣ ازل٣بد االػخسبعم اجالص اػزبصب ا٤ئخ اؼبخ الؿزثبع
PAGE 12 OF 14
Article No. 14:-
The First Party is responsible to finalize the procedures of issuing the
required authorization letters for the imported items and to be certified from
the general authority of investment and to furnish all the necessary power of
attorneys and authorization letters to the second party essential to conclude
the customs clearance procedure also to facilitate the necessary procedures
for allowing the entrance of all concerned persons working for the Second
Party to the customs area, to fulfill their obligations under this contract.
Article No. 15:-
The Second Party submitted a performance guarantee no. dated with total value (only ) representing 10% from the total contract
value as a performance guarantee to grant the contract performance, issued
by bank without any conditions or restrictions payable at the first party
first demand by the First Party. The letter of guarantee is valid for 30 days
following the end of the main warranty period (24 ) month and final
acceptance of contractual items except the chassis and BOOM.
This letter of guarantee value to be reduced to an amount of 5% from its
original total value , to be (only ) upon the expiry of the
main warranty period (24) month and final acceptance of contractual items
except the chassis. And to be extended with the amount of (only ) until the expiry of the addition warranty period related to the
chassis only, which is 24 month starting from the expiry of the main warranty
period.
Article No. 16:-
Force Majeure applied when events outside the control of Second Party and
can not be predicted on the issuance of this contract occur, such as riots or
civil strikes, terrorism ,war or civil war, flood, earthquake, landslides or
similar natural disasters or circumstances , The second party must report
Force Majeure upon its occurrence, Visa refusals by embassies for the first
party personnel also foreign governments warnings for travelling restrictions
for their citizens in case of instabilities inside Egypt and any of the above
بء اجغاءاد ازش٤ن اجغ٠ ظا او٤ب ثبكزخ ازـز٤الد ال طغف اثب٠
االػخ ضس سجغاء ضث٠ الزغخ اطزغف اثزب٠ ازضائغح اجغ٤زخ زل٤زظ
غاد ظا اؼوض .
عطر: خايسانبــــذ ان
هزبصع ثززبع٣ز عه سطبة ب ث٠ بئ٠هب اطغف اثب٠ ثزوض٣
% ز ه٤زخ اؼوزض ززب٤ 12ثاهزغ الؿ٤زغ( )كو ؾ ئجب٠ ثج
سززب زز ا٣ززخ كززغ ا رذلظززبد ززبئ٠ لبززخ رل٤ززظ هززبصع زز اجززي
ؿزبع الؼزز زضح ثالثزز٤ وجزال ززضكغ وزبخ اطززغف اال ػزض ا ززت
( كززغا اؿزززال 09ضعب ) هزز االؿبؿزز٤خ ٣ززب ثؼززض رززبع٣ز ازززبء كزززغح اززب
. اج ػضا البؿ٤بد اطغف اال ابئ٠ جص ع اؼوض
االؿبؿز٤خ االجب٤زخ % ه٤ززخ4ا٠ بئ٠اب اسطبة ه٤خ٣ز رشل٤ي
هزضعب االؿبؿ٤خ كزغح اب كع ازبء الؿ٤غ( )كو زوجخ
ػضا البؿ٤بد طغف اال ابئ٠ جص ع اؼوض( كغا اؿزال ا09)
اززبء كززغح ذز٤ الؿ٤زغ( )كوز هزضعح ثو٤زخ ٣زض لؼزخ .
رجزضاء ز رزبع٣ز اززبء ( كزغا 09 هزضعب ) لبؿ٤بد كو االبك٤خ اب
االؿبؿ٤خ. كزغح اب
عطر:دس نساانبــــذ اكزغ اوزح اوزبغح ػزض دزضس ادزضاس سبعجزخ ػز اعاصح اطزغف ٣ز رطج٤زن
اثزززب٠ ال ٣ززز ازجزززإ ثزززب ػزززض رذغ٣زززغ اؼوزززض ازززز٠ رؼززز٠ اػزززب الزززـت
٤زززببد االعزززبة اذزززغة اذزززغة اال٤زززخ ال االزززغاثبد اض٤زززخ
ػز٠ ا ٣وز اطزغف , اؼالػ ا٤بع ازغثخ ا ااعس اطج٤ؼ٤زخ الزبثخ
ززظا عكززي اـززلبعاد اثززب٠ ثززبالثالؽ ػزز هززع اوززح اوززبغح كززع دززضثب
اسطزبعاد اذزبد االجج٤زخ ثذظزغ اهضاع ازأك٤غاد الكغاص اطغف اال
ؿلغ عػب٣بب ك٠ دبخ ػض االؿزوغاع صاس وغ ال ٣ؼزض ثب زغف ز رزي
ز اـزلبعح اوزغ٣خ طغف االاظغف اال ثؼض اػزبص اـزضاد اوضخ
ثبشبعم االثالؽ ػب.
عطر:سابع انبــــذ ان
اؼوض ـ٤غ جؼئ٤ب أ ٤ب أ ػ اجبؾ ظا ال ٣جػ طغف اثب٠ ازبػ ػ
اـزذوخ ب أ ثؼب
PAGE 13 OF 14
circumstances won’t be considered unless the second party submit the
relevant evidencing documents legalized from the Egyptian Embassy abroad.
Article No. 17 :-
Under no circumstance shall the Second Party assign the contract or any
amounts due to him partly or totally.
Article No. 18 :-
It is understood that, as a result of presence of any remarks during the
preliminary acceptance or during the warranty period or as a result of
presence of any amounts of applied penalties, the First Party has the right to
deduct these values from any sums that may be due to the Second Party or
from the performance guarantee, without the need of sending alerts or
warnings, incase those remarks were not rectified in the period mentioned in
the contract.
Article No. 19 :-
Legal disputes and actions arising out of the contract shall be dealt with
according to the Egyptian law with the Egyptian courts in Alexandria.
Article No. 20 :-
The provisions of the civil law and maritime trading law no.17 for the year
1999 and the law no.72 for the year 2017 for the guaranty of investments
and its execution list and the First Party’s regulations relating to contracts,
purchasing and stores to be considered complementary to this contract
conditions where it is not explicitly stated.
عطر:ثاي انبــــذ ان
اوبثزز اـزززذن ظ٤ززغ جززص الدظززبد كزز٠ اطززغف االرـزززأص الززغخ
اطززغف ػزز٠ االؿزززال االثزززضائ٠ ا كزززغح اززب ا اـغاززبد اززز٠ هززض رهززغ
اثززب٠ ػزز غ٣ززن سوززب زز ـزززذوبد اطززغف اثززب٠ ا زز ه٤ززخ سطززبة
اب ابئ٠ ثض اذبجخ ا٠ رج٤ ا اظاع ك٠ دبخ ػض رالكز٠ االدظزبد
سال اضح اوم ػ٤ب ك٠ اؼوض .
:سع عطرخاانبــــذ ان
االؿضع٣خ ثجع٣خ وغ اؼغث٤خ ص ؿ٤غب ثبلو ض٣خ رشزن ذب
ك٠ ا ؼاع ٣لأ ػ ظا اؼوض ٣ اوب اوغ اوب ااجت
.ازطج٤ن
انعطرو:انبــــذ
17أدزب ز ز اوزب ازض٠ هزب ازجزبعح اوزبصع ثبوزب عهز رؼزجغ
الئذززخ ازل٤ظ٣زخ الئذزخ 0217ـزخ 70عهز االؿزثبع هب 1444ـخ
ززخ الدززب ززظا اؼوززص الزززغ٣بد اشززبػ لززغخ ) اطززغف األ (
اؼوض ك٤ب ٣غص ك٤ ن سبم.
PAGE 14 OF 14
Article No. 21 :-
Both parties agreed that the chosen location of the second party in Egypt is
its commercial agent premises stated at the contract heading to which all
fax correspondences are legally effective and their dates are considered,
which to be confirmed later by registered mail.
Article No. 22 :-
Intellectual Property Rights , All drawings, technical documents and software
submitted to the first party remain Second Party's property. First Party is
allowed to use them for the purpose of operating, maintaining or installing
the equipment.
Article No. 23:-
Contract has been issued in 4 originals in Arabic and English languages.
Each party has received one original to act in accordance in case of need,
while the remaining copies is keep with the first party for administrative and
legal procedures, incase of contradiction between the Arabic and English
texts that Arabic text shall prevail.
FIRST PARTY SECOND PARTY
وانعطرو: حاديانبــــذ ان٤ززخ اذزز اشزززبع طززغف اثززب٠ كزز٠ وززغ زز زز ٣وززغ اطغكززب ثززب
ج٤ززغ اغاؿززالد ازجززبع اثبثززذ ثوززضع ززظا اؼوززض اززز٠ روززخ ػ٤زز هبززب
خ سطبثبد ه٠ ػ٤ب ثؼز اهزثبلبؾ ٣ؼزض ثزبع٣شب رؼؼػ ثاؿط
رؼزجغ زج الثبعب اوب٤خ
وانعطرو: انبــــذ انثااز اوضخ ئ٠ اغؿبد اثبئن ازو٤خ اجغ، دوم ا٤خ الغ٣خ
اثب٢. ٣ـخ طغف األ ثبؿزشضاب اطغف اال رظ خ طغف
.اؼضاد ـغى رلـ٤ ه٤بخ أ رغ٤ت
وانعطرو:ثانث انبــــذ ان
ـز ثبـخ اؼغث٤خ االج٤ؼ٣خ رـ غف اعثغرذغع ظا اؼوض
، اوب٤خ جغاءاد االصاع٣خاجبه٤خ ال ـشخ ٣ذزلظ اطغف اال ثبـز
ك٠ دبخ االسزالف ك٠ ازلـ٤غ ٣ؼزض ثبـشخ اؼغث٤خ.
انطرف األول انطرف انثا