52
Page 1 of 22 TECHNICAL SPECIFICATIONS FOR 4 LADEN CONTAINER REACH STACKERS Capacity 45 ton under twist lock وزارةنعاول ااعع ا قطاقمنقابضت نه انشركت ا انبحر وانبرى شركتتدرسك انبضائعث واانحاو نخداول اALEXANDRIA CONTAINER & CARGO HANDLING CO. ) ش.ث.و.و( ت يصر يسا حابع شرك

TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

Page 1 of 22

TECHNICAL SPECIFICATIONS

FOR 4 LADEN CONTAINER REACH STACKERS

Capacity 45 ton under twist lock

قطاع االعال انعاووزارة وانبرى انبحرانشركت انقابضت نهقم

نخداول انحاواث وانبضائع اإلسكدرتشركت ALEXANDRIA CONTAINER & CARGO

HANDLING CO. شرك حابع يسات يصر ) ش.ث.و.و(

Page 2: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 2 of 22

COMMITMENT

We hereby commit if our offer is accepted, to undertake the following: -

1- To provide all the basic specifications needed to Alexandria Container & Cargo Handling Co.

(ACCHCO.) to purchase the spare parts from its original manufacturers as follows:-

A- Main components (Engine,Transmission, Drive axle,Spreader,Pumps, Hyd. Controls & valves)

installed in the REACH STACKER (R.S.) must be provided with its original manufacturer

name plate (in English language) .

B- Submit the required copies of complete spare parts and workshop manuals (in English

language) of the main components for each equipment from its original manufacturer,

including the requisition form of spare parts, quantity of parts and codes in equipment ( see

the form of attached spare parts list ) as well as CD (compact disc ) registering these

information .

C- Submit the basic specification for all standard parts installed in the R.S. or in its components

so as to be purchased by (ACCHCO. ) from any local or foreign supplier.

2- To ensure and guarantee that no constraints for (ACCHCO.) to get the spare parts from any of the

sub - suppliers (Even during the warranty period) and that would not make any deals with the sub -

suppliers to refuse supplying any required parts for (ACCHCO.),or to raise its prices than the usual

market prices.

3- The supplier under takes that the prices of the attached & recommended lists spare parts will be

fixed during guarantee period (two years).

4 - Tenderer must assure and provide a guarantee for the continuous production of the R.S. main

components ( engine, transmission , axles;….etc) and their spare parts at least for the coming ten

years and that their local agents can supply at any time the required spare parts and programs to

repair and maintain the equipment’s in good working conditions from the date of final acceptance .

Name of the company :

Name of representative :

Signature :

Date :

Page 3: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 3 of 22

Table of contents

Chapter I : General 1-1 Object of the Tender 4

1-2 Lift capacity 4

1-3 Climatic conditions 4

1-4 Standards and codes 4

1-5 Technical service 5

1-6 Spare Parts 5

1.7 Documents 6

1.8 Software &hardware 6

1.9 Training and inspection 6

1.10 Factory and site tests 7

Chapter II : R.S. requirements and performance 2.1 Chassis& boom 8

2.2 Engine 8

2.3 Transmission 9

2.4 Front axle 9

2.5 Rear axle 9

2.6 Hydraulic system 9

2.7 Brake system 10

2.8 Steering system 10

2.9 Greasing system 10

2.10 Tyres and Wheels 10

2.11 Spreader 11

2.12 Cabin 11

2.13 Stability 13

2.14 Performance 13

2.15 Safeties 13

2.16 Guarantee 14

Technical data List 15

Attached spare parts List ( 1 ) 20

Recommended Spare Parts List ( 2 ) 21

Evaluating Point System List 22

Page 4: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 4 of 22

CHAPTER I

1 – General

1.1 Object of the tender

Tenderers are invited by Alexandria Container and Cargo Handling Company (ACCHCo.)

branch (private free zone) for delivery and commissioning of the following:-

- Four in number (two for Alexandria terminal + two for Dekhila terminal) brand-new REACH

STACKERS (R.S. ) capacity not less than 45 ton under twist lock .

- The required RS will be able to handle 20` to 40` ISO containers on terminal tractor’s trailer and

stacking the container by the spreader to a height of five ( 5 ) stacking high cube containers of 9`6"

height in stacking areas.

- The maximum height under twist lock must be not less than 14.8 mt.

- The Reach stacker must be made in USA, Japan ,Great Britain, European Union not under license

(under license will be rejected).

- R.S. painting colour & ACCHCO logo will be determined during commissioning stage.

1.2 Lift capacity

- S.W.L. under twist locks not less than 45 ton for five ( 5 ) stacking high cube containers of 9`6"

at the first row& 35 ton for four ( 4 ) stacking at the second row &not less than 18 ton for (3)

stacking at third row.

1.3 Climatic conditions

The R.S. must be designed and guaranteed by the manufacturer to operate under the following

climatic conditions:

1. Sea water spray and in general a marine atmosphere.

2. Temperature up to 50º C.

3. Relative humidity of 100 %.

4. Area full of smooth dust(Presence of fine sands, and coal dust) .

1.4 Standards and codes

The R.S. must be designed for the heavy – duty operation conditions. New and of the latest

model, robust construction and high reliability to meet the international design standards for this

particular duty (design standards and classes should be mentioned).

The original manufacturer must prove in his experience list that his company has already manufactured in

a wide range the same type of R.S. not be less than 50 trucks of the same R.S. offered,

Page 5: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 5 of 22

working in mutli international terminals and of standard series and not of special design to meet

the required specifications the experience list must be registered and stamped from the chamber of

commerce in the manufacturer country.

1.5 Technical service

Tenderers must assure and provide guarantees for the continues production of spare parts for the R.S. at

least for the next ten years and that their local agents can at anytime supply the spare parts required to

maintain the equipment in a good working condition. Further assurance is required that the local agents

can provide technical staff to give technical assistance as may be requested by A.C.C.H.CO for

maintaining and repairing this equipment.

1.6 Spare parts

Tenderers must submit the attached spare parts list (1) and the recommended spare parts list(2)

Prices will be evaluated with the R.S. prices .

Tenderers must submit itemized recommended spare part list(2) for two years. List must

include the determined spare parts in the list in addition to any other spare parts the

manufacturer recommends for safe operating performance .

The supplier under takes that the prices of the attached &recommended spare parts will be

fixed during guarantee period(two years).

The financial evaluation include the attached spare parts and recommended spare parts prices.

Tenderers must indicate their own sub suppliers / manufacturers for main components in R.S.

Tenderers must submit a commitment and guarantee direct supply of spare parts by the

specified sub-suppliers to ACCHCO. without any constraint or overhead additional cost;

Tenderers must state the basic specifications, manufacturers, and codes for main components

installed in the R.S. in order to be purchased by ACCHCO. from any local or foreign suppliers;

All mechanical and electrical components to be installed in the R.S. must be of the standard

production models / types of their original manufacturer (unique, modified and special products

must be avoided).

Tenderers must provide all components with their original manufacturer name plates, specially

for the following:

- Engine,

- Transmission,

- Drive, Steer axles,

- Spreader,

- Hydraulic pumps/motors

Page 6: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 6 of 22

1.7 Documents :

The manufacturer must furnish each equipment with 1 copy of the following documents (must be in

English language-all the provided documents and technical charts must be for the offered model and not

generic ):-

Full specification, manual including the name plate data for the R.S. and its different components.

Operating& maintenance manual.

OEM descriptive workshop manual (assembly& disassembly) for engine, transmission, drive axle and

spreader from their original manufacturers .

Hydraulic and electric charts &outlay of connecting plugs for the whole equipment( copy must be

submit in the technical offer)

OEM Spare parts manual for each main component ( engine, transmission, drive axle, spreader )

from their original manufacturers including quantities of parts installed

Spare parts manual from the R.S’s manufacturer with part no. and remarks.

Original fault codes lists must be provided for engine, transmission .

Lubrication and greasing charts for all moving and rotating parts including the recommended and

alternative types of oils and grease covered by our local market ( Shell, Esso, and Mobil products ) .

1.8 Software and hardware

The successful tenderer must submit the following items:-

For each R.S an electric screen sheet (Tab) well-known brand device with display not less than 9.6

inch, octa core processor with software package of engine, transmission.

Eight flash memories include software database for spare parts, maintenance instruction, manual

instruction for all R.S. components (engine, transmission, hydraulic system, control system

,…etc).

Page 7: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 7 of 22

1.9 Training and inspection

The manufacturer have to submit training program for two weeks for each of:

Maintenance engineers, technicians and drivers, on site during receiving stage ( primary test).

ACCHCO has the right to send Four Engineers and four technicians at

manufacturer firm for two weeks, air tickets and accommodation and internal

transportation will be on behalf of contractor The manufacturer must submit in the

offer an intensive training course proposal in english language within two weeks at

manufacturer firm, training will be for engine &transmission ,hydraulic , electric

wiring,…etc maintenance, repair, analyzing, faults diagnostic, loading software

program practically on the R.S., ACCHCO will review and evaluate the training

course proposal .

ACCHCO has the right to send four (4) engineers for two weeks for inspection and

testing R.S. performance in the manufacturer factory , air tickets and

accommodation and internal transportation will be on behalf of contractor.

1.10 Factory and site tests:

- Test load under twist locks (handling and maneuvering) must be 45 ton for five ( 5 ) stacking at the

first row& 35 ton for four ( 4 ) stacking at the second row &not less than 18 ton for (3) stacking at

third row .

- Tenderers must submit the factory test certificates for all main components installed in the

R.S.(Engine, axles, transmission, spreader, …etc) .

- Inspection and final tests in tenderer’s factory should be carried out under the supervision of one of

the international societies (LR,GL,ABS,BV) and in the presence of ACCHCO inspectors .

- The stamped certificates by one of the above mentioned international societies should be submitted

at the receiving stage

– All performance tests on site, is bidder’s responsibility and on his account to prepare all facilities

for performance test in primary acceptance .

– Charges due to supervision of the international society in tenderer’s firm will be on the tenderer’s

account .

Page 8: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 8 of 22

CHAPTER II

2- R.S. requirements and performance :

2.1 Chassis & boom:

- Main frame must be heavy duty steel construction and of torsion resistant in accordance to the

acceptable international design standards to give maximum durability, rigidity and long service

life.

- The manufacturer must state the material and the chassis construction type.

- The boom must be telescopic box shape section the tenderer must submit full dimentions of the

boom(length, width& thickness) for both inner and outer boom .

- The boom must have a suitable construction to withstand high lateral and torsional stresses in

accordance to relevant international design standards.

- Design standards and classes should be mentioned.

2.2 Engine:

1. The diesel engine must be Volvo or Cummins( Volvo is preferable); new and latest model

;environment adapted of industrial type (Tier III emission compliant) without UREA.

2. The diesel engine must be heavy duty, four stroke in line cylinders arrangement with direct

injection, water cooled and equipped with direct mounted cooling fan and tropical heavy duty

radiator, the engine maximum power without fan must be not less than 350Hp at rated rpm.

3. Fresh air intake to engine must be through a suitable air cleaner with renewable air filter element.

4. Fuel /water-trap separator assembly and must be equipped with water drain system (done from

the cabin is preferable) .

5. The exhaust system must be of heavy duty type mounted in an up-swept position, completely

shielded with suitable expanded metal grill and must incorporate a rain cap or trap.

6. The engine must be protected with a shut-off device in case of mal-function,limphome (low oil

pressure and high water cooling temperature) . it will be checked at factory firm during inspection.

7. R.S shall be equipped with an automatic and adjustable delay shutdown time for engine after

ignition switch off.

8. R.S must be equipped with an automatic shutdown device to stop the engine after adjustable

certain time when the engine working in idle speed without any movement.

9. The engine production year must be the recent year of the offer.

10. The engine must be made by the original manufacturer (USA /G.B./ Western Europe /Japan) not

under license (under license will be rejected).

Page 9: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 9 of 22

2.3 Transmission:

- The transmission system must be of a well known standard type, robust, and rated to transmit the

maximum engine torque, the transmission must be heavy-duty power shift with torque converter

suitable for the engine power,

- Number of speeds by gear selector with automatic shift not less than 3 forward and 3 reverse.

- The transmission must be equipped with protection device against sudden direction change.

- Tenderer must prove with a certificate from the transmission manufacturer for the compatibility of

the offered transmission with the offered engine accomplish with the related calculations & curves

to be evaluated.

- The fixation between torque converter and engine must be flexible steel plates (Ring gear will be

rejected).

2.4 Front (drive) axle:

Front drive axle must be Kessler Germany :wider type(not less than 4000 mm) -high strength, heavy-

duty rigid type with dual reductions through drives head and planetary gears in wheel hub.

All front wheel should be mounted on the drive axle .

2.5 Rear (Steer) axle:

Steering axle with extra-wide operational range. Full hydro static power steering single cylinder/ double

acting type, steering shafts must have an ability for greasing. The bidder must submit all detailed

information about the axle (manufacturer, capacity , ……. etc. ).

2.6 Hydraulic system:

- Hydraulic system must consist of pumps,hyd.motors, filters, valves. safety valves must be

incorporated in the speed limiting system for both telescoping , lifting and lowering. Relief valves

must be provided and fitted to the hydraulic system and also safety valves that prevent boom in and

boom lowering in case of hydraulic system failure . Hydraulic oil cooling system must be fitted.

Filters must be fitted in the hydraulic return line.

- Separated hydraulic tanks for brake oil and working hydraulics.

- Adequate number of pressure checking points must be provided at suitable positions as

recommended by the manufacturer.

Page 10: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 10 of 22

- The hydraulic system design must have the proper protocol and components that ensure

that no uneven lifting of the RH and LH cylinders that can lead to boom torsion.

2.7 Brake system

- The brake system must be suitable and durable to perform its function. Bidder has to indicate the

manufacturer and specify the system.

- Service brake and parking brake must be separate as follows:-

a. Service brake ( wet disc brake) on drive axle fully enclosed and maintenance free ; actuated from

the cabin by pedal.

b. Parking brake must be actuated from cabin;consists of disc brake on the universal drive shaft.

Preferable to be between universal drive shaft and differential, actuated by a powerful spring and

released hydraulically.

2.8 Steering system:

- Full hydro static power steering single cylinder type . Bidders are requested to specify and submit full

information about the system and manufacturer of its components.

-Steering valve (orbitrol)should be outside the cabin.

2.9 Greasing System

- The R.S. should be equipped with 2 separate automatic greasing units with tank capacity not less

than 6 kgs /unit , to grease and cover all movable & rotating parts (steering, boom ,spreader lifting

cylinders, ..etc).

- Greasing unit must have the ability to setup its pause and operating time.

2.10 Tyres and wheels

- Heavy-duty type interchangeable front and rear wheels pneumatic tyres BAIS type.

- Tyre size must be not less than 1800x33 .

- Bidder must indicates the manufacturer and specifications of tyres and rims .

- Preferable : Bridgestone––Yokohama.

- Drive axel wheels should be four ( 4 ).

- Steer axel wheels should be two ( 2 ).

2.11 Spreader

- Must be telescopic provided with 2 hydraulic extension cylinders (chain type not acceptable) and

high mounted , adjustable for 20 and 40-feet (ISO standard) containers and flats (ELME

INNOVATION is preferable) . Spreader must be equipped with 4 floating/pendular twist locks

Page 11: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 11 of 22

and relevant indicators, electric cable and hoses for cylinder of twist lock must be inside spreader

beam.

- Spreader signal lights indicating spreader function status, must be provided on the spreader and

in driver’s cab and must be easily visible by driver for all spreader positions.

- Rotation not less than +190/-95 degree.

- Side shift of spreader must be not less ± 800 mm in both directions.

- The spreader must be able to mechanically pile slope.

- The spreader must be equipped with 2 rotation motors.

The Spreader must be provided with the following safeties:-

a- Safety device preventing container locking, when all twist locks are not correctly seated,

b- Safety device preventing container lifting when all twistlocks are not correctly locked. (no lock no

lift ),

c- Safety device preventing, container unlocking, when all twistlocks are not correctly seated,

d- Safety device preventing, spreader down when twist locks are seated,

e- Safety device preventing spreader extension when spreader is locked,

f- Safety device preventing spreader extension when spreader is seated.

g- Safety device preventing boom extension when spreader is seated.

h- Each twistlock is protected individually against unwanted rotation (mechanical interlocking against

faulty locking and unlocking) .

2.12 Cabin.

1. Must be safe, comfort.

2. Provide wide visibility range for the driver to do his job easily; and has interior mirror.

3. The front shield glass must be safe type(Semi flat is preferable) and equipped with wipers.

4. Cabin must be able to be slide electrically or hydraulically.

5. Two sides’ movable safety glass windows( up to down is preferable).

6. Noise proof, heat insulated and has efficient ventilation.

7. Provided with suitable fire fighting extinguishers (2 x 6 kg powder) From Egyptian local

market to meet the traffic regulations.

# The cabin must be equipped with:-

1- Indicators for the following functions:

a. Spreader correctly seated on the container.

b. Spreader twist locks closed.

Page 12: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 12 of 22

c. Spreader twist locks opened.

2- A multifunctional display must has and indicates :

a- Parker IQAN control or equivelant ( Parker IQAN is preferable ).

b- Written and readable faults (engine, transmission, hydraulic system).

c- Transmission‎ calibration needed must be done from the display.

d- Maintenance intervals must be shown in display (preferable pop up/splash screen) .

e- Lift height ,boom angle & boom length .

f- Engine Cooling temperature

g- Engine RPM.

h- Engine Oil Pressure gauge.

i- Fuel level.

j- Transmission oil temperature and pressure.

k- Hour meter.

l- Container actual weight and total number of the handled containers.

m- Safety override by pass key switch for spreader (preferable done from the display) .

n- Safety over load by pass key switch .

o- Access steps/ladder to the cabin with hand rail must to be from both sides.

3- Multifunction joystick to control hydraulic functions and spreader

4- Control gear shift selector is preferable to be separate .

5- Warning indicators for:-

a. Battery Charging.

b. Low oil pressure for engine.

c. Parking brake.

d. Low oil pressure for brake system.

e. low engine coolant level.

f. Direction indicator.

2.13 Stability

R.S. must be stable at full operating parameters, and protected against tipping .

Stability factor must comply with international standards (standards must be mentioned).

Page 13: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 13 of 22

2.14 Performance

Tenderer must submit in his offer:

1 - Boom full out/in time (laden, empty) .

2 - Boom full lifting/lowering time (laden, empty).

3 - Combination time for boom telescopic and derricking.

4 - Spreader telescopic time.

5 -Maximum traveling speed for R.S. with / without load

6 Acceleration rate with / without load.

2.15 Safeties

In addition to the previously stated safeties for hydraulic system stated in item (2 – 6), safeties for

spreader stated in item (2 – 12), and for cabin in item (2-13)

The R.S. must be equipped with:-

1- Anti - tipping device to prevent boom out and lowering the load when the design limits of the

machine have been reached .

2- An audible and visible warning must be fitted to warn the driver when approach 90% of the

max. load.

3- Automatic twist locks locking activation for spreader when are seated.

4- Camera at rear/back up and camera at boom nose with LCD coloured monitor inside the cabin.

5- Transmission protection against sudden change of direction.

6- Rotating beacon on boom.

7- Acoustic back up warning alarm with back up LED light, direction and rear stops indicators

8- Extra working LED (not less than 3000 lumin) under front of outer boom .

9- LED spot lights on spreader (not less than two).

10- LED spot lights(position,reverse,brake and the mudguards.

11- Rear view mirrors in both mudguard sides

12- Maintenance free batteries in a suitable place.

13- Extra external analogue operating hour meter.

The R.S. Is preferable to be equipped with:-

1- Automatic thermal fuses (circuit breaker) .

Page 14: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 14 of 22

2- Automatic parking brake activation & gearshift inching in case of driver leave his

seat.

3- An external oil dipstick for both engine & transmission.

4- Spot light in electric control box.

2.16 Guarantee:

- The manufacturer must guarantee the R.S with all components manufactured

for a period of two years with unlimited operating hours against 10% of the total value

of the contract.

- After these two years, an additional two years for both boom and chassis guarantee

against 5% from the total value of the contract

The guarantee will be started from primary acceptance /start up date at

ACCHCO site.

Page 15: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 15 of 22

Technical Data List

Page 16: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 16 of 22

Technical data list

1. THE OFFERED MACHINE:

A. Manufacturer – origin :

B. Model:

2. CAPACITY :

A. 1 row / load center : ton/mm

B. 2 row / load center : ton/mm

C. 3 row / load center : ton/mm

3. OVERALL DIMENSIONS :

A. Length including spreader

B. Width

C. Wheel base

D. Ground clearance

E. Turning radius

F. 90° stacking aisle(40 feet container)

4. PRE-QUALIFICATION :

No. of machines of the same type :

5. ENGINE :

A. Manufacturer/origin :

B. Type :

C. Power: Hp/r.p.m

D. Torque: Nm/r.p.m

E. No. of cylinders:

F. Malfunction shut off device Yes/No

6. TRANSMISSION : A. Manufacturer/origin –:

B. Model /Type :

C. No. of gears F/R :

Page 17: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 17 of 22

D. Power: Hp

E. Torque : Nm

F. Protection device againest sudden change

Yes/No

7. DRIVE AXLE : A. Manufacturer and model :

B. Drive axle static capacity ton

C. Drive axle dynamic capacity ton

8. REAR AXLE: A. Manufacturer and model :

B. Rear axle capacity with /without load Ton

9. CHASSIS & BOOM:

A.

B.

C.

Description of chassis design, type, manufacture

technique, steel code & properties and welding

electrodes must be mentioned.

Design standards and classes should be specified

Boom Section dimensions (length,width&thickness)

for the two stages are required

10. BRAKE SYSTEM :

A. Main brake :

Manufacturer, type , braking force , cooling fluid,

braking fluid and location

B. Parking brake :

Manufacturer, type, braking force, and location

11. HYDRAULIC SYSTEM : A. Type of pumps :

B. Type of control valves :

C. Type of accumulators

D. Safety control valve to avoid abrupt lowering of

load in case of hydraulic failure. Yes/No

Page 18: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 18 of 22

12. SPREADER :

A. Manufacturer and origin

B. Model:

C. Spreader weight : ton

D. Side shift (R/L) : mm

E. Rotation at both direction : degrees

F. MPS: degrees

G. No. of rotation motors :

H. No. of damping cylinders :

I. -Safety device preventing container locking when all

twist-locks are not correctly seated.

-Safety device preventing container lifting, when all

twist-locks are not correctly locked. ( No lock No lift )

-Safety device preventing container unlocking when

all twist locks are not correctly seated.

-Safety device preventing spreader down when

twistlocks are seated.

-Safety device preventing extension when spreader is

locked

- Safety device preventing extension when spreader is

seated

- Mechanical interlocking against faulty locking and

unlocking

13. TYRES & RIMS : A. Manufacture of Tyres:

B. Manufacture of Rims:

C. Size

D. ply rating

E. Tread depth :

14. WEIGHTS : A. Weight of reach stacker unladen :

B. Front axle load at load center L1 :

(unladen / at rated load) :

C. Front axle load at load center L2 :

(unladen / at rated load) :

D. Front axle load at load center L3 :

(unladen / at rated load) :

E. Front axle load at driving position at rated load

F. Rear axle at load center L1

(unladen / at rated load) :

G. Rear axle at load center L2

(unladen / at rated load) :

Page 19: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 19 of 22

H. Rear axle at load center L3

(unladen / at rated load) :

I. Rear axle load at driving position at rated load:

L1: Load center at 1 row

L2: Load center at 2 row

L3: Load center at 3 row

15. PERFORMANCE : A. Boom full telescopic time (load/empty) :

B. Boom full derricking time (load/empty) :

C. Combination time for boom telescopic and

derricking

D. Spreader telescopic time

E. Gradeability laden/unladen

16. SAFETIES :

LIST(1)

Page 20: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 20 of 22

Attached Sprae Parts List

Descriptions Qty

Unit

Price

Total

Price

Tenderer

Part No

Sub-

supplier

Part No

1- For filters

All filters needed to maintain each RS

for 8000 operating hours :

1- Engine oil filter

(Bidder must take in his consideration

that the engine oil filter change interval is

250 working hours)

2- Fuel filter

3- Engine air filter

4- Hydraulic filter

5- Breathing filters

6- Transmission filter

7- Water separator

8- Return hyd. Filter

And other filters exist in RS

2- For wheels :

1- Spare wheel complete with rim

2- Spare tyre without rim

8

8

List (2)

Recommended Spare Parts

Page 21: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 21 of 22

Descriptions Qty

Unit

Price

Total

Price

Tenderer

Part No

Sub-

supplier

Part No

1- For Engine

1- Turbocharger

2- Water pump

3- Starter motor

4- Alternator

5- Fuel injectors

6- Fuel Pump

All engine hoses (fuel – water – air)

2

2

2

2

12

2

2 set

2- For Hydraulic system:

1- Hydraulic pump of each type exist in RS.

2- Repair kit for each type of hydraulic cylinders exist in RS

3- Control lever(joystick)

4- Electric Solenoid valve for each type exist in RS

5- Hydraulic motor for each type exist in RS

2

2

2

2

2

3- Set of all belts 2 sets

4- Electronic components

1- Set of all electronic cards exist in the RS programmed and

ready to use as: EMS for Engine, TCU for transmission,

cabin main display,spreader and any control unit exist in

the RS.

2- Engine sensors set includes (camshaft, crank shaft, flywheel,

fuel, boost pressure, temperature, oil pressure & any other

sensors exist).

3- Transmission sensors set includes ( turbine, speed

,pressure, temperature any other sensors exist)

4- All Hydraulic sensors & tranceducers exist

5- Set of working lights LED

2 sets

5 - For spreader

1- Complete Set of twist locks for spreader includes (sleeve, washers, nuts

….etc.)

2- Hydraulic cylinder for Twist lock

3- Complete Set of proximity switches

2 set

6-Set of all Anti wear Pads in the RS (Including

Spreader)

2 sets

7- Tyre 24

Page 22: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS

Page 22 of 22

Tender Technical Evaluation will be by pointing system

No ITEM %

1 Main frame(chassis, boom, and overall dim. ) 10

2 Drive train(engine-transmission-drive axle) 25

3 Hydraulic, Steering and Brake system 10

4 Performance and Stability 10

5 Spreader 15

6 Cabin and Safeties 15

7 After sale service ,Experience 15

Total 100

ال حقم سبت و % نكم بد عهي حد 08 ال حقم ع حصم عهي سبتأانقبول فا جب طاء انعأاحفقج انهجت

. انفدرجاث انخقى أجان % ي 08 ع

Page 23: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

/ / انراسيخ :

خطاب ضمان الدفعة المقدمة رقم

انسادج/ ششكح االسكذسيح نرذاول انذاوياخ و انثضائع

يياء االسكذسيح –يذطح انذاوياخ 49-94سصيف

ض تقرضي هزا

في دذود يثهغ

) فقط

تخصىص

و رعهذ تذفع هزا انثهغ نذي اول طهة يكى و تذو انظش اني ايح يعاسضح و يسشي يفعىل خطاب انضا هزا

دري / /

و عهي رنك فا ايح يطانثح تانقيح في هزا انشأ يجة ا ذقذو نا دري هزا انراسيخ يصذىتح تاالذي

ال شئ

ح دري رنك انراسيخ يقضي يكى ايح يطانثح تانقيفارا نى ذصها انرزايا ي ذهقاء فسه و يصثخ هزا انضا الغيا و ضارا يرهيح.

انشجاء اعادج خطاب انضا هزا انيا عذ ارهاء انذج نالنغاء

و ىد االفادج ا انصىس انفىذىغشافيح و انكشتىيح نهزا انخطاب ال يعرذ تها.

نا ته الصذاس خطاتاخ انضا.و قش تاا نى رعذ انذذ انصشح

و ذفضهىا تقثىل فائق االدرشاو ,

: يشاعي ا يصذس خطاب انضا ي تك يذهي دسجح ملحوظة ثك انشكزي.اوني يعرذ ي ان

Date: / /

ADVANCE PAYMENT L/G NO.

Messrs , Alexandria container & cargo handling CO.

Quay 49-50 containers terminal – port of Alexandria

We hereby guarantee

To the extent of

(Say

In respect of

And we undertake to pay his sum on your first demand, Notwithstanding any contestation. This letter of guarantee holds good until the / /

Consequently, any claims for payment in respect thereof should be made to us by that date accompanied by:

Should we receive no claim for payment from you by that date, our liability will cease "ipso facto" and the present letter of guarantee will definitely become null and cancelled and our guarantee expired.

Please return to us this letter of guarantee on expiry date for cancellation.

Please be informed that the photocopies and copies of this letter are considered non negotiable copies. We certify that we have not exceeded the limit permitted to us for issuing letters of guarantee.

Yours faithfully,

ذ انعرانرىقيع

Authorized signature

يعرثش خطاب انضا الغيا و ال يعرذ ته في دانح وجىد

اي ذعذيم او كشط او اضافح اني انثيااخ انىاسدج ته دري

ا كاد يعرذج

Page 24: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

Date: / /

BID BOND GUARANTEE NO.

Messrs.' of Alexandria Container& Cargo Handling

Co.

Quay 49-54 Containers Terminal – Port of Alexandria

With reference to the tender of

In connection with the adjudication no

Date

For the supply of

We hereby undertake to hold at your disposal as

provisional deposit, free of return and payable in

cash on your first demand and notwithstanding any

contestation by the tenders the sum of:

This undertaking remains in force until a decision is

taken on the offer and ( in the event of the whole or

part of the offer being accepted) until the tenders

has provided such final guarantee deposit as may be

required but it will in any case automatically expire

on the / /

Consequently any claim for payment in respect

thereof should be made to us by the

accompanied by :

At the least should we receive no claim for payment

from you by that date , our liability will cease “ ipso

facto “ and the present letter of guarantee will

definitely become null and void.

This guarantee is not to be used as final guarantee ,

please be informed that the photocopies and copies

of this letter are considered non-negotiable copies.

Please return to us this letter of guarantee on expiry

date for cancellation.

We certify that we should have not exceeded the

limit permitted to us for issuing letters of guarantee.

Yours faithfully,

التوقيع المعتمد

Authorized signature

/ / التاريخ:

خطاب الضمان االبتدائى رقم

انسادج / ششكح االسكذسح نرذال انذااخ انثعائغ

ياء االسكذسح –يذطح انذااخ 49-94سصف

تاالشاسج ان انؼطاء انقذو نكى ي

تخصص انقاصح سقى

تراسخ

نرسذ

تذ رؼذ تقرع زا تأ عغ ذذد ذصشفكى كرأي اترذائ,

ػائذ, قاتال نهذفغ قذا ػذ أل طهة يكى تغط انظش ػ أ

اػرشاض ي يقذي انؼطاء يثهغ :

سش يفؼل يفؼل زا انرؼذ ان أ رخز قشاس تشأ انؼطاء

) ف دانح قثل انؼطاء كه أ جضء ي ( ان أ قو يقذو انؼطاء

نك سر ػه أ دال تاذاع انعا انائ انز قذ ذطهث

ذهقائا ف / /

ػه فا أ يطانثح تانقح ف زا انشأ جة أ ذقذو انا ف

يؼاد غار

يصذتح تاالذ :

فارا نى ذصها يكى اح يطانثح تانقح ف زا انشأ در رنك انراسخ,

ئا يرح.قع انرضايا ي ذهقاء فس ذصثخ ز انعاح ا

كا ا ال جص اسرخذاي كعا ائ , د االداطح ا انصس

انفرغشافح انكشتح نزا انخطاب ال ؼرذ تا.

انشجاء أ ذؼذا انا خطاب انعا زا ػذ اراء انذج نالنغاء.

قش تاأا نى رؼذ انذذ انصشح نا ت ألصذاس خطاتاخ انعا

ذفعها تقثل فائق االدرشاو ,

ؼرثش خطاب انعا الغا ال ؼرذ ت ف دانح جد أ ذؼذم أ

كشط أ اظافح ان انثااخ اناسدج ت در ا كاد يؼرذج

شاػ أ صذس خطاب انعا ي تك يذه دسجح أن يؼرذ ي انثك انشكض. : ملحوظة

Page 25: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

Date : / /

PERFORMANCE BOND NO.

Messrs Alexandria Container & Cargo Handling Co.

Quay 49- 54 Containers Terminal – Port of

Alexandria

We hereby guarantee

To the extent of

(Say

In respect of

And we undertake to pay this sum on your first

demand, notwithstanding any contestation .This

Letter of guarantee holds good until the / /

Consequently , any claims for payment in respect

thereof should be made to us by that date

accompanied by :

Should we receive no claim for payment from you by

that date , our liability will cease “ ipso facto “ and

the present letter of guarantee will definitely

become null and cancelled and our guarantee

expired.

Please return to us this letter of guarantee on expiry

date for cancellation.

Please be informed that the photocopies and copies

of this letter are considered non-negotiable copies.

We certify that we should have not exceeded the

limit permitted to us for issuing letters of guarantee.

Yours faithfully,

انرقغ انؼرذ

Authorized signature

التاريخ: / /

رقم خطاب الضمان النهائى

انسادج / ششكح االسكذسح نرذال انذااخ انثعائغ

ياء االسكذسح –يذطح انذااخ 49-94سصف

ذع تقرع زا

ف دذد يثهغ

)فقط

تخصص

رؼذ تذفغ زا انثهغ نذ أل طهة يكى تذ انظش ان اح

يؼاسظح سش يفؼل خطاب انعا زا

در / /

ػه رنك فا أح يطانثح تانقح ف زا انشأ جة أ ذقذو نا در

تح تاالذ :زا انراسخ يصذ

فارا نى ذصها يكى أح يطانثح تانقح در رنك انراسخ قع

انرضايا ي ذهقاء فس صثخ زا انعا الغا ظارا يرح.

انشجاء اػادج خطاب انعا زا انا ػذ اراء انذج نالنغاء

د االفادج ا انصس انفرغشافح انكشتح نزا انخطاب ال ؼرذ

تا

قش تأا نى رؼذ انذذ انصشح نا ت ألصذاس خطاتاخ انعا

ذفعها تقثل فائق االدرشاو ,

ؼرثش خطاب انعا الغا ال ؼرذ ت ف دانح جد أ ذؼذم أ

ظافح ان انثااخ اناسدج ت در ا كاد يؼرذجكشط أ ا

: شاػ أ صذس خطاب انعا ي تك يذه دسجح أن يؼرذ ي انثك انشكضملحوظة

Page 26: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

TO WHOM IT MAY CONCERN

Hereby I …….. Board director of …………… And duly authorized

to engage the company, give power to attorney to Messrs …………….

Our commercial agent in A.R.E to sign the contract for the supply of

…………… according to our offer No. ………… For Branch of

Alexandria Container And Cargo Handling Co, Private Free Zone, on

behalf of our company.

Name:

Signature:

Date:

Page 27: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PROFORMA INVOICE No. Date / /

ITEM DESCRIPTION QTY UNIT

PRICE

TOTAL

PRICE

1

VALUE OF EQUIPMENT ( C.I.F )

INCLUDING TEST , INSTALATION AND START UP ON

SITE.

2 PERSONNEL TRAINING IN FACTORY

ON SITE

3 COST FOR COMPANY ENGINEERS INSPECTION

4 CHARGES FOR INTERNATIONAL SOCIETY IN FACTORY

5 ATTACHED SPARE PARTS

Total value CIF on site

COUNTRY OF ORIGIN :

PORT OF SHIPMENT :

DELIVERY PERIOD CIF ON SITE:

PAYMENT TERMS :

VALIDITY :

`WE CONFIRM THAT THIS PROFORMA INVOICE IS TRUE AND CORRECT.

MESSRS

BRANCH OF ALEXANDRIA CONTAINER AND CARGO HANDLING CO,

PRIVATE FRE ZONE

QUAY 49-54 PORT OF ALEXANDRIA

ALEXANDRIA, EGYPT

Page 28: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

1

ARAB REPUBLIC OF EGYPT

MINISTRY OF BUSINESS SECTOR

HOLDING COMPANY FOR MARITIME & LAND TRANSPORT

ALEXANDRIA CONTAINER AND CARGO HANDLING COMPANY

GENERAL CONDITIONS

FOR GENERAL TENDER TO SUPPLY AND DELIVERY

FOR FOUR (4) LADEN CONTAINER REACH STACKERS

Capacity 45 ton under twist lock

Page 29: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

2

GENERAL CONDITIONS

FOR GENERAL TENDER TO SUPPLY AND DELIVERY

FOR FOUR (4) LADEN CONTAINER REACH STACKERS

Capacity 45 ton under twist lock TENDERNESS ARE INVITED BY FOREIGN PURCHASING COMMITTEE OF BRANCH OF ALEXANDRIA

CONTAINER & CARGO HANDLING COMPANY PRIVATE FREE ZONE (ACCHCO) TO SUPPLY AND DELIVERY OF

FOUR (4) LADEN CONTAINER REACH STACKERS CAPACITY 45 TON UNDER TWIST LOCK, AS FOLLOWS:

- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA

CONTAINER TERMINAL - PRIVATE FREE ZONE, QUAY 49-54 , PORT OF

ALEXANDRIA,ALEXANDRIA,EGYPT.

- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA

CONTAINER TERMINAL- PRIVATE FREE ZONE, QUAY 96 , PORT OF EL DEKHEILA,

ALEXANDRIA, EGYPT.

- BEFORE SUBMITTING THE TENDERS, THE TENDERERS SHOULD CAREFULLY REVISE THESE INSTRUCTIONS

AND TECHNICAL SPECIFICATIONS.

- TENDERERS HAVE THE RIGHT TO ASK ANY QUESTIONS THAT CAN CLARIFY ANY MISUNDERSTANDING

BEFORE SUBMITTING THEIR OWN PROPOSAL UP TO 21 DAYS BEFORE OPENING ENVELOPE (A).

- TENDERERS MUST PRESENT THEIR TENDER COMPLYING WITH TECHNICAL SPECIFICATIONS, IN CASE

TENDERS NOT COMPLYING WITH THE TECHNICAL SPECIFICATIONS THE COMPANY HAS THE RIGHT TO

REJECT THESE TENDERS.

- TENDERERS SHOULD CONSIDER ALL THE TENDER ITEMS AND STICK TO THE SPECIFIED TECHNICAL

SPECIFICATIONS IF ANY TENDERER DESIRES TO OFFER SPECIAL CONDITIONS OR INTRODUCE TECHNICAL

CHANGES OR ALTERATION HE MAY SEND THESE MODIFICATIONS BY SEPARATE LETTER PROVIDED THAT

IT REACHES THE PURCHASING COMMITTEE BEFORE THE FIXED DATE AND TIME FOR SUBMITTING THE

ENVELOPE (A) .

- TENDERES SHOULD COMPLY WITH ALL THE TENDER'S BOOK ATTACHED SPECIMENS ESPECIALLY THE

CONTRACT TERMS & CONDITIONS, AND THE COMPANY COULDN'T ACCEPT ANY AMENDMENTS UPON IT.

- THE COMPANY COULDN’T ACCEPT ANY QUESTIONS CONCERNING THE DESIGN , REVIEWING THE

DRAWING OR AMENDMENTS AFTER THE FIXED DATE AND TIME FOR UNSEALING ENVELOPE (A)

- NO ATTENTION WILL BE PAID TO TENDERS NOT INCLUDING THE FINANCIAL C.V REQUIRED IN ENVELOPE

(A) AS IT IS CONSIDERED AN OBLIGATION

- IN CASE OF INSERTING ANY FINANCIAL / COMMERCIAL CONDITIONS IN THE TECHNICAL OFFER , NO

ATTENTION WILL BE PAID TO THIS CONDITION .

- TENDERER IS OBLIGED TO SIGN AN ACCEPTANCE UNDERTAKEN AS PER ATTACHED FORM.

- ALL QUESTIONS & ANSWERBACKS WILL BE SUBMITTED TO ALL TENDERERS.

ART. 1- SUBMISSION OF TENDERS:

THE TENDERS MUST BE DELIVERED IN THREE COPIES (ONE ORIGINAL + 2 PHOTOCOPIES) AND PLACED IN 2

SEPARATE ENVELOPES (A, B) SEALED WITH SEALING WAX.

IN CASE OF ANY DISCREPANCY, THE ORIGINAL SHOULD BE CONSIDERED.

Page 30: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

3

THE TENDER DOCUMENTS TO BE PRESENTED AS FOLLOWS:

ENVELOPE (A) : INCLUDES THE FOLLOWING:

1. TECHNICAL OFFER AND TECHNICAL SPECIFICATIONS.

2. PAST EXPERIENCE (REFERENCE LIST) AUTHORIZED BY THE CHAMBER OF COMMERCE.

3. THE PROVISIONAL DEPOSIT.

4. FORM 14C , COPY OF TAXES CARD & COMMERCIAL REGISTRY FOR LOCAL AGENT OR LOCAL TENDERER .

5. FINANCIAL C.V FOR THE SUPPLIER CONFIRMED BY FIRST CLASS BANK.

6. THE COMMITMENT ATTACHED WITH TECHINCAL SPECIFICATIONS SIGNED BY AUTHORIZED PERSON .

7. POWER OF ATTORNEY FROM SUPPLIER TO AUTHORIZED PERSON RESPONSIBLE TO SIGN THE CONTRACT.

ENVELOPE (B) : INCLUDES THE FOLLOWING :

ITEMIZED FINANCIAL OFFER AND CONDITIONS AND ANY ELEMENTS AFFECTS THE FINANCIAL OFFER.

- BOTH ENVELOPES (A) & (B) SHOULD BE PUT TOGETHER INSIDE ANOTHER ENVELOPE TO BE SUBMITTED

ON DATE OF OPENING ENVELOPE (A) & TO BE ADDRESSED AS FOLLOWS:

PRESIDENT OF FOREIGN PURCHASING COMMITTEE OF BRANCH OF ALEXANDRIA

CONTAINER AND CARGO HANDLING CO. BRIVATE FREE ZONE. QUAY 49/54 PORT OF ALEXANDRIA .

FAX: 03-4862124 E-MAIL: [email protected]

TITLE: GENERAL CONDITIONS FOR GENERAL TENDER TO SUPPLY AND DELIVERY

FOUR (4) LADEN CONTAINER REACH STACKERS CAPACITY 45 TON UNDER TWIST LOCK

- TENDER DOCUMENTS SHOULD BE SIGNED BY AUTHORIZED PERSONS.

- THE DATE AND TIME OF ENVELOPES DELIVERY TO THE FOREIGN PURCHASING COMMITTEE SHOULD

BE BEFORE 12.00 O’CLOCK AT NOON.

* OPENING OF THE TECHNICAL ENVELOPE (A) AT 12.00 O’CLOCK ON / /2019

* OPENING OF THE FINANCIAL ENVELOPE (B) AT 12.00 O’CLOCK ON / /2019

FOR SUCCESSFUL AND ACCEPTED TECHNICAL OFFERS.

- ENVELOPES RECEIVED AFTER DATE AND TIME WILL NOT BE CONSIDERED, WHATEVER MAY BE THE

REASON OF DELAY.

- TENDERERS OR THEIR AUTHORIZED REPRESENTATIVES SHOULD ATTEND BOTH UNSEALING ENVELOPES

(A) & (B) AGAINST A STAMPED AUTHORIZATION FORM ISSUED BY CONTRACTOR TO ATTEND.

- NO ATTENTION WILL BE PAID TO ANY FINANCIAL MODIFICATION RECEIVED AFTER OPENING OF THE

ENVELOPE (A).

ART. 2- PRICE LIST:

TENDERERS SHOULD OBSERVE THE FOLLOWING PROCEDURES IN THE PRICE LISTS OR THEIR SUBSTITUTES:

A) PRICE MUST BE GIVEN ON CIF BASIS ON SITE, BRANCH OF ALEXANDRIA CONTAINER &

CARGO HANDLING COMPANY - PRIVATE FREE ZONE, QUAY 49-54 PORT OF ALEXANDRIA, &

QUAY 96 PORT OF EL DEKHEILA, ALEXANDRIA - EGYPT ,

THE PRICE INCLUDES: THE VALUE OF THE REACH STACKERS (COST, INSURANCE AND FREIGHT).

TESTS, COMMISSIONING IN FACTORY AND AT SITE.

COSTS OF INSPECTION OF FOUR ENGINEERS AT FACTORY FOR TWO WEEKS .

COSTS AND EXPENSES OF INTERNATIONAL CLASSIFICATION SOCIETY IN FACTORY.

COSTS FOR THE TRAINING OF FOUR ENGINEERS & FOUR TECHNICAL AT FACTORY FOR TWO WEEKS

COSTS FOR THE TRAINING ON SITE.

ATTACHED SPARE PARTS.

FOUR ELECTRIC SCREEN SHEET (TAB)

EIGHT FIRE EXTINGUISHERS 6 KG FROM THE LOCAL MARKET.

Page 31: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

4

VESSEL DISCHARGING EXPENSES, CUSTOMS, CLEARANCE FEES AND STORAGE FEES IN

A.R.E AND INTERNAL TRANSPORT TO FIRST PARTY CONTAINER TERMINALS LOCATION IN

ALEXANDRIA AND DEKHELA PRIVATE FREE ZONE.

B) TOTAL PRICE SHOULD BE WRITTEN IN FIGURES AND IN WORDS. THE UNIT PRICE FOR EACH ITEM

SHOULD BE SPECIFIED IN THE PRICE LIST.

C) NO ERASURES OR CROSSING SHOULD BE MADE IN THE PRICE LISTS.

IN CASE OF ANY DIFFERENCE BETWEEN THE UNIT PRICE AND THE TOTAL PRICE, THE UNIT PRICE

WILL BE CONSIDERED CORRECT.

ART. 3- ORIGIN OF ARTICLES:

IT SHOULD BE MENTIONED CLEARLY IN THE TENDERS THE ORIGIN OF EACH ITEM AND MUST NOT BE UNDER

LICENSE. FALSE INFORMATION GIVEN WILL ENTAIL REFUSAL OF THE ARTICLE. THE TENDERER SHOULD BE

SUBMIT A CERTIFICATE OF ORIGIN LEGALIZED BY A.R.E REPRESENTATION WITH SHIPPING DOCUMENTS.

ART. 4-CUSTOM DUTIES AND TAXES:

PRICES QUOTED BY TENDERERS SHOULD COMPRISE: ALL RIGHT CHARGES, STAMP DUTIES AND ALL OTHER

TAXES ACCORDING TO THE TENDERERS COUNTRY LAW AND FEES TO BE PAID ABROAD ACCORDING TO

THEIR LAWS AND REGULATIONS.

ALL STAMP DUTIES AND TAXES TO BE PAID IN ACCORDANCE WITH LAWS OF THE ARAB REPUBLIC OF EGYPT

(A.R.E.) SHOULD BE BORN BY THE BRANCH OF ( ACCHCO.) - PRIVATE FREE ZONE .

CUSTOMS CLEARANCE WILL BE CARRIED OUT BY THE SUPPLIER ON HIS RESPONSIBILITY AND ACCOUNT

(INCLUDING DOCKAGE & WHARFAGE CHARGES, UNLOADING, LOCAL TRANSPORTATION, AND STORAGE

CHARGES IN A.R.E).

ART. 5-VALIDITY OF TENDERS:

TENDERS MUST BE VALID FOR 90 DAYS FROM THE DESIGNATED DATE OF OPENING ENVELOPE (A).

AT THE EXPIRE DATE OF TENDER VALIDITY, THE TENDERER MAY WITHDRAW HIS PROVISIONAL DEPOSIT,

AND IN THIS CASE THE TENDER BECOMES NULL AND INEFFECTIVE.

IF THE TENDERER WITHDRAWS HIS TENDER BEFORE THE DESIGNATED DATE OF UNSEALING TENDERS, THE

PROVISIONAL DEPOSIT WILL BE FORFEITED TO THE COMPANY WITHOUT NEED FOR ANY NOTICE OR

RECOURES TO COURTS.

IF HE DOES NOT WITHDRAW HIS DEPOSIT, HE WILL BE DEEMED TO REMAIN BOUND BY HIS TENDER UNTIL

COMPANY RECEIVES NOTICE FROM HIM FOR WITHDRAWAL OF HIS DEPOSIT AND CANCELLATION OF HIS

TENDER.

ART. 6- RESIDENCE OF TENDERER:

THE TENDERER MUST GIVE THE NAME AND ADDRESS OF HIS AGENT OR REPRESENTATIVE RESIDING IN

EGYPT.

TENDERS SUBMITTED BY AGENTS REPRESENTING CONTRACTORS MUST BE ACCOMPANIED BY A POWER OF

ATTORNEY DULY AUTHENTICATED BY THE COMPETENT AUTHORITIES.

Page 32: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

5

ART. 7- PAYMENT TERMS:

THE CONTRACT VALUE SHALL BE PAID BY AN IRREVOCABLE & DIVISIBLE LETTER OF CREDIT AND PAYMENT

TERMS WILL BE AS FOLLOWS:

20% OF THE VALUE OF THE CONTRACT AS ADVANCE PAYMENT AGAINST AN IRREVOCABLE BANK

LETTER OF GUARANTEE OF THE SAME VALUE AND CURRENCY WITHOUT ANY CONDITIONS OR

RESERVATIONS TO BE SUBMITTED BY THE CONTRACTOR AND ACCEPTED BY THE COMPANY VALID FOR

A PERIOD NOT LESS THAN TWO MONTHS AFTER THE DATE OF ACCEPTANCE OF THE TRUCKS ( AS PER

ATTACHED FORM ) .

THE SAID VALUE SHALL BE TRANSFERRED AGAINST A SIMPLE NOTIFICATION FROM THE COMPANY TO

THE BANK.

70% OF THE VALUE OF THE CONTRACT AFTER RECEIVING, COMMISSIONING AND ACCEPTING THE R.S.

AND ITS ATTACHMENTS BY THE COMPANY.

THE SAID VALUE SHALL BE TRANSFERRED AGAINST A SIMPLE NOTIFICATION FROM THE COMPANY TO

THE BANK.

10 % OF THE VALUE OF THE CONTRACT AGAINST A CERTIFICATE ISSUED BY THE COMPANY

CONFIRMING THE TERMINATION OF THE TRAINING ON SITE. THE TRAINING PROGRAM SHOULD BE

TWO WEEKS FROM THE DATE OF HANDING OVER AND THE PRELIMINARY ACCEPTANCE OF THE

TRUCKS AFTER CONCLUDING PERFORMANCE TESTS ON SITE.

- IF THE TENDERER DESIRE TO PROPOSE AN ALTERNATIVE PAYMENT TERMS SHOULD BE NOTED THAT ANY

ADVANCE PAYMENT (BEFORE RECEIVING ON SITE) WILL BE AGAINST AN IRREVOCABLE BANK LETTER OF

GUARANTEE OF THE SAME VALUE AND CURRENCY WITHOUT ANY CONDITIONS OR RESERVATIONS.

- IF THE SUPPLIER NEEDS TO CONFIRM THE L/C, THE CONFIRMATION FEES WILL BE BORN BY HIMSELF.

ART. 8 THE PROVISIONAL DEPOSIT:

TENDERS MUST BE ACCOMPANIED BY A PROVISIONAL DEPOSIT LE 1000000 OR EQUIVALENT.

ART. 9 - PAYMENT OF PROVISIONAL DEPOSIT:

THE PROVISIONAL DEPOSIT MAY BE PAID BY EITHER ONE OF THE FOLLOWING:

A) DEPOSIT IN CASH MAY BE PAID INTO THE COMPANY TREASURY AGAINST AN OFFICIAL RECEIPT

WITH NO INTEREST CALCULATED ON DEPOSIT , A COPY OF THE RECEIPT TO BE ATTACHED WITH

THE TENDER .

B) LETTER OF GUARANTEE ISSUED BY ONE OF THE AUTHORIZED LOCAL BANKS WITHOUT ANY

CONDITIONS OR RESERVATIONS, THE BANK MUST GIVE DECLARATION TO PAY IT IN FULL

IMMEDIATELY TO THE COMPANY ON FIRST DEMAND WITHOUT ANY OPPOSITION OF THE CONTRACTOR

(AS PER ATTACHED FORM ) , THE LETTER OF GUARANTEE MUST BE VALID UP TO 60 DAYS AFTER THE

END OF VALIDITY DATE OF THE TENDER .

IN CASE OF SUBMITTING CONDITIONAL L/G, THE TENDER WILL BE CANCELLED.

ART.10. REIMBURSEMENT OF THE PROVISIONAL DEPOSIT :

THE PROVISIONAL DEPOSIT IS TO BE REIMBURSED TO NON-SUCCESSFUL TENDER WITHOUT APPLICATION

AFTER EXPIRATION OF THE SPECIFIED DATE OF TENDER VALIDITY OR IF THE FINAL DEPOSIT OF

SUCCESSFUL TENDER HAS BEEN RECEIVED , WHICH EVER COMES FIRST .

Page 33: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

6

SUCH REIMBURSEMENT IS TO BE MADE AGAINST WITHDRAWAL OF RECEIPT GIVEN FOR CASH

PAYMENTS. IF THE GUARANTEE IS A LETTER FROM A BANK, THE LETTER OF GUARANTEE WILL BE

RETURNED TO THE BANK ITSELF.

ART 11 - THE FINAL DEPOSIT:

THE TENDERER WHO'S OFFER HAS BEEN ACCEPTED MUST SUBMIT 10% OF THE TOTAL VALUE OF HIS

TENDER AS A FINAL DEPOSIT IN SAME CURRENCY WITH MAXIMUM 20 DAYS CALCULATED FROM THE DAY

OF TENDER ACCEPTANCE NOTIFICATIONS (SUPPLY ORDER) AND NOT ALLOWED TO EXTEND THIS PERIOD.

i.e. : IN CASE OF DELAY IN SUBMITTING THE FINAL DEPOSIT WITHIN THE SAID PERIOD THE COMPANY HAS

THE RIGHT TO CANCEL THE CONTRACT, AND PROJECT TO BE PERFORMED ON HIS ACCOUNT BY THE

FOLLOWING TENDERER.

SUCH DEPOSIT WILL BE A SECURITY FOR THE FULFILLMENT OF THE CONDITIONS OF THE CONTRACT, AND

FINAL ACCEPTANCE.

THE FINAL DEPOSIT WILL BE A LETTER OF GUARANTEE ISSUED BY ONE OF THE AUTHORIZED LOCAL

BANKS WITHOUT ANY CONDITIONS OR RESERVATIONS, THE BANK MUST GIVE DECLARATION TO PAY IT IN

FULL IMMEDIATELY TO THE COMPANY ON FIRST DEMAND WITHOUT ANY OPPOSITION OF THE

CONTRACTOR ( AS PER ATTACHED FORM ) , THE LETTER OF GUARANTEE MUST BE VALID 30 DAYS AFTER

THE GUARANTEE PERIOD .

N.B. ALL LETTERS OF GUARANTEE MUST BE ISSUED AND CONFIRMED BY FIRST CLASS BANK IN EGYPT,

PREFERABLE NATIONAL BANK OF EGYPT.

ART. 12 - NOT LODGING THE FINAL DEPOSIT:

IF THE TENDERER DOES NOT LODGE THE FINAL DEPOSIT WITHIN THE PRE-DESCRIBED PERIOD FIXED FOR

LODGING THAT DEPOSIT, BY NOTIFICATION WITHOUT NEED FOR OTHER MEASURES, OR HAVING RECOURSE

TO COURTS THE COMPANY MAY:

A) CANCEL THE SUPPLY ORDER AND FORFEIT THE PROVISIONAL DEPOSIT.

B) FULFILL THE WHOLE OR PART OF THE CONTRACT AT THE CHARGE OF THE TENDERER OR BY ONE OF

THE TENDERERS WHOSE OFFERS COME NEXT TO HIS OWN ONE, OR BY PRIVATE TREATY, OR BY A

LIMITED OR GENERAL ADJUDICATION.

IN SUCH EVENT, THE COMPANY WILL HAS THE RIGHT TO DEDUCT THE VALUE OF ANY DAMAGE OR LOSS

ARISED FROM THAT EVENT FROM ANY SUMS WHICH ARE OR MAY BECOME DUE TO HIM RELATED TO ANY

TRANSACTION WITH THE COMPANY OR BY ANY OTHER GOVERNMENTAL DEPARTMENT AND WITHOUT

PREJUDICE TO ITS RIGHT TO BRING A LAWSUIT FOR SUCH LOSSES OR DAMAGE IF IT FAILED TO RECOVER.

ART. 13- ACCEPTANCE OF TENDER:

THE TENDER WILL BE HELD ON THE LOWEST CONSIDERED PRICE RELATIVE TO ITS TECHNICAL

EVALUATION . TENDER WILL BE EVALUTED TECHICALLY (BY POINT SYSTEM) , THE WINNER WILL BE THE

LOWEST CONSIDERED PRICE ACCORDING TO THE FOLLWING EQUATION :

THE EVALUATION CONSIDERED PRICE =

THE CONTRACTED PRICE WILL BE THE TENDER PRICE AFTER FINANCIAL EVALUATION PRICE OF THE

LOWEST TENDER CONSIDERED PRICE.

HIGHEST TECHNICAL TENDER DEGREE

------------------------------------------------------------

TECHNICAL TENDER DEGREE

TOTAL PRICE OF THE TENDER x

Page 34: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

7

IT MAY PLACE THE CONTRACT FOR THE SUPPLY OF THE REQUIRED ITEMS AS A WHOLE OR CANCEL THE

ENTIRE TENDER ENTIRELY WITHOUT GIVING ANY REASON AND THE SUPPLIER SHALL HAVE NO RIGHT TO

CLAIM FOR DAMAGE OR ANYTHING ELSE .

ART. 14 - CORRESPONDENCE:

SUPPLIERS ABROAD ARE TO BE NOTIFIED BY FAX OR E-MAIL OR CONFIRMED REGISTERED MAIL.

ART. 15 - THE CONTRACT:

THE CONTRACT TO BE SIGNED BY THE SUPPLIERS OR HIS COMMERCIAL AGENT AGAINST POWER OF

ATTORNEY { PRESENTED WITH ENVELOPE (A) } WITHIN 20 DAYS FROM THE DATE OF SUPPLY ORDER .

IN CASE OF DELAY IN SIGNING THE CONTRACT WITHIN THE SAID PERIOD THIS IS CONSIDERED WAIVING

FROM HIS PART TO PERFORM THE PROJECT; THE COMPANY HAS THE RIGHT TO PERFORM THE PROJECT BY

THE FOLLOWING TENDERER AND THE PRICE DIFFERENCE TO BE BORNE BY THE WAIVING PARTY.

IF THE SUPPLIER MAKE ANY CHANGE IN THE TECHNICAL SPECIFICATION SUBMITED IN HIS TECHNICAL

OFFER FOR ANY REASON AFTER SIGNING THE CONTRACT, THIS IS CONSIDERD A FAULT & FAILURE FROM

HIS SIDE TO MEET THE TENDER BOOK REQUIREMENTS, AND IN SUCH CASE THE COMPANY HAS THE RIGHT

TO CANCEL THE CONTRACT, AND PROJECT TO BE PERFORMED ON HIS ACCOUNT BY THE FOLLOWING

TENDERER.

ART. 16 - CESSION OF CONTRACT:

UNDER NO CIRCUMSTANCE IT IS UNALLOWABLE FOR THE TENDERER OR CONTRACTOR TO ASSIGN THE

CONTRACT OR AMOUNTS DUE TO HIM OR TRANSMIT ITS OBLIGATIONS OR RIGHTS PARTIALLY OR TOTALLY

TO A THIRD PARTY .

ART. 17 - CANCELLATION OF CONTRACT:

THE CONTRACT MAY BE CANCELED AND THE DEPOSIT FORFEITED TO THE RIGHT OF THE COMPANY

(WITHOUT PREJUDICE) TO ANY DAMAGES RESULTING FROM SUCH PROCEDURE IN THE FOLLOWING CASES:

A) IF THE CONTRACTOR RESORTS TO FRAUD OR TO DECEIT IN HIS DEALING , IN SUCH CASE HIS NAME WILL

BE DELETED FROM THE LIST OF CONTRACTORS AND HE WILL NOT BE PERMITTED TO PARTICIPATE IN ANY

ADJUDICATION OR BARGAIN IN ADDITION TO TAKE LEGAL ACTION IF NECESSARY .

B) IF IT IS PROVED THAT THE CONTRACTOR HAS ATTEMPTED PERSONALLY OR BY MEANS OF ANOTHER

PERSON, DIRECTLY OR INDIRECTLY, TO OFFER BRIBERY TO ANY EMPLOYER, OR HAS COMMITTED ANY

HARM TO THE COMPANY, HIS NAME WILL BE DELETED FROM THE LIST OF CONTRACTORS, AND COMPANY

WILL TAKE LEGAL ACTION AGAINST HIM.

C) IF HE BECOMES BANKRUPT OR HAS FINANCIAL DIFFICULTY.

ART. 18 - DECEASE OF THE CONTRACTOR:

IF THE SUPPLIER IS DECEASED, THE COMPANY (THROUGH A NOTICE) WITHOUT NEED FOR A JUDICIAL

PROCEEDING OR RESORTING TO THE COURTS MAY EITHER:

A) CANCEL THE CONTRACT AND REFUND THE DEPOSIT, IF NO CLAIMS ARE EXISTED AGAINST HIM.

B) ALLOW HIS HEIRS ON HIS DEMAND TO CONTINUE THE EXECUTION OF THE CONTRACT, PROVIDED THAT

THEY APPOINT SOMEONE TO REPRESENT THEM LEGALLY WITH OFFICIAL POWER OF ATTORNEY AND

PROVIDED THAT SUCH REPRESENTATIVE IS ACCEPTED BY THE COMPANY. IF THE CONTRACT INCLUDES

SEVERAL CONTRACTORS, AND ONE OF THEM IS DECEASED, THE COMPANY MAY CANCEL THE

CONTRACT AND REFUND THE DEPOSIT OR MAY ALLOW HIS ASSOCIATES TO CONTINUE THE CONTRACT.

Page 35: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

8

ART. 19- DAMAGE IN TRANSPORT AND INSURANCE:

THE SUPPLIER SHALL BE FULLY RESPONSIBLE FOR ALL R.S. AND ITS ATTACHMENTS UNTIL ACCEPTANCE ON

SITE.

ART. 20 - DELIVERY OF THE ITEMS:

THE FOUR (4) LADEN CONTAINER HANDLERS TOP LIFTTRUCKS SHALL BE DELIVERED AS THE FOLLOWING:

- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA CONTAINER TERMINAL -

PRIVATE FREE ZONE, QUAY 49-54 , PORT OF ALEXANDRIA,ALEXANDRIA,EGYPT.

- TWO (2) LADEN CONTAINER REACH STACKERS FOR BRANCH OF ALEXANDRIA CONTAINER TERMINAL-

PRIVATE FREE ZONE, QUAY 96 , PORT OF EL DEKHEILA, ALEXANDRIA, EGYPT.

IN A FULLY ASSEMBLED CONDITION LEAVING ONLY MINOR WORK AS USUAL/NORMAL PRACTICE OF REACH

STACKERS START-UP. THE SUPPLIER IS RESPONSIBLE FOR UNLOADING THE REACH STACKERS & ITS

ATTACHMENTS FROM THE SHIP TO THE BRANCH OF ACCHCO. PRIVATE FREE ZONE PREMISES, QUAY 49-54

PORT OF ALEXANDRIA & QUAY 96 PORT OF EL DEKHEILA, ALEXANDRIA – EGYPT.

THE TENDERER MUST STATE IN HIS TENDER THE TOTAL PERIOD NECESSARY TO SUPPLY THE ITEMS WHICH

TO BE COUNTED FROM THE DATE OF THE TWO PARTIES SIGN THE CONTRACT, AND MUST SUBMIT THE

SCHEDULE OF SUPPLY (WITHIN ONE MONTH AFTER CONTRACT COMING IN FORCE).

ON THE ARRIVAL OF THE CONTRACTED ITEMS TO SITE A COMMITTEE APPOINTED BY THE COMPANY WILL

BE ON SITE TO CARRY OUT THE TESTS.

THE COMMITTEE IS ENTITLED TO EXAMINE EACH ITEM AND ALL ITS PARTS TO CHECK THAT ALL ARE

SOUND AND IN GOOD CONDITION. ALL TESTS AND CERTIFICATES SHALL BE ON THE SUPPLIER

RESPONSIBILITY AND ON HIS EXPENSE. THE SUPPLIER MUST DELIVER THE ITEMS CONTRACTED WITHIN THE

PERIODS AND PLACES SPECIFIED IN THE CONTRACT ACCORDING TO THE ORDER OF SUPPLY.

DELIVERY PERIOD WILL BE CONSIDERD IN EVALUATION AND IT MUST INCLUDE ALL

VACATIONS

ART. 21 - REJECTION OF ITEMS AND WORKS:

IN CASE OF ONE OR MORE ITEMS FOUND MISSING, DAMAGED, DETERIORATED OR HAVE ANY DEFICIENCY

OR DEFECT OR NOT IN CONFORMITY WITH THE APPROVED SAMPLE OR WITH THE SPECIFICATIONS WILL BE

REJECTED BY THE COMMITTEE WITH A NOTICE IN WRITING TO THE CONTRACTOR, OR HIS COMMERCIAL

AGENT EXPLAINING THE REASON OF REJECTION, AND DEMAND HIM TO WITHDRAW THE REJECTED ITEMS,

AND SUPPLY REPLACEMENT WITHIN MAX. TEN WORKING DAYS (14 DAYS) EXCLUDES CUSTOMS CLEARANCE

PERIOD FROM THE NEXT DAY OF NOTIFYING HIM OR HIS COMMERCIAL AGENT BY FAX OR E-MAIL, AFTER

THIS PERIOD THE COMPANY HAS THE RIGHT TO TAKE THE NECESSARY PROCEDURES FOR REPLACEMENT

ON THE CONTRACTORS ACCOUNT . THE CONTRACTOR HAS NO RIGHT TO DISCUSS THE EXPENSES INCURRED

THE MANNER ADOPTED BY THE COMPANY IN CARRYING OUT .

THE REJECTED ITEMS SHALL REMAIN AT THE CONTRACTOR'S RISK UNTIL THE DATE OF THEIR REMOVAL .

IN ALL CASES THE REJECTED ITEMS MUST BE WITHDRAWN WITHIN (4) FOUR WEEKs FROM THE NEXT DAY

OF THE NOTIFICATION. ELSE A STORAGE FEE EQUAL (2) PERCENT OF THE VALUE OF THE GOODS PER WEEK,

OR ANY FRACTION OF WEEK UP TO FOUR WEEKS WILL BE CHARGED. AFTER THIS PERIOD THE COMPANY

WILL HAVE THE RIGHT TO SELL THESE GOODS AND DEDUCT FROM THE SALE PRICE ANY AMOUNT WHICH

MAY BE DUE TO IT, THE COMPANY IS NOT RESPONSIBLE FOR ANY DAMAGE WHICH MAY OCCUR TO THE

REJECTED ITEMS THROUGH FIRE OR OTHER CAUSE PENDING THEIR WITHDRAWL BY THE CONTRACTOR OR

DISPOSAL THEREOF BY THE COMPANY.

Page 36: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

9

ART. 22- DELAY IN DELIVERY:

IN CASE OF DELAY, ON THE SUPPLIER PART IN THE SUPPLY OF THE WHOLE OR PART OF CONTRACT AFTER

THE DATE FIXED IN THE CONTRACT . THE COMPANY MAY GRANT TO THE SUPPLIER AN EXTENSION PERIOD

FOR THE SUPPLY SUBJECT TO FINE IN RESPECT OF THE DELAY AS (1%) FOR EVERY WEEK OR PART OF IT, IN

ANY CASE THE TOTAL AMOUNT OF THIS FINE SHALL NOT EXCEED (3%) OF THE VALUE OF THE CONTRACT .

FINE WILL BE CALCULATED TO THE FULL VALUE OF THE R.S. , IF THE DELAYED PART WOULD DIRECT OR

INDIRECT LEAD UP TO HINDER THE R.S. USAGE WITH FULL SATISFACTION AS WELL AS WITHIN THE FIXED

DELIVERY PERIOD .

IN CASE OF THE SUPPLIER FAILS TO FULFILL ANY OF THE CONTRACT CONDITIONS OR IN CASE HE

BREACHES OR FAILURE TO PERFORM ANY OF HIS CONTRACTUAL OBLIGATIONS , HE HAS TO PROPERLY

START CURE SUCH A DISCREPANCY WITHIN TEN WORKING DAYS MAX. EXCLUDES CUSTOMS CLEARANCE

PERIOD FROM THE NEXT DAY OF NOTIFYING HIM OR HIS COMMERCIAL AGENT THROUGHT A REGISTER

CERTIFIED LETTER BY MAIL , FAX OR E-MAIL , OTHERWISE THE COMPANY HAS THE RIGHT TO ADOPT

EITHER OF THE TWO FOLLOWING ALTERNATIVES, WITHOUT NEED OF HAVING RECOURSE TO THE COURTS:

A) PROCURE ELSE WHERE EITHER BY PRIVATE TREATY, OR BY LIMITED OR PUBLIC ADJUDICATION OR

BARGAIN FOR THE OBLIGATIONS WHICH THE SUPPLIER FAILED TO SUPPLY, ANY EXCESS IN PRICE DUE

TO SUCH PROCUREMENT PLUS ANY OTHER CHARGES OVER AND ABOVE THE AMOUNT OF FINE

INFLICTED ON ACCOUNT OF DEFAULTS OFFERED IN SUPPLY ARE TO BE DEDUCTED FROM THE DEPOSIT

OFFERED IN SECURITY ON THE CONTRACT OR FROM ANY SUMS THAT MAY BE DUE TO THE

CONTRACTOR BY THE COMPANY OR BY ANY OTHER GOVERNMENTAL DEPARTMENT.

SHOULD HOWEVER THE PROCUREMENT PRICE OF ANY ARTICLES BE LESS THAN THAT OF THIS

CONTRACT, HE WILL NOT BE ENTITLED TO THE DIFFERENCE AS WELL AS WILL NOT BE EXEMPTED

FROM THE FINE RELATING TO THE DELAY IN SUPPLY OR THE OTHER CHARGES .

B) TERMINATE THE CONTRACT ON HIS OWN AND THE FORCE ON LAW AND FORFEIT THE FINAL DEPOSIT

AMOUNTING (10%) OF ITS VALUE AS WELL AS ALL FINES AND COMPENSATIONS DUE TO THE COMPANY

AFTER SERVING A NOTICE TO THE CONTRACTOR AND WITHOUT PREJUDICE TO THE RIGHT OF THE

COMPANY TO TAKE LEGAL ACTIONS AGAINST THE CONTRACTOR FOR RIGHTS WHICH THE COMPANY

FAILED TO RECOVER .

ART. 23 - PROVISIONAL ACCEPTANCE:

IN THE DATE WHEN THE R.S. HAVE BEEN TESTED BY THE COMMITTEE APPOINTED BY THE COMPANY UNDER

THE SUPERVISION OF THE INTERNATIONAL SOCIETY, AND TRANING HAS BEEN COMPLETED, APROVISIONAL

ACCEPTANCE CERTIFICATE WILL BE ISSUED.

ART. 24 - GUARANTEE:

THE TENDERER WILL GUARANTEE THE R.S. WITH ALL COMPONENTS MANUFACTURED FOR A PERIOD OF 24

MONTHS (WITH UNLIMITED OPERATING HOURS) FOLLOWING PROVISIONAL ACCEPTANCE OF THE R.S. BY THE

COMPANY.

AFTER THESE TWO YEARS, AN ADDITIONAL GUARANTEE 24 MONTHS FOR BOTH BOOM AND CHASSIS

THE SUPPLIER GUARANTEES THAT THE R.S. WILL WORK EFFICIENTLY TO PERFORM ALL REQUIRED TARGETS

DURING THE GUARANTEE PERIOD AND AS FOLLOWS:

Page 37: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

11

1- THE SUPPLIER IS COMMITTED AS SOON AS NOTIFYING HIM OR HIS COMMERCIAL AGENT BY FAX

OR E-MAIL TO REPAIR, OR REPLACE ON HIS ACCOUNT, ANY DEFECTED EQUIPMENT OR PARTS OF IT

WITHIN TEN WORKING DAYS MAX. NOT INCLUDED CUSTOMS CLEARANCE PERIOD COUNTED FROM THE

NEXT DAY OF NOTIFYING HIM OR HIS COMMERCIAL AGENT BY FAX OR E-MAIL DURING THE GUARANTEE

PERIOD.

IN CASE OF DELAYS IN THE REPAIRING WORKS MORE THAN THE MAX. SPECIFIED DATE ( TEN WORKING

DAYS ) , THE COMPANY HAS THE RIGHT FOR COMPENSATION OF (250 EURO) FOR THE R.S. , AGAINST

TECHNICAL DEFECT, MANUFACTURING DEFECTS OR DEFECTS DUE TO FABRICATING MATERIALS FOR

EVERY DAY TO COMPENSATE THE LOSS OCCURED TO THE COMPANY AS A RESULT OF STOPPING WORK ,

AND IF THE SUPPLIER FAILS TO ACHEIVE SAID REPAIR , THE COMPANY WILL HAVE THE RIGHT TO

EXECUTE THE REQUIRED WORKS ON THE ACCOUNT AND RESPONSIBILITY OF THE SUPPLIER .

THE COMPENSATION WILL BE COUNTED FROM THE NEXT DAY FOLLOWING OF THE ABOVE MENTIONED

SPECIFIED DATE, AND EACH CASE OF DELAY WILL BE CONSIDERED SEPARATELY WITH MAXIMUM

AMOUNT NOT EXCEED 10% (TEN PERCENT) OF THE VALUE OF THE R.S.

2- IN ALL CASES , ON REPLACING ANY PART OF THE R.S. PARTS DURING THE GUARANTEE PERIOD , AS

A RESULT OF ANY DEFECTS , A NEW GUARANTEE PERIOD OF TWENTY FOUR (24) MONTHS FOR THIS PART

OF THE R.S. WILL BE CONSIDERED AND STARTED FROM DATE OF BEING EFFICIENTLY OPERATED AFTER

REPLACEMENT .

3- ALL PERIODS OF STOPPING THE R.S. RESULTING FROM MALFUNCTION DUE TO DEFECTS DURING THE

GUARANTEE PERIOD WILL BE ADDED TO THE ORIGINAL GUARANTEE PERIOD OF THE R.S. .

ART 25 - FINAL ACCEPTANCE:

UPON CONCLUSION OF GUARANTEE PERIOD IF R.S. HAS BEEN PROVED SATISFACTORY, FINAL ACCEPTANCE

WILL BE GIVEN AND SUPPLIER'S LETTER OF GUARANTEE WILL BE RELEASED AS FOLLOW.

10% FOR MAIN GUARANTEE (24 MONTHS) REDUCES TO 5% FOR ADDITIONAL GUARANTEE (24 MONTHS FOR

BOTH BOOM AND CHASSIS

ART. 26 - LEGAL DISPUTES:

LEGAL DISPUTES AND ACTIONS ARISING OUT THE CONTRACT SHOULD BE DEALT ACCORDING TO THE

EGYPTIAN LAW WITH THE EGYPTIAN COURTS IN ALEXANDRIA STIPULATIONS OF THE REGULATION

RELATING TO ADJUDICATION ARE TO BE CONSIDERED COMPLEMENTARY TO THE CONDITIONS OF

CONTRACT WHERE NO STIPULATIONS HAVE BEEN MADE IN IT .

ART. 27 – FORCE MAJEURE :

FORCE MAJEURE IS APPLIED WHEN EVENTS OUTSIDE THE CONTROL OF THE SUPPLIER OCCURE SUCH AS

RIOTS OR CIVIL COMMOTION , WAR OR CIVIL WAR , FLOOD , EARTHQUAKE , LANDSLIDE OR SIMILAR

NATURAL DISASTERS, ALSO FOREIGN GOVERNMENTS WARNINGS FOR TRAVELING RESTRICTIONS FOR

THEIR CITIZENS IN CASE OF INSTABILITIES INSIDE EGYPT. THE SUPPLIER MUST DECLARE AND PROVE

THESE EVENTS AT ONCE AND SATISFACTION OF THE COMPANY THAT THESE EVENTS WERE REASONABLY

OUTSIDE HIS CONTROL.

ART 28 SECRTNESS OF DOCUMENTS

ALL DOCUMENTS CONCERNING THIS CONTRACT ARE CONSIDERED TOP CONFIDENTIAL.

Page 38: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

11

ART. 29- LAWS AND REGULATIONS:

THE SUPPLIER UNDERTAKES TO OBEY ALL GOVERNMENTAL AND LOCAL LAWS AND REGULATIONS

CONCERNING EXECUTION OF THIS CONTRACT AND SHOULD BE RESPONSIBLE FOR THE DISCIPLINE IN THE

SITE. THE SUPPLIER HAS TO OBEY THE ORDER OF THE COMPANY TO DISMISS ANY EMPLOYEE WHO

NEGLECT IN HIS WORK OR DOES NOT OBEY THE RULES OR REGULATIONS OF THE COMPANY OR TRIES TO

CHEAT THE SUPPLIER UNDERTAKES ALL THE SAFETY MEASURES (O.H.S.A.S) TO AVOID ALL INJURIES OR

DEATH OF THE WORKERS OR ANY THIRD PARTY IN THE SITE OR DAMAGE TO ANY PERSON OR MATERIAL OR

PHYSICAL DAMAGE TO PROPERTY WHATSOEVER .

THE RESPONSIBILITIES IN SUCH CASE ARE DIRECT WITHOUT THE INTERVENTION OF THE COMPANY. IF THE

SUPPLIER FAILS TO FULFILL THESE MEASURES THE COMPANY SHOULD UNDERTAKES TO FULFILL ALL THE

SAFETY MEASURES ON HIS ACCOUNT, THE SUPPLIER SHOULD INSURE ALL HIS WORKERS AGAINST

ACCIDENTS AND CIIVIL INJURIES AND WILL BE SOLELY RESPONSIBLE FOR THEM FOR INDEMNITY .

ART . 30 - FINANCIAL EVALUATION :

THE FOLLOWING (7) ITEMS WILL BE CONSIDERED IN THE FINAL EVALUATION :

ITEM DESCRIPTION QTY UNIT

PRICE

TOTAL

PRICE

1 VALUE OF EQUIPMENT ( C.I.F )

INCLUDING TEST , INSTALATION AND START UP ON SITE.

2 PERSONNEL TRAINING IN FACTORY

ON SITE

3 COST FOR COMPANY ENGINEERS INSPECTION

4 COST FOR ATTACHED SPARE PARTS

5 COST FOR RECOMMENDED SPARE PARTS

Total value CIF on site

THIS FORM SHOULD BE PRICED & DISPATCHED WITHIN ENVELOPE B "FINANCIAL OFFER"

ART . 31 OTHER CONTRACT RULES:

THE RULES OF CONTRACT, PURCHASING AND STORES REGULATIONS OF ACCHCO. ARE APPLICABLE ON THIS

CONTRACT AND ITS EXECUTIVE STATUS IS CONSIDERED AN INTEGRAL PART IN CASE OF ANY STIPULATION

NOT INCLUDED.

Page 39: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 1 OF 14

Contract For Supplying and handing over four laden container reach

stackers capacity 45 ton under twist lock to both Alexandria and Dekhela

container terminals for Branch of Alexandria Container & Cargo Handling

company–Private Free Zone -Alexandria Port- Egypt

On ……. / /20….. this contract was issued between the following parties:-

1- First Party:- Branch of Alexandria Container & Cargo Handling Company

"Private Free Zone" an Egyptian shareholding company, One of the

companies belonging to the Maritime & Inland Transport Holding Company

and legally represented by Mr. Admiral /Mamdouh Tawfik Draz

- Chairman of the Board and CEO. Its premises Quay 49/54 Alexandria

Seaport – Alexandria- A. R. of Egypt .

Herein after referred to as first party.

Fax no. 00 20 3 4862124

Email : [email protected]

(First party)

2-: Second Party and its premises Box

Herein after referred to as second party.

Tel no. : Fax no. :

Email : Legally represented by in signing this contract according to the

power of attorney countersigned by and notarized by the Egyptian

embassy in dated / /20 .

Represented in Arab Republic of Egypt by

Tel no. Fax no.

Commercial registry no. Tax Registration no.

(Second Party)

بسم ميحرلا نمحرلا هللا 44حىنت Reach Stacker(RS) ثقموص ( 4عذد ) ىرذ و حسهىعقــــذ ح

انذخهت نفرع ضركت و اإلسكذرت بحطخى حاواث ط ححج اطار اناونت

–ياء اإلسكذرت -يطقت حرة خاصت –اإلسكذرت نخذاول انحاواث وانبضائع

يصر

رذغع ظا اؼوض ث٤ : 02 ..... / / ااكن .....ئ ك٠ ٣

صت"اإلسكذرت نخذاول انحاواث وانبضائع "يطقت حرة خاكغخ كغع -1

ئدض الغبد ازبثؼخ لغخ اوبثخ و ـبخ وغ٣خربثؼخ كغخ

عئ٤ؾ -ثذغ١/ضح رك٤ن صعاػ اجذغ اجغ ٣ثب هبب اـ٤ض ااء

٤بء اإلؿضع٣خ 94/49جؾ اإلصاعح اؼ ازضة وغب عه٤ق

اجذغ.

٣لبع ئ٤ب ب ك٤ب ٠٣ ثبطغف اال.

2202 49120109البؾ عه

[email protected]اجغ٣ض االزغ٠ :

) غف أ (

غؼب اغئ٤ـ٠ كغخ -0

اثب٣٠لبع ئ٤ب ب ك٤ب ٠٣ ثبطغف

عه البؾ عه از٤ل :

اجغ٣ض االزغ٠ :

اؼوض ثجت ازه٤غ ػ٠ ظا ك٢ ٣ة ػب هبب اـ٤ض /

اثن اـلبعح اـغكخ ازجبع٣خ ازل٣ي اوضم ػ٤

. 02 // إعر ك٠ ظا الأ ا اوبصع اوغ٣خ

وغب ٣ثب ك٠ جع٣خ وغ اؼغث٤خ ٤ب ازجبع كغخ

عه البؾ عه از٤ل :

رـج٤ غ٣ج٠ : ؿج رجبع :

) غف ثب٠ (

Page 40: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 2 OF 14

Preamble

Alexandria Container Handling Company (First Party) has announced the

General tender no. ( ) for year 2019/2020, for the delivery and handing

over of Four RS with capacity 45 ton under spreader for Alexandria and

Dekhela container terminals.

According to the authorization granted from General Authority For

Investment and free zones no. 460 for the year 2005 dated 16/1/2005 ,

according to the tender technical specifications and conditions stipulated

under the published tender documents and to the conclusions reached by

the technical and financial evaluation committees for the said tender and to

the documents and ratifications included within them and the negotiation

session held on / /2019, from which it was concluded to accept the offer

submitted by .

On / / , the first party board of directors according to their decree no.

/2019 approved on purchasing Four RS with capacity 45 ton under

spreader with a total amount of (only ). CIF to location of first

party branches in Alexandria and Dekhela container terminals Private Free

Zone from the second party.

On / / the commercial agent of the second party was notified with the

awarding letter no. /F- / with the acceptance of the second party offer

and that it was decided to award the delivery and handing over of Four RS

with capacity 45 ton under spreader model for both Alexandria and

Dekhela terminals , CIF to location of first party branches in Alexandria and

Dekhela container terminals Private Free Zone with a total amount of

(only ) to based on:

-Two (2) RS for Alexandria Terminal – Private Free Zone – Quay 49/54

Port of Alexandria- Egypt.

- Two (2) RS for Dekhela Terminal – Private Free Zone –

The prices are including the following:

- Tests, commissioning in factory and at site.

حهـــــــــــذ

اطغف اال( اإلؿضع٣خ زضا اذب٣بد اجبئغ ) كغخغدذ

( 9ػضص ) رـ٤ زع٣ض 0214/0202( ـخ ابهوخ اؼبخ عه )

دب٣بد االؿضع٣خ ز٠ذط رذذ ابع ابخ 94دخ RS ق ثو٤

. اضس٤خ

ابن اذغح ثغه ثوز٠ ازغس٤ن اوبصع ا٤ئخ اؼبخ الؿزثبع

اهلبد ال٤خ 12/1/0224ثزبع٣ز 0224ـخ 922 طي جوب

االكزغابد ااعصح ثغاؿخ الغ ااهلبد اشبهخ ثبطغح ب

ازذ ا٤ جز٠ ازو٤٤ ال٠ اب٠ ك٠ ابهوخ اـزضاد اإلهغاعاد

از٠ اؿلغد ز٤جزب ػ / / جـخ البخ ثزبع٣ز اوضخ ث

. هج اؼغى اوض كغخ

اكن جؾ اصاعح الغخ اطغف اال ثجت هغاع / / ثزبع٣ز

94دخ RS ق ثو٤ اعثؼخػضص كغاءهج ( ػ٠ عه )

( الؿ٤غ كو ) عح ثبجب٠ جؾ هض رذذ ابع ابخ

طوخ دغح -ثذطز٠ دب٣بد االؿضع٣خ اضس٤خلغخ كغػ٠ اؿ٤ق هغ

سبهخ اطغف اثب٠.

)اثب٠ ثأغ االؿبص عه الغخ اطغف ر اسطبع ٤ ثزبع٣ز

رع٣ض رـ٤ ػضص اؿبصاثب٠ اخ هض روغع الغخ اطغف ثوج ػغى(

ص٣ رذذ ابع ابخ 94دخ RS ق ثو٤أعثؼخ

ثذطز٠ ؿ٤ق هغ كغػ٠ الغخ ذطز٠ دب٣بد االؿضع٣خ اضس٤خ

ثبجب٠ جؾ هضعطوخ دغح سبهخ -دب٣بد االؿضع٣خ اضس٤خ

اذ ازب٠: ػ٢ لغخ الؿ٤غ( كو )

لغع الغخ ثذطخ دب٣بد ص٣ RS ق ثو٤ 0ػضص -

طوخ دغح سبهخ. –االؿضع٣خ

لغع الغخ ثذطخ دب٣بد ص٣ RS ق ثو٤ 0ػضص -

طوخ دغح سبهخ - اضس٤خ

اـؼغ ٣ل االر٠:

Page 41: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 3 OF 14

- Costs of Inspection of four engineers in factory for two weeks.

- Costs and expenses of international classification society in factory.

- Costs for the training of (4) engineers and (4) technicians in factory

for two weeks .

- Costs for the training on site.

- Attached spare parts (as detailed stated in the awarding letter

no.(……….)and the performa invoice no. ………….

- Two electric screen sheet (tablet) .

- Eight fire extinguishers 6 KG from the local market.

- Vessel discharging expenses, customs clearance fees and storage

fees in A.R.E and internal transport to first party container terminals

location in Alexandria and Dekhela Private Free Zone according to

article no.4 from the tender documents.

-

On / / 2019 the second party submitted Proforma invoice no. dated and the performance guarantee no dated with total value

(only ) representing 10% from the total contract value as a

performance guarantee to grant the contract performance , issued by

bank without any conditions or restrictions payable at the first party first

demand and the advance payment guarantee no. dated with

total value (only ) representing 20% from the total contract

value, issued by bank without any conditions or restrictions payable at

the first party first demand and valid with the transfer of its amount and a

Power of Attorney dated notarized and legalized for the person who

have the right to sign the contract.

After the two parties fully acknowledged their qualifications for contracting

and legal actions , they agreed on the following:

ثبوغ اهغ.ازلـ٤ األسزجبعاد -

ثبوغ ضح اؿجػ٤. ضؽ ( 9وبع٣ق رلز٤ق ػضص ) -

ارؼبة وبع٣ق ٤ئخ ازلز٤ق اض٤خ ثبوغ. -

. ثبوغ ضح اؿجػ٤ ( ك٤٤ 9ضؿ٤ ػضص ) ( 9ص )ازضع٣ت ؼض -

ازضع٣ت ثبهغ. -

البرعح ...... ب خ رلو٤ال ثأغ االؿبص عه هطغ اـ٤بع -

اجضئ٤خ عه ............

electric screen sheet ( tablet)( 9ػضص ) -

.ذ٠ اـم ا ٤ 2( لب٣خ دغ٣ن ؿؼخ 1ػضص ) -

وبع٣ق ازلغ٣ؾ وبع٣ق ازش٤ن اجغ٠ ازشؼ٣ ثجع٣خ -

اطغف اال كغػ٠ الغخ وغ اؼغث٤خ او دز٠ هغ

ثذطز٠ دب٣بد االؿضع٣خ اضس٤خ طوخ دغح سبهخ جوب ن ابصح

( غاؿخ الغ ااهلبد.9عه )

رلو٤٤خ الغخ )اطغف اثب٠( كبرعح جضئ٤خ هضذ 0214// ثزبع٣ز

هبصع عه سطبة ب ث٠ بئ٠ إعسخ غه ث

الؿ٤غ( ثاهغ )كو ثجؾ ئجب٠ 0214/ / ثزبع٣ز

% ه٤خ اؼوض زب٤ بئ٠ لبخ رل٤ظ هبصع اجي 12

وبخ اطغف اال ػض ا ا٣خ كغ ا رذلظبد وجال ضكغ سب

هبصع ثزبع٣ز سطبة ب ث٠ سبم ثبضكؼخ اوضخ عه ت

% 02الؿ٤غ( ثاهغ )كو هضعح ثجؾ ئجب٠ 0214/ /

سب ا٣خ كغ ا رذلظبد وجال خ اؼوض هبصع اجي ه٤

رل٣ي ضكغ وبخ اطغف اال ػض ا ت ؿبع ثزذ٣ ه٤زخ

. / / إعرؼزض ثن ث خ اذن ك٠ ازه٤غ ػ٠ اؼوض

قذ ها نهخعاقذ و انخصرفاث انقاىت، فهخبعذ ا اقر انطرفا بكايم اهو

-عهى يا هى :اأحفق

Page 42: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 4 OF 14

Article No. 1 The above preamble, all papers and documents related to tender no. and the

second party offer no. and the awarding letter no. ,the submitted

commitments and ratifications and the mutual correspondences which were

accepted by the two parties, and the negotiation session dated and the

Proforma invoice no. are all considered as an integral part of this contract as

well the tender documents related to this contract completes its provisions and is

part of it.

Article No. 2 :-

The Second Party is committed to deliver and hand over (4) RSs Model

and their relevant spare parts to the location of first party branches in

Alexandria and Dekhela container terminals – Private Free Zone,fully erected

and operational as mentioned in details in the attached performa invoice no

……….dated…../…../……as follows: -Two (2) LADEN CONTAINER REACH STACKER for Alexandria Terminal –

Private Free Zone – Quay 49/54 Port of Alexandria- Egypt.

- Two (2) LADEN CONTAINER REACH STACKER for Dekhela Terminal –

Private Free Zone –

Article No. 3:-

The total and final contract value is (only ) and this value

include delivery and handing over of four RSs with capacity 45 ton under

spreader model CIF to location of first party branches in Alexandria

and Dekhela container terminals -Private Free Zone, And the prices includes:

- The value of the RSs (cost , insurance and Freight) .

- Tests, commissioning in factory and at site.

- Costs of Inspection of four ENGINEERS in factory for two weeks.

- Costs and expenses of international classification society in factory.

- Costs for the training of eight persons in factory for two weeks.

- Costs for the training on site.

- Attached spare parts (as detailed stated in the awarding letter no.

).

انبـــــذ األول :

اؼبخ بك االاعم اـزضاد ازؼوخ ثببهوخ ؿبق اظغ ٣ؼزجغ از٤ض

سطبة االؿبص عه ػغى اطغف اثب٠ ( ـخ عه )

اوجخ د اوضخ اغاؿالد ازجبصخ ازؼضاد االهغاعاعه

عه البرعح اجضئ٤خ البخ ثزبع٣ز ذغ جـخ اطغك٤

ال ٣زجؼأ ظا اؼوض ب رؼزجغ غاؿخ الغ ااهلبد اشبهخ جؼء

ثظا اؼوض خ الدب ربسظ د .

ا:ذ انثبـــــان

RS ززززق ثو٤ززززأعثؼززززخ ( ٣9زززززؼ اطززززغف اثززززب٠ ثزع٣ززززض رـزززز٤ ػززززضص )

كغػززز٠ الزززغخ ثذطزززز٠ دب٣زززبد االؿزززضع٣خ ؿززز٤ق هزززغ هطزززغ ؿ٤بعزززب

بخ ازغ٤ت ازج٤غ ااعصح رلوز٤ال ثبلزبرعح اضس٤خ طوخ دغح سبهخ

جوب الر٠: اإعسخ عه اغكوخاجضئ٤خ

( 0ػضص )ق ثو٤(RS ) كغع الغخ اطغف اال ثذطخ ؿ٤ق هغ

طوخ دغح سبهخ. -دب٣بد االؿضع٣خ

( 0ػضص )ق ثو٤ (RS ) ثذطخ اطغف االكغع الغخ ؿ٤ق هغ

.طوخ دغح سبهخ -دب٣بد اضس٤خ

:ثانثانبــــذ ان

)كو هضعثولخ ئجب٤خ بئ٤خ ثجؾ رذضصد ه٤خ ظا اؼوض

94دخ RS ق ثو٤ اعثؼخظ او٤خ رل رع٣ض رـ٤ ػضص الؿ٤غ(

ثذطز٠ ؿ٤ق هغ كغػ٠ الغخ ص٣ رذذ ابع ابخ

طوخ دغح سبهخ -دب٣بد االؿضع٣خ اضس٤خ

-: االر٠ ل٣ ـؼغا

. او ازأ٤ ه٤خ األبف -

ثبوغ اهغ.ازلـ٤ األسزجبعاد -

. ثبوغ ضح اؿجػ٤ ضؿ٤( 9وبع٣ق رلز٤ق ػضص ) -

ارؼبة وبع٣ق ٤ئخ ازلز٤ق اض٤خ ثبوغ. -

ثبوغ ضح اؿجػ٤ ( ك٤٤ 9ضؿ٤ ػضص ) ( 9)ازضع٣ت ؼضص -

.ازضع٣ت ثبهغ -

Page 43: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 5 OF 14

- four electric screen sheet (tablet) from the local market.

- Eight fire extinguishers 6 KG from the local market.

- Vessel discharging expenses, customs clearance fees and storage

fees in A.R.E

- and internal transport to first party container terminals location in Alexandria and Dekhela Private Free Zone according to article no.4 from the

tender documents.

This value is final and the second party has no right to ask for any reason to

increase it. The First Party is committed to pay this value through issuing an

irrevocable and divisible letter of credit to be issued within maximum two weeks

from the contract date, the Second Party will bear confirmation fees in case he

request to confirm the L/C. The payment of this value in installments as follows:

20% (Twenty Percent) of the contract value as advance payment, against

advance payment bank letter of guarantee of the same value and currency, issued

by a local bank operating in Arab Republic of Egypt subject to the central bank of

Egypt supervision, irrevocable and without any conditions or reservations, valid for

a period not less than two months after the date of arrival of the contractual items

on site of the first party terminals location in Alexandria and Dekhela -Private Free

Zone-. according to the advance payment letter of guarantee template included in

the tender documents , this installment to be paid within maximum three weeks

from the contract signing date.

70% (Seventy Percent) from the value of each RS and its spare parts after

preliminary acceptance by the First Party on Site. This installment to be paid within

maximum four weeks from the date of vessel arrival at Alexandria port or two

month from the bill of lading date.

10% (Ten Percent) of the contract value against certificate issued by the First

Party after completion of the training on site on the RSs after commissioning and

operation. This installment to be paid within maximum one month from the

preliminary acceptance date. The training has to be executed within two week from

the date of handing over and the preliminary acceptance of the RSs and after

concluding tests.

All the above mentioned installments will be paid against a written notification from

the First Party to the bank issuing the letter of credit.

In case of First Party is delayed in implementing his contractual obligations

including but not limited to transfer of installments and the letter of credit

البرعح عه )ب خ رلو٤ال ثأغ االؿبصهطغ اـ٤بع -

اجضئ٤خ عه .

electric screen sheet ( tablet)( 9)ػضص -

. اـم اذ٠ ٤ 2( لب٣خ دغ٣ن ؿؼخ 1ػضص ) -

وبع٣ق ازلغ٣ؾ وبع٣ق ازش٤ن اجغ٠ ازشؼ٣ ثجع٣خ -

اطغف اال كغػ٠ الغخ ؼغث٤خ او دز٠ هغوغ ا

ثذطز٠ دب٣بد االؿضع٣خ اضس٤خ طوخ دغح سبهخ جوب ن ابصح

( غاؿخ الغ ااهلبد.9عه )

ال ٣جززػ طززغف اثززب٠ ززت ػ٣ززبصح االؿززؼبع ال ؿززجت زز االؿززجبة ٣زززؼ

غ٣ززن كزززخ اػزززبص ـزززض ؿ٤ززغ هبثزز اطززغف اال ثبكززبء ثزززي او٤ززخ ػزز

الـززبء هبثزز زجؼئززخ ٣لزززخ كزز٠ سززال ززضح أهوززبب أؿززجػ٤ ثؼززض ره٤ززغ اؼوززض

٣زذزز اطززغف اثززب٠ وززبع٣ق رؼؼ٣ززؼ كزز٠ دبززخ جزز طززي ػزز٠ ا ٣زز

اكبء ثظ او٤خ ػ٠ صكؼبد ػ٠ اذ ازب٠ :

كؼخ وضخ وبث سطزبة زب % ) ػلغ ك٠ ابئخ ( ه٤خ اؼوض ص02 -

ث٠ ثلؾ او٤زخ طاد اؼزخ هزبصع ز ادزض اجزى صاسز جع٣زخ وزغ

اؼغث٤خ اشبؼخ الكغاف اجي اغؼ ؿ٤غ هبث الـزبء ؿ٤زغ وززغ ثزب

كغ ا رذلظبد ؿبع الؼ ضح كغ٣ ز رزبع٣ز هز االهزبف

ثذطزززز٠ دب٣زززبد خ اطزززغف االبهزززض ػ٤زززب اززز٠ هزززغ كغػززز٠ الزززغازؼ

طوززخ دززغح سبهززخ جوززب ززطم سطززبة اززب –االؿززضع٣خ اضس٤ززخ

.اهلبد اضكؼخ اوضخ اغكن ثغاؿخ الغ ا

٣ززز هجزز ذوبرزز ززق ثو٤زز% )ؿززجؼ كزز٠ ابئززخ( زز ه٤ززخ زز 72 -

.اؿزالب اثزضائ٤ب اؿزال

اجبه٤خ ه٤خ ازؼبهض رضكغ وبث كبصح روزضع ز % )ػلغح ك٠ ابئخ( 12 -

رل٤ززض ارززب رززضع٣ت االكززغاص ازززبثؼ٤ ززب ثززبهغ ػزز٠ اطززغف االالززغخ

. ػزز٠ ا ٣ززز اجززبػ ززظا ازززضع٣ت كزز٠ ززض اؿززجػ٤ زز لززـ٤باؼززضاد ثؼززض ر

٤زب ربع٣ز هج األهبف اؿززالب اؿززالب اثززضائ٤ب ثؼزض اززبء االسزجزبعاد ػ

ثبهغ .

ػزز٠ أ ٣ززز ؿززضاص اززضكؼبد اززاعصح ثززظا اجززض ثجززت سطززبة رجزز الززغخ

Page 44: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 6 OF 14

issuance, the delayed time to be added to the delivery period.

Article No. 4 :-

All duties, stamp duties, and all other taxes and fees to be paid outside of

Egypt shall be born by the Second Party.

The Second party to conclude all customs clearance procedures for the

contracted items on his responsibility and account (pay costs) starting from

the vessel berthing and discharging and till the contracted items are inside

the location of first party branches in Alexandria and Dekhela container

terminals – Private Free Zone , also the second party is committed to pay

any bank charges (if any) resulting from delivery delay after the agreed

delivery period in the contract. Also any expenses resulting from shortage in

the delivered items or related to the items which are delivered separately

after the RSs delivery.

All duties, stamp duties, and all other taxes and fees to be paid inside of

Egypt shall be born by the First Party except for what is mentioned in the

above paragraph.

Article No. 5 :-

The Second Party is committed to deliver and hand over (4) RSs Model

and their relevant spare parts to the location of first party branches in

Alexandria and Dekhela container terminals – Private Free Zone on due date

maximum months CIF Alexandria seaport starting from the contract

signing date, this delivery period excludes the custom clearance period,

which will be concluded by the second party. In case of second party delivery delay, in supplying of the whole or part of

contractual items after the fixed due date in the contract, including the

rejected items, the First Party may grant the Second Party an extension

period to deliver, subject to delivery delay penalty in respect of the delay

interval, being (1%) for every week or part of a week from the value of the

undelivered quantities or items , in any case the total amount of this delay

penalty shall not exceed (3%) from the value of items in which the second

party delayed to deliver, the delivery delay penalty will be applied upon the

delay occurrence without the need for any warnings or legal disputes.

IF the delayed items would prevent the benefit from the usage or full

ئ٠ اجي كبرخ االػزبص . اطغف األ

ك٠ دبخ رأسغ اطغف اال ك٠ اكبء ثبزؼابرخ ازؼبهض٣خ ثب ك٤ب رذ٣

٣ض.ربف كزغح ازأسغ ا٠ ضح ازع كزخ االػزبص اـزض اضكؼبد

:رابعانبــــذ ان

بكزخ ازغائت اغؿز ؿ٤غزب ز اغؿز ازز٠ ـضاص ٣زؼ اطغف اثب٠ ث

رلغى سبعم اه٤ اطغف اال ، ب ٣زؼ ثببء اجغاءاد ازشز٤ن

اجغ٠ ػ٠ األهبف ع ظا اؼوض ػ٠ لوز رذذ ـئ٤ز ثضء ز

دزز٠ صسزب هزغ كغػز٠ الزغخ اطزغف رغا٠ اـل٤خ رلغ٣زؾ االزبف

ثذطزز٠ دب٣زبد االؿزضع٣خ اضس٤زخ طوزخ دزغح سبهزخ ، زب ٣زززؼ اال

وغكبد ث٤خ رزغرت ػ ازبس٤غ كز٠ ازع٣زض ػز اػزض اذزضص ثـضاص ا٣خ

وغكبد رلزأ ػز االهزبف اؼجزؼ ا االهزبف ازز٠ رزعص ظا اثبؼوض.

ع ازؼبهض.ثؼض رع٣ض االبف

٣زؼ اطغف اال ثبكخ اغائت اغؿ ؿ٤غب اغؿ از٠

.اال ػضا ب طغ ك٠ الوغح اػالرلغى صاس اه٤ اطغف

: خايسانبــــذ ان

ص٣ززز RS زززق ثو٤ززز( ٣9ززززؼ اطزززغف اثزززب٠ ثزع٣زززض رـززز٤ ػزززضص )

ثذطززززز٠ دب٣ززززبد ثلغػزززز٠ الززززغخ اطززززغف اال هطززززغ اـ٤ززززبع

ؿز٤ق ( أكزغ كز٠ ػزض اهوزب ) طوخ دزغح سبهزخ –االؿضع٣خ اضس٤خ

٤بء اإلؿضع٣خ ز رزبع٣ز ره٤زغ اؼوزض ال٣زضس كز٠ دـزبة زظا ا٤ؼزبص زضح

ازشزز٤ن ػزز٠ لزز اغؿززبخ ثبجززبعى اززظ ؿززف ٣ززز ثؼغكززخ الززغخ

اطغف اثب٠.

طا رأسغ اطغف اثب٠ كز٠ رع٣زض االهزبف ازؼبهزض ػ٤زب أ أ جزؼء زب كب

ك٠ ا٤ؼبص اذضص ثبؼوض ٣ضس كز٠ طزي االهزبف اغكزخ ك٤جزػ طزغف

اال اػطبؤ خ ابك٤خ زع٣ض ػز٠ ا ٣هزغ ػ٤ز ؿغازخ رزأس٤غ ػز زضص

غ أ جززؼء زز % ػزز زز اؿززجع رززأس1٤ازززأس٤غ أ ػزز ززظ اززخ وززضاعب

االؿجع ه٤زخ ا٤زخ أ االهزبف ازز٠ ٣ززأسغ اطزغف اثزب٠ كز٠ رع٣زضب

رـزذن اـغاخ ثجغص دضس ازأس٤غ ز % ظ او٤خ ، 4ثذض اهو٠

٣زغرت ػ٤ ا غع ص دبجزخ از٠ رج٤ز ا ئزظاع ا ارشزبط ا٣زخ اجزغاءاد

Page 45: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 7 OF 14

operation of the RS, the delivery delay penalty will be calculated on the total

value of each RS.

Second Party’s responsibility

The Second Party’s responsibility under this contract shall be limited to the

amount of the actual direct damages incurred by the First Party. The First

Party shall be entitled to no other remedies regardless of the form of claim

or cause of action, whether based in contract, negligence or otherwise. The

Second Party’s overall maximum liability (including e.g. liquidated damages)

to the First Party relating to this contract or the Works shall not exceed forty

percent (45%) of the Total Contract Price.

Without any contradictions with the delivery delay penalty mention in this

contract item.

Article No. 6 :-

In case the First Party will find any shortage in the contractual items or a non

conformity with the conditions or specifications, the first party will notify by

fax the Second Party, followed by a confirmed registered mail on the Second

Party address outside the country, but the date of fax will be considered as a

base, and will also notify by fax in the same date his commercial agent

followed by a registered mail, explaining the reasons of rejection and

requesting them to withdraw the rejected articles and supply a replacement.

In all cases the Second Party or his agent must withdraw the rejected

articles within 15 days maximum calculated from the second day of the

notification date. Otherwise a storage fee will be applied equivalent to 2% of

the value of the rejected items per week or part of a week up to four weeks

maximum.

After four weeks The First Party will have the right to sell these goods on

behalf of the second party and the expenses to be deducted from the sales

sum, without any contradiction with what have been mentioned in article 6

from this contract.

It is agreed upon according to this contract that the responsibility and the

ownership of the First Party shall start from the date of preliminary

acceptance of the RSs and their attachments and spare parts, and before

هبئ٤خ.

أ اؿززـال ػز٠ ق ثو٤ز ص االزلبع ثباطا بذ االهبف ازأسغ رذ

ق اخ ػ٠ او٤خ اإلجب٤زخ زاج األ ك٠ ا٤ؼبص اظع كزذـت اـغ

.ثو٤

ـإ٤خ اطغف اثب٢

ر ـإ٤خ اطغف اثب٢ ثجت ظا اؼوض ذوعح ثبذض األهو٠ و٤خ

األ.الؼ٤خ ألغاع اجبكغح از٢ رجضب اطغف

أسغ ثـي اظغ ػ ك ال ٣ دن اطغف األ أ١ رؼ٣بد

اطبجخ أ ؿجت اذضس ، ؿاء ثبؼوض أ ز٤جخػض اؼغكخ أ ؿ٤غ طي.

ـإ٤خ اطغف اثب٢ البخ اوو )ثب ك٤ب رؼ٣بد وطػخ ثال( ئ٠

األعثؼ٤ ك٢ ائخ جبػاطغف األ ك٤ب ٣زؼن ثظا اؼوض أ األػب ال رز

٪( اـؼغ اإلجب٢ ؼوض.92)

طغف اال اظع ثظاد ثب ال ٣زؼبعى غ ؿغاخ ازأس٤غ اـزذو

اجض.

: دسانبــــذ انسا

اطا رج٤ طغف اال جص ا٣خ شبلخ لغ ااهلبد ك٠ األهبف

غ اطغف اثب٠ ثظي ػ٠ ػا ازؼبهض ػ٤ب أ جض ثب ون كؼ٤ أ ٣شط

٣ؼزض ثزبع٣ز البؾ ب ٣شطغ ك٠ عم ثجت كبؾ رإ٣ض ثزبة الدن .ثبشب

وغ ػ٠ ذ اشزبع ث ٤ ازجبع ثجت كبؾ ك٠ طاد ازبع٣ز

٣إ٣ض ثشطبة ـج وذة ثؼ اه الدن ثأؿجبة عكي االهبف

٣ ) سـخ ػلغ ٣ب ( 14اشبلخ ثجة ؿذجب رع٣ض ثضال ب سال

سطبع ثظي ٤ ازجبع .ػ٠ االثغ ا٤ ازب٠ ال

كززبطا رززأسغ اطززغف اثززب٠ كزز٠ ؿززذجب ك٤زز طززغف اال اذززن كزز٠ رذوزز٤

% ) اثزب كز٠ ابئزخ ( ز ه٤ززب ػز ز اؿزجع 0وغكبد رشزؼ٣ ثاهزغ

رززأس٤غ أ جززؼء زز ززضح اهوززبب اعثؼززخ اؿززبث٤غ ثؼززض ازززبء ززظ اززضح رزشززظ

اثب٠ رشو ري اوغكبد ثز اج٤ز غ اجغاءاد ث٤ؼب ذـبة اطغف

ظا اؼوض . ـبصؽ ص االسال ثبجبء ثبجض ا

ازلن ػ٤خ ثجت ظا اؼوض أ ـئ٤خ ٤خ اطغف األ رجضأ

ربع٣ز اوج االؿزال االثزضائ٢ ألبف برب ذوبرب هطغ اـ٤بع

Page 46: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 8 OF 14

that all responsibilities for the RSs are the Second Party responsibility.

Article No. 7 :-

The Second Party is committed to supply the mechanical, electrical and

electronic components for the contracted RSs, from the original

manufacturer and not manufactured under license, in accordance to the

sub-suppliers list submitted in the offer.

The second party is committed to submit a certificate of origin for those RSs

certified by the Chamber of commerce.

The second party is also committed that all main components (Engine ,

Transmission , Front axle , Spreader) of the RSs to have a fixed name plate

in English language from the original sub supplier.

The Second Party is committed to ensure the availability of the necessary

and essential spare parts specially the main spare parts when requested

and ordered which will be needed to keep the RSs in operation for at least a

period of ten years after the end of the warranty period,and fixing the prices

of spare parts attached & recommended during the guarantee period (24

months)

The second party is committed to allow the first party to purchase the spare

parts directly from any of the sub-suppliers, according to the part numbers or

code numbers indicated in the spare part list of each RS, submitted from the

original manufacturer incase they are not delivered.

Article No. 8 :-

The Second Party is allowed to modify the agreed delivery schedule if it was

necessary, and in this case the First Party may agree on doing these

changes in the delivery schedule without any effect on the total delivery

period and without any contradiction with conditions of articles 6 and 14

from this contract.

Article No. 9 :-

Both parties have agreed that the international classification society (LR,

GL, ABS ,or BV) is assigned to issue the certificates and supervise the tests

at the factory according to delivery time schedule and to issue an original

certificates authenticated from them upon the completion of Tests and

ـئ٤بد اشبهخ ثبألبف برب هطغ اـ٤بع هج طي ر ج٤غ ا

.ـئ٤خ اطغف اثب٢

: سابعانبــــذ ان

٣زززززؼ اطززززغف اثززززب٠ ثززززأ ٣ززززز رع٣ززززض اززززبد ا٤ب٤٤ززززخ اغثبئ٤ززززخ

االزغ٤خ ألبف ع ازؼبهزض ز اوزبغ االهز٠ ز٤ؾ ثززغس٤ن

.وضخ ثبؼغىطي جوب وبئخ عص اجب ا

. اـغكخ ازجبع٣خ ب ٣زؼ ثزوض٣ كبصح لأ ظ االبف ؼزضح

ب ٣زؼ ثب ر ج٤غ ازبد اغئ٤ـز٤خ )اذزغى ، اج٤غثزؾ ، االزؾ

االززب٠ ، االؿززجغ٣ضع( ثبالززبف ثجززذ ػ٤ززب دززخ ث٤بززبد سبهززخ ثززب )ثبـززخ

ه٠.االج٤ؼ٣خ( اوغ االكااا هخااتو بخااىفر قطااع انزااار انورياات وانضاارورت وخاصاات اعساسااى يهااا ورناا عااذ

ساىاث حانات نسات اعساخوو انهاائى عطرطهبها نخزطت حطزم األواش نذة عحقم ع

خاول فخارة انضاا و انىصا بهااانقخرحات انصااحبت ويع حثبج ساعر قطاع انزاار

( ضهرا44يذحها )

طغف اال كغاء هطغ اـ٤زبع ز زعص اجزب جبكزغح ثبـبح ب ٣زؼ

ازاعصح ثلزف هطزغ ؿ٤زبع زق ثو٤زجوب العهب اص٣خ وطغ اـ٤بع

. ك٠ دب ػض رع٣ضباوبع االه٤٤

: ثايانبــــذ ان

٣جػ طغف اثب٠ ت اجغاء ثؼزي ازؼزض٣الد كز٠ اجغزبز اؼز٠ ازلزن

ػ٤ زع٣ض اطا اهز٠ االغ طي ك٠ ظ اذبخ ٣جػ طغف اال ااكوزخ

ػ٠ ظ ازؼض٣الد ثض ازأث٤غ ػ٠ الزغح ا٤خ زع٣ض ص االسال ثبدب

ػلغ ثص ظا اؼوض . غاثغا ـبصؽاجض٣ ا

:خاسعانبــــذ ان

( LR ,GL,ABS, or BV) ض٤زخ٤ئزخ ازلزز٤ق اارلن اطغكب ػ٠ ا رز

االكغاف ػ٠ ػ٤خ اجغاء االسزجزبعاد هضاع البصاد ٠ اجخ اؼزضح ال

ب جغبز اؼ٠ زع٣ض اهضاع كبصح اهز٤خ ؼززضح زب رل٤زض ثبوغ جو

غاجؼزززخ ااهزززلبد ال٤زززخ ث٤زززب زززض طبثوززززب غاؿزززخ السزجزززبعاارزززب

.ل٤خ ع ازؼبهضالغ ااهلبد ا

٣ذززن ػزز٠ ا رزز ج٤ززغ ارؼززبة ٤ئززخ ازلززز٤ق ػزز٠ لوززخ اطززغف اثززب٠ ززب

Page 47: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 9 OF 14

revise the technical specification and to insure its compliance with the

tender documents Technical conditions and specifications related to this

contract.

The second party will be responsible for the international classification

society costs and expenses. The First Party has the right to delegate four

engineers for a period of two weeks to inspect the RSs and test the

functionality and inspect the spare parts and tools, They are responsible to

issue an inspection report signed by both parties during inspection at factory

for all the found remarks during the inspection which are not in compliance

with the technical specifications specified in the second party offer and the

second party is obliged to rectify those remarks prior to shipping.

Full accommodation, airfares and internal transportation will be on behalf of

the Second Party, the second party is also committed to handover to the first

party all the issued certificate by the international classification society.

The second party is committed to submit the factory test certificates for the

main components (engine , transmission , front axle and spreader)

Article No. 10 :-

On site training: the Second Party is committed to provide a training course

for the first party employees (engineers - technicians –operators) for two

weeks on site during the preliminary acceptance.

Factory training: The Second Party is committed to provide a training course

for training eight engineers and technicians for duration of two weeks in the

factory premises in, Full accommodation, airfares and internal transportation

to be born by the second party.

Article No. 11 :-

The Second Party guarantee that the RSs and their components will be

brand new and genuine and complying with the latest design and that all the

equipments are genuine and produced by the original manufacturers and

not under licenses, and in accordance with the contractual technical

specifications and the recent international technological levels also that The

RSs will not have any defects or faults due to wrong design or materials or

due to fabrications and should perform efficiently during the guarantee

زلز٤ق طزي و٤زب ثزبزضح اؿزجػ٤ ٤ضؿز( 9 طغف اال ا٣لزبص ػزضص )

ػزز٠ ا ػزز٠ االززبف اسزجززبع ا ززبئق هطززغ اـ٤ززبع اؼززض اوززبدج

طزززغك٤ اثزززبء ازلزززز٤ق ثبوزززغ ززز ثزبثزززخ روغ٣زززغ لززززغى ثززز٤ ا ا٣وززز

االدظبد از٠ رظغ ػزض ازلزز٤ق ازز٠ رشزبق اهزلبد ال٤زخ ازظعح

ثؼززغى اطززغف اثززب٠ ، ٣زززؼ اطززغف اثززب٠ ثزالكزز٠ رززي االدظززبد هجزز

الذ .

ػ٠ ا ر ج٤غ رزب٤ق االهبزخ اززوالد اضاس٤زخ رزظاغ اـزلغ ثبطزبئغح

اطزغف اال ج٤زغ لوخ اطغف اثزب٠ زب ٣ززؼ اطزغف اثزب٠ ثزـز٤ ػ٠

البصاد اوبصعح ٤ئخ ازلز٤ق اض٤خ

٣ززززؼ اطزززغف اثزززب٠ ثزوزززض٣ كزززبصاد اسزجزززبع اوزززغ زززبد اغئ٤ـززز٤خ

)اذغى ، اج٤غثؾ ، االؾ االب٠ االؿجغ٣ضع(

:عاضرانبــــذ ان

اززبثؼ٤ اؼزب٤ ززضع٣ت٣زؼ اطزغف اثزب٢ ثزوزض٣ ثغزبز غ :ازضع٣ت ثبه

االؿزال اثبء اـبئو٤( ضح أؿجػ٤ ثبهغ -ك٤٤ -ضؿ٤ )طغف اال

.االثزضائ٠

(9) ؼززضصزززضع٣ت ٣زززؼ اطززغف اثززب٠ ثزوززض٣ ثغززبز : ازززضع٣ت ثبوززغ

رز ج٤زغ رزب٤ق ثوزغ اوزغزضح اؿزجػ٤ ٤ك٤ز ( 9ػزضص ) ٤ضؿ

االهبخ ازوالد اضاس٤خ رظاغ اـلغ ثبطبئغح ػ٠ لوخ اطغف اثب٠.

عطر: حاديانبــــذ انجض٣زضح طبثوزخ ب ـززؼبر ر االبف ازعص ٣ اطغف اثب٠ ا

٤ـزذ الدضس رو٤ ا ر اه٤خ ا ر ج٤زغ اؼزضاد ززز اهز٠

زجززخ ثزززغس٤ن رزلززن ززغ اـززز ااهززلبد ال٤ززخ ازؼبهززض ػ٤ززب جوززب

الدضس اظ ازج٤خ اؼب٤خ از ز ٣ظزغ ثزب ا ػ٤زت ٣غجزغ از٠ سطزأ

كز٠ ازوز٤ ا ازاص ا اوززبػخ ا رؼز ثلزبءح طززي سزال زضح اززب

:وضاعب

ربع٣ز هجب اؿزالب ٤غ بربجكغا البف أعثؼخ ػلغ -

.اؿزالب اثزضائ٤ب

Page 48: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 10 OF 14

period:

(24) months for the RSs and its components starting from the date of

preliminary acceptance.

(48) months for the Chassis and BOOM starting from the date of preliminary

acceptance.

without violating the civil law decrees in regards of the warranty for the

hidden defects.

The second party is committed to provide any enhancements, modifications,

or new technologies done by the original manufacturer to the first party in

sufficient time to use them when needed.

Article No. 12 :-

The Second Party guarantees that the RSs will work efficiently to perform all

required targets during the warranty period and as follows :

1- During the warranty period, the Second Party is committed as soon as

notifying him or his commercial agent in written by fax, to repair or replace,

on his account, any defected equipment or parts of it within ten working

days (fourteen days) maximum excluding customs clearance period ,counted

from the next day of notifying him by fax.

In case the Second Party fails to achieve the said repair, the First Party will

have the right to execute the required works on the account and

responsibility of the Second Party.

In case of delay in the repairing works more than the maximum due date

(fourteen days), the First Party has the right for compensation penalty

amounting (250) two hundred and fifty EURO per each RS per day to

compensate the loss occurred to the first party as a result of stopping

operations, and the compensation penalty will be counted from the next day

following the above mentioned grace period for the repair, and each case of

delay will be considered separately, with maximum value of 10% from each

RS value.

2- In all cases, when replacing any part of the RS parts, during the warranty

period, as a result of manufacturing defects mentioned in article no. 12 of

this contract, a new warranty period of twelve months, for this specifically

ربع٣ز هجب اؿزالب اؿزالب اج لبؿ٤بدكغا ثب٤خ أعثؼ -

.اثزضائ٤ب

زؼوخ ثب اؼ٤ة اشل٤خ .ص االسال ثبدب اوب اض٠ ا

٣الد ا رج٤ب جض٣ضحب ٣زؼ اطغف اثب٠ ثزوض٣ ا رذـ٤بد ا رؼض

٣و ثب اوغ االه٠ لغخ اطغف اال ك٠ د٤ الؿزلبص ثب د٤

اذبجخ.

عطر: انبــــذ انثااعصح ؿف رؼ ثوعح كؼبخ بؿجخ ٣ اطغف اثب٠ ا االبف

زذو٤ن االضاف اذضصح ب ا كزغح اب ػ٠ اذ ازب٠ :

زؼ اطغف اثب٠ ثجغص اسطبع ا اسطبع ٤ زبثخ ثلبؾ ثب ٣ -1

ثشالف ضح ثذض اهو٠ ٣( 19) ٣و ػ٠ لوز سال ػلغح ا٣ب ػ

ا ٤ ازجبع ا٤ ازب٠ السطبع ازش٤ن اجغ٠، رذزـت

ا ثبلبؾ ثبه الح ا اؿزجضا اؼضاد ا ا اجؼاء ب هض ٣ظغ ثب س

ػ٤ة سال كزغح اب ك٠ دبخ ػض ه ٤ب اطغف اثب٠ ثظي ٣

طغف اال اذن ك٠ رل٤ظ االػب اطثخ ػ٠ ل وخ ـئ٤خ اطغف

اثب٠ ٣ـزذن طغف اال ك٠ دبخ رأسغ االهالح ػ اضح ا ذضصح

) بئزب ٣ع ٣042 ( رؼ٣ي ثاهغ 19) هضعب ػلغح ا٣ب ػ =

ق ثو٤( ػ ٣عسـ ػ اغع ابرز ػ ازهق ػ ٤٣ب

اؼ ٣ذزـت ازؼ٣ي اػزجبعا ا٤ ازب٠ الزبء اضح اذضصح ػب٤

ق %( ه٤خ 12ثذض اهو٠ ػلغح ك٠ ابئخ ) دبخ ػ٠ دضح

2 ثو٤

اثبء RSق زجضا ا جؼء اجؼاء اك٠ ج٤غ االدا ك٠ دبخ اؿ -0

كزغح اب ز٤جخ ػ٤ت ك٠ اوبػخ جوب جض )اثب٠ ػلغ( ظا اؼوض

كغ 09كغا ) أعثؼخ ػلغرذزـت كزغح ب جض٣ضح ظا اجؼء ضح

( رجضأ ربع٣ز ازلـ٤ اـ٤ ثؼض االؿزجضا .

ػطب ابرجخ ػ ػ٤ة ك٠ اوبػخ ز٤جخ اال ق ربف كزغاد رهق ا - 2

. سال كزغح اب ا٠ كزغح اب االؿبؿ٤خ

Page 49: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 11 OF 14

replaced part of the RS, will be considered and counted from the date of

being efficiently operated after replacement.

3- All stoppage periods (down times) of the RSs, resulting from malfunctions

due to manufacturing defects during the warranty period, will be added to

the original warranty period of the RSs.

Article No. 13:-

If the Second Party would fail to fulfill his obligations for the supply and

commissioning of the contracted RSs or spare parts , fully or partially, at

the specified delivery date mentioned in the contract or within the extra

grace period, the First Party has the right without warning or any legal

procedures , to adopt one of the following two alternatives after notifying the

Second Party or his commercial agent by fax on his address mentioned in

the contract:

1. To purchase the items which the second party failed to deliver from any

other sources and on his account in a way granting the fast delivery , either

through a general or public or limited tender or limited bargaining or direct

award with the same previously announced and contracted technical

specifications and conditions, any excess in price due to such procurement

shall be deducted from the value of the deposited guarantee or any due

amounts at the first party side or any other governmental authorities, in

addition to any administration expenses that the first party incurred to

implement such procurement, however should such procurement price of

any articles be less than that of the contract price , the second party will not

be entitled to the difference, as well as will not be exempted from the

delivery delay penalty or the compensation penalty.

2. To terminate the contract in relation to the undelivered items and to

liquefy the performance guarantee amounting 10% from the contract value,

without the prejudice to first party deserved delivery delay or compensation

penalties who will also have the right to recourse to the courts against the

second party to what he could not conduct for any rights due to him.

عطر: ثانث انبــــذ ان

اطا اس اطغف اثب٠ ثبزؼا ثزع٣زض رـز٤ االزبف هطزغ اـ٤زبع ازؼبهزض

٣جزػ ػ٤ب ب ا ثؼب ك٠ ا٤ؼبص اذضص ثبؼوض ا سزال ازخ االزبك٤خ

طززغف اال ص رج٤زز ا اززظاع ا ارشززبط ا٣ززخ اجززغاءاد هززبئ٤خ ا ٣زشززظ ادززض

االجززغاء٣ ازززب٤٤ طززي ثؼززض اسطززبع اطززغف اثززب٠ ثبشززبعم ا ػزز٠ ذزز

اشزبع ثوغ ث ٤ ازجبع ثلبؾ ػ٠ ػا اج٤ ك٠ اؼوض :

ؿ٤غ ػ٠ دـبث كغاء االهبف از٠ ٣و اطغف اثب٠ ثزع٣ضب -1

ؿاء ثطغ٣ن ابهوخ اؼبخ ا اذضصح ا ابعؿخ ا ثبالرلبم اجبكغ

ثظاد الغ ااهلبد ال٤خ اؼ ػب ازؼبهض ػ٤ب ٣شو ه٤خ

ازأ٤ اصع ا أ٣خ ـزذوبد ض اطغف اال ا ا٣خ جخ د٤خ

اؼ٣بصح ك٠ اث بكب ا٤ب اوغكبد از٠ اسغ ه٤خ الغم ابرجخ ػ

٣ اطغف اال هض رجضب ك٠ ازل٤ظ ػ٠ دـبة اطغف اثب٠ ب ٣ـزذن

رؼ٣ي، ال٣ذن طغف اثب٠ اطبجخ اطغف اال ؿغابد رأس٤غ

ثلغم االؿؼبع اطا ب ؿؼغ الغاء ػ٠ دـبث اه اث ازلن ػ٤ ك٠

ظا اؼوض.

٣وجخ ازأ٤ ابئ٠ ابء ازؼبهض ك٤ب ٣شزن ثبالهبف از٠ رعص-0

% ) ػلغح ك٠ ابئخ ( 12 دن الغخ ) اطغف األ ( ثب ٣ اػ

ص االسال ثب ٣ـزذو اطغف اال ؿغابد رأس٤غ اؼوضه٤خ

ال ك٠ اغجع ػ٠ رؼ٣ي .. طي غ ػض االسال ثذن اطغف اا

اطغف اثب٠ هبئ٤ب ثب ٣ز اؿز٤لبئ دوم .

عطر:رابع انبــــذ ان

ثأززبء اجززغاءاد اؿزززشغام اهززغاعاد اززاعص زز رزؼززض الززغخ اطززغف اال

روض٣ ازل٣بد االػخسبعم اجالص اػزبصب ا٤ئخ اؼبخ الؿزثبع

Page 50: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 12 OF 14

Article No. 14:-

The First Party is responsible to finalize the procedures of issuing the

required authorization letters for the imported items and to be certified from

the general authority of investment and to furnish all the necessary power of

attorneys and authorization letters to the second party essential to conclude

the customs clearance procedure also to facilitate the necessary procedures

for allowing the entrance of all concerned persons working for the Second

Party to the customs area, to fulfill their obligations under this contract.

Article No. 15:-

The Second Party submitted a performance guarantee no. dated with total value (only ) representing 10% from the total contract

value as a performance guarantee to grant the contract performance, issued

by bank without any conditions or restrictions payable at the first party

first demand by the First Party. The letter of guarantee is valid for 30 days

following the end of the main warranty period (24 ) month and final

acceptance of contractual items except the chassis and BOOM.

This letter of guarantee value to be reduced to an amount of 5% from its

original total value , to be (only ) upon the expiry of the

main warranty period (24) month and final acceptance of contractual items

except the chassis. And to be extended with the amount of (only ) until the expiry of the addition warranty period related to the

chassis only, which is 24 month starting from the expiry of the main warranty

period.

Article No. 16:-

Force Majeure applied when events outside the control of Second Party and

can not be predicted on the issuance of this contract occur, such as riots or

civil strikes, terrorism ,war or civil war, flood, earthquake, landslides or

similar natural disasters or circumstances , The second party must report

Force Majeure upon its occurrence, Visa refusals by embassies for the first

party personnel also foreign governments warnings for travelling restrictions

for their citizens in case of instabilities inside Egypt and any of the above

بء اجغاءاد ازش٤ن اجغ٠ ظا او٤ب ثبكزخ ازـز٤الد ال طغف اثب٠

االػخ ضس سجغاء ضث٠ الزغخ اطزغف اثزب٠ ازضائغح اجغ٤زخ زل٤زظ

غاد ظا اؼوض .

عطر: خايسانبــــذ ان

هزبصع ثززبع٣ز عه سطبة ب ث٠ بئ٠هب اطغف اثب٠ ثزوض٣

% ز ه٤زخ اؼوزض ززب٤ 12ثاهزغ الؿ٤زغ( )كو ؾ ئجب٠ ثج

سززب زز ا٣ززخ كززغ ا رذلظززبد ززبئ٠ لبززخ رل٤ززظ هززبصع زز اجززي

ؿزبع الؼزز زضح ثالثزز٤ وجزال ززضكغ وزبخ اطززغف اال ػزض ا ززت

( كززغا اؿزززال 09ضعب ) هزز االؿبؿزز٤خ ٣ززب ثؼززض رززبع٣ز ازززبء كزززغح اززب

. اج ػضا البؿ٤بد اطغف اال ابئ٠ جص ع اؼوض

االؿبؿز٤خ االجب٤زخ % ه٤ززخ4ا٠ بئ٠اب اسطبة ه٤خ٣ز رشل٤ي

هزضعب االؿبؿ٤خ كزغح اب كع ازبء الؿ٤غ( )كو زوجخ

ػضا البؿ٤بد طغف اال ابئ٠ جص ع اؼوض( كغا اؿزال ا09)

اززبء كززغح ذز٤ الؿ٤زغ( )كوز هزضعح ثو٤زخ ٣زض لؼزخ .

رجزضاء ز رزبع٣ز اززبء ( كزغا 09 هزضعب ) لبؿ٤بد كو االبك٤خ اب

االؿبؿ٤خ. كزغح اب

عطر:دس نساانبــــذ اكزغ اوزح اوزبغح ػزض دزضس ادزضاس سبعجزخ ػز اعاصح اطزغف ٣ز رطج٤زن

اثزززب٠ ال ٣ززز ازجزززإ ثزززب ػزززض رذغ٣زززغ اؼوزززض ازززز٠ رؼززز٠ اػزززب الزززـت

٤زززببد االعزززبة اذزززغة اذزززغة اال٤زززخ ال االزززغاثبد اض٤زززخ

ػز٠ ا ٣وز اطزغف , اؼالػ ا٤بع ازغثخ ا ااعس اطج٤ؼ٤زخ الزبثخ

ززظا عكززي اـززلبعاد اثززب٠ ثززبالثالؽ ػزز هززع اوززح اوززبغح كززع دززضثب

اسطزبعاد اذزبد االجج٤زخ ثذظزغ اهضاع ازأك٤غاد الكغاص اطغف اال

ؿلغ عػب٣بب ك٠ دبخ ػض االؿزوغاع صاس وغ ال ٣ؼزض ثب زغف ز رزي

ز اـزلبعح اوزغ٣خ طغف االاظغف اال ثؼض اػزبص اـزضاد اوضخ

ثبشبعم االثالؽ ػب.

عطر:سابع انبــــذ ان

اؼوض ـ٤غ جؼئ٤ب أ ٤ب أ ػ اجبؾ ظا ال ٣جػ طغف اثب٠ ازبػ ػ

اـزذوخ ب أ ثؼب

Page 51: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 13 OF 14

circumstances won’t be considered unless the second party submit the

relevant evidencing documents legalized from the Egyptian Embassy abroad.

Article No. 17 :-

Under no circumstance shall the Second Party assign the contract or any

amounts due to him partly or totally.

Article No. 18 :-

It is understood that, as a result of presence of any remarks during the

preliminary acceptance or during the warranty period or as a result of

presence of any amounts of applied penalties, the First Party has the right to

deduct these values from any sums that may be due to the Second Party or

from the performance guarantee, without the need of sending alerts or

warnings, incase those remarks were not rectified in the period mentioned in

the contract.

Article No. 19 :-

Legal disputes and actions arising out of the contract shall be dealt with

according to the Egyptian law with the Egyptian courts in Alexandria.

Article No. 20 :-

The provisions of the civil law and maritime trading law no.17 for the year

1999 and the law no.72 for the year 2017 for the guaranty of investments

and its execution list and the First Party’s regulations relating to contracts,

purchasing and stores to be considered complementary to this contract

conditions where it is not explicitly stated.

عطر:ثاي انبــــذ ان

اوبثزز اـزززذن ظ٤ززغ جززص الدظززبد كزز٠ اطززغف االرـزززأص الززغخ

اطززغف ػزز٠ االؿزززال االثزززضائ٠ ا كزززغح اززب ا اـغاززبد اززز٠ هززض رهززغ

اثززب٠ ػزز غ٣ززن سوززب زز ـزززذوبد اطززغف اثززب٠ ا زز ه٤ززخ سطززبة

اب ابئ٠ ثض اذبجخ ا٠ رج٤ ا اظاع ك٠ دبخ ػض رالكز٠ االدظزبد

سال اضح اوم ػ٤ب ك٠ اؼوض .

:سع عطرخاانبــــذ ان

االؿضع٣خ ثجع٣خ وغ اؼغث٤خ ص ؿ٤غب ثبلو ض٣خ رشزن ذب

ك٠ ا ؼاع ٣لأ ػ ظا اؼوض ٣ اوب اوغ اوب ااجت

.ازطج٤ن

انعطرو:انبــــذ

17أدزب ز ز اوزب ازض٠ هزب ازجزبعح اوزبصع ثبوزب عهز رؼزجغ

الئذززخ ازل٤ظ٣زخ الئذزخ 0217ـزخ 70عهز االؿزثبع هب 1444ـخ

ززخ الدززب ززظا اؼوززص الزززغ٣بد اشززبػ لززغخ ) اطززغف األ (

اؼوض ك٤ب ٣غص ك٤ ن سبم.

Page 52: TECHNICAL SPECIFICATIONS 4 LADEN...TECHNICAL SPECIFICATIONS FOR 4 REACH STACKERS WITH CAPACITY 45 TONS Page 8 of 22 CHAPTER II 2- R.S. requirements and performance : 2.1 Chassis &

PAGE 14 OF 14

Article No. 21 :-

Both parties agreed that the chosen location of the second party in Egypt is

its commercial agent premises stated at the contract heading to which all

fax correspondences are legally effective and their dates are considered,

which to be confirmed later by registered mail.

Article No. 22 :-

Intellectual Property Rights , All drawings, technical documents and software

submitted to the first party remain Second Party's property. First Party is

allowed to use them for the purpose of operating, maintaining or installing

the equipment.

Article No. 23:-

Contract has been issued in 4 originals in Arabic and English languages.

Each party has received one original to act in accordance in case of need,

while the remaining copies is keep with the first party for administrative and

legal procedures, incase of contradiction between the Arabic and English

texts that Arabic text shall prevail.

FIRST PARTY SECOND PARTY

وانعطرو: حاديانبــــذ ان٤ززخ اذزز اشزززبع طززغف اثززب٠ كزز٠ وززغ زز زز ٣وززغ اطغكززب ثززب

ج٤ززغ اغاؿززالد ازجززبع اثبثززذ ثوززضع ززظا اؼوززض اززز٠ روززخ ػ٤زز هبززب

خ سطبثبد ه٠ ػ٤ب ثؼز اهزثبلبؾ ٣ؼزض ثزبع٣شب رؼؼػ ثاؿط

رؼزجغ زج الثبعب اوب٤خ

وانعطرو: انبــــذ انثااز اوضخ ئ٠ اغؿبد اثبئن ازو٤خ اجغ، دوم ا٤خ الغ٣خ

اثب٢. ٣ـخ طغف األ ثبؿزشضاب اطغف اال رظ خ طغف

.اؼضاد ـغى رلـ٤ ه٤بخ أ رغ٤ت

وانعطرو:ثانث انبــــذ ان

ـز ثبـخ اؼغث٤خ االج٤ؼ٣خ رـ غف اعثغرذغع ظا اؼوض

، اوب٤خ جغاءاد االصاع٣خاجبه٤خ ال ـشخ ٣ذزلظ اطغف اال ثبـز

ك٠ دبخ االسزالف ك٠ ازلـ٤غ ٣ؼزض ثبـشخ اؼغث٤خ.

انطرف األول انطرف انثا